| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹7.6 Laccepted-aoc | ₹7.6 L | accepted-aoc |
Tender Value
₹7.3 L
EMD Value
₹7,280
Closing Date
23 Mar 2026, 5:00 pmClosed
EEGRP2 Ongole
Ongole
Construction of pipe culvert across the doddavaram minor tailend at km 1.125 of HLC near Tellapadu Village Maddipadu Mandal, Praksam district 2nd call.
914805
18/2025-26 Dt:13.03.2026
OPEN - NCB
Civil Engineering Works
PRAKASAM
9 documents required · 8 mandatory · 1 optional
₹258
₹7,280
7 Apr 2026
16 Mar 2026
16 Mar 2026
Clearing thick jungle growth (less than 50 percent open space) including bushes upto 30 cm / parthenium and other weeds including burning or disposing off the same as directed etc., complete.
Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal, seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed etc., complete with initial lead upto 1 km and all lifts. (IRR-CAW-1-1).
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material ( depth upto 3 meters).IRR-CCDW-1-2
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 220 kg / cum with use of super plasticiser(0.4% by wt. of cement), CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)IRR-CCDW-2-5
Laying and jointing 1200 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 66.8 kg / joint, FA : 0.069cum/joint, Hemp Yarn : 0.453kg/joint)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement), CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.45 cum)IRR-CCDW-2-10
Providing and filling murrum / gravely soil ( CNS soil ) for foundation or around pipes including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by earth masters to achieve density control of not less than 95 percent etc., complete with leadupto 50 m and all lifts.IRR-CCDW-7-2
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ carpet 2025-26.xlsx
TENDER_DOCUMENT • 0.59 MB
Inviting bid - Main page 250KV.doc
TENDER_DOCUMENT • 0.19 MB
TENDER SCHEDULE CONDITIONS-32 pages.doc
TENDER_DOCUMENT • 0.16 MB
~$viting bid - Main page garden 2023-24.doc
TENDER_DOCUMENT • 0.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .