Tender Value
₹99.8 L
EMD Value
₹1.7 L
Closing Date
28 Oct 2025, 10:30 pmClosed
Karnataka Neeravari Nigam Limited
Consultancy services for Preparation of Detailed Project Report as per the CWC Guidelines for Flood control and Flood Management of Bennihalla up to confluence of Malaprabha River and Liaisoning with various directorates of CWC for approval of Detailed Project Report
KNNL/2025-26/SE0287
KNNL/2025-26/SE0287
Open
Two Tender Document System(Two Cover)
KNNL Division MRBC Div No 4 Navalgund
₹2,500
₹1.7 L
13 Oct 2025
13 Oct 2025
30 Oct 2025
24 Oct 2025
Collection of all necessary data such as, relevant topo sheets of the area, details of Bennihalla, reports and other details , etc complete as directed by EngineerinCharge.
Detailed study of the Socio economic impact and capacity building of habitation due to implementation of the project in the Bennihalla Basin , complete as per directions & guidelines of CWC and as directed by Engineer-in-Charge.
Calculation of Benefit Cost Ratio of the Project as per the CWC Guidelines for Preparation of DPR for Flood management works
Preparation of Detailed Project Report as per the CWC Guidelines for Preparation of DPR for Flood management works Chapter wise 1.Foreward, 2.Salient Features,3. Executive Summary,4.Prioritizition of the Schemes,5. Hydrology,6.Design of works.7.Abstract of Cost,8.Benefir Cost Ratio,9.Constrcution Plan and as directed by Engineer-in-Charge
Detailed Study of the Hydrology of the Bennihalla Basin ,Design Flood Computations, Flood Frequency analysis as per CWC handbook Flood Protection, Anti erosion and River Training Works -2012 complete as per directions & guidelines of CWC and as directed by Engineer-in-Charge
Preparation of required no. sets of hard copies in bound volumes and submitting to the Central Water Commission for scrutiny at various directorates. Complete as directed by Engineer-in-Charge.
Liaisoning with various Directorates viz., approval of Detailed Project Report Finance Management, Cost Appraisal, Hydrology, Planning etc., for attending technical observations and to obtain approval of each Directorate etc., complete as directed by Engineer-in-Charge.
Preparation of Final DPR based on approval of various Directorates for final investment clearance, etc.complete as directed by Engineer-in-Charge.
Submission of 10 sets of hardcopies and 2 sets of soft copies for record purpose after approval of DPR from CWC.complete as directed by Engineer-in-Charge.
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].