Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC WEST BHUBANBAN BARJALA AGARTALA TRIPURA W PIN 799002 | AGARTALA | WEST TRIPURA | TRIPURA | 799002 | ₹19.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹20.0 LRejected-AOC RAMNAGAR ROAD NO 11 P O RAMNAGAR WARD NO 14 AMC AGARTALA TRIPURA W PIN 799002 | WEST TRIPURA | TRIPURA | 799002 | ₹20.0 L | L2 | Rejected-AOC L2 |
Tender Value
₹22.7 L
EMD Value
₹45,392
Closing Date
23 Dec 2025, 3:00 pmClosed
Executive Engineer, Div-II, AMC
Office of the Executive Engineer, Div-II, AMC
Construction of CC road and drain from the H/O Arpan Bhattacharjee to the H/O Dilip Datta, under ward no.04, AMC
2025_SAMC_68300_1
70/Div-II/AMC/2025-26
Open Tender
Civil Works
Ward No.04, AMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹45,392
11 May 2026
12 Dec 2025
23 Dec 2025
12 Dec 2025
23 Dec 2025
12 Dec 2025
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
First class brick work in foundation and plinth including cost of all materials as required complete: In cement mortar 1:4 ( 1 cement : 4 fine sand ).
12 mm cement plaster of mix Cement mortar 1:4 (1 cement : 4 fine sand). Neat cement punning.
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m : All kind of soil.
Providing and laying dry flat brick flooring in required pattern complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
Centering shuttering including struttings, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platform with 12 mm thick shuttering ply
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work upto plinth level: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_69491.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
DNIet70.pdf
Tender Documents • 2.79 MB
BOQ_69491.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid