Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.4 LAccepted-AOC 38 4 NEW SANTOSHPUR 1ST LANE KOLKATA 700075 | KOLKATA | WEST BENGAL | 700075 | ₹38.4 L | L1 | Accepted-AOC Overall L1 |
| 2 | L2₹41.5 LRejected-Finance | ₹41.5 L | L2 | Rejected-Finance Not L1 |
| 3 | L3₹50.2 LRejected-Finance 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 UDYAM WB 10 0078972 19CQSPB7095J1Z2 R M MII STATUS AS VERIFIED | KOLKATA | WEST BENGAL | 700060 | ₹50.2 L | L3 | Rejected-Finance Not L1 |
Tender Value
₹46.0 L
EMD Value
₹92,007
Closing Date
25 Sept 2025, 3:00 pmClosed
The GM, SGTPP.
Administrative Building, SgTPP, PO-Manigram, Dist- Murshidabad, Pin-742237
Service contract for overhauling of Air Pre-heater 1A and 1B of Unit 1 under BM1, at Sgtpp.
2025_WBPDC_896177_1
WBPDCL/SGTPP/NIT/E3652/25-26
Open Tender
Support/Maintenance Service
21 days
SgTPP, WBPDCL
Qualification required as per NIT and Tender documents signed and stamped in each page as a token of acceptance
3 documents required · 3 mandatory
₹0
₹92,007
Yes
Contract Cell, SGTPP
26 Dec 2025
29 Aug 2025
27 Sept 2025
6 Sept 2025
25 Sept 2025
6 Sept 2025
9 Sept 2025
Both APH #1 Mandatory OH Job HE Radial Seal Work-Replacement
Both APH #1 Mandatory OH Job HE Rotor Angle work (Refurbishment or replacement)
Both APH #1 Mandatory OH Job HE T Bar (Remove all ALCS plate)Work-Refurbishment
Both APH #1 Mandatory OH Job HE T Bar-Replacement- (Confirm for one APH)
Both APH #1 Mandatory OH Job HE Spool Piece Repairing Work
Both APH #1 Mandatory OH Job HE Bypass Seal Work (Repairing/ replacement)
Both APH #1 Mandatory OH Job HE Bypass Seal Angle work (Refurbishment or replacement)
Both APH #1 Mandatory OH Job HE Rotor Post Seal Work (Replacement)
Both APH #1 Mandatory OH Job HE Static Seal Work Repairing/ replacement
Both APH #1 Mandatory OH Job HE Radial Tab (Inboard& Outboard) seal Making and Installation-(Confirm for both APH)
Both APH #1 Mandatory OH Job HE Diaphragm Plate Repair (PAY WILL BE DONE IN PRO RATA BASIS)
Both APH #1 Mandatory OH Job CE Radial Seal Work-Replacement
Both APH #1 Mandatory OH Job CE Rotor Angle work Refurbishment or replacement
Both APH #1 Mandatory OH Job CE T Bar Work Refurbishment Work
Both APH #1 Mandatory OH Job CE T Bar Replacement (Confirm for one APH)
Both APH #1 Mandatory OH Job CE Spool Piece Repairing Work
Both APH #1 Mandatory OH Job CE Bypass Seal Work
Both APH #1 Mandatory OH Job CE Bypass Seal Angle Work Refurbishment or replacement
Both APH #1 Mandatory OH Job CE Rotor Post Seal Work(Replacement)
Both APH #1 Mandatory OH Job CE Static Seal Work(Repairing/replacemet
Both APH #1 Mandatory OH Job CE Radial Tab seal (Inboard& Outboard) Making and Installation-(Confirm for both APH)
Both APH #1 Mandatory OH Job CE Gratings & stopper Repair Work
Both APH #1 Mandatory OH Job New Gratings Replacement Work With 14 nos new stopper(50/50/12THK mm) and 3 nos 50/300/16 THK mm(at outboard) installation in each sector-Replacement confirm for both APH
Both APH #1 Mandatory OH Job Installation of New Stopper(50X50X12THK)
Both APH #1 Mandatory OH Job CE Diaphragm Plate Refirbishment Work -PAY WILL BE DONE PRO RATA BASIS
Both APH #1 Mandatory OH Job Axial Seal Work
Both APH #1 Mandatory OH Job Axial Seal Plate Door Seal Replacement
Both APH #1 Mandatory OH Job HE Sacrificing Basket(2 APH-QTY 384 Nos) Work- Removal/Replacement/Repair With Jet Washing. (Minimum 150 nos replacement compulsory)
Both APH #1 Mandatory OH Job HE Intermediate Basket(2 APH-QTY 384Nos) Type-1 Work-Removal/Replacement/Repair With Jet Washing (Minimum 100 nos replacement compulsory)
Both APH #1 Mandatory OH Job HE Intermediate Basket(2 APH-QTY 384Nos) Type 2 Work- Removal/Replacement/Repair With Jet Washing (Minimum 100 nos replacement compulsory) WITH ALL STOPPER REPLACEMENT
Both APH #1 Mandatory OH Job CE Basket(2 APH- QTY 384 Nos) Work-Removal/Replacement/Repair With Jet Washing (Minimum 175 nos replacement compulsory)
Both APH #1 Mandatory OH Job Guide Bearing Insitu Inspection&leveling
Both APH #1 Mandatory OH Job Support Bearing Insitu Inspection and leveling
Both APH #1 Mandatory OH Job HE&CE air sealing system Repairing Work
Both APH #1 Mandatory OH Job HE sector plate replacement with installation of manual sector plate adjusting system- (4 nos confirm)
Both APH #1 Mandatory OH Job CE sector plate replacement
Both APH #1 Mandatory OH Job Axial Seal Plate Replacement
Both APH #1 Mandatory OH Job All ash removal from from APH HE section and CE and center section completely by water jetting before commencement of the work(After shutdown)
Both APH #1 Mandatory OH Job New 12 mm/16 mm SAILHARD/TISCRAL plate installation at all three centre section area-(All 4 nos for both APH compulsory)
Both APH #1 Mandatory OH Job GearBox Insitu inspection Work
Both APH #1 Mandatory OH Job Air Motor Inspection/ replacement Work
Both APH #1 Mandatory OH Job Soot Blower Work Including Lance Tube replacement
Both APH #1 Mandatory OH Job: HE Spool Piece Replacement Confirm For 1 APH
Both APH #1 Mandatory OH Job: HE Air Seal Housing Replacement Work(Confirm For 1 APH)
Both APH #1 Mandatory OH Job: HE & CE Wash pipe repairing work
Both APH #1 Mandatory OH Job: APH Body Repairing Work from man height of HE upto APH hopper(Scaffloding included).-(Compulsary for both APH)
Both APH #1 Mandatory OH Job:Replacement of 150NB bracing pipe with new gusset plate (500X300X12 MM) installation (Compulsory for both APH)
Both APH #1 Mandatory OH Job: Replacement of 80 NB bracing pipe new gusset plate (500X300X12 MM) installation-(Compulsory for both APH)
Both APH #1 Mandatory OH Job:Making of angle or pipe 150 NB bracing pipe (Compulsory for both APH) for 150 NB pipe from MS plate 8/6 MM thick and installed at
Both APH #1 Mandatory OH Job : Fit up and run welding of new 90MM angle on 80 NB bracing pipe-(Compulsory for both APH)
Both APH #1 Mandatory OH Job: Walk way refurbishment with 65 MM & 50 MM Channel Angle at cold end gas side L- 30 M & Width- 600 MM
Both APH #1 Mandatory OH Job: Refurbishment of HE and CE door lock
Both APH #1 Mandatory OH Job: Arrangement of CE basket removal process due to damage in CE gratings
Both APH #1 Mandatory OH Job: Tractor Trip for material collection Tractor Trip for material collection from store
Both APH#1 Optional OH Job: Guide Bearing Replacement Work Guide Bearing Replacement Work
Both APH#1 Optional OH Job: Support Bearing Replacement Work
Both APH#1 Optional OH Job:Gear Box Replacement
Both APH#1 Optional OH Job:CE Spool Piece Replacement Work
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid