Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC VILL P O PEERPURA ROORKEE DISTT HARIDWAR UTTARAKHAND | ROORKEE | HARIDWAR | UTTARAKHAND | L1 | Accepted-AOC Technically qualified L1 Bidder | |
| 2 | L2₹9.3 L+₹17,900.60 (1.92%)Accepted-AOC 110 3 PAHAN PURA CIVIL LINE ROORKEE 247667 | ROORKEE | HARIDWAR | UTTARAKHAND | 247667 | L2 | Accepted-AOC Technically qualified L1 Bidder | |
| 3 | L3₹10.0 L+₹65,584.40 (7.04%)Rejected-AOC | L3 | Rejected-AOC Technically qualified L3 Bidder |
Tender Value
Refer Docs
Closing Date
15 Mar 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Deputy Registrar
Material Management, IIT Roorkee
Rate Contract for Passive Laying Service With Passive items like Rack, Patch Panel, I/O, Cable etc.
2024_IITR_798243_1
2023240570/MM-4/RC/ICC/563
Open Limited
Miscellaneous Services
Supply
IIT Roorkee
Please refer Enquiry Letter
5 documents required · 5 mandatory
₹0
Exempted
1 Aug 2024
29 Feb 2024
15 Mar 2024
29 Feb 2024
15 Mar 2024
7 Mar 2024
29 Feb 2024 - 5 Mar 2024
Amount
Rate Contract for Passive Laying Service With Passive items like Rack, Patch Panel, I/O, Cable etc.
Digging for laying of OFC cable (trench 1.0 x .4m) including back filling of trench with sand and brick channel.
Hard Digging for laying of OFC cable (trench 1.0 x .4m)
HDP Pipe Installation
Road crossing by boring
Laying of PVC conduit on wall with supply of 25 mm dia PVC pipe ISI medium quantity (concealed)
Road crossing or cutting asphalt concrete conc. Slab or brick and reinstatement of same
Laying of OFC in trench
Laying of OFC indoor on wall
Laying of PVC conduit on wall with supply of 25 mm dia PVC pipe ISI medium quantity (surface)
Laying of PVC flexible on wall
Laying of UTP cable
I/O Installation (with Gangbox & faceplate)
Installation of fiber patch panel
OFC splicing, OFC termination (per core count)
Installation of racks
Installation of patch panel in Rack
Installation of Switch
Installation of CMS
Installation of Access points
In case of shifting of old nodes
I/O Installation (without Gangbox or faceplate)
Laying of UTP cable without PVC conduit
R.N.Technology
rk enterprises
stage.html
html • 0.05 MB
technical_839074.pdf
PDF • 0.12 MB
techsummary_839074.pdf
PDF • 0.35 MB
finance_839074.pdf
PDF • 0.12 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_839074.pdf
PDF • 0.29 MB
AOC2023240570.pdf
PDF • 0.50 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .