Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically Qualified |
| 2 | Accepted-Technical | Accepted-Technical Technically Qualified |
Tender Value
₹78.3 L
EMD Value
₹1.6 L
Closing Date
20 Feb 2026, 5:00 pmClosed
The Engineer-in-Chief, PR PMGSY, Vijayawada.
The Engineer-in-Chief, PR PMGSY, Z.P.P. Compound, Opp.PWD Grounds, Bandar Road, Vijayawada.
Package No.AP20PMJN04, L022- Road from Gurla-Rompalli Road to Panukuvalasa in Mentada mandal of Vizianagaram District. Est.Cost Rs.108.00 Lakhs and Rs.6.63 Lakhs for Routine Mtc.
2026_ENCPR_146487_1
NIT No.97/2025-26, Dt.31.12.2025 of the Engineer-In-Chief, Panchayat Raj, Vijayawada.
National Competitive Bid
Civil Works - Roads
365 days
Panukuvalasa in Mentada Mandal
As per Bid Document
3 documents required · 3 mandatory
₹0
₹1.6 L
O/o the SE PR Circle Z.P.P.Compound,Vizianagaram.
2 Apr 2026
29 Jan 2026
23 Feb 2026
29 Jan 2026
20 Feb 2026
29 Jan 2026
29 Jan 2026 - 20 Feb 2026
11 Feb 2026
Road Portion
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, but excluding GST and Seigniorage charges etc., complete.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Construction of un-reinforced, panneled cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, as per design, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, wedges, steel plates including levelling the formwork etc complete as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation, admixtures as approved, curing of concrete slab for 14-days, using curing compound (where specified) and water and contraction sawn joint groove (using daimond studded nblades) 3 to 5 mm wide and 1/3rd to 1/4th depth of the slab + or - 5mm or .Thecontraction joint shall be cut as soon as the concrete as under goneinitial hardening and as hard enogh to take up the load of joint swaing machine with out causing damage to the slab. The joint ceilling compound shall not be poured bitumen type having flexibility, resistaance to age hardening and durability of the sealant shall be in accordance with BS 5212 (part-2) with all leads and lifts and coat and conveyance of all materials for 100 thickness for forming the panels of 0.75 X 0.75 mts size as per drawing and Technical Specification Clause 1501 including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Providing and applying primer coat with bitumen emulsion (CSS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including contractors profit & Over head charges, but excluding GST etc., complete for Prime Coat
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc., complete for Tack Coat
Providing, laying and rolling of close-graded premix surfacing (Mix seal surfacing) material of 20 mm thickness composed of 13.2 mm to 0.09 mm (Type-B) aggregates as per Table 500.15 of MORD using VG 30 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable Hot Mix plant (By mechanical means), laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 507 MORD'2014, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Road Furniture
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., KM Stones
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., HM stones
Providing & fixing of typical PMGSY informatory sign board with LOGO as per MORD secifications and drawing Consisting of Three boards made of encapsulated lens type Retro reflective sheeting as per IRC 67 fixed over Alluminium Composite Material of 4mm thickness fixed on a frame of 25x25x5mm MS angle alround edges and MS flats 25x5mm in the middle duly welding he lower plate and middle plate to 2 nos of verticle posts 75x75 x6mm MS square hallow section of 2.80m length welded with 200x200x5mm thick MS base plate at bottom duly embedded in CC M20 grade blocks of 450x450x600mm, 600mm below ground level and the top most diamond plate welded to middle plate by 47x47 X6mms MS square hallow section tube duly supported by 47x47x6mm MS square tube in between two vertical posts including lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheetwith primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges ,contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for finshed item of work
Supply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.
Providing and fixing of Citizen information board as per MoRD specifications and drawings consists of two boards made of encapsulated lens type Retro reflective sheeting as per IRC 67 fixed over Alluminium Composite Material of 4mm thickness and 900/750mm size fixed on a frame of 25x25x5mm thick MS angle alround edges and 25x5mm thick MS flats in the middle welded to 75 x 5 mm size MS Flat plates on back and welded to 75x75x6mm MS square hallow sections of length 3.05m welded with 300x300x5mm MS Base plate at bottom duly embedded in cement concrete M20 grade of size 600x600x750 mm, 750mm below ground level including lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheet with primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges ,contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for finshed item of work
Providing & fixing of typical PMGSY LOGO Board as per MORD secifications and drawing consists of two boards made of encapsulated lens type Retro reflective sheeting as per IRC fixed over Alluminium Composite Material of 4mm thickness fixed on a 25x25x5mm size MS frame alround edges and 25mmx5mm size Ms flats in middle duly welding the top and bottom plates 1 No of 75x75 x6mm MS Square hallow section post of 2.95 m height welded with 200x200x5mmthick MS base plate of at bottom duly embedded in CC M20 grade block of 450x450x600mm, 600mm below ground level including lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheet with primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges ,contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for finshed item of work
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign boards as per MoRD specifications and drawings made of encapsulated lens type reflective sheeting as per IRC:67 fixed over aluminium sheeting 4 mm thick fixed on 25x25x5mm size MS angles alround and 25mm x5mm size MS flats in middle supported on 75x75 x6mm MS angle section post welded with 50x50x5 mm MS angle hold fast at bottom firmly fixed in the ground by means of properly designed foundation with M 20 cement concrete 450 x450x600 mm,600 mm below ground level including lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheet with primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges ,contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for finshed item of work Triangular board 600mm x600mm
Providing and erecting direction and place identification retro-refectorised sign as per MoRD specifications and drawings made of encapsulated lens type refective type sheeting as per IRC 67 fixed over aluiminium sheeting,4mm thick with area not exceeding 0.90 sqm board fixed on 25x25x5mm size MS frame alround and 25mm x5mm size MS flat in the middle supported on 75x75 x6mm MS angle section posts welded with 50x50x5 mm MS hold fast at bottom, firmly fixed in the ground by means of properly designed foundation with M 20 cement concrete 450 x450x600 mm,600 mm below ground level including lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheet with primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges ,contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for finshed item of work
Providing and fixing of Maintenance information board as per MoRD specifications and drawings made of encapsulated lens type Retro reflective sheeting as per IRC:67 fixed over Alluminium Composite Material of 4mm thickness and size of 900 x 1500 mm fixed on a frame of 25X25X6mm thick MS angles alround edges and MS flats 25x5mm in the middle and welded to 75 x 5 mm size MS flat plates on back and welded to 75 x 75 x6mm MS Square hollow section of height 3.00m length welded with base MS plate of 300x300x5mm thick base MS plate at bottom duly embedded in to cement concrete M20 grade of size 600 x 600 x 750 mm, 750 mm below ground level including lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheet with primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges ,contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for finshed item of work
Pavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.
Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 – DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges,
Sub Work: Construction of 1 vent 1000 mm dia pipe culverts -4 Nos
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST etc., complete- For Foundations
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- for Head walls of pipe culverts & footings of slab culverts
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. including contractors profit & Over head charges, but excluding GST etc., complete
Sub Work :Construction of 1 vent 2mts span RCC slab culvert (1 No)
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST etc., complete- For Foundations
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- for Head walls of pipe culverts & footings of slab culverts
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Abutments & wing walls of slab culvert, Retaining walls
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height) excluding cost of reinforcement
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete excluding cost of reinforcement upto 5m height. - For Super Structure (Deck slab)
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete
Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1404.2.2 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., excluding cost of reinforcement complete
Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures - For Sub Structures
Supplying, fitting, and placing HYSD bar reinforcement FE 500 in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures
Name of the sub Work : DRAIN
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST etc., complete- For Foundations
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Abutments & wing walls of slab culvert, Retaining walls
Please Enable Macros to View BoQ information
MoRD Cleareance No P-17024/3/32024/RC(part)FTS386903 Dt 16.3.2024 of Director, RC Division, MoRD New Delhi.
G.O Rt.No. 549 , Dt: 03-10-2024 of PR&RD(Progs.II).
State share
Remarks
Total
Tonne
6mm MS rods
Quantity
Jungle clearence
Prime coat
Total
Total
Length
Material
Sand Filling
Sand for mortar
Metal
State share
Rs.446.00 lakhs
Remarks
Total
6mm MS rods
6mm MS rods
Quantity
Jungle clearence
Prime coat
Total
Total
Length
Material
Gravel
Sand (Mortar)
Sand (Concrete)
Sand for filling
Metal
Parvathipuram
Vishakapatnam
Part B of Schedule A (Routine Maintenance after completion of construction works)
Name of the work:
For 1st year
For 2nd year
For 3rd Year
For 4th Year
For 5th Year
Total for 5 years
Routine Maintenance is the maintenance of roads for five years as specified in the Contract Data
The Contractor shall do the routine maintenance of approach roads, including pavement, road berms and surface drains to the required standards and in the manner as defined in clause 1.1 and keep the entire road surface and bridge structure in Defect free condition during the entire maintenance period.
The payment to the Contractor is performance based for routine maintenance of roads.
The above are LS Provisions made in the estimate
The tender percentage will not be operated on the above Items
Engineer-in-Chief,P.R
PMGSY, Hyderabad
Schedule-A for Construction
Road Portion
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, but excluding GST and Seigniorage charges etc., complete.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain (not exceeding 0.6 m depth) and foundation of other structures including breaking clods, ramming, spreading, sectioning, grading compacting with vibratory roller 80-100KN to OMC compaction including to a top width of 7.5m and raising to required height complete etc.as per requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc., complete for Tack Coat
Road Furniture
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST etc., complete- For Foundations
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course
802, 804, 805, 806, 807, 1202 and 1203 MORD
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. including contractors profit & Over head charges, but excluding GST etc., complete
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST etc., complete- For Foundations
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course
802, 804, 805, 806, 807, 1202 and 1203 MORD
802, 804, 805, 806, 807, 1202 and 1203 MORD
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST etc., complete- For Foundations
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course
802, 804, 805, 806, 807, 1202 and 1203 MORD
Schedule -A (Part-B)
LS Provisions towards GST & Seigniorage
For Construction
For Routine Maintenance
Schedule-A for Routine Maintenance
Routine maintenance
Routine maintenance cost for 1st Year
Routine maintenance cost for 2nd Year
Routine maintenance cost for 3rd Year
Routine maintenance cost for 4th Year
Routine maintenance cost for 5th Year
Total
2. For Routine maintenance, the Unit rate (per km per month) indicated above by the Authority shall apply. The bidder is required to accept these rates
3. The bidder is required to perform the routine maintenance as mentioned in the clause 32 and payment will be made as per clause 38.2 of GCC.
Sub Estimate
Package No.AP09 IX LB 02 - Construction of bridge across Yenugugaddavagu @ 1/0-1/4 km on the road from NH9 to Kotikalapudi, Ibrahimpatnam (M)
Name of the sub Work : Bridge Part
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, VAT and Seigneorage etc., complete in Oridinary soils up to 3 m depth including dewatering.
Cut off walls u/s
Cut off walls d/s
Cross cut off walls
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, VAT and Seigneorage etc., complete in Oridinary soils from 3 m to 6 m depth including dewatering.
Cut off walls u/s
Cut off walls d/s
Cross cut off walls
Filling in foundation trenches bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH, including contractors profit & Over head charges, VAT and Seigneorage etc., complete.
Below raft
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete For levelling course
Below raft
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- For cutoff walls
Cut off walls u/s
Cut off walls d/s
Cross cut off walls
Reinforced cement concrete M20 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in foundations complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete For Raft
Plain cement concrete M 20 grade (Design mix) using 40,20 & 10mm metal (HBG) mechanically mixed in foundations complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- For Footings
Pier Footing-1
Pier Footing-2
Abutment Footing-1
Abutment Footing-2
Plain cement concrete M 20 grade (Design mix) using 40,20 & 10mm metal (HBG) mechanically mixed in Sub structure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- For Abutments & Piers
Piers
Abutments
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal mechanically mixed in sub structure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH including overhead charges & Contractors profit, VAT and Seigniorage but excluding cost of steel etc., complete. For Bed Blocks/ Backing walls
Bed blocks for Abutments
Bed blocks for Piers
Backing walls
Vibrated reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH including overhead charges & Contractors profit, VAT and seigneorage charges but excluding cost of steel etc. complete. For Fly wings
Rectangle portion
Trapezoidal portion
Haunches
Vibrated reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH including overhead charges & Contractors profit, VAT and seigneorage charges but excluding cost of steel etc. complete. For Deck slab
Deck slab
Deck slab triangle portion
Kerb portions
Deduct for joints
P.C.C. M 15 ordinary grade (1:2.5:5) leveling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 MORD & 2700 MORTH including overhead charges & Contractors profit, VAT and seigneorage charges etc. complete
Under Approach slabs
deduct haunches of fly wings
Vibrated reinforced cement concrete M30 grade (Design Mix) using 20 & 10mm metal mechanically mixed for approach slab as per drawing and technical specifications Clauses 800 and 1211 MORD / Sections 1500, 1600 & 1700 & 2704 MORTH including overhead charges & Contractors profit, VAT and seigneorage charges but excluding cost of steel etc. complete.
Approach slabs
Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH including overhead charges & Contractors profit, VAT and seigneorage charges but excluding cost of steel etc. complete.
Over Deck slab & approach slabs
deduct exp. Joints
Construction of R.C.C. railing of M 25 grade excluding reinforcement in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 MORD including overhead charges & Contractors profit, VAT and seigneorage charges but excluding cost of steel etc. complete.
Railing on deck slab
-do- approach slab
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, VAT etc., complete
Mastic pad
Supplying, fitting, and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications Clauses 1000 and 1202 MORD / 1100, 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded including overhead charges & contractors profit and VAT etc. complete.
Supplying, fitting, and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications Clauses 1000 and 1202 MORD / 1100, 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded including overhead charges & contractors profit and VAT etc. complete.
Supplying, fitting, and placing HYSD bar reinforcement in super structure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded including overhead charges & contractors profit and VAT etc. complete.
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, VAT and Seigneorage etc., complete
For Abutments (approx. no. & length)
For Abutments (approx. no. & length)
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH including overhead charges & Contractors profit, VAT and seigneorage charges etc. complete.
Behind Abutments
Behind wings
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH including overhead charges & Contractors profit, VAT and seigneorage charges etc. complete.
Behind Abutments
Providing and laying boulder apron for bed protection with stone boulders (300 mm rough stone) of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH including contractors profit & Over head charges, VAT and Seigneorage etc., complete - For Protection Work
Providing and laying pitching on slopes laid over prepared filter media/ gravel backing as per drawing and technical specifications Clause 1302 MORD / 2504 MORTH including cost and conveyance of all materials and all labour charges etc., complete including contractors profit & Over head charges, VAT and Seigneorage etc., complete.
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH including contractors profit & Over head charges, VAT and Seigneorage etc., complete - For Protection Work
Launching appron u/s
Launching appron d/s
Providing drainage spouts made 0.15 sqm of 6 mm thick MS plate 210 x 210 mm water spout at top with 100 mm dia GI drain spout and 5 Nos MS plate 12 mm x 40 mm x 210 mm long inluding cost of all materials and labour charges, over heads & contractors profit and VAT etc., complete.
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. including contractors profit & Over head charges, VAT etc., complete
For Railing and deck slab sides
Total
2nd Year
3rd Year
4th Year
5th Year
Deck Slab
Deck Slab
Wing walls
Engineer -in -Chief (PR)
PMGSY,Vijayawada
Deck Slab
Wings
approaches
Engineer -in -Chief (PR)
PMGSY,Vijayawada
General Abstract
Estimate amount:
Road Work (PART-A)
Road portion
Road furniture
Provision for Seigniorage Charges (As per statement)
Total
Provision for GST @ 18%
Provision for DPR Charges
Provision for Shifting of Electrical poles
Unforeseen items
Sub_total
Routine maintenance (PART-B)
Routine maintenance for 5 years
Provision for GST @ 18%
Unforseen items, if any
Total Routine maintenance Cost
Construction cost + 5 Years Post Construction Mtc.
The Estimate for the work 'Road from T02-Gooty to vajrakarur up to Nagasamudram Cross Gooty mandal of Anantapuramu Dt.' is technicall approved for Rs.1344.00 Lakhs only .(Rupees Twelve Crore Fifty lakhs pnly)
Engineer-in-Chief (PR)
PMGSY , Vijayawada
Administrativ sanction ref:
MORD share:
State share
Total
The road work is administratively sanctioned for Rs.202.14 lakhs (MORD share Rs.120.5 lakhs + State share Rs.81.64 lakhs) for Construction and Rs. 13.14 lakhs (During DLP) for Routine maintenance vide GO Ms No. 605 of PR & RD (Progs.II) Dept. Dt..
The Original Estimate for Rs.165.00 Lakhs against the original administrative sanction for Rs.202.14 Lakhs is Technically sanctioned for Rupees one crore sixty five lakhs only vide TSR. No. /2020-21 Dt. .05.2020.
Engineer-in-Chief (PR)
PMGSY , Vijayawada
FORMAT F-6
PMGSY COST ESTIMATE FOR ROADS CONSTRUCTION
Name of the work:
Sub work:
As per Calculation Sheets
Providing and laying bituminous premixed Seal coat (Type C) comprising of a thin application of fine aggregate premixed with bituminous binder; with Crushed stone chips of 6.7 mm size 100% passing through 9.5mm seive and retained on 2.36 mm sieve applied @ 0.09 cum per 10 sqm, chips to be premixed by mechanical means to be laid simultaneously along with the of bitumen VG30 grade with 8% waste plastic by Dry process (Shredded waste plastic) at the rate of 6.50 kgs for 10 sqm and rolling with power roller including of required line, level, grade to serve as wearing course on previously prepared surface and finishing to rquired level and grades including cost and conveyance of all materials from approved sources and stacking at site to departmental gauge for premeasurements, seigniorage, labour charges and hire and operational charges of power road roller 8 to 10 tonnes capacity and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per technical specification clause 508 of MORD Using Hot mix plant including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete. (by Mechanical means)
Paneled Cement Concrete Pavement (Panel Size 0.75 X 0.75 mts)
Construction of un-reinforced, panneled cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, as per design, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, wedges, steel plates including levelling the formwork etc complete as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation, admixtures as approved, curing of concrete slab for 14-days, using curing compound (where specified) and water and contraction sawn joint groove (using daimond studded nblades) 3 to 5 mm wide and 1/3rd to 1/4th depth of the slab + or - 5mm or .Thecontraction joint shall be cut as soon as the concrete as under goneinitial hardening and as hard enogh to take up the load of joint swaing machine with out causing damage to the slab. The joint ceilling compound shall not be poured bitumen type having flexibility, resistaance to age hardening and durability of the sealant shall be in accordance with BS 5212 (part-2) with all leads and lifts and coat and conveyance of all materials for 100 thickness for forming the panels of 0.75 X 0.75 mts size as per drawing and Technical Specification Clause 1501 including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Total
Sub Estimate
Sub Work : Construction of Single Row Cable Duct 300 mm dia Pipe's
Under Pipe
Total Quantity
Under pipes
Total Quantity
Under pipes
Total Quantity
Under pipes
300 mm dia NP3 pipes
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. including contractors profit & Over head charges, but excluding GST etc., complete
For Head walls and Parapet
Total
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Sub Work : Repairs to 3V-5.00mts Span Slab Culvert
Cement Concrete
approach slabs
Total Quantity
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete upto 5m height. - For Super Structure (Deck slab)
Parapet Walls
Total Quantity
Waering Coat
Total Quantity
Paneled Cement Concrete Pavement (Panel Size 0.75 X 0.75 mts)
Construction of un-reinforced, panneled cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, as per design, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, wedges, steel plates including levelling the formwork etc complete as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation, admixtures as approved, curing of concrete slab for 14-days, using curing compound (where specified) and water and contraction sawn joint groove (using daimond studded nblades) 3 to 5 mm wide and 1/3rd to 1/4th depth of the slab + or - 5mm or .Thecontraction joint shall be cut as soon as the concrete as under goneinitial hardening and as hard enogh to take up the load of joint swaing machine with out causing damage to the slab. The joint ceilling compound shall not be poured bitumen type having flexibility, resistaance to age hardening and durability of the sealant shall be in accordance with BS 5212 (part-2) with all leads and lifts and coat and conveyance of all materials for 100 thickness for forming the panels of 0.75 X 0.75 mts size as per drawing and Technical Specification Clause 1501 including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Head walls
Total Quantity
Head walls at
Deduct pipes portion
Parapet
Total
Sub Estimate
Sub Work :Construction of 1 vent 6 mts span RCC slab culvert (1 No) @ KM 2/615
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH, including contractors profit & Over head charges, but excluding GST etc., complete.
Deck slab
Abutments
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- For Foundations
Total Quantity
Filling in foundation trenches with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including overhead charges & Contractors profit but excluding VAT and seigniorage charges etc.,complete for foundations.
Below raft
Total Quantity
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete For levelling course
Levelling course
Total Quantity
Abutments Below GL
Above GL
Bed blocks
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete- For Sub Structures
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete- For Sub Structures
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete - For Super Structures
For Deck slab , RCC railing
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. including contractors profit & Over head charges, but excluding GST etc., complete
Total
The Sub estimate for '1 vent 4 mts span RCC slab culvert' (1 No) is Technically approved for Rs.31,48,084,/- (Rupees Thirty one lakhs Forty eight thousand and eighty four only)
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Head walls
Under pipes
Total Quantity
Head walls
Under pipes
Total Quantity
Head walls
Total Quantity
Head walls at
Deduct pipes portion
Parapet
Head walls at
Deduct pipes portion
Parapet
Total Quantity
600mm dia NP3 pipes
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. excluding GST & Seigniorage Charges. etc., complete.
Parapet walls
Total
The Sub estimate for '1 vent 600mm Dia Pipe culvert' (1 No) is Technically approved for Rs.88890,/- (Rupees Eighty eight thousand eight hundred and Ninty only)
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Head walls
Barrel Portion
Total Quantity
Head walls
Under pipes
Total Quantity
Head walls
Total Quantity
Head walls at
Deduct pipes portion
Parapet
Total Quantity
1000mm dia NP3 pipes
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. excluding GST & Seigniorage Charges. etc., complete.
Parapet walls
Total
The Sub estimate for Single Row 1000 mm dia. Pipe culvert' (1 Nos) is Technically approved for Rs.386418- (Rupees Three lakhs Eighty six thousand four hundred and Eighteen only)
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Head walls
Barrel Portion
Total Quantity
Head walls
Under pipes
Total Quantity
Head walls
NþMFor Encasement (6.7+5.7)/2Dedcuct for pipe Portion Vent Portion (0.9+0.40)/2 (0.5+1.0)/2 (0.9+0.4)/2]Sub Work :Construction of 1000 mm dia
luding cost and conveyance and other incidental charges ,contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for finshed item of work 1700.1 MORD ÕSupply and Installation of Hazard Markers using M.S. Angle of size 55X55X6mm and 120 cm high above ground level painted with two coats of black & white stripes of 15cm wide with first quality synthetic enamel paint over one coat of appropriate primer of approved brand, colour, with 30cm X 90cm retro reflective sheeting type III/IV of yellow colour fixed at top over 1.5mm aluminium sheet with standard supports consisting of alternately black and yellow stripes, with black stripes in screen printing sloping downward at an angle of 45degree towards the side of the obstruction on which the traffic is pass and buried in to the ground in a trench of size 30cm X 30cm, and 50cm depth filled with CC 1:2:4 including cost and conveyance of all materials, equipment, machinery and labour with all lead and lifts, loading and unloading charges necessary for successful completion of works as directed by the Engineer-in-Charge and conforming to IRC 79-1981 & MoRTH specification no. 805 and approved drawings etc., complete for finished item of work including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work. 805 MORTHNProviding and fixing of Citizen information board as per MoRD specifications and drawings consists of two boards made of encapsulated lens type Retro reflective sheeting as per IRC 67 fixed over Alluminium Composite Material of 4mm thickness and 900/750mm size fixed on a frame of 25x25x5mm thick MS angle alround edges and 25x5mm thick MS flats in the middle welded to 75 x 5 mm size MS Flat plates on back and welded to 75x75x6mm MS square hallow sections of length 3.05m welded with 300x300x5mm MS Base plate at bottom duly embedded in cement concrete M20 grade of size 600x600x750 mm, 750mm below ground level including lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheet with primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges ,contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for finshed item of workProviding & fixing of typical PMGSY LOGO Board as per MORD secifications and drawing consists of two boards made of encapsulated lens type Retro reflective sheeting as per IRC fixed over Alluminium Composite Material of 4mm thickness fixed on a 25x25x5mm size MS frame alround edges and 25mmx5mm size Ms flats in middle duly welding the top and bottom plates 1 No of 75x75 x6mm MS Square hallow section post of 2.95 m height welded with 200x200x5mmthick MS base plate of at bottom duly embedded in CC M20 grade block of 450x450x600mm, 600mm below ground level including lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheet with primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges ,contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for finshed item of work(Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign boards as per MoRD specifications and drawings made of encapsulated lens type reflective sheeting as per IRC:67 fixed over aluminium sheeting 4 mm thick fixed on 25x25x5mm size MS angles alround and 25mm x5mm size MS flats in middle supported on 75x75 x6mm MS angle section post welded with 50x50x5 mm MS angle hold fast at bottom firmly fixed in the ground by means of properly designed foundation with M 20 cement concrete 450 x450x600 mm,600 mm below ground level including lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheet with primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges ,contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for finshed item of work Triangular board 600mm x600mm,Providing and erecting direction and place identification retro-refectorised sign as per MoRD specifications and drawings made of encapsulated lens type refective type sheeting as per IRC 67 fixed over aluiminium sheeting,4mm thick with area not exceeding 0.90 sqm board fixed on 25x25x5mm size MS frame alround and 25mm x5mm size MS flat in the middle supported on 75x75 x6mm MS angle section posts welded with 50x50x5 mm MS hold fast at bottom, firmly fixed in the ground by means of properly designed foundation with M 20 cement concrete 450 x450x600 mm,600 mm below ground level including lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheet with primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges ,contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for finshed item of workcProviding and fixing of Maintenance information board as per MoRD specifications and drawings made of encapsulated lens type Retro reflective sheeting as per IRC:67 fixed over Alluminium Composite Material of 4mm thickness and size of 900 x 1500 mm fixed on a frame of 25X25X6mm thick MS angles alround edges and MS flats 25x5mm in the middle and welded to 75 x 5 mm size MS flat plates on back and welded to 75 x 75 x6mm MS Square hollow section of height 3.00m length welded with base MS plate of 300x300x5mm thick base MS plate at bottom duly embedded in to cement concrete M20 grade of size 600 x 600 x 750 mm, 750 mm below ground level including lettering , colour,band, diagrams, specifications etc., complete as per MORD specifications and paining to all sections of framed posts,tubes and sheet with primer and two coats of epoxy paint in required shade and colour as per drawing clause 1701 and annexure 1700.1 of MORD including cost and conveyance and other incidental charges ,contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for finshed item of workMPavement markings with hot line applied Thermo plastic compound 2.50 mm thick including reflecting glass beads at 250 gms/sqm, thickness of 2.5mm is exclusive of surface applied glass beads for providing centerline marking 300 cms length and 10cm width with a gap of 450 cms including cost and convenyace of all materials equipment machinary and labour with all leads and lifts loading and unloading charges necessary for sucessful completion of work as directed by the Engineer-in-Charge and confirming to IS 164 - 1981 (1st revison reaffirmed in 1986) and clause 803 of MOST specification for roads and bridge works and also confirming to IRC 35 -1997 including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work. 803 of MORTH;Supplying & Fixing of Moulded Shanks Raised Pavement Markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No. RW/NH/33023/10-97 DO III Dt 11.06.1997. The height, width and length shall not exceed 50 mm, 100 mm and 100 mm and with minimum reflective area of 13 Sqcm on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 700 Kgf. Fixing will be by drilling holes on the road for the twin shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer s recommendation and complete as directed by the Engineer-in-Charge including cost and conveyance of all materials, all labour charges, 804 MORTH1701 MORDDSub Work :Construction of 1 vent 2mts span RCC slab culvert (1 No) Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Abutments & wing walls of slab culvert, Retaining wallsReinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height) excluding cost of reinforcement´Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete excluding cost of reinforcement upto 5m height. - For Super Structure (Deck slab)800 &1401.4.1 MORD- 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH yProviding and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1404.2.2 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., excluding cost of reinforcement complete $800 and 1404.2.2 MORD and 2702 MORTHSupplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures - For Sub Structures(1001 & 1206 MORD / Sections 1600 & 2200 1001 and 1401 MORD / 1600 MORTHTowards DMF and MERIT ChargesDETAILS OF WORKS Sl.No.Name of the WorkEst. Cost in LakhsEst. Contract Value GrantAdmn. SanctionTechnical Sanction2025-26TOTAL ESTIMATE COST uPackage No.AP20PMJN04:L022- Road from Gurla Rompalli Road to Panukuvalasa in Mentada mandal of Vizianagaram DistrictName of the sub Work : DRAIN PM-JANMANBatch-ITotal of 40 ItemsuPackage No.AP20PMJN04:L022- Road from Gurla-Rompalli Road to Panukuvalasa in Mentada mandal of Vizianagaram District1501.2.2 MORD CSub Work: Construction of 1 vent 1000 mm dia pipe culverts -4 NosName of the Work : Package No.AP20PMJN04:L022- Road from Gurla-Rompalli Road to Panukuvalasa in Mentada mandal of Vizianagaram District=Est. Cost : Rs. 108.00 Lakhs + Rs.6.63 Lakhs for Routine Mtc.%Package No.AP20PMJN04:L022- Road from/Gurla-Rompalli Road to Panukuvalasa in Mentadamandal of Vizianagaram District!G.O. Rt. No. 1028, Dt: 22.12.2025of PR & RD ( Progs-II) Dept.for Rs. 108.00 Lakhs.hC.R.No. /2025-26, Dt: 09.01.2026 for Rs.108.00 Lakhs of the Superintending Engineer,PR,Vizianagaram-3
Total Quantity
Under pipes
For Head walls and Parapet
Head walls at
Deduct pipes portion
Parapet
Total Quantity
1000mm dia NP3 pipes
Total
The Sub estimate for Double Row 1000 mm dia. Pipe culvert' (1 Nos) is Technically approved for Rs.386418- (Rupees Three lakhs Eighty six thousand four hundred and Eighteen only)
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Sub Work : Construction of 1 vent 2 mts span RCC slab culvert (1No)
For Wing walls
Total Quantity
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
Abutments
For Wing walls
Total Quantity
Levelling course
For Wing walls
Total Quantity
Abutments Below GL
Abutments
Wing Walls
Total Quantity
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Abutments & wing walls of slab culvert, Retaining walls
Abutments above GL
Abutments
Wing walls
Parapet wall
Total Quantity
Bed blocks
Bed blocks
Backing walls
Deck slab
Wearing course
in Abutments
for expension joints
bed blocks
For Deck slab
Construction of granular sub-base by providing well graded material(Table 400.1-A) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. including contractors profit & Over head charges, but excluding GST etc., complete
Total
The Sub estimate for 'Construction of 1 vent 2 mts span RCC slab culvert (4 Nos) is Technically approved for Rs.9,71,468/- (Rupees Nine Lakh ninty one thousand Four hundred seven only)
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Name of the sub Work : Construction of 1m span RCC slab culvert
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- For Foundations
Wing walls
Total Quantity
Filling in foundation trenches with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including overhead charges & Contractors profit but excluding VAT and seigniorage charges etc.,complete for foundations.
Wing walls
Total Quantity
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete For levelling course
Levelling course
Wing walls
Total Quantity
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete-
Footings
For Abutments
For Wing walls
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete (upto 5m height)
Bed blocks
For Bed blocks
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete upto 5m height. - For Super Structure (Deck slab)
Deck slab
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete - For Super Structures
For Deck slab
Total
Sub Estimate
Head walls
Barrel Portion
Total Quantity
Under pipes
Total Quantity
Head walls
Total Quantity
Head walls
Deduct pipes portion
Parapet
Total Quantity
1000mm dia NP3 pipes
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. excluding GST & Seigniorage Charges. etc., complete.
Parapet walls
Total
The Sub estimate for Single Row 1000 mm dia. Pipe culvert' (1 Nos) is Technically approved for Rs.386418- (Rupees Three lakhs Eighty six thousand four hundred and Eighteen only)
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Head walls
Barrel Portion
Total Quantity
Head walls
Under pipes
Total Quantity
Head walls
Deduct pipes portion
Total Quantity
Under pipes
For Head walls and Parapet
Head walls at
Deduct pipes portion
Parapet
Total Quantity
1000mm dia NP3 pipes
Total
Sub Estimate
Head walls
Barrel Portion
Total Quantity
Head walls
Under pipes
Total Quantity
Head walls
Deduct pipes portion
Total Quantity
Under pipes
For Head walls and Parapet
Head walls at
Deduct pipes portion
Parapet
Total Quantity
1000mm dia NP3 pipes
Total
Sub Estimate
Abutments
Wing walls
Total Quantity
Filling in foundation trenches with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including overhead charges & Contractors profit but excluding VAT and seigniorage charges etc.,complete for foundations.
Total Quantity
Abutments
Wing walls
Total Quantity
For Raft
Footings
Abutments
Wing walls
Above GL
Wing walls
Parapet
Total Quantity
Bed blocks
Bed blocks
Backing walls
Deck slab
Abutments
Wings
over deck slab
For Bed blocks
For Deck slab
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. including contractors profit & Over head charges, but excluding GST etc., complete
Total
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Sub Work : Construction of Ten Row 1000 mm dia. Vented road dam (1 Nos) @ 5/2-5/3 KM
Head walls
Under pipes
Total Quantity
Head walls
Under pipes
Total Quantity
Head walls
Total Quantity
Under pipes
For Head walls and Parapet
Head walls
Deduct pipes portion
Parapet
Total Quantity
1000mm dia NP3 pipes
Total Quantity
Head walls
Total Quantity
Total
The Sub estimate for 'Ten Row 1000 mm dia. Vented Road Dam' is Technically approved for Rs.19,04,429/- (Rupees Nineteen lakhs four thousand Four hundred and twenty nine only)
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Sub Work :Construction of 2 vent 3 mts span RCC slab culvert (1 No)
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- For Foundations
For Abutment
For Pier
For wing walls
Total Quantity
Filling in foundation trenches with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including overhead charges & Contractors profit but excluding VAT and seigniorage charges etc.,complete for foundations.
For Piller
Total Quantity
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete For levelling course
Levelling course
For Abutment
For Piller
Wing walls
Total Quantity
For Raft
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete
Below GL
Abutments
For Piller
Wing walls
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- for Abutments
Above GL
Abutments
For Piller
For Wing walls
Parapet walls
Total Quantity
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete (upto 5m height) for Bed Blocks.
Bed blocks
Bed blocks
over Pier
Backing wall
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete upto 5m height. - For Super Structure (Deck slab)
Deck slab
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, VAT and Seigneorage etc., complete
Abutments
Wings
over deck slab
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete- For Sub Structures
For Bed blocks
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete - For Super Structures
For Deck slab
Construction of RCC guide posts of 250 mm dia M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Behind abutments
Total
The Sub estimate for '1 vent 3 mts span RCC slab culvert' (3 No) is Technically approved for Rs.11,52,551/- (Rupees Eleven lakhs fifty two thousand five hundred and fifty one only)
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Sub Work : Construction of single vent 600 mm dia. Pipe culvert. (4 Nos) in Km 0/009,1/180,1/440,2/400 Km (body walls only )
Head walls
Under pipes
Total Quantity
Head walls
Under pipes
Total Quantity
Head walls
Total Quantity
Head walls at
Deduct pipes portion
Parapet
Head walls at
Deduct pipes portion
Parapet
Total Quantity
Total
The Sub estimate for '1 vent 600mm Dia Pipe culvert' (1 No) is Technically approved for Rs.66,394,/- (Rupees Sixty six thousand three hundred and Ninty four only)
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Sub Work :Construction of 1 vent 7.50 mts span RCC slab culvert (3 No) @ 0/570,3/820,12/150
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- For Foundations
Bund cutting
Below Bed level
Bund cutting FOR WINGS
Below Bed level
Total Quantity
Filling in foundation trenches with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including overhead charges & Contractors profit but excluding VAT and seigniorage charges etc.,complete for foundations.
abutment
for wing walls
Below approach slab
Total Quantity
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete For levelling course
Levelling course
abutment
Wing walls
Total Quantity
For Raft
Below GL
Raft slab
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete
Below GL
Abutment footings 1
footings 2
footings 3
Wing wall footings
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- for Abutments
Above GL
Abutments
Wing walls stem
Total Quantity
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete (upto 5m height) for Bed Blocks.
Bed blocks
Bed Blocks over abutments
Dirt wall
Kerbs
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete upto 5m height. - For Super Structure (Deck slab)
Deck slab
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, VAT and Seigneorage etc., complete
Abutments, Wing walls
approaches
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum size of coarse agregate not exceeding 25mm and cement content in the mix to be 350 kg /cum (Ordinary portland cement ) with minimum water cement ratio of 0.45, mixed in a concrete mixer and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer bitumenous sealant, admixers as adopted, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.22 MORD including cost of materials, labour charges, conveyance, hire charges of machinaries etc complete as per direction of Engineer in charge for CC pavement inlcuding contractors profit & Over head charges, but excluding GST and seigniorage etc., complete .200mm thick with 3.75mt spacing
over approaches
over Bridge slab
over approaches
Construction of granular sub-base by providing well graded material(Table 400.1-A) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
For RCC raft
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete- For Sub Structures
For Bed blocks
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete - For Super Structures
For Deck slab , RCC railing
Construction of RCC guide posts of 250 mm dia M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Total
The Sub estimate for '2 vent 7.5mts span RCC slab culvert' widening (1 No) is Technically approved for Rs.7,81,024,/- (Rupees Seven lakhs Eighty one thousand and twenty four only)
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Sub Work :Construction of 2 vent 4 mts span RCC slab culvert (1 No) @ 'KM 9/8
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- For Foundations
For Abutment
For Pier
For wing walls
for cutoff walls U/s
for cutoff walls D/s
Total Quantity
Filling in foundation trenches with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including overhead charges & Contractors profit but excluding VAT and seigniorage charges etc.,complete for foundations.
For Pier
for cutoff walls U/s
for cutoff walls D/s
Total Quantity
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete For levelling course
Levelling course
For Abutment
For Pier
Wing walls
for cutoff walls U/s
for cutoff walls D/s
Total Quantity
For Raft
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete
Below GL
Abutments
For Pier
Wing walls
for cutoff walls U/s
for cutoff walls D/s
Total Quantity
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- for Abutments
Above GL
Abutments
For Pier
Cut waters
For Wing walls above G L
Parapet walls
Total Quantity
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete (upto 5m height) for Bed Blocks.
Bed blocks
Bed blocks
over Pier
Backing wall
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete upto 5m height. - For Super Structure (Deck slab)
Deck slab
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, VAT and Seigneorage etc., complete
Abutments
Wings
over deck slab
approaches
Construction of granular sub-base by providing well graded material(Table 400.1-A) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete- For Sub Structures
For Bed blocks
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete - For Super Structures
For Deck slab
Construction of RCC guide posts of 250 mm dia M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Behind abutments
Total
The Sub estimate for '1 vent 4 mts span RCC slab culvert' (1 No) is Technically approved for Rs.13,37,326/- (Rupees Nine lakhs Thirty eight thousand Nine hundred and Fifty only)
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Sub Work :Construction of 1 vent 5 mts span RCC slab culvert (1 No) '@ KM 1/418 & 1902
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- For Foundations
For Abutments
For Return walls
Total Quantity
Filling in foundation trenches with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including overhead charges & Contractors profit but excluding VAT and seigniorage charges etc.,complete for foundations.
for wing walls
Below approach slab
Total Quantity
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete For levelling course
Levelling course
For Vent Portion
For Return walls
Total Quantity
For Raft
Abutments Below GL
Abutments
Wing Walls
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Abutments & wing walls of slab culvert, Retaining walls
Above GL
Abutments
Wing walls
Parapet wall
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete (upto 5m height) for Bed Blocks.
Bed blocks
Bed Blocks
Dirt wall
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete upto 5m height. - For Super Structure (Deck slab)
Deck slab
Wearing course
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, VAT and Seigneorage etc., complete
Abutments, Wing walls
approaches
over approaches
Construction of granular sub-base by providing well graded material(Table 400.1-A) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete- For Sub Structures
For Bed blocks
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete - For Super Structures
For Deck slab , RCC railing
Construction of RCC guide posts of 250 mm dia M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. including contractors profit & Over head charges, but excluding GST etc., complete
Total
The Sub estimate for '1 vent 4 mts span RCC slab culvert' (1 No) is Technically approved for Rs.31,48,084,/- (Rupees Thirty one lakhs Forty eight thousand and eighty four only)
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Sub Work : Construction of 2 vent 5.00 mts span RCC slab culvert (3 No) @ KM 3/890, 7/665 & 16/760
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- For Foundations
For Vent Portion
For Return walls
Total Quantity
Filling in foundation trenches with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including overhead charges & Contractors profit but excluding VAT and seigniorage charges etc.,complete for foundations.
for wing walls
Below approach slab
Total Quantity
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete For levelling course
Levelling course
For Abutments
For Piers
For Return walls
Total Quantity
For Raft
Abutments Below GL
Abutments
Wing Walls
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Abutments & wing walls of slab culvert, Retaining walls
Above GL
Abutments
Extra for Cut Water Way
Wing walls
Parapet wall
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete (upto 5m height) for Bed Blocks.
Bed blocks
Bed Blocks
Over pier
Dirt wall
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete upto 5m height. - For Super Structure (Deck slab)
Deck slab
Wearing course
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, VAT and Seigneorage etc., complete
Abutments, Wing walls
approaches
over approaches
Construction of granular sub-base by providing well graded material(Table 400.1-A) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete- For Sub Structures
For Bed blocks
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete - For Super Structures
For Deck slab , RCC railing
Construction of RCC guide posts of 250 mm dia M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. including contractors profit & Over head charges, but excluding GST etc., complete
Total
The Sub estimate for '1 vent 4 mts span RCC slab culvert' (1 No) is Technically approved for Rs.31,48,084,/- (Rupees Thirty one lakhs Forty eight thousand and eighty four only)
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Sub Work : Construction of Three Row 1000 mm dia. Pipe culvert. (2 Nos) @ 5/0-2 Km
Head walls
Barrel Portion
Total Quantity
Head walls
Under pipes
Total Quantity
Head walls
Total Quantity
Under pipes
For Head walls and Parapet
Head walls at
Deduct pipes portion
Parapet
Total Quantity
1000mm dia NP3 pipes
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. including contractors profit & Over head charges, but excluding GST etc., complete
For Head walls and Parapet
Total
The Sub estimate for 'Three Row 1000 mm dia. Pipe culvert' is Technically approved for Rs.7,43,405/- (Rupees Seven lakh Forty Three thousand Four hundred and Five only)
Engineer -in -Chief (PR)
PMGSY,
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including contractors profit & Over head charges, but excluding GST etc., complete- For Foundations
For Abutments
For pier
For Wing walls
Total Quantity
Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
For Abutments
For pier
For Wing walls
Total Quantity
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For levelling course
Leveling Course
For Abutments
For pier
For Wing walls
Total Quantity
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1203 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- for Head walls of pipe culverts , footings of slab culverts & Side Drain walls.
Abutments
For Abutments
For Abutments
For Abutments
For pier
For pier
For pier
For Wing walls
For Wing walls
For Wing walls
Total Quantity
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete- For Abutments & wing walls of slab culvert, Retaining walls
Superstructure
For Abutments
For pier
For Wing walls
Total Quantity
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1206 MORD and 1500, 1700 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height) For bed blocks
Bedblock
Over Abutments
Over pier
Dirt Wall
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1401.4.1 and 1401.4.2 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete upto 5m height. - For Super Structure (Deck slab)
Deck Slab
Parapet Walls
Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1404.2.2 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-
Wearing Course
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1001 & 1206 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete- For Sub Structures - For Sub Structures
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1001 and 1401 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc., complete - For Super Structures
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
EW quantity
Deduct Sand filling
deduct PCC M10
Deduct M15 qty of Sub structure
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. excluding GST & Seigniorage Charges. etc., complete.
deduct vent portion
Construction of RCC guide posts of 250 mm dia M 20 grade cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 but excluding GST & Seigniorage Charges. etc., complete.
Total
Sub Estimate
Engineer -in -Chief (PR)
PMGSY,Vijayawada
Sub Estimate
Sub Work :Construction of protection wall 'In KM 3/700 to 3720
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- For Foundations
Total Quantity
Filling in foundation trenches with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including overhead charges & Contractors profit but excluding VAT and seigniorage charges etc.,complete for foundations.
Total Quantity
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete For levelling course
Total Quantity
For Raft
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- for Abutments
Abutments
Abutments
Total Quantity
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete (upto 5m height) for Bed Blocks.
Bed blocks
Bed blocks
Dirt walls
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete upto 5m height. - For Super Structure (Deck slab)
Deck slab
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, VAT and Seigneorage etc., complete
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete- For Sub Structures
For Bed blocks
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete - For Super Structures
For Deck slab & Bed blocks
Behind abutments
Total
The Sub estimate for 'Protection wall'(1 Nos) is Technically approved for Rs.26,26,822- (Rupees twenty Six lakhs twenty six thousands eight hundred and twenty two only)
Engineer -in -Chief (PR)
PMGSY,
Seigniorage Charges Statement
C/o. Embankment with Carted earth
Shoulders, Sub grade
Wetmix Macadam
CC Pavement
SubTotal
1st &5th Km stones
Sand in PCC M15
Ordinary Km stones
Sand in PCC M15
HM stones
Sand in PCC M15
PMGSY information sign board with Logo
Sand in PCC M15
PMGSY Maintenance & Citizen
Sand in PCC M15
Logo boards every 2 Km
Sand in PCC M16
Place identification and direction boards
Sand in PCC M16
Cautionary Sign Boards
Sand in PCC M15
SubTotal
Earth work
Sand Filling
Earth
Metal
SubTotal
Earth work
Sand Filling
Laying of pipes
SubTotal
Total
Earth work
Sand Filling
SubTotal
Total
Grand Total
OR say
Engineer-in-Chief, PR
PMGSY, A.P-Vijayawada
Sub Estimate
Sub Work : Construction of six Row 1000 mm dia. Vented road dam (1 Nos) @ 4/0-4/2 KM
Head walls
Under pipes
Total Quantity
Head walls
Under pipes
Total Quantity
Head walls
Total Quantity
Under pipes
For Head walls and Parapet
Head walls
Deduct pipes portion
Total Quantity
1000mm dia NP3 pipes
Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1404.2.2 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete-
Head walls
Total Quantity
Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Protection Work
Head walls
Total Quantity
Total
The Sub estimate for 'six Row 1000 mm dia. Vented Road Dam' is Technically approved for Rs.15,30,043/- (Rupees Fifteen lakh Thirty thousand Forty three only)
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Sub Work :Construction of protection wall in km 0/2-0/3
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- For Foundations
Total Quantity
Filling in foundation trenches with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including overhead charges & Contractors profit but excluding VAT and seigniorage charges etc.,complete for foundations.
Total Quantity
Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete For levelling course
Levelling course
Total Quantity
For Raft
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete
Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete- for Abutments
Abutments
Abutments
Total Quantity
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete (upto 5m height) for Bed Blocks.
Bed blocks
Bed blocks
Dirt walls
Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges, VAT and Seigneorage etc., complete upto 5m height. - For Super Structure (Deck slab)
Deck slab
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, VAT and Seigneorage etc., complete
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete- For Sub Structures
For Bed blocks
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete - For Super Structures
For Deck slab & Bed blocks
Behind abutments
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. including contractors profit & Over head charges, but excluding GST etc., complete
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete- For Sub Structures
For Bed blocks
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, VAT etc., complete - For Super Structures
For Deck slab & Bed blocks
Behind abutments
Total
The Sub estimate for '1 vent 4 mts span RCC slab culvert' is Technically approved for Rs.1296257/- (Rupees Twelve lakhs ninety six thousand two hundred and fifty seven only)
Engineer -in -Chief (PR)
PMGSY,
ESTIMATE FOR ROAD FURNITURE
5th KM Stone
Ordinary KM Stone
200 M Stone
Logo and PMGSY information
Maintenance Board
Citizen information board
Logo board with every 2 Km
Providing and fixing of retro-reflectorised cautionary,mandatory and informatory sign as per IRC:67 3 nos mounted on singla pole of 100x100x6 mm MS angle 5.00 Mts long and made of encapsulated lens type reflective sheeting vide clause 1701.2.3 MORD fixed over aluminium sheeting 1.50 mm thick supported on a mild steel iron post 100 mmx100 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 cement concrete 450mm x450mmx900 mm, 900mm below ground level as per drawings and technical specification clause 1701 MORD including cost and conveyance of all materials, all labour charges, over head charges & Contractors Profit but excluding GST and seigniorage charges etc., complete for finished item of work.
Triangular 600x600
at Speed breakers near Junctions, (triangle of 600 X 600mm), curves
L/S, R/S, Curves & Bends Indication Boards
T Boards at junctions (triangle of size 600 X 600mm size)
Prohibited boards at junctions (triangle of size 600 X 600mm size)
Circular sign Boards 600mm dia
At Curves
at Culverts
Speed Brakers (16x6)
Total
Engineer -in -Chief (PR)
PMGSY,
Sub Estimate
Name of the Sub Work: Protection work
Providing and laying pitching on slopes laid over prepared filter media/ gravel backing as per drawing and technical specifications Clause 1302 MORD / 2504 MORTH including cost and conveyance of all materials and all labour charges etc., complete including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete for protection of Embankment along the tank bunds
Sub Estimate
Name of the sub Work : Const. Of Wing walls to Existing Bridge
Wing walls
Total Quantity
Wing walls
Wing walls
Total Quantity
Wing walls
Total Quantity
Wing walls
for four wings,bottom layer
Total
Sub Estimate
Name of the sub Work : Providing Drain.
Total Quantity
Total Quantity
Total Quantity
Total Quantity
Total Quantity
Total Quantity
Total
By Mechanical means (Type-B)
CRRI-BitChem tailor made cold mix Binder
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mazdoor (Unskilled)
Mazdoor (Skilled)
By Mechanical means (Type-B)
b) Machinery
HMP of appropriate capacity (40-60 TPH) considered (without heating)
(10% of HMP hours is considered i.e., 6 hrs X 0.10)
Electric generator set 125 KVA
Tipper 5.5 cum - 10 t capacity
(Conveyance included in Material rates)
Paver finisher
Three wheel 80-100 kN static roller
c) Material
tailor made cold mix Binder @ 30 kg per 10 sqm
(As per SP-100 30 kg is considered)
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27 cum per 10 sqm
Over heads & Contractor's profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm
Mix Seal Surfacing - 20 mm thick (HMP)( Using Waste Plastic Wet Process)
RBR-BASC-17- I -A - Case III -(II)
By Mechanical means (Type-B)
Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mazdoor (Unskilled)
Mazdoor (Skilled)
Providing, laying and rolling of close-graded premix surfacing (Mix seal surfacing) material of 20 mm thickness composed of 13.2 mm to 0.9 mm (Type-B) aggregates as per Table 500.15 of MORD using VG 30 grade bitumen with 8% waste plastic by wet process(waste plastic impregnated and concentrated bitumen tablets) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable Hot Mix plant (By mechanical means), laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 MORD' 2014, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
b) Machinery
HMP of appropriate capacity (40-60 TPH) considered
Electric generator set 125 KVA
Front end loader 1 cum bucket capacitry
Tipper 5.5 cum - 10 t capacity
Paver finisher
Three wheel 80-100 kN static roller
c) Material
Bitumen (S-65) @ 15.96 kg per 10 sqm
Waste plastic impregnated and concentrated bitumen tablets(1.52 Kg/10 Sqm waste plastic (ie 8% of 19 Kgs) mixed with 1.52 Kg/10 Sqm of Bitumen)
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27 cum per 10 sqm
By Mechanical means (Type-B)
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm
Low porosity
Providing and applying primer coat with Tailor made Cold mix bitumen emulsion (CSS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including contractors profit & Over head charges but excluding GST etc., complete for Prime Coat
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Bitumen emulsion pressure distributor @ 1750 sqm/hour
Water tanker 6 kl capacity 1 trip per hour
c) Material
Cold Mix Bitumen emulsion (CSS-1) @ 0.85 kg per sqm
Water
By Mechanical means (Type-B)
Cost of 1750 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/1750
Providing and applying tack coat with Tailor made cold mix Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges but excluding GST etc., complete for Tack Coat
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
b) Machinery
Hydraulic broom @ 1250 sqm per hour
Air compressor 210 cfm
Emulsion pressure distributor @1750 sqm per hour
c) Material
Cold Mix Bitumen emulsion (RS-1) @ 0.275 kg per sqm
Cost of 1750 sqm = (a+b+c+d+e)
Rate per sqm = a+b+c+d+e/1750
Rate per Sqm
20mm thick Open-Graded Premix Carpet using Cold Mix Technology using Mixall
Providing and laying Open Graded Premix Carpet (OGPC) surfacing material of 20 mm thick composed of 13.20 mm to 5.60 mm size machine crushed hard blasted granite chips (Table 500.10 of MORD) using tailor made cold mix binder at the rate of 21.50 kgs per 10 sqm area of road surface over tack coat to required line, level, grade to serve as wearing course on previously prepared base including mixing in a Mixer of 6 to 10 T capacity, trasporting the mixer to point of use and rolloing with three wheeled 8-10 Tonnes capacity power roller and finishing to required level and grades including cost, conveyance, leads and lifts of all materials from approved sources, labour charges and hire and operational charges of power road roller and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per technical specificationsclause 506.2 of MoRD including contractors profit & Over head charges but excluding GST and Seigniorage etc., complete for OGPC
By manual means as per 506.2 of MORD
Unit = sqm
Taking output = 900 sqm (24.3 cum)
Mazdoor (Unskilled)
Mazdoor (semi-Skilled)
Providing, laying and rolling of close-graded premix surfacing (Mix seal surfacing) material of 20 mm thickness composed of 13.2 mm to 0.9 mm (Type-B) aggregates as per Table 500.15 of MORD using VG 30 grade bitumen with 8% waste plastic by wet process(waste plastic impregnated and concentrated bitumen tablets) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable Hot Mix plant (By mechanical means), laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 MORD' 2014, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Mixall 6/10 T capacity
Three wheel 80-100 kN static roller
Material
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum per 10 sqm
Basic rate for 900 Sqm
Basic rate per Sqm
Rate per sqm
Providing and laying bituminous premixed seal coat (Type C) comprising of stone chipping of grading as defined with Crushed stone chips of 6.7 mm size 100% passing through 9.5mm seive and retained on 2.36 mm sieve applied @ 0.09 cum per 10 sqm, chips to be premixed by manual means with the bitumunous binder using 10 kgs of tailor made Cold Mix Binder for 10 sqm and rolling with power roller including of required line, level, grade to serve as wearing course on previously prepared surface and finishing to required level and grades including cost and conveyance of all materials from approved sources and stacking at site to departmental gauge for premeasurements, labour charges and hire and operational charges of power road roller 8 to 10 tonnes capacity and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per technical specification clause 508 of MORD including contractors profit & Over head charges but excluding GST and Seigniorage etc., complete for seal coat.
Unit = sqm
Taking out put = 1250 Sqm
Labour
Mazdoor (un-skilled)
Mazdoor (semi-skilled)
Providing, laying and rolling of close-graded premix surfacing (Mix seal surfacing) material of 20 mm thickness composed of 13.2 mm to 0.9 mm (Type-B) aggregates as per Table 500.15 of MORD using VG 30 grade bitumen with 8% waste plastic by wet process(waste plastic impregnated and concentrated bitumen tablets) to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable Hot Mix plant (By mechanical means), laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 MORD' 2014, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Machinery
Mixall 6/10 T capacity
Three wheel 80-100 kN static roller
Materials
Cold Mix Binder @ 21.50 kg per 10 sqm
Crushed stone chipping of 6.7 mm size 100% passing 9.50mm seive and retained on 2.36 mm sieve applied @ 0.09 cum per 10 sqm.
By Mechanical means (Type-B)
Basic rate of Seal coat Type-C for 1250 Sqm
Rate per sqm
WASTE PALSTIC - DRY PROCESS
Shredded Waste plastic
1. OGPC 20mm thick Mechanical means (Using Shredded Waste plastic Dry process) data:
RBR-BASC-14
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates (Table 500.9) either using viscous grade bitumen VG30 grade with 8% waste plastic by Dry process (Shredded waste plastic) at the rate of 14.6 kg/10 sqm to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Hot Mix plant of 30-40TPH, laying and rolling with a three wheel 0-100 kN static roller capacity, paver finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C including cost and conveyance of all materials from approved sources, , labour charges and hire and operational charges of power road roller and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red flags other incidental and operational charges etc., complete for finished item of work as per clause 506 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mazdoor (Unskilled)
Mazdoor (Skilled)
Add Municipal/ Agency Allowance
b) Machinery
HMP 30/40 t per hour
Electric generator set 125 KVA
Front end loader 1 cum bucket capacity
Tipper 5.5 cum - 10 t capacity
Paver finisher
Three wheel 80-100 kN static roller
c) Material
Bitumen (S-65) @ 13.432 kg per 10 sqm
Shredded Waste plastic [1.168 kg/10sqm waste plastic (i.e., 8% of 14.60 kg)]including conveyancy to work site)(Rs 32.00 per Kg+Rs3.90 per Kg per Km= 35.90)
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum per 10 sqm
Over Heads and contractors profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
RBR-BASC-17
By Mechanical Means
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mazdoor (Unskilled)
By Mechanical means (Type-B)
b) Machinery
Hydraulic self propelled chips spreader
Tipper 5.5 cum capacity
Front end loader 1 cum bucket capacity
Bitumen pressure distributor
Three wheel 80-100 kN static roller
c) Material
Bitumen (S-65) @ 9.016 kg per 10 sqm
Shredded Waste plastic [0.784 kg/10sqm waste plastic (i.e., 8% of 9.80 kg)]including conveyancy to work site)(Rs 32.00 per Kg+Rs3.90 per Kg per Km= 35.90)
Crushed stone chipping of 6.7 mm size 100 per cent passing 11.2 mm sieve and retained on 2.36 mm sieve applied @ 0.09 cum per 10 sqm
CRRI-BitChem tailor made cold mix Binder
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
RBR-BASC-17
Unit = sqm
Taking out put = 7500 Sqm (67.5 cum)
a) Labour
Mazdoor (Unskilled)
By Mechanical means (Type-C)
b) Machinery
Hydraulic self propelled chips spreader
Bitumen pressure distributor
Front end loader 1 cum bucket capacity
Tipper 5.5 cum - 10 t capacity
Three wheel 80-100 kN static roller
c) Material
Bitumen VG30 grade @ 92 % of 6.500 kgs per 10 sqm.
Shredded Waste plastic [0.520 kg/10sqm waste plastic (i.e., 8% of 6.5 kg)]including conveyancy to work site)(Rs 32.00 per Kg+Rs3.90 per Kg per Km= 35.90)
Over Heads and contractors profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
MORTH 403
Construction of Cement treated Granular Base by providing, laying and spreading crushed rock materials ( as per table 400.4 of MoRTH i.e.., using crushed stone materials of 37.5 to 9.50mm @ 32.50%, 9.50 to 4.75mm @5% and 4.75mm to 75 microns @62.50% ) on a prepared sub base by adding 5.5 per cent quantity of cement by weight ( i.e.., at 110 Kgs/Cum of finished qty of item, the mix shall be designed for a minimum laboratory test for 7 days unconfined compressive strength and not less than 3.00 MPa (30 Kg/cm2) ) for base course and mixing in place with rotavator, grading with the tractor grader and compacting with the vibratory roller 8-10 Tonnes capacity at OMC to achieve the desired unconfined compressive strengthand to form a layer of Base, as per MORTH specification 403, including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.as per clause 403.2 and Table 400.4 for Cement Treated crushed rock base
Unit = cum
Taking output = 300 cum (600 t)
Quantity of cement is 5.5 per cent of quantity of crushed rock by weight.
a) Labour
Mazdoor (Skilled)
Mazdoor (Unskilled)
Agency area allowence /MAA
b) Machinery
Tractor Mount Grader, (6 wheel - 4 wheel drive) is used in place of motor grader, for grading @ 25 cum per hour
Vibratory roller 8 - 10 tonne
Tractor with rotaor and blade @ 25 cum per hour
Water tanker 6 kl capacity
c) Material
Cement at site @ 5.5 per cent by weight of crushed aggregate (600 tonne)
Grading of material for sub-base course
37.5 mm to 9.5 mm @ 32.5 per cent
9.5 mm to 4.75 mm @ 5 per cent
4.75 mm to 75 micron @ 62.5 per cent
Cost of water
Over heads & Contractor's profit
Rate per cum =(a+b+c+d)/300
Cement Concrete cell fill Pavement
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, and using high density plastic (HDPE) cells consist of 200-220 micron HDPE sheet having cell of size of 150mmx150mm &100mm deep with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, as per design, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, wedges, steel plates including levelling the formwork and HDPE plastic cell streighting, threading, string, iron nailing, lacing etc complete as per drawing), spreading the concrete with shovels, rakes, labours compacted using needle, screed and plate vibrators and finished in continuous operation, admixtures as approved, curing of concrete cell for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Unit = cum
Taking output = 37.5 cum (86.25 t)
a) Labour
Mason (1st class)
Mason (2nd class)
Mazdoor (Unskilled)
Mazdoor (Skilled)
Surveyor
Mazdoor (Semi-Skilled)
Bhisti
Extra labour for laying, streighting , threding, string, iron nailing, lacing of plastic cell.(20% of labour expenditure)
Agency area allowence /MAA
b)Machinery
Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with weigh batcher and suitable capacity calibrated water tank
Needle vibrator
Screed vibrator
Plate vibrator
Water tanker 6 kl capacity
Air Compressor (1 hour initial + 1 hour final)
c)Material
Crushed stone coarse aggregates, grading will be as per Clause 1501.2.4.1 (Table 1500.1) of specifications @ 0.90 cum/cum of concrete
Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ 0.45 cum/cum of concrete
Cement @ 350 kg/cum of concrete
Plasticizer 0.5 per cent by weight of cement
Curing compound (if used) @ 0.33 litre per sqm
Water for curing
HDPE cells @ 125mm depth
Formwork @ 3% of (a+b+c)
Over heads & Contractor's profit
Cost for 37.5 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/37.5
Paneled Cement Concrete Pavement (Panel Size 0.75 X 0.75 mts)
Construction of un-reinforced, panneled cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, as per design, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, wedges, steel plates including levelling the formwork etc complete as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation, admixtures as approved, curing of concrete slab for 14-days, using curing compound (where specified) and water and contraction sawn joint groove (using daimond studded nblades) 3 to 5 mm wide and 1/3rd to 1/4th depth of the slab + or - 5mm or .Thecontraction joint shall be cut as soon as the concrete as under goneinitial hardening and as hard enogh to take up the load of joint swaing machine with out causing damage to the slab. The joint ceilling compound shall not be poured bitumen type having flexibility, resistaance to age hardening and durability of the sealant shall be in accordance with BS 5212 (part-2) with all leads and lifts and coat and conveyance of all materials for 100 thickness for forming the panels of 0.75 X 0.75 mts size as per drawing and Technical Specification Clause 1501 including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Unit = cum
Taking output = 37.5 cum (86.25 t)
a)Labour
Mason (1st class)
Mason (2nd class)
Mazdoor (Unskilled)
Mazdoor (Skilled)
Surveyor
Mazdoor (Semi-Skilled)
Bhisti
Agency area allowence /MAA
b)Machinery
Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with weigh batcher and suitable capacity calibrated water tank
Needle vibrator
Screed vibrator
Plate vibrator
Water tanker 6 kl capacity
Air Compressor (1 hour initial + 1 hour final)
c)Material
Crushed stone coarse aggregates, grading will be as per Clause 1501.2.4.1 (Table 1500.1) of specifications @ 0.90 cum/cum of concrete
Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ 0.45 cum/cum of concrete
Cement @ 350 kg/cum of concrete
Plasticizer 0.5 per cent by weight of cement
Curing compound (if used) @ 0.33 litre per sqm
Water for curing
Bitumen primer @ 26.67ml. Per meter joint for 900 mts. of Joint length.
Bitumenous sealant @ 106.67ml. Per meter joint for 900 mts. of Joint length.
Concrete Groove Cutting Charges for (400+500 =900 mts) (R&B Approved rate)
Formwork @ 3% of (a+b+c)
Over heads & Contractor's profit
Cost for 37.5 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/37.5
Cement - Flyash Concrete Pavement.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade Ordinary Portland Cement and replacing cement by Fly Ash to the extent of 30% by weight of the cement as per Clause 1502.3.2 of Specification for Rural Roads (First Revision) 2014, M30 (Grade), coarse and fine aggregates conforming to IS : 383, mixing in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
Unit = cum
Taking output = 75cum (172.50 t)
Labour
Mason (1st class)
Mason (2nd class)
Mazdoor (unskilled)
Mazdoor(skilled)
Surveyor
Mazdoor (semi-skilled)
Bhisti
Black smith for cutting of dowel bars including removal of burrs, fabrications & fixing of dowel bars
Agency area allowence /MAA
Machinery
Concrete mixer 0.28/0.40 cum capacity ( 6 mixers) with weight batcher and suitable capacity calibrated water tank
Needle vibrator
Screed vibrator
Plate vibrator
Water tanker 6 Kl. Capacity
Air compressor ( 1 hour initial + 1 hour final)
Material
Crushed stone coarse aggregates, grading will be as per clause 1501.2.4.1 (Table 1500.1) of specifications @ 0.90 Cum/cum of concrete
Sand as per IS:383 and conforming to clause 1500.2.4.2. @ 0.45 cum of concrete
Cement @ 270 Kg/cum of concrete
Fly Ash @ 81 Kg/cum of concrete
Polythene sheet 125 micron
Mild steel dowel bar 25mm dia of grade S 240.500 mm long 20 Nos. at culvert/bridge slab and at construction joiont including 5 percent wastage
(4x20x0.500) + 5 per cent wastage = 42m @ 3.85 Kg per m = 162 kg.
Bitumen primer @ 200ml. Per joint for 23 joints
Bitumenous sealant 800 ml. Per joint for 23 joints
Jute rope 12mm dia including 5 per cent wastage
Debonding strips 3.75m. (length) x 10mm (width) x 5 mm (thick) cut-out of rubber fillter board of similar material including 5 per cent wastage
Polythene sheathing, covering 2/3rd dowel bars (20x23) and tight fit including 5 per cent wastage
Plasticizer 0.5 per cent by weight of cement BMT H63
Water for Curing
Joint filler board 20mm thick as per IS:1838 - BMT U02
(4x3.75x0.200 = 3 sqm)
Form work @ 3% on (a+b+c)
Cost for 75 cum = a+b+c+d
Over heads & Contractor's profit
Add Labour welfare Cess @ 1%
Sum of (a+b+c+d+e)
Rate per Cum = (a+b+c+d+e)/75
Road datas 10 Nos (Ten numbers) approved
Engineer -in -Chief (PR)
PMGSY,Vijayawada
Data for Soiil Stabilization ( Green Field)/ Full depth reclamation with Cement and additive (stabil Road) as per MoRTH Data (with 2021-22 SoR)
Construction of base with avilable Granular material/soil pulverising, mixing the soil in place with soil stabilizer, with cement and stabil road( as per design mix achieve 7 days UCS of 3.00MPa) using binder spreder machine and additive spreader machine, compactiing with 20T pad foot roller, grading with motor grader and again compacting with road roller at OMC to the desired density to form alayer of BAse as per Technical Specification clause 404 of MoRD 2014
By Mechanical Means
Unit= cum
Taking out put = 300 mm
a) Labour
Skilled mazdoor for alignment and geometrics
Mazdoor
Machinery
Hydralic Excavator
Tipper
10Cum Capacity Lead (5KM)
Loading & un loading charges
Tipper 10Cum Capacity
Soil Stabilizer for mixing and pulverising with 1000m2 per hour
Binder Spreader
Additive Spreader
Vibratory Roller
Motor Grader 3.35 meter blade
20 Ton Pad Foot Roller
Water Tanker 6Kl capacity
Material
Cement at Site 40.00 Kg/sqm
Additive 1.4 Kg/ Sqm
Cost of water including water for curing
Compensation for earth taken from private land
on (a+b+c+d)
Overhead charges
Cost for 300 cum
Rate per Cum 210mm thick
Rate per Sqm
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Water (Yes/ No)
Excavation for Structures
RBR-FNDN-1 1B i
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary soil
Mechanical Means
Unit = cum
Taking output = 240 cum
a) Labour
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
b) Machinery
Hydraulic Excavator 1 cum bucket capacity
Royalty/ Seigniorage
Over heads & Contractor's profit
Cost for 240 cum = a+b+c+d
Rate per cum
Mechanical Means
Unit = cum
Taking output = 210 cum
a) Labour
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
b) Machinery
Hydraulic excavator 1.0 cum bucket capacity
Royalty/ Seigniorage
Over heads & Contractor's profit
Cost for 210 cum = a+b+c+d
Rate per cum = (a+b+c+d)/210
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD and 301.2.1 of MORT&H
Ordinary soil
Mechanical Means
Upto 3 m depth (including dewatering)
Unit = cum
Taking output = 240 cum
a) Labour
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
b) Machinery
Hydraulic Excavator 1 cum bucket capacity
Dewatering charges
Royalty/ Seigniorage
Over heads & Contractor's profit
Cost for 240 cum = a+b+c+d
Rate per cum
Mechanical Means
Unit = cum
Taking output = 210 cum
a) Labour
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
b) Machinery
Hydraulic excavator 1.0 cum bucket capacity
Dewatering charges
Royalty/ Seigniorage
Over heads & Contractor's profit
Cost for 210 cum = a+b+c+d
Rate per cum = (a+b+c+d)/210
Note : Cost of dewatering upto 5 per cent of (a+b) may be added, where required. Assessment for dewatering shall be made as per site conditions.
2. Cost of shoring and shuttering, where needed, may be taken @ 10 per cent on cost of excavation for open foundation.
Back Filling with Sand
RBR-FNDN-2
Sand filling
Unit = 1 cum
a) Labour
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
b) Material
Over heads & Contractor's profit
Rate per 1 cum
Rate per cum = a+b+c+d
RBR-FNDN-4
Nominal mix 1:3:6
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity fitted with water measuring device and preferably also with load cell.
Water tanker 6 kl capacity
(d) Formwork @ 4% on cost of material, labour and machinery (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-FNDN-4 I(iii)
P.C.C grade M 15
Nominal mix 1:2.5:5
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity fitted with water measuring device and preferably also with load cell.
(d) Formwork @ 4% on cost of material, labour and machinery (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-SBST-5 I
For Head walls of pipe culverts & footings of slab culverts
Note : Water for concrete : A provision for cost of water may be added at 1.2 kl / 1 cum (including curing purpose) keeping the site conditions
Coarse Aggregate : Single grade nominal size can also be used instead of graded metal, keeping the site conditions in view
For height upto 5 m
Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer (MORD)
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
RBR-PVCT-8, 9 For Head walls of BM, SM Foundation chapter rates considered, and hence for M15 also foundations data considered
(d) Formwork @ 4% on cost of material, labour and machinery (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-SBST-5 I
For Cutoff walls
Note : Water for concrete : A provision for cost of water may be added at 1.2 kl / 1 cum (including curing purpose) keeping the site conditions
For height upto 5 m
Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer (MORD)
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
(d) Formwork @ 4% on cost of material, labour and machinery (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-SBST-5 I
For Abutments & wing walls of slab culvert, Retaining walls
Note : Water for concrete : A provision for cost of water may be added at 1.2 kl / 1 cum (including curing purpose) keeping the site conditions
Coarse Aggregate : Single grade nominal size can also be used instead of graded metal, keeping the site conditions in view
For height upto 5 m
Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer (MORD)
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
(d) Formwork @ 10% on cost of material, labour and machinery (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-SBST-5 I
For Abutments & wing walls foundations
Note : Water for concrete : A provision for cost of water may be added at 1.2 kl / 1 cum (including curing purpose) keeping the site conditions
Coarse Aggregate : Single grade nominal size can also be used instead of graded metal, keeping the site conditions in view
For height upto 5 m
Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer (MORD)
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 kVA
(d) Formwork @ 4% on cost of material, labour and machinery (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-SBST-5 I
For Abutments & wing walls sub structure
Note : Water for concrete : A provision for cost of water may be added at 1.2 kl / 1 cum (including curing purpose) keeping the site conditions
Coarse Aggregate : Single grade nominal size can also be used instead of graded metal, keeping the site conditions in view
For height upto 5 m
Unit = cum
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 kVA
(d) Formwork @ 10% on cost of material, labour and machinery (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-PCVT-3
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1101.6 MORD ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete - For Pipe Culverts
Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
a) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Laying & fixing of Pipes with colors in position including lifting, aligning etc.,
b) Material
Sand for mortar
Cement at site
RCC pipe NP3 pipe at site
RCC pipe NP3 collar at site
Over heads & Contractor's profit
Cost for 7.5 m = a+b+c+d
Rate per m = (a+b+c+d)/7.5
Data for 1000 mm dia
a) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Laying & fixing of Pipes with colors in position including lifting, aligning etc.,
b) Material
Sand for mortar
Cement at site
For 1000 mm dia
Proportinate For 900 mm dia
RCC pipe NP3 pipe at site
RCC pipe NP3 collar at site
Over heads & Contractor's profit
Cost for 7.5 m = a+b+c+d
Rate per m = (a+b+c+d)/7.5
Data for 750 mm dia
a) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Laying & fixing of Pipes with collars in position including lifting, aligning etc.,
Add Municipal/ Agency Allowance
b) Material
Sand for mortar
Cement at site
For 750 mm dia
For 600 mm dia
RCC pipe NP3 pipe
RCC pipe NP3 collar at site
Over heads & Contractor's profit
Cost for 7.5 m = a+b+c+d
Rate per m = (a+b+c+d)/7.5
Data for 750 mm dia
a) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Laying & fixing of Pipes with collars in position including lifting, aligning etc.,
Add Municipal/ Agency Allowance
b) Material
Sand for mortar
Cement at site
For 750 mm dia
For 450 mm dia
RCC pipe NP3 pipe
RCC pipe NP3 collar at site
Over heads & Contractor's profit
Cost for 7.5 m = a+b+c+d
Rate per m = (a+b+c+d)/7.5
Data for 750 mm dia
a) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Laying & fixing of Pipes with collars in position including lifting, aligning etc.,
Add Municipal/ Agency Allowance
b) Material
Sand for mortar
Cement at site
For 750 mm dia
For 300 mm dia
RCC pipe NP3 pipe
RCC pipe NP3 collar at site
Over heads & Contractor's profit
Cost for 7.5 m = a+b+c+d
Rate per m = (a+b+c+d)/7.5
RBR-FNDN-7
Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage
Binding wire
(b) Labour for cutting, bending, shifting to site, tying and placing in position
Blacksmith
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Rate per t = a+b+c+d
RBR-SBST-6
Unit = t
(a) Material
HYSD bars including 5 per cent overlaps and wastage
Binding wire
(b) Labour for cutting, bending, shifting to site, tying, and placing in position
Blacksmith
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Rate per t = a+b+c+d
RBR-SPST-2
Unit = t
(a) Material
HYSD bars including 5 per cent for laps and wastage
Binding wire
(b) Labour for cutting, bending, tying and placing in position
Blacksmith/ Rod Binder
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Rate per t = a+b+c+d
RBR-FNDN-7
Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and wastage
Binding wire
(b) Labour for cutting, bending, shifting to site, tying and placing in position
Blacksmith
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Rate per t = a+b+c+d
RBR-SBST-6
Unit = t
(a) Material
HYSD bars including 5 per cent overlaps and wastage
Binding wire
(b) Labour for cutting, bending, shifting to site, tying, and placing in position
Blacksmith
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Rate per t = a+b+c+d
RBR-SPST-2
Unit = t
(a) Material
HYSD bars including 5 per cent for laps and wastage
Binding wire
(b) Labour for cutting, bending, tying and placing in position
Blacksmith/ Rod Binder
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Rate per t = a+b+c+d
Reinforced cement concrete M20 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in foundations complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete (upto 5m height)
For Raft slab
R.C.C. grade M 20 (Design Mix)
Unit = cum
Case I : Using concrete Mixer
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
Vibrator
(d) Formwork @ 4% on (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
R.C.C. grade M 30 (Design Mix)
Unit = cum
Case I : Using concrete Mixer
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
Vibrator
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-SBST-5 VI
R.C.C. grade M 25 (Design Mix)
Unit = cum
Height upto 5m
Case I : Using concrete Mixer
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
Vibrator
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-SBST-5 VI
R.C.C. grade M 25 (Design Mix)
Unit = cum
Height upto 5m
Case I : Using concrete Mixer
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
Vibrator
(d) Formwork @ 3.75% on (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-SBST-5 VI
For piers, side walls, bed blocks
R.C.C. grade M 25 (Design Mix)
Unit = cum
Height upto 5m
Case I : Using concrete Mixer
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
Vibrator
(d) Formwork @ 10% on (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-SBST-5 VI (ii)
R.C.C. grade M 25 (Design Mix)
Height 5m to 10m
Case I : Using concrete Mixer
Per Cum Basic Cost of Labour, Material & Machinery (a+b+c) of Item VI (i) Case I excluding of Formwork
d) formwork
Add on cost of material, labour and machinery (a+b+c) for Formwork
Add on cost of material, Labour and machinery excluding formwork to cater for extra lift
Over heads & Contractor's profit
Rate perm (a+b+c+d+e+f)
RBR-SPST-1- II
R.C.C M 25 Grade (Design Mix)
Unit =cum
(i) Height upto 5m
Case I : Using Concrete Mixer.
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
d) For formwork and staging refer to sub-item I (B) case I above
d) Formwork and staging of (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-SPST-1
R.C.C M 25 Grade (Design Mix)
Unit =cum
Height 5m to 10m
Case I : Using Concrete Mixer.
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
d) For formwork and staging refer to sub-item I (B) case I above
d) Formwork and staging of (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-SPST-5 (i)
Unit = cum
(a) Material
Cement
20 mm aggregate
10 mm aggregate
HYSD bar reinforcement including binding wire (Rate as per item 13.2) except OH & CP
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Mazdoor (Unskilled) for cleaning deck slab concrete surface
Add Municipal/ Agency Allowance
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA.
(d) Formwork @ 3% of cost of concrete
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-SPST-7
Unit = Running m
Taking output = 4x12 m
Span = 48 m
(a) M 25 grade R.C.C.
No. of vertical posts = (6+1) 4 = 28 nos
Cross-sectional area of vertical post = 0.25x0.275 = 0.069 sqm
Concrete in vertical posts = 0.069x28x1.00 = 1.932 cum
Hand rail in 3 tiers = 3x48 = 144 m
Cross-sectional area = 0.17x0.175 = 0.03 sqm
Concrete in hand rails = 0.03 x 144 = 4.32 cum
Total concrete = 1.932+4.32 = 6.252 cum
(b) HYSD bar reinforcement (Rate as per item 13.2)
Over heads & Contractor's profit
Cost for 48 m = (a+b+c+d)
Rate per m = (a+b+c+d)/48
Sub Analysis for Rate of Concrete
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Formwork @ 12%
Total (a+b+c+d)
RBR-SPST-12
Nominal mix (1:2.5:5) / PCC M 15 using Concrete Mixture
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class0
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA.
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-SPST-13
Unit = cum
(a) Material
Reinforced cement concrete M 25 grade
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Bhisti
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
(d) Formwork @ 2.00% on (a+b+c)
Over heads & Contractor's profit
HYSD reinforcement
Rate per item 2
Rate per cum = (a)
Reinforced Cement Concrete M 30 grade approach slab using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1211 MORD / 1500, 1600, 1700 & 2704 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Unit = cum
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Bhisti
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA.
(d) Formwork @ 2.00% on (a+b+c)
Over heads & Contractor's profit
HYSD reinforcement
Rate per cum = (a)
Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete
Initial cost BMS-W.20
Over heads & Contractor's profit
Rate per sqm = a+b+c+d+e+f
Cost, supply and fixing of Bituminous Mastic pad 12.7 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc., complete
Initial cost BMS-W.20
Over heads & Contractor's profit
Rate per sqm = a+b+c+d+e+f
Unit = cum
Taking output = 10 cum
(a) Material
Granular material
(b) Labour
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Plate compactor / power rammer
Water Tanker
Over heads & Contractor's profit
Cost for 10 cum of granular backfill = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/10
Unit = cum
Taking output = 10 cum
(a) Material
Filter media as per specification
(b) Labour
Mazdoor (Unskilled)
Mazdoor (Skilled)
Add Municipal/ Agency Allowance
c) Machinery
Water Tanker of 6 KL capacity
Over heads & Contractor's profit
Cost for 10 cum of granular backfill = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/10
Note : Suitable Grade of Filter media shall be proposed as per Specification in said IRC.
Gravel Backing for Revetments as per APSS including cost and conveyance of all materials and all labour charges and contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Unit = cum
(a) Material
Gravel
(b) Labour
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Cost for 10 cum of granular backfill = a+b+c+d+e
Over heads & Contractor's profit
Cost for 1 cum
Rate per cum = (a+b+c+d+e)/1
Jeddy Stone Dry Packing for Aprons and Revetments Section 1300 MORD including cost and conveyance of all materials and all labour charges etc., complete including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Unit = cum
(a) Material
Jeddy Stone (Including small stone for wedging)
(b) Labour
Mason 1st Class
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Cost for 10 cum of granular backfill = a+b+c+d+e
Over heads & Contractor's profit
Cost for 1 cum
Rate per cum = (a+b+c+d+e)/1
Providing and laying pitching on slopes laid over prepared filter media/ gravel backing as per drawing and technical specifications Clause 1302 MORD / 2504 MORTH including cost and conveyance of all materials and all labour charges etc., complete including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Unit = cum
(a) Material
Stone boulder (25 kg minimum) /(MORTH - 40 kg)
Stone spalls of minimum 25 mm size
(b) Labour
Mason 1st Class
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Cost for 1 cum
Over heads & Contractor's profit
Cost for 1 cum
Rate per cum = (a+b+c+d+e)/1
RBR-PTWK-1
Unit = cum
(a) Material
Rough stone for revetment 300 mm thick
Stone spalls/Gravel
(b) Labour
Mason 1st Class
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Total
Total
Rate per cum = a+b+c+d
Construction of toe walls for protection of slopes using dry random rubble masonry as per drawing and technical specifications Clause 1302.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
Unit = cum
(a) Material
Stone for RR masonry
Through and bond stone (7 no x 0.24 x 0.24 m x 0.39 m = 0.16 cum)
(b) Labour
Mason 1st Class
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Total
Total
Rate per cum = a+b+c+d
RBR-SBST-9
Unit = Nos
Taking output = 30 Nos
(a) Material
PVC pipe 100 mm dia including wastage @ 5 per cent. Average length of weep hole is taken as one metre for the purpose of estimating
MS clamps
Collar for PVC pipe (average taking 10% of above pipe rate)
Cement mortar 1:3 (For rate refer to item 11.5 I)
(b) Labour
Mason 1st Class
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Total
Over heads & Contractor's profit
Cost for 30 Nos = (a+b+c+d)
Rate per No of 1m or per 1 Rmt= (a+b+c+d)/30
RBR-SBST-9
Unit = Nos
Taking output = 30 Nos
(a) Material
AC pipe Basic rate
Transportation @ 10%
AC pipe 100 mm dia including wastage @ 5 per cent. Average length of weep hole is taken as one metre for the purpose of estimating incl CED & transportation charges
MS clamps
Collar for AC pipe (average taking 10% of above pipe rate)
Cement mortar 1:3 (For rate refer to item 11.5 I)
(b) Labour
Mason 1st Class
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Total
Over heads & Contractor's profit
Cost for 30 Nos = (a+b+c+d)
Rate per No of 1m or per 1 Rmt= (a+b+c+d)/30
Sub analysis
RBR-SPST-1 -B
R.C.C M 20 Grade (Design Mix)
Unit =cum
(i) Height upto 5m
Case I : Using Concrete Mixer.
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
d) For formwork and staging refer to sub-item I (B) case I above
d) Formwork and staging of (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-TSRA-6
Unit = sqm
Taking output = 40 sqm
a) Labour
Painter (1st Class)
Painter Assistant
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
b) Material
Cement Primer as per specifications
Paint conforming to requirement of Clause 1701.3.8
Add for scaffolding @ 1 per cent of labour cost where required
Filling Material on Paint Cost
Total
Over heads & Contractor's profit
toatl
Cost for 40 sqm = a+b+c+d
Rate per sqm = (a+b+c+d)/40
RBR-HLRD-8
Unit = cum
Rates as per item No. 1 of Chapter 11
Unit = cum
Rate as per item No. 4 (C) (i) of Chapter 11
Unit = t
Rate as per item No. 7 of Chapter 11
Unit = sqm
Rate as per item No. 5 of Chapter 10
Total cost for each stone
Flush Pointing with CM (1:3) to RR Masonry including cost and conveyance of all materials and all labour chrages, contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Unit = 10 sqm
A. MATERIALS:
Cement
Fine aggregate (Sand)
B. LABOUR:
Mason 2nd class
Mazdoor (unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Rate per 10 sqm
Rate per sqm
Sub analysis
Cement mortar 1:4 (1 cement : 4 sand)
Unit = cum
(a) Material
Cement
(b) Labour
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Total material and labour = (a+b)
Plastering with cement mortar (1:4), in substructure as per technical specification Clauses 613.4 & 1204 MORD including cost and conveyance of all materials, Overheads & contractor's profit, but excluding GST and seigniorage etc., complete.
Unit = 10 sqm
Taking output = 10 sqm
(a) Material
Cement mortar 1:4 (Rate as in item 11.5 II )
(b) Labour
Mason 1st Class
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Total
Over heads & Contractor's profit
Rate per 10 sqm = (a+b+c+d)
Rate per 1 sqm
RBR-SBST-5 VI
For Footings/ Drain cover slabs
R.C.C. grade M 25 (Design Mix)
Unit = cum
Case I : Using concrete Mixer
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
Vibrator
(d) Formwork @ 4% on (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
RBR-SPST-1 -B
P.C.C M 20 Grade (Nominal Mix : 1:2:4)
Unit =cum
(i) Height upto 5m
Case I : Using Concrete Mixer.
(a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
c) Machinery
Concrete mixer 0.4/0.28 cum capacity
d) Formwork and staging of (a+b+c)
Rate per cum = a+b+c+d+e+f
(a) Material
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810 MORTH
Unit = Running metre
Market rate recommended by the Superintending Engineer, PR, Guntur which was also approved by the Engineer-in-Chief (R&B), State Roads and proposed in the estimate is considered.
Taking output = 4.5 metre length
a) Labour
Blacksmith
Mazdoor
Add Municipal/ Agency Allowance
b) Machinery
Tractor-trolley
c) Material
Corrugated sheet,3 mm thick, "W" beam section railing,4.5 m in length
Channel post 150 x 75 x 5 mm,1.8 m long,3 Nos @ 16.4 kg per metre
Spacer 150 x 75 x 5 mm channel 0.33 m long, 3 Nos @ 16.4 kg per metre
Nuts and bolts
Add 25 per cent of the cost of material for fabrication, nuts, bolts and washers etc.)
d&e) Overheads & Contractors Profit
Cost for 4.5 metre = a+b+c+d+e
Rate per metre = (a+b+c+d+e)/4.5
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH, including contractors profit & Over head charges, but excluding GST etc., complete.
Unit = cum
Taking output = 1.25 cum
a) labour
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley 3t
d&e) Overheads & Contractors Profit
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
Unit = cum
Taking output = 1.25 cum
a) labour
Mazdoor (Unskilled)
b) Machinery
Tractor with trolley 3t
d&e) Overheads & Contractors Profit
Cost for 1.25 cum = a+b+c+d
Rate per cum = (a+b+c+d)/1.25
Supplying, fitting and fixing in position true to line and level elastomeric / Neoprane bearing of size 630 x 220 x 61 mm conforming to IRC:83 (Part II) Section IX complete including all accessories as per drawings and technical specification clause 1207.1 of MORD including all over heads & contractors profit and VAT etc., complete.
Rate as per previously approved market rates
Providing and laying Strip seal expansion joint catering to maximum horizontal movement up to 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer / supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation etc., comlete including over heads & contractors profit and VAT etc., complete.
Rate as per previously approved market rates
Providing drainage spouts made 0.15 sqm of 6 mm thick MS plate 210 x 210 mm water spout at top with 100 mm dia GI drain spout and 5 Nos MS plate 12 mm x 40 mm x 210 mm long inluding cost of all materials and labour charges, over heads & contractors profit and VAT etc., complete.
Rate as per previously approved market rates
CD datas 09 Nos (Nine numbers) approved
Engineer -in -Chief (PR)
PMGSY,
PILE / WELL FOUNDATION DATAS
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Water (Y/N)
Bored cast-in-situ M25 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications in Section 1100 & 1700 MORTH and removal of excavated earth with all lifts and lead upto 1000 m, including cost and conveyance of all materials, contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
a) Materials
Sub analysis of PCC Grade M25 Design Mix
Case 1 : Using Concrete Mixer
Unit = 1 cum
Taking output = 15 cum
a) Material
Cement
Coarse sand
40 mm Aggregate
20 mm Aggregate
10 mm Aggregate
Admixture
Water
b) Labour
Mason
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum)
Generator 33 KVA
Light Crane of 3 tonnes capacity for handling tremie pipe
Add 5 per cent of cost of material and labour towards cost of forming sump, protective bunds, chiselling and making arrangements for under water concreting with tremie pipe.
cost of 15 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/15
Unit = meter
Taking output = 9 m
PCC Grade M25
Rate for concrete may be adopted same as for bottom plug vide item no. 12( C ) (IV)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery( for boring and construction )
Hire and running charges of hydraulic piling rig with power unit and complete accessories including shifting from one bore location to another & Hire and running charges of Bentonite pump
Hire and running charges of light crane for lowering reinforcement cage
Loader I cum bucket capacity.
Tipper 5.5 cum capacity for disposal of muck from pile bore hole
Bentonite
c) Labour
Mate/Supervisor
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Cost for 9 m = a+b+c+d+d+e
Rate per metre (a+b+c+d+e)/9
Unit = meter
Taking output = 10 m
PCC Grade M25
Rate for concrete may be adopted same as for bottom plug vide item no. 12( C ) (IV)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery( for boring and construction )
Hire and running charges of hydraulic piling rig with power unit and complete accessories including shifting from one bore location to another & Hire and running charges of Bentonite pump
Hire and running charges of light crane for lowering reinforcement cage
Loader I cum bucket capacity.
Tipper 5.5 cum capacity for disposal of muck from pile bore hole
Bentonite
c) Labour
Mate/Supervisor
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Cost for 10 m = a+b+c+d+d+e
Rate per metre (a+b+c+d+e)/10
Unit = meter
Taking output = 15 m
Sub analysis of PCC Grade M25 Design Mix
Rate for concrete may be adopted same as for bottom plug vide item no. 12( C ) (IV)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery( for boring and construction )
Hire and running charges of hydraulic piling rig with power unit and complete accessories including shifting from one bore location to another & Hire and running charges of Bentonite pump
Hire and running charges of light crane for lowering reinforcement cage
Loader I cum bucket capacity.
Tipper 5.5 cum capacity for disposal of muck from pile bore hole
Bentonite
c) Labour
Mate/Supervisor
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Cost for 15 m = a+b+c+d+d+e
Rate per metre (a+b+c+d+e)/15
Bored cast-in-situ M30 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications in Section 1100 & 1700 MORTH and removal of excavated earth with all lifts and lead upto 1000 m, including cost and conveyance of all materials, contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
a) Materials
Sub analysis of PCC Grade M30 Design Mix
Case 1 : Using Concrete Mixer
Unit = 1 cum
Taking output = 15 cum
a) Material
Cement
Coarse sand
40 mm Aggregate
20 mm Aggregate
10 mm Aggregate
Admixture
Water
b) Labour
Mason
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum)
Generator 33 KVA
Light Crane of 3 tonnes capacity for handling tremie pipe
Add 5 per cent of cost of material and labour towards cost of forming sump, protective bunds, chiselling and making arrangements for under water concreting with tremie pipe.
cost of 15 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/15
Unit = meter
Taking output = 9 m
Sub analysis of PCC Grade M30 Design Mix
Rate for concrete may be adopted same as for bottom plug vide item no. 12( C ) (IV)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery( for boring and construction )
Hire and running charges of hydraulic piling rig with power unit and complete accessories including shifting from one bore location to another & Hire and running charges of Bentonite pump
Hire and running charges of light crane for lowering reinforcement cage
Loader I cum bucket capacity.
Tipper 5.5 cum capacity for disposal of muck from pile bore hole
Bentonite
c) Labour
Mate/Supervisor
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Cost for 9 m = a+b+c+d+d+e
Rate per metre (a+b+c+d+e)/9
Unit = meter
Taking output = 10 m
PCC Grade M30
Rate for concrete may be adopted same as for bottom plug vide item no. 12( C ) (IV)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery( for boring and construction )
Hire and running charges of hydraulic piling rig with power unit and complete accessories including shifting from one bore location to another & Hire and running charges of Bentonite pump
Hire and running charges of light crane for lowering reinforcement cage
Loader I cum bucket capacity.
Tipper 5.5 cum capacity for disposal of muck from pile bore hole
Bentonite
c) Labour
Mate/Supervisor
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Cost for 10 m = a+b+c+d+d+e
Rate per metre (a+b+c+d+e)/10
Unit = meter
Taking output = 15 m
Sub analysis of PCC Grade M30 Design Mix
Rate for concrete may be adopted same as for bottom plug vide item no. 12( C ) (IV)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery( for boring and construction )
Hire and running charges of hydraulic piling rig with power unit and complete accessories including shifting from one bore location to another & Hire and running charges of Bentonite pump
Hire and running charges of light crane for lowering reinforcement cage
Loader I cum bucket capacity.
Tipper 5.5 cum capacity for disposal of muck from pile bore hole
Bentonite
c) Labour
Mate/Supervisor
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Cost for 15 m = a+b+c+d+d+e
Rate per metre (a+b+c+d+e)/15
Bored cast-in-situ M35 grade R.C.C. Pile excluding Reinforcement complete as per Drawing and Technical Specifications in Section 1100 & 1700 MORTH and removal of excavated earth with all lifts and lead upto 1000 m, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
a) Materials
Sub Analysis of PCC Grade M35 Design Mix
Case 1 : Using Concrete Mixer
Unit = 1 cum
Taking output = 15 cum
a) Material
Cement
Coarse sand
40 mm Aggregate
20 mm Aggregate
10 mm Aggregate
Admixture
Water
b) Labour
Mason
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum)
Generator 33 KVA
Light Crane of 3 tonnes capacity for handling tremie pipe
Add 5 per cent of cost of material and labour towards cost of forming sump, protective bunds, chiselling and making arrangements for under water concreting with tremie pipe.
Cost of 15 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/15
Unit = meter
Taking output = 9 m
PCC Grade M35
Rate for concrete may be adopted same as for bottom plug vide item no. 12( C ) (IV)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery( for boring and construction )
Hire and running charges of hydraulic piling rig with power unit and complete accessories including shifting from one bore location to another & Hire and running charges of Bentonite pump
Hire and running charges of light crane for lowering reinforcement cage
Loader I cum bucket capacity.
Tipper 5.5 cum capacity for disposal of muck from pile bore hole
Bentonite
c) Labour
Mate/Supervisor
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Cost for 9 m = a+b+c+d+d+e
Rate per metre (a+b+c+d+e)/9
Unit = meter
Taking output = 10 m
PCC Grade M35
Rate for concrete may be adopted same as for bottom plug vide item no. 12( C ) (IV)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery( for boring and construction )
Hire and running charges of hydraulic piling rig with power unit and complete accessories including shifting from one bore location to another & Hire and running charges of Bentonite pump
Hire and running charges of light crane for lowering reinforcement cage
Loader I cum bucket capacity.
Tipper 5.5 cum capacity for disposal of muck from pile bore hole
Bentonite
c) Labour
Mate/Supervisor
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Cost for 10 m = a+b+c+d+d+e
Rate per metre (a+b+c+d+e)/10
Unit = meter
Taking output = 15 m
PCC Grade M35
Rate for concrete may be adopted same as for bottom plug vide item no. 12( C ) (IV)
Concrete to be cast with a tremie pipe 200mm dia.
b) Machinery( for boring and construction )
Hire and running charges of hydraulic piling rig with power unit and complete accessories including shifting from one bore location to another & Hire and running charges of Bentonite pump
Hire and running charges of light crane for lowering reinforcement cage
Loader I cum bucket capacity.
Tipper 5.5 cum capacity for disposal of muck from pile bore hole
Bentonite
c) Labour
Mate/Supervisor
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Cost for 15 m = a+b+c+d+d+e
Rate per metre (a+b+c+d+e)/15
Cement Concrete for Reinforced Concrete RCC Grade M25 Design Mix in Pile Cap complete as per Drawing and Technical Specifications in Section 1100, 1500 & 1700 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
RCC Grade M25 Design Mix
Unit = cum
Taking output = 15 cum
Using Concrete Mixer
a) Material
Cement
Coarse sand
20 mm Aggregate
10 mm Aggregate
Water
b) Labour
Mason
Mazdoor (Unskilled) for concreting
Mazdoor (Unskilled) for breaking pile head, bending bars, cleaning etc.
Add Municipal/ Agency Allowance
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum)
Generator (capacity 33 KVA)
Formwork @ 4 per cent on cost of concrete i.e. cost of a) Material, b) Labour and c) Machinery
Over heads & Contractor's profit
Cost for 15 cum = a+b+c+d+e
Rate per metre (a+b+c+d+e)/15
Cement Concrete for Reinforced Concrete RCC Grade M30 Design Mix in Pile Cap complete as per Drawing and Technical Specifications in Section 1100, 1500 & 1700 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
RCC Grade M30 Design Mix
Unit = cum
Taking output = 15 cum
Using Concrete Mixer
a) Material
Cement
Coarse sand
20 mm Aggregate
10 mm Aggregate
Water
b) Labour
Mason
Mazdoor (Unskilled) for concreting
Mazdoor (Unskilled) for breaking pile head, bending bars, cleaning etc.
Add Municipal/ Agency Allowance
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum)
Generator (capacity 33 KVA)
Formwork @ 4 per cent on cost of concrete i.e. cost of a) Material, b) Labour and c) Machinery
Over heads & Contractor's profit
Cost for 15 cum = a+b+c+d+e
Rate per metre (a+b+c+d+e)/15
Cement Concrete for Reinforced Concrete RCC Grade M35 Design Mix in Pile Cap complete as per Drawing and Technical Specifications in Section 1100, 1500 & 1700 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
RCC Grade M35 Design Mix
Unit = cum
Taking output = 15 cum
Using Concrete Mixer
a) Material
Cement
Coarse sand
20 mm Aggregate
10 mm Aggregate
Water
b) Labour
Mason
Mazdoor (Unskilled) for concreting
Mazdoor (Unskilled) for breaking pile head, bending bars, cleaning etc.
Add Municipal/ Agency Allowance
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum)
Generator (capacity 33 KVA)
Formwork @ 4 per cent on cost of concrete i.e. cost of a) Material, b) Labour and c) Machinery
Over heads & Contractor's profit
Cost for 15 cum = a+b+c+d+e
Rate per metre (a+b+c+d+e)/15
Leveling Course for Pile cap
Providing and laying of PCC M15 (Design Mix) leveling course 100mm thick below the pile cap, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete
Unit = cum
Taking output = 15 cum
a) Material
Cement
Coarse sand
40 mm aggregate
20 mm Aggregate
10 mm Aggregate
Water
b) Labour
Mason
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
c) Machinery
Concrete mixer (cap. 0.40/0.28 cum)
Generator 33 KVA
Over heads & Contractor's profit
Cost for 15 cum = a+b+c+d+e
Rate per metre (a+b+c+d+e)/15
Providing Steel Liner 10 mm thick for Curbs and 6 mm thick for Staining of Wells including Fabricating and Setting out as per Detailed Drawing as per Tech. Specifications 1200 & 1900 MORTH, including contractors profit & Over head charges, excluding GST etc, complete
Unit = 1 MT
Taking output = 1 MT
a) Material
i) Structural steel including 5 per cent wastage
b) Labour
Fitter
Blacksmith
Welder
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Electrodes, cutting gas and other consumables @ 5 per cent on cost a (a) above.
Over heads & Contractor's profit
Rate for per MT (a+b+c+d)
Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation complete as per Drawing and Technical Specification 1204, 1900 MORTH including overhead charges & Contractors profit but excluding GST etc, complete.
Unit = 1 MT
Taking output = 1 MT
a) Material
Structural steel in plates, angles, etc including 5 per cent wastage
Nuts & bolts
b) Labour
(for cutting, bending, making holes, joining, welding and erecting in position)
Fitter
Blacksmith
Welder
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Electrodes, cutting gas and other consumables @ 10 per cent of cost of (a) above
Handling loading and unloading on (a)
Hire charges of Welding machine on (a)
Over heads & Contractor's profit
Rate per MT (a+b+c+d)
Well curb
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 1200 MORTH, including overhead charges & Contractors profit, but excluding GST and seigniorage etc., complete For Well Curb.
Well curb
R.C.C. grade M 25 (Design Mix)
Unit = cum
Case I : Using concrete Mixer
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
Vibrator
(d) Formwork @ 20% on (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
Reinforced cement concrete M30 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 1200 MORTH, including overhead charges & Contractors profit, but excluding GST and seigniorage etc., complete For Well Curb.
Well curb
R.C.C. grade M 30 (Design Mix)
Unit = cum
Case I : Using concrete Mixer
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
Vibrator
(d) Formwork @ 20% on (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
Reinforced cement concrete M35 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 1200 MORTH, including overhead charges & Contractors profit, but excluding GST and seigniorage etc., complete For Well Curb.
Well curb
R.C.C. grade M 35 (Design Mix)
Unit = cum
Case I : Using concrete Mixer
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
Vibrator
(d) Formwork @ 20% on (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 1211 MORTH, including overhead charges & Contractors profit, but excluding GST and seigniorage etc., complete For Well Cap
Well cap
R.C.C. grade M 25 (Design Mix)
Unit = 15 cum
Case I : Using concrete Mixer
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
Vibrator
(d) Formwork @ 3.75% on (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in Foundations complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 1200 MORTH, including overhead charges & Contractors profit, but excluding GST and seigniorage etc., complete.
For Footings
R.C.C. grade M 25 (Design Mix)
Unit = cum
Case I : Using concrete Mixer
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
Vibrator
(d) Formwork @ 3.75% on (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
Plain cement concrete M20 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 1206 MORTH ,including overhead charges & Contractors profit, but excluding GST and seigniorage etc., complete For Well steining
Well steining
R.C.C. grade M 20 (Design Mix)
Unit = cum
Case I : Using concrete Mixer
(a) Material
Cement
Coarse sand
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
Vibrator
(d) Formwork @ 10% on (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
Plain cement concrete M20 grade (Design Mix) using 40, 20 & 10mm metal (HBG) mechanically mixed complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 1208 MORTH ,including overhead charges & Contractors profit,but excluding GST and seigniorage etc., complete For Bottom Plug
Bottom Plug
P.C.C. grade M 20 (Design Mix)
Unit = 15 cum
Case I : Using concrete Mixer
(a) Material
Cement
Add extra 10% cement for under water
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
Water
Admixture
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 KVA
Light crane 3 tonnes capacity for handling tremie pipe
Add 5 per cent of cost of material and labour towards cost of forming sump, protective bunds, chiselling and making arrangements for under water concreting with tremie pipe.
Over heads & Contractor's profit
Rate per 15 cum
Rate per cum =
Sand Filling in Wells complete as per Drawing and Technical Specifications 1207 MORTH, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete.
Unit = 1 cum
a) Material
Sand (assuming 20 per cent voids )
a) Labour
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
Over heads & Contractor's profit
Rate per 1 cum
Rate per cum = a+b+c+d
Plain cement concrete M 15 grade Design mix using 40,20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 1210 MORTH, including overhead charges & Contractors profit, but excluding GST and seigniorage etc., complete - For Top Plug
For Top Plug
Unit = cum
P.C.C grade M 15
Design mix using CC Mixer (MORTH)
Unit = cum
(a) Material
Cement
Coarse sand
40 mm aggregate
20 mm aggregate
10 mm aggregate
Water
(b) Labour
Mason (1st Class)
Mazdoor (Unskilled)
Add Municipal/ Agency Allowance
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity
Generator 33 kVA
(d) Formwork @ on cost of material, labour and machinery (a+b+c)
Over heads & Contractor's profit
Rate per cum = a+b+c+d+e+f
Sinking of 8 m external diameter well (other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications 1207 MORTH. Depth of sinking is reckoned from bed level including overhead charges & Contractors profit but excluding GST etc, complete.
Unit = Running Meter.
Taking output = 1 m
Diameter of well - 8 m.
Depth below bed level upto 3.0 M
Sandy Soil
Rate of sinking @ 0.25 m/hour
Labour
Sinker (Skilled)
Sinking helper ( semi-skilled )
Add Municipal/ Agency Allowance
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum capacity and accessories.
Consumables in sinking @10 % of (b)
Rate per 1 Metre
Over heads & Contractor's profit
Cost for 1 Mtr
Clayey Soil
Depth below bed level upto 3.0 M
Rate of sinking @ 0.18 m/hour
Labour
Sinker (Skilled)
Sinking helper ( semi-skilled )
Add Municipal/ Agency Allowance
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum capacity and accessories.
Consumables in sinking @10 % of (b)
Rate per 1 Metre
Over heads & Contractor's profit
Cost for 1 Mtr
Avergare rate for sandy & clayey soils
Sinking of 8m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications clause 1207 MoRTH. Depth of sinking is reckoned from bed level including overhead charges & Contractors profit but excluding GST etc, complete.
Beyond 3m upto 10m depth
Sandy Soil
Rate of sinking @ 0.20 m/hour
Labour
Sinker (Skilled)
Sinking helper ( semi-skilled )
Add Municipal/ Agency Allowance
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum capacity and accessories.
Consumables in sinking @10 % of (b)
Rate per 1 Metre
Over heads & Contractor's profit
Cost for 1 Mtr
Clayey Soil
Rate of sinking @ 0.17 m/hour
Labour
Sinker (Skilled)
Sinking helper ( semi-skilled )
Add Municipal/ Agency Allowance
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum capacity and accessories.
Air compressor with pneumatic chisel attachment for cutting hard clay.
Consumables in sinking @10 % of (b)
Rate per 1 Metre
Over heads & Contractor's profit
Cost for 1 Mtr
Avergare rate for sandy & clayey soils
Sinking of 8 m external diameter well (other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications 1207 MORTH. Depth of sinking is reckoned from bed level including overhead charges & Contractors profit but excluding GST etc, complete.
Unit = Running Meter.
Taking output = 1 m
Diameter of well - 8 m.
Depth below bed level upto 3.0 M
Soft rock
Rate of sinking @ 0.20 m/hour
Labour
Sinker (Skilled)
Sinking helper ( semi-skilled )
Diver
Add Municipal/ Agency Allowance
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum capacity and accessories.
Air compressor with pneumatic breakers
Consumables in sinking @10 % of (b)
Add for dewatering @ of 5 per cent of (a+b)
Rate per 1 Metre
Over heads & Contractor's profit
Cost for 1 Mtr
Sinking of 7 m external diameter well (other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications 1207 MORTH. Depth of sinking is reckoned from bed level including overhead charges & Contractors profit but excluding GST etc, complete.
Unit = Running Meter.
Taking output = 1 m
Diameter of well - 7 m.
Depth below bed level upto 3.0 M
Sandy Soil
Rate of sinking @ 0.30 m/hour
Labour
Sinker (Skilled)
Sinking helper ( semi-skilled )
Add Municipal/ Agency Allowance
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum capacity and accessories.
Consumables in sinking @10 % of (b)
Rate per 1 Metre
Over heads & Contractor's profit
Cost for 1 Mtr
Clayey Soil
Depth below bed level upto 3.0 M
Rate of sinking @ 0.18 m/hour
Labour
Sinker (Skilled)
Sinking helper ( semi-skilled )
Add Municipal/ Agency Allowance
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum capacity and accessories.
Consumables in sinking @10 % of (b)
Rate per 1 Metre
Over heads & Contractor's profit
Cost for 1 Mtr
Avergare rate for sandy & clayey soils
Sinking of 7m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications clause 1207 MoRTH. Depth of sinking is reckoned from bed level including overhead charges & Contractors profit but excluding GST etc, complete.
Beyond 3m upto 10m depth
Sandy Soil
Rate of sinking @ 0.22 m/hour
Labour
Sinker (Skilled)
Sinking helper ( semi-skilled )
Add Municipal/ Agency Allowance
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum capacity and accessories.
Consumables in sinking @10 % of (b)
Rate per 1 Metre
Over heads & Contractor's profit
Cost for 1 Mtr
Clayey Soil
Rate of sinking @ 0.17 m/hour
Labour
Sinker (Skilled)
Sinking helper ( semi-skilled )
Add Municipal/ Agency Allowance
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum capacity and accessories.
Air compressor with pneumatic chisel attachment for cutting hard clay.
Consumables in sinking @10 % of (b)
Rate per 1 Metre
Over heads & Contractor's profit
Cost for 1 Mtr
Avergare rate for sandy & clayey soils
Sinking of 7 m external diameter well (other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications 1207 MORTH. Depth of sinking is reckoned from bed level including overhead charges & Contractors profit but excluding GST etc, complete.
Unit = Running Meter.
Taking output = 1 m
Diameter of well - 7 m.
Depth below bed level upto 3.0 M
Soft rock
Rate of sinking @ 0.20 m/hour
Labour
Sinker (Skilled)
Sinking helper ( semi-skilled )
Diver
Add Municipal/ Agency Allowance
Machinery
Hire & running charges of crane with grab bucket of 0.75 cum capacity and accessories.
Air compressor with pneumatic breakers
Consumables in sinking @10 % of (b)
Add for dewatering @ of 5 per cent of (a+b)
Rate per 1 Metre
Over heads & Contractor's profit
Cost for 1 Mtr
Sub Estimate
Name of the sub Work : Construction of 1 row 600 mm dia. Pipe culvert. 12.5 m long
Head walls
Barrel Portion
Total Quantity
Head walls
Under pipes
Total Quantity
Head walls
Total Quantity
Under pipes
For Head walls and Parapet
Head walls at
Deduct pipes portion
Parapet
Total Quantity
600mm dia NP3 pipes
Total
Sub Estimate
Name of the sub Work : Construction of 1.5 m span RCC slab culvert
For Raft foundation
cut off wall u/s
cut off wall d/s
For Wing walls
Total Quantity
Total Quantity
Levelling course
For Raft foundation
cut off wall u/s
cut off wall d/s
For Wing walls
Total Quantity
Footings
For Raft foundation
Wing walls 1st footing
-do- 2nd footing
-do- 3rd footing
Abutments
Abutments
Wing walls
Parapet
Total Quantity
Bed blocks
Bed blocks
Dirt walls
Deck slab
For Bed blocks
For Deck slab
Total
Sub Estimate
Name of the sub Work : Construction of one vent of 3 m span RCC slab culverts ( 2 Nos) at KM 2/0 - 3/0, and at KM 4/6 - 4/8
For Footings of abuttments
For Wing walls
Total Quantity
Total Quantity
Levelling course
For Footings of abuttments
For Wing walls
Total Quantity
Footings
Abutments 1st footing
-do- 2nd footing
-do- 3rd footing
Wing walls 1st footing
-do- 2nd footing
-do- 3rd footing
Abutments
Abutments
Wing walls
Parapet
Total Quantity
Bed blocks
Bed blocks
Dirt walls
Deck slab
Wearing course
For Bed blocks
For Deck slab
Total
Sub Estimate
Name of the sub Work : Construction of 1 vent 1000 mm dia. Piped CC Dips
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of cement concrete including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH, including contractors profit & Over head charges, VAT and Seigneorage etc., complete.
Head walls
Barrel Portion
Total Quantity
Head walls
Barrel Portion
Total Quantity
Head walls
Under pipes
Under pipes
Total Quantity
Head walls
Under pipes
Total Quantity
Under pipes
For Head walls and Parapet
Head walls at
Head walls at
Head walls at
Head walls at
Deduct pipes portion
Total Quantity
1000mm dia NP3 pipes
Total
Sub Estimate
Name of the sub Work : Construction of 3 vent 1000 mm dia. Piped CC Dips
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of cement concrete including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH, including contractors profit & Over head charges, VAT and Seigneorage etc., complete.
Head walls
Barrel Portion
Total Quantity
Head walls
Barrel Portion
Total Quantity
Head walls
Under pipes
Under pipes
Total Quantity
Head walls
Under pipes
Total Quantity
Under pipes
For Head walls and Parapet
Head walls at
Head walls at
Head walls at
Head walls at
Deduct pipes portion
Total Quantity
1000mm dia NP3 pipes
Total
Sub Estimate
Name of the sub Work : Construction of 3 vent 600 mm dia. Piped CC Dips
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of cement concrete including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH, including contractors profit & Over head charges, VAT and Seigneorage etc., complete.
Head walls
Barrel Portion
Total Quantity
Head walls
Barrel Portion
Total Quantity
Head walls
Under pipes
Under pipes
Total Quantity
Head walls
Under pipes
Total Quantity
Under pipes
For Head walls and Parapet
Head walls at
Head walls at
Head walls at
Head walls at
Deduct pipes portion
Total Quantity
600mm dia NP3 pipes
covered in road
Total
Sub Estimate
Name of the sub Work : Construction of 5 vent 600 mm dia. Piped CC Dips
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of cement concrete including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202 MORD / MORTH, including contractors profit & Over head charges, VAT and Seigneorage etc., complete.
Head walls
Barrel Portion
Total Quantity
Head walls
Barrel Portion
Total Quantity
Head walls
Head walls
Under pipes
Under pipes
Total Quantity
Head walls
Under pipes
Total Quantity
Under pipes
For Head walls and Parapet
Head walls at
Head walls at
Head walls at
Head walls at
Deduct pipes portion
Total Quantity
600mm dia NP3 pipes
Total
Sub Estimate
Name of the sub Work : Construction of single vent 900 mm dia. Pipe culverts ( 6 Nos) at 2/3, 2/8, 3/4, 4/8, 7/0, and 7/5
Head walls
Barrel Portion
Total Quantity
Head walls
Under pipes
Total Quantity
Head walls
Under pipes
Total Quantity
Under pipes
For Head walls and Parapet
Head walls at
Head walls at
Deduct pipes portion
Total Quantity
900mm dia NP3 pipes
Total
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.97 MB
SBD_Panukuvalasa.pdf
Tender Documents • 1.64 MB
BOQ_226927.xls
BOQ • 0.39 MB
Schedule_AP20PMJN04.xls
Additional Documents • 5.71 MB
Download all tender documents and submit your bid