Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 1ST FLOOR CHITRAKOOT 230A A J C BOSE ROAD KOLKATA 700020 | KOLKATA | KOLKATA | WEST BENGAL | 700020 | Accepted-Technical Qualified as per NIT |
| 2 | Accepted-Technical MONIGRAM MURSHIDABAD WB 742237 | MURSHIDABAD | WEST BENGAL | 742237 | Accepted-Technical Qualified as per NIT |
| 3 | Accepted-Technical | Accepted-Technical Qualified as per NIT |
| 4 | Accepted-Technical MECHEDA NEAR PNB PURBA MEDINIPUR MECHEDA 721137 | MECHEDA | PURBA MEDINIPUR | WEST BENGAL | 721137 | Accepted-Technical Qualified as per NIT |
| 5 | Accepted-Technical | Accepted-Technical Qualified as per NIT |
Tender Value
₹13.4 Cr
EMD Value
₹26.8 L
Closing Date
24 Dec 2025, 3:00 pmClosed
The General Manager, SGTPP WBPDCL
Administrative Building, SgTPP, PO-Manigram, Dist- Murshidabad, Pin-742237
Biennial Maintenance contract for Housekeeping/Cleaning work at different location of CHP, at Sg.T.P.P (2X300MW, 2X500MW, 1x660 MW).
2025_WBPDC_944937_1
WBPDCL/SGTPP/NIT/E3755/25-26
Open Tender
Support/Maintenance Service
Lump-sum
730 days
SGTPP, WBPDCL.
Qualification required as per NIT and Tender documents signed and stamped in each page as a token of acceptance.
3 documents required · 3 mandatory
₹0
₹26.8 L
Yes
Contract Cell, SGTPP
23 Mar 2026
17 Nov 2025
26 Dec 2025
24 Nov 2025
24 Dec 2025
24 Nov 2025
8 Dec 2025
Mandatory Jobs: Housekeeping & Cleaning at CHP I & II ;SgTPP (24x7) in 03 shifts
Crash Cleaning of Dust extraction systems along with all duct at CHP;SgTPP(Total-02 Nos.at Ph-1 & 09 Nos. at Ph-II)
Crash Cleaning of Conv-7 & S/R & it's adjoining area
Crash cleaning of conv.-5A/B along with drain & sump-pit & it's adjoining area
Crash cleaning of Conv-1A/B along with drain & sump-pit & it's adjoining area
Crash Cleaning of bunker floor at CHP-I Crash Cleaning of Conv-8 along with drain & sump-pit & it's adjoining area
Crash cleaning of Crusher House -1 with it's adjoining area
Crash Cleaning of conv-8 with drain & Crash cleaning of conv-2A/B along with drain and sump pit & it's adjoining area
Crash Cleaning of conv-2A/B along with It's drain & sump-pit & it's adjoining area
Crash Cleaning of conv-11A/B with drain & sump-pit & it's adjoining area
Crash Cleaning of TP-11 & 12, AF floor along with drains and sump-pit & Wagon Tippler and it's adjoining area
Crash cleaning of conv-12A/B with drain & sump-pit & it's adjoining area & structure
Crash Cleaning of Crusher House 2 and & adjoining area and structure
Crash cleaning of conv.-13A/B/C & TP-13 & it's adjoining structural area
Crash cleaning of Conv.-14A/B & TP-14 & it's adjoining and structural area & Sump-pit
crash cleaning OF CONV.-15A/B & TP-15 & it's adjoining and structural area
Crash cleaning of CONV.-16A/B along with & it's adjoining and structural area
Crash cleaning of conv.17-A/B along with TP-18 & TP-19 & it's adjoining and structural area
Crash cleaning of conv.-18 &19 including Bunker floor & it's adjoining and structural area
Crash cleaning of conv.-20 &21 including Bunker floor & it's adjoining and structural area
CRASH CLEANING OF CONV-22A & S/R-1 & it's adjoining and structural area
Engagement of JCB for coal cleaning at different areas of CHP Stage 1 & 2
Crash cleaning of TP-4 & it's adjoining and whole structure
Crash cleaning of conv.-22B & S/R-2 & it's adjoining and structural area
SAFETY PPE cost for 1st Year
SAFETY PPE cost for 2nd Year
Mandatory Job: Housekeeping and Cleaning at CHP III ;SgTPP (24x7) in 03 Shifts
Crash cleaning of TP-23 & BCN 29 A/B, AF floor along with sump-pit, and Twin Tippler surrounding areas
Crash cleaning of Crusher House #3 & it's structure and adjoining area of CHP Phase-III
Crash Cleaning of Dust extraction system along with all ducts at CHP Phase III, SgTPP
Crash cleaning of Conv.- 30 A/B it's structure and adjoining area of CHP Phase-III
Crash cleaning of Conv.- 32 A/B & TP-25 it's structure and adjoining area of CHP Phase-III
Crash cleaning of Conv.- 33 A/B & TP-26 it's structure and adjoining area of CHP Phase-III
Crash cleaning of Conv.- 34 A/B & TP-27 it's structure and adjoining area of CHP Phase-III
Crash cleaning of Conv.- 35 A/B & TP-28
Crash cleaning of Conv.- 24 A/B, TP-20A and Conv.- 36 A/B & it's structural area of CHP Phase-III
Crash cleaning of Conv.- 23 A/B & TP-20 & it's structural area of CHP Phase-III
Crash cleaning of Conv.- 25A/B & TP-21 & TP-22 & their structural areas of CHP Phase-III
Crash cleaning of Conv.-26 A/B & Bunker 1 and it's structural area of CHP Phase-III
Crash cleaning of Conv.-27 A/B & Bunker 2 and it's structural area of CHP Phase-III
Engagement of JCB for coal cleaning
SAFETY PPE cost for 1st Year
SAFETY PPE cost for 2nd Year
N.B. 1. G.S.T will be paid extra as applicable. 2. Tender Evaluation shall be done excluding GST.
stage.html
html • 0.04 MB
tech_eval.pdf
cancelled_1.pdf
pdf • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
BOQ_2244642.xls
BOQ • 0.36 MB
TD2.pdf
Tender Documents • 1.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .