Loading…
Loading…
Tender Value
₹9.5 L
EMD Value
₹19,000
Closing Date
2 Jul 2026, 6:00 pm5d left
Similar tender results from the same govt authority in the past 3 years.
GE (I) (CG) Gandhinagar
GE (I) (CG) Gandhinagar, G-252, Sector-09, Gandhinagar-382007
REPAIRS / MAINT OF HT / LT ELECTRIC PANEL, TRANSFORMER, VCB ETC WITH MISC ALLIED WORKS AT CGRA NALIYA AND ICGS JAKHAU UNDER GE (I) (CG) GANDHINAGAR
2026_MES_750567_3
8180/E8
Open Tender
Electrical and Maintenance Works
180 days
CGRA Naliya and ICGS Jakhau
As per NIT
7 documents required · 7 mandatory
₹500
GE (I) CG Gandhinagar
₹19,000
Yes
18 Jun 2026
18 Jun 2026
4 Jul 2026
18 Jun 2026
2 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance / servicing of VCB / RMU 11 KV, 400/ 630 /1200 Amps including removal of VCB trolley, cleaning of all copper male and female contacts, tightening of all connections, checking of all auxiliary contacts, control wiring, servicing of relays, etc. refixing the VCB trolley to its original position including proper setting of manual/motorize operation of VCB, checking/setting of tripping system, etc complete all as specified and directed.
Note:-
(i) Maintenance to be carried out by authorized technician of OEM.
(ii) After completion test certificate shall be furnished.
(iii) Calibration of relay by injecting High voltage through CTS checking the over load system of VCB upto 90 % rated load and artificial fault creation and setting of relay by 10 to 15 % of rated load removing unserviceable overload and earth fault relay including connection with power pack.
(iv) Opening out the trolly checking the operation of VCB mechanically and electrically through shunt trip coil including energizing of springs automatically including checking of TNC switch | 3 | EACH JOB | - | - |
| 2 | Taking down carefully Transformer of 160/250 KVA and above capacity, any make, any type from pole / plinth/ base, disconnecting HT & LT side connections, earthing strip of transformer, supporting angles, cross arm, shifting / transporting transformer carefully from the site to the workshop opening the top cover of the transformer, bushing, draining of oil from the transformer, lifting the core complete taking out defective coils from the core, cleaning the tank and reassembling the transformer after carrying out the repairs/replacement of worn out part, ovening the complete unit till to get desired megger value, transporting returning back to the site installing re-commissioning and testing of the transformer at its original place, connecting up HT & LT sides, earthings, supports / cross arms etc complete all as specified and directed.
Note :- Spares, rewinding of transformer, reinsulating & heating if required will be measured and paid separately under respective items of BOQ. | 1 | EACH | - | - |
| 3 | Supply and fixing in repair top cover gasket made up of 5 mm thick cork sheet complete all as specified and directed. | 1 | EACH | - | - |
| 4 | Supply and fixing in repair HT bushing, porcelain vitreous brown body 1100 V grade as per IS 3347 complete all as specified and directed. | 3 | EACH | - | - |
| 5 | Supply and fixing in repair LT bushing, porcelain vitreous brown body 1100 V grade as per IS 3347 complete all as specified and directed. | 4 | EACH | - | - |
| 6 | Supply and fixing in repair HT brass studs along with washers for one terminal 11 KV transformer complete all as specified and directed. | 3 | EACH | - | - |
| 7 | Supply and fixing in repair LT brass studs along with washers for one terminal 1100 Volts grade transformers complete all as specified and directed. | 4 | EACH | - | - |
| 8 | Supply and fixing in repair breather assembly complete with silica GEL complete all as specified and directed. | 2 | EACH | - | - |
| 9 | Supply and fixing in repair temp level indicator including its bolts, nuts, gasket etc complete complete all as specified and directed. | 2 | EACH | - | - |
| 10 | M & L for rewinding old / burnt out HT/LT coils by super enamelled copper winding wire / strips of appropriate size of super quality (as per existing material & size of transformer coils) including, insulating, varnishing, heating, keeping coils in position, etc for transformer up to 500 KVA complete all as specified and directed. | 60 | KILOGRAM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
8180ps.pdf
Tender Documents • 0.86 MB
BOQ_865876.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid