Loading…
Loading…
Tender ID
Tender Value
Refer Docs
Closing Date
17 Feb 2026, 11:00 amClosed
M(SRC-OS)
HSL
CALIBRATION OF PRESSURE TRANSMITTERS AND GAUGES OF VARIOUS SYSTEMS ON INS PROJECT -22050
2026_HSL_98938_1
SR COMPLEX/PRODUCTION/OUT SOURCE REQUISITION/2025/818
Open Tender
Miscellaneous Services
Service
60 days
VISAKHAPATNAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
13 Feb 2026
7 Feb 2026
17 Feb 2026
7 Feb 2026
17 Feb 2026
7 Feb 2026
DEEP SEA SEALS: Calibrate pressure gauges. (Qty - 02, Range - 0 to 10 Bar). Renew defective gauges. Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
SCREW AND GEAR PUMPS: Calibrate all instrumentation, which includes pressure transmitters (Range 0-10 Bar, 0-3 Bar), Temperature Transmitters (0-100 deg C), pressure switches (set pressure 01 Bar). Renew defective instrumentation. Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
MAIN ENGINE STARTING AIR BOTTLES: Check for correct functioning of system gauges, Calibrate all. Pressure Gauge - 0-40 Bar, Qty 04. Renew defective gauges. Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
MAIN ENGINE STARTING AIR BOTTLES: Carryout functional checks of all instrumentation and sensors. Undertake calibration/ repairs.Renew defective instrumentation and sensors. Instrumentation includes pressure transmitters of range 0-40 Bar (Qty 04), pressure gauges of range 0-40 Bar (Qty 04). Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
SHIP LUB OIL SYSTEM: Calibrate all instrumentation in the system. Renew defective instrumentations. Instrumentation includes Pressure Transmitters (Range 0-10 Bar, Qty: 15). Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
CENTRIFUGAL PUMPS: Calibrate all instrumentation. Defective instruments to be renewed. Instrumentation includes Pressure Transmitters (Range -1 to 5 Bar, Range 0-15 Bar), Pressure Gauges (Range -1 to 5 Bar , Range 0-15 Bar). Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
AC CHILLED WATER SYSTEM: Check operation of thermostats in the chilled water line and calibrate. Defective thermostats to be repaired/ replaced. Qty - 5 each. Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
AC CHILLED WATER SYSTEM: Refit all pressure gauges cocks. Survey associated pressure gauges pipes. Defective cocks and damaged pipe lines to be renewed. Pressure Gauge Cocks Qty - 12, size - 1/4". Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
FRESH WATER PUMP FOR SPRINKLING SYSTEM: Carryout functional checks of all instrumentation, alarms and sensors. Renew/ Repair defective instrumentation. Instrumentation includes Flow Switch (Qty 21), NO/NC Sensors (Qty 21). Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
SHIP FUEL SYSTEM: Check and calibrate fuel flow meters. Renew/ repair defective fuel flow meters. Make - Rockwin, Qty 02, Range 0-300 m3/hr. Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
SHIP FUEL SYSTEM: Check and calibrate all instrumentation in the system. Renew/ Repair defective instrumentations. Pressure Gauges (0-20 Bar, Qty 10). Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
FRESH WATER HYDROPHORE: Calibrate automatic cut-in and cut-out mechanism of hydrophore tanks. Defective Pressure switch to be replaced. Cut-in Pressure - 4 Bar Cut-out Pressure - 5 Bar Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
FRESH WATER HYDROPHORE: Carryout functional checks of all instrumentation and sensors. Undertake calibration/ repairs. Defective instrumentations and sensors to be replaced. Instrumentation includes Pressure Transmitter (Range 0-10 Bar, Qty 06), Pressure Gauge (Range 0-10 Bar, Qty 06). Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
LADDER SPRINKLING SYSTEM: Calibrate system pressure gauges. Defective gauges to be replaced. Qty - 10 nos, Range 0-15 Bar. Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
BILGE EDUCTOR SYSTEM: Carryout functional checks and calibration of all instrumentation and sensors. Replace defective ones. Instrumentation includes Pressure Gauges (Range 0-15 Bar, Qty 04, Range -1 to 10 Bar, Qty 04), Pressure Switch (Qty 02), Pressure Transmitter (Qty 02). Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
AVCAT SYSTEM: Carryout functional checks of all instrumentation and sensors. Undertake calibration/ repairs. Replace defective instrumentations. Instrumentation includes dry run protection sensor, Pressure Transmitters (Range 0-15 Bar, Qty 03 each), Temperature Sensors (0-100 Deg C, Qty 02 each), Pressure Relief Valves (Set Pressure 11.5 Bar, Qty 01 each). Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
DIESEL GENERATOR AIR INDUCTION & EXHAUST SYSTEM: Calibrate the thermo couples and temperature indicators. Sensor Range : 0 to 700 Deg C,(Two Qty for Each DA, Total - 02x03 = 06 Qty). Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
DA STARTING AIR BOTTLE: Carryout calibration/functional checks of all instrumentation and sensors. Undertake calibration/ repairs, if required (a) Pressure Gauge; Working Range : 0-70 bar; Qty - 03 (b) Pressure Sensor; Working Range: 0-400 bar; Qty - 03 (c) Air Starter Solenoid valve; rating: 24 VDC; Qty- 03 Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
HP AIR SYSTEM: Carryout functional checks of all instrumentation and sensors. Undertake calibration/ repairs, if required. (a) Pressure Sensor; Range: 0- 400 bar; Qty - 04 (b) Pressure Sensor; Range: 0- 25 bar; Qty - 01 (c) Prerssure Gauge; Range: 0-500 bar; Qty - 06 (d) Prerssure Gauge; Range: 0-70 bar; Qty - 03 (e) Prerssure Gauge; Range: 0-14 bar; Qty - 01 Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
SERVICE AIR RECEIVER: Carryout calibration/functional checks of all instrumentation and sensors. Undertake calibration/ repairs, if required (a) Pressure Gauge; Working Range : 0-14 bar; Qty - 01 (b) Pressure Sensor; Working Range: 0-25 bar; Qty - 01 Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
DD Firemain Engine: Replace battery 01no Battery 12V 180AH . New Battery to be Supplied by vendor and satisfactory trials to be shown to ship staff. NOTE: All spares required to be supplied by vendor.
DIESEL DRIVEN FIRE PUMP: Calibrate all instrumentation. (Replace if BER) (a) Discharge Pressure Gauge ; Working Range: (0 to 16 Kg/cm2); Qty - 01 (b) Suction Pressure Gauge; Working Range: (-1 to 4 kg/cm2 ); Qty - 01 Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
FUEL CENTRIFUGE SYSTEM: Undertake calibration of defective instrumentation. (a) Flow sensor; Qty 02 (b) Feed pump discharge relief valve; Set point - 3.5 bar,Qty :02 (c ) Pressure Gauge; Working Range: 0-7 Bar ; Qty: 02 (d) Pressure Gauge; Working Ranget : 0-4 Bar ; Qty : 02 (e) Pressure Gauge; Working Range : 0-10 Bar ; Qty: 02 Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
Beko Dehumidifier: Auto drain valve of instrument air dehumidifier found to be malfunctioning. Suspect Pressure Switch faulty. Renewal of pressure switch and Undertake calibration of timer relay. Make - Beko, Model - DRY POINT DEHUMIDIFIER (DPRA20/AC) Pressure Switch - XE RA 5655NNN160. Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
Ship's Siren: Intermittent failure of ship's siren observed during routine exploitation. Suspect solenoid malfuctioning. Defect Identification and Defect Rectification to be carried out. Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
FRESH WATER HYDROPHORE PUMP: Fresh water pump 2 not cutting in intermittently during exploitation.Suspect pressure switch malfunctioning .Undertake DR/ replacement of pressure switch and calibration. Make- Danfoss, Qty- 02 Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
FRESH WATER HYDROPHORE PUMP 6: Fresh water pump 6 not cutting in intermittently during exploitation.Suspect control panel malfunctioning.Undertake Defect Rectification. Make- Grundfoss, Capacity- 10 TPH. Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
AC CHILLED WATER SYSTEM: Thermometer for chilled water inlet and outlet temperature of 20 in no. ATU/HE not working. Undertake repair/Replacement .Qty- 40. Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
SS & COPPER GAUGE LINES: Gauge lines found detriorated at multiple location of various equipments. Undertake Manufacturing of new gauge lines as per sample. Dia 1/4 inch, 1/2 inch. Mat - as per sample. Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
SHIP FUEL SYSTEM: Undertake calibration of fuel system pressure gauges. Defective gauges to be replaced. Range 0-300 Psi. Satisfactory trials to be offered to Ship Staff. NOTE: All spares required to be supplied by vendor.
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.18 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
TBID_818.pdf
Tender Documents • 0.63 MB
ANNEXURE_A.pdf
Tender Documents • 0.51 MB
BOQ_108509.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .