Tender Value
₹4.9 Cr
EMD Value
₹9.8 L
Closing Date
10 Sept 2026, 4:00 pm
Superintending Engineer (Harbour)
AMC of Custom Fencing Wall, Gates, Weigh Bridges and screen wall inside cargo jetty area
332600
HD-21/26
Open
Civil - All
Works
Kachchh
₹1,770
As per tender
₹9.8 L
7 Aug 2026
7 Aug 2026
7 Aug 2026
10 Sept 2026
8 Aug 2026
BILL OF QUANTITY
Name of Work: AMC of Custom Fencing Wall, Gates, Weigh Bridges and
screen wall inside cargo jetty area
Short Description Qty Rate Unit Unit in words Amount
1 Earth work in excavation by mechanical means (Hydraulic
excavator)/manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 sqm on plan) including
getting out and disposal of excavated earth lead upto
m and lift upto 1.5 m, as directed by Engineer-in-charge.
All kinds of soil One Cubic
2 Providing and laying in position cement concrete of
specified grade including the cost of centering and
shuttering - All work up to plinth level :1:1½:3 (1
Cement: 1½ coarse sand : 3 graded stone aggregate
mm nominal size). One Cubic
3 Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering - All work up to plinth level 1:4:8 (1 Cement :
4 coarse sand : 8 graded stone aggregate 40 mm
nominal size) One Cubic
4 Providing and laying in position specified grade of
reinforced cement concrete, including the cost of
centering, shuttering, finishing and excluding the cost of
reinforcement - All work up to plinth level :1:1.5:3 (1
cement : 1.5 coarse sand : 3 graded stone aggregate
mm nominal size). Foundations, footings, bases of
columns, BEAMS AND CANTILEVER LINTEL, LINTEL
BANDS, PLINTH BANDS, BED BLOCK COPPING COLUMN,
PILLARS, POSTS & STRUSS CHAJJAS, slabs, precast One Cubic
members, etc 600.00 6829.33 m3 Metre
5 Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position and
binding all complete below plinth level & upto floor five
level Thermo-Mechanically Treated bars of grade Fe-500D
or more 60000.00 62.76 Kg One Kilogram
6 Random rubble masonry with hard stone in foundation
and plinth including levelling up with cement concrete
1:6:12 (1 cement : 6 coarse sand : 12 graded stone
aggregate 20 mm nominal size) upto plinth level with :
Cement mortar 1:6 (1 cement : 6 coarse sand) One Cubic
7 Providing & laying cement concrete solid blocks 1:8:6
(machine made) confirming to relevant IS (Latest Edition)
masonry 200mm thick set in cement mortar 1:6 including
curing etc. complete as directed.
a - ) plinth & foundations & superstructure upto floor two One Cubic
level. 200.00 3500.00 m3 Metre
8 Structural steel work riveted, bolted or welded in built up
sections,trusses and framed work, including cutting,
hoisting, fixing in position all complete.
70000.00 77.81 Kg One Kilogram
9 Structural steel work riveted, bolted or welded in built up
sections,trusses and framed work, including cutting,
hoisting, fixing in position all complete. (Structural steel
to be reused / supplied free of cost by DPT)
50000.00 26.91 Kg One Kilogram
10 Providing & fixing screen wall net as per the details:
The primary layer shall be a green/black 125 GSM mono-
filament HDPE net of Approved make, with a 50% shade
factor and a 5-year UV guarantee, having a tensile
strength of 385 N in warp and 490 N in weft. Eyelets shall
be provided at 1-meter intervals, and the net shall be
supplied in 8 m × 100 m rolls with machine-stitched joints
The secondary layer shall be a green/black 2.5 mm
braided HDPE net of Approved make with a 50 mm mesh,
installed behind the mono-filament net for sag control.
Twine breaking strength of 86 kg and knot strength of
107 kg, providing long-term durability and structural
(WITH VERTICAL JOINT & 2.5 MM GREEN/BLACK COLOR
BRAIDED UV TWINE FOR TYING AT TOP AND BOTTOM ON
Including the cost of labour material machinery tools and
plants required for the work Complete as directed by One Square
Engineer in charge 56000.00 137.50 m2 Metre
11 Supplying and filling in plinth with sand under floors,
including watering, ramming, consolidating and dressing One Square
complete 100.00 1512.84 m2 Metre
12 Providing and laying damp-proof course 40mm thick with
cement concrete 1:2:4 (1 cement : 2 coarse sand :
graded stone aggregate 12.5mm nominal size)
13 12 mm cement plaster finished with a floating coat of neat
cement of mix :
1:3 (1 cement: 3 fine sand) One Square
14 Finishing with Deluxe Multi surface paint system for
interiors and exteriors using Primer as per manufacturers
specifications :
Two or more coats applied on walls @ 1.25 ltr/10 sqm
over and including one coat of Special primer applied @
0.75 ltr /10 sqm
15 Finishing walls with Acrylic Smooth exterior paint of
required shade :
New work or old surface (Two or more coat applied @
1.67 ltr/10 sqm over and including priming coat of
exterior primer applied @ 2.20 kg/10 sqm) One Square
16 Removing oil paint and the like by scrapping, sand
papering and preparing the surface smooth including
necessary repairs to scratches etc. complete. One Square
17 Finishing with Epoxy paint (two or more coats) at all
locations prepared and applied as per manufacturer's
specifications including appropriate priming coat,
preparation of surface, etc. complete On steel work
18 Providing and fixing on wall face unplasticised Rigid PVC
rain water pipes conforming to IS : 13592 Type A,
including jointing with seal ring conforming to IS :
leaving 10 mm gap for thermal expansion,(i) Single
socketed pipes. 110mm OD
100.00 223.83 Rmt metre
19 Demolishing R.C.C. work manually/ by mechanical means
including stacking of steel bars in main store DPA and
disposal of unserviceable material within 3km lead as per
direction of Engineer - in- charge.
20 Demolishing stone rubble masonry manually/ by
mechanical means including stacking of serviceable
material and disposal of unserviceable material within
metres lead as per direction of Engineer-in-charge : In One Cubic
cement mortar 100.00 1418.97 m3 Metre
21 Dismantling steel work in built up sections in angles, tees,
flats and channels including all gusset plates, bolts, nuts,
cutting rivets, welding etc. including dismembering and
stacking within 50 metres lead
50000.00 3.26 Kg One Kilogram
22 Surface dressing of the ground including removing
vegetation and in- equalities not exceeding 15 cm deep
and disposal of rubbish, lead up to 50 m and lift up to
m All kinds of soil One Square
23 Welding by gas or electric plant including transportation of
plant at site etc. complete One
1000.00 2.38 Cm Centimetre
24 Painting with synthetic enamel paint of approved brand
and manufacture to give an even shade :Two or more
coats on new work
25 Providing and fixing concertina coil fencing with punched
tape concertina coil 600 mm dia 10 metre openable length
( total length 90 m), having 50 nos rounds per 6 metre
length, upto 3 m height of wall with existing angle iron 'Y'
shaped placed 2.4 m to 4.00 m apart and with
horizontal R.B.T. reinforced barbed wire, stud tied with
G.I. staples and G.I. clips to retain horizontal, including
necessary bolts or G.I. barbed wire tied to angle iron, all
complete as per direction of Engineer-in-charge, with
reinforced barbed tape(R.B.T.) / Spring core (2.5mm
thick) wire of high tensile strength of 165 kg/ sq.mm with
tape (0.52 mm thick) and weight 43.478 gm/ metre (cost
of M.S. angle, C.C. blocks shall be paid separately)
5000.00 212.56 Rmt metre
26 Hire charges for a Hydraulic excavator ( J.C. B.) of loading
capacity 0.5 to 1.0 m3 includingwages of driver , cleaner
and cost of fuel, for 8 hours /day
48.00 6491.00 day One Day
27 Hire charges for Tractor including Trolley of loading
capacity upto 5 MTincluding wages for driver , cleaner and
cost of fuel for 8 hours day
96.00 1113.00 day One Day
28 Hire charges for light crane (Hydra) of loading capacity
upto 5 MT including wages for driver, cleaner and cost of
fuel for 8 hours /day. 48.00 3245.00 day One Day
29 Providing corrugated G.S. sheet roofing including vertical
/ curved surface fixing the sheet on top sloping roof of
storage shed having 10 to 12m height with self-driving
screw of Xylan coated steel 12x65mm minimum size on
roofing and 12x40mm on vertical cladding with pitch
TPI on existing purlins including a coat of approved steel
primer and two coats of approved paint on overlapping of
sheets complete (up to any pitch in horizontal/ vertical or
curved surfaces),excluding the cost of purlins, rafters and
trusses and including cutting to size and shape wherever
required. 0.63 mm thick with zinc coating not less than
150 gm/ m² One Square
30 Providing and laying factory made chamfered edge
Cement Concrete paver blocks In foot path, park & lawns
driveway or light & traffic parking etc. of required
strength, thickness & size/ shape, made by table vibratory
method using PU mould, laid in required colour & pattern
over 50mm thick compacted bed of course sand,
compacting and proper embedding /laying of inter locking
paver blocks into the sand bedding layer through
vibratory compaction by using plate vibrator, filling the
joints with sand and cutting of paver blocks as per
required size and pattern, finishing and sweeping extra
sand, all complete as per manufacturer's specifications
60mm thick Cement concrete paver block of M-35 grade One Square
with approved colour, design & pattern. 4000.00 652.65 m2 Metre
31 Fixing of corrugated G.S. sheet roofing including vertical /
curved surface fixing the sheet on top sloping roof of
storage shed having 10 to 12m height with self-driving
screw of Xylan coated steel 12x65mm minimum size on
roofing and 12x40mm on vertical cladding with pitch
TPI on existing purlins ,excluding the cost of GS SHeet,
purlins, rafters and trusses and including cutting to size
and shape wherever required. One Square
32 Providing and laying water proofing treatment in Gutter
provided on edge and valley of godowns, by applying
damp proof ultra of asian paints or equivalent with brush
consisting of applying :
Cleaning the existing surface with wire brush, scrapping
filling cracks with cement or any chemical compound
Three coats of damp proof ultra of asian paints or
equivalent, evenly over the surface finish smooth
I/we am/are willing to carry out this work at ________% above/ below (percentage should be
written in figure & words). The tendered rates mentioned above amount of my/our tender are put
Estimated amount put to tender Rs. __________ Estimated amount put to tender Rs.____________
In words. (Rupees_______________________ In words (Rupees___________________________
Contractor Superintending Engineer (Harbour)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
schA.pdf
BOQ.pdf
TENDER.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].