Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 38 22 39 PLOT NO C11 SRI TOWER ROAD NO 10 INDUSTRIAL ESTATE INDUSTRIAL ESTATE KANCHARAPALEM VISAKHAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 22 1 48 1 CHENGALARAOPETA BEACH ROAD VISAKHAPATNAM ANDHRA PRADESH 530001 | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
23 Nov 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-Com
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Overhauling of Auxiliary Engine on SCI PAWAN
2021_HSL_88007_1
20/22000/126/2021-22
Open Tender
Miscellaneous Services
Service
20 days
HSL Visakhapatnam
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
Exempted
29 Nov 2021
12 Nov 2021
23 Nov 2021
12 Nov 2021
23 Nov 2021
12 Nov 2021
120 days
Amount
AUX.ENGINE, DETAILS: VOLVO PENTA, MARINE GENSET, TYPE: D9 MG HE. CAPACITY : 250KW (E20017.1 TO E20017.3)
Routines / Overhauling are to be carried out on Aux. Engine as per Scope of Work. Satisfactory trials to be offered to ship staff, Class Surveyor & HSL post completion of routines. Defects if any observed by Ship staff to be liquidated and trials to be reoffered. And Finally, Satisfactory trials to be shown to ship staff, Class & HSL.
ENGINE TO BE DECOUPLED FROM ALTERNATOR TO GET ACESS FOR MAJOR OVERHAULING OF THE ENGINE. AS ENGINE ARE DIRECTLY COUPLED WITH ALTERNATOR AND THERE WAS NO FOUNDATION BOLT IN ENGINE DRIVE END. HENCE TWO FOUNDATION ( L TYPE ANGLE) TO BE MADE AND FIXED BEFORE DECOUPLED THE ALTERNATOR. ALTERNATOR CABLE TO BE DISCOUNECTED AFTER PROPER MARKING. ALTERNATOR TO BE SHIFTED FROM POSITION .
AUX ENGINE NO 1 MAJOR OVERHAULING JOBS TO BE CARRIED UNDER SUPERVISION OF OEM / OEM AUTHORIZED SERVICE ENGINEER. SATISFACTORY RUNNING TRIAL TO BE GIVEN ON COMPLETETION OF OVERHAULING ENGINES. THE SPARE PARTS WILL BE SUPPLIED FROM SHIP'S STOCK. AUX ENGINE NO 1 MAJOR OVERHAULING JOBS TO BE CARRIED UNDER SUPERVISION OF OEM / OEM AUTHORIZED SERVICE ENGINEER. SATISFACTORY RUNNING TRIAL TO BE GIVEN ON COMPLETETION OF OVERHAULING ENGINES. THE SPARE PARTS WILL BE SUPPLIED FROM SHIP'S STOCK. MAJOR OVERHAULING OF AUX ENGINES AS FOLLOWS: 1. REMOVE ALL ENGINE POWER ASSEMBLIES. 2. REMOVE EXHAUST MANIFOLDS AND REPLACE EXHAUST MANIFOLD GASKETS. 3. COMPLETELY DISASSEMBLING AND CLEANING OF ENGINE. 4. CLEAN AND INSPECT CONNECTING RODS FOR LENGTH & TWIST. 5. REBUILD CYLINDER HEADS WITH NEW VALVES, VALVE GUIDES, VALVE SPRINGS, VALVE RETAINERS AND OTHER INSTALLING PARTS INCLUDING PRESSURE TESTING OF CYLINDER HEAD. 6. INSTALL NEW LOWER MAIN BEARINGS AND MAIN BEARING THRUST COLLARS. 7. INSPECT AND QUALIFY THE PISTON COOLING TUBES (P-PIPES); REPLACE AS REQUIRED. 8. INSTALL NEW LINER SEALS AND HEAD GASKETS. 9. INSTALL NEW LOWER LINER INSERTS. 10. RECORD THE OLD AND THE NEW HEAD, LINER, AND ROD SERIAL NUMBERS BY LOCATION. INSPECT CAMS AND REPLACE AS REQUIRED, INSPECT CAM FOLLOWERS, VALVE BRIDGES, ROCKER ARMS, ROCKER ARM BUSHINGS, AND ROCKER PINS. 11. REPLACE CAMSHAFT BEARINGS WITH NEW. 12. REPLACE FUEL INJECTOR AND RECORD SERIAL NUMBERS BY LOCATION. 13. REPLACE WORM PARTS AND REPLACE AS REQUIRED. 14. ASSEMBLE ENGINE USING ALL NEW GASKETS, SEALS, O-RINGS, BUSHINGS AND MISCELLANEOUS HARDWARE. 15. ASSEMBLE USING OEM RECOMMENDED TORQUE SPECIFICATIONS, CLEARANCES AND GEAR LASH. PROVIDE ASSEMBLY RECORD SHEETS. 16. INSPECT AND QUALIFY ALL ELECTRICAL AND ELECTRONIC COMPONENTS AND WIRING ON THE ENGINE THAT HAVE BEEN HANDLED OR MOVED DURING THE OVERHAULING AND REPLACE WITH NEW AS NECESSARY. 17. REPLACE ALL LUBE OIL FILTERS. 18. REPLACE ENGINE AIR FILTERS. 19. REPLACE ALL FUEL FILTERS. PERFORM A COOLANT LEAK TEST, IN ACCORDANCE WITH THE OEM REQUIREMENTS, INCLUDING PRESSURE LEVEL. LOAD TEST 1. PRESSURE TEST AND INSPECT THE FUEL SYSTEM FOR LEAKS. 2. PERFORM PRE-LUBRICATION OF THE ENGINE, INSPECTING FOR PROPER OIL FLOW AT ALL BEARINGS AND ROCKERS. 3. OPERATE THE ENGINE DURING A “BREAK-IN” PERIOD, AS SPECIFIED BY THE OEM. 4. PERFORM A COOLANT LEAK TEST, IN ACCORDANCE WITH THE OEM REQUIREMENTS, INCLUDING PRESSURE LEVEL. 5. PRESSURE TEST AND INSPECT THE FUEL SYSTEM FOR LEAKS. 6. PERFORM PRE-LUBRICATION OF THE ENGINE, INSPECTING FOR PROPER OIL FLOW AT ALL BEARINGS AND ROCKERS. 7. OPERATE THE ENGINE DURING A “BREAK-IN” PERIOD, AS SPECIFIED BY THE OEM.
SRI SRINIVASA ENGINEERING WORKS
Asha Engineering Works
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .