Executive Engineer HPPWD Division Kotla Behar
Executive Engineer HPPWD Division Kotla Behar
Construction of Balance Work for ITI building at Sansarpur Terrace Tehsil Jaswan Kotla District Kangra (HP). (Sub Head Construction of Building portion, including water supply Sanitary installation and Rain Harvesting Tank, Septic Tank for 200 Users
2026_PWD_145246_5
3751-80 DT 01.10.2026
Open Tender
Civil Works - Roads
Percentage
90 days
Executive Engineer HPPWD Division Kotla Behar
Please refer Tender documents.
15 documents required · 15 mandatory
₹2,000
₹1.6 L
8 Oct 2026
8 Oct 2026
14 Oct 2026
8 Oct 2026
13 Oct 2026
8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation trenches etectra in earth work in all kinds of classification of soil such as pick work, jumper work, pick jumper work, blasting work, soft and hard blasting and doing work in saturated soil, including chiseling or wedging out rock where blasting is prohibited, or any other mixed variety of soil including shoring, strutting, de-watering and pumping or bailing out water (surface and sub soil water) upto any depth or any quantum of water including slush which may arise during dewatering, removal of slush and stacking the excavated soil clear from the edge of excavation with in all leads, as directed by Engineer-in-Charge and then returning the stacked soil in 15cm (fifteen centimeters) layers when required into plinths, sides of foundations etc. consolidating each deposited layer by ramming watering and then disposing of all surplus excavated earth as directed by Engineer-in-Charge with in all leads and lifts, disposed earth to be levelled and neatly dressed including carriage of materials within all leads and lifts. | 117.08 | Cubic metre | 210 | ₹24,586.8 |
| 2 | Filling in plinth with sand under floors including watering, ramming consolidating and dressing complete as per HPPWD specification or as directed by Engineer-in-Charge, including carriage of materials with in all leads, lifts and other incidental. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 1.63 | Cubic metre | 984 | ₹1,603.92 |
| 3 | Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights. below supporting floor to ceiling and removal of the same for in situ reinforced concrete and plain concrete work in foundation footings, basis of columns etcetera and mass concrete, and as directed by the Engineer-in-Charge including carriage of materials. Within all leads, lifts and other incidentals. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 70.2 | Square metre | 356.85 | ₹25,050.87 |
| 4 | Providing form work with steel plates 3.15mm (Three decimal one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, heights of propping and centering in all heights below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in flat surfaces such as soffits of suspended floors, roofs, landings, shelves, and the like floor, etc. up to any thickness, up to all floor level and as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 72.3 | Square metre | 383.45 | ₹27,723.43 |
| 5 | Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in beams cantilevers, girders and lintels, sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels upto any depth/heights, up to all floor level and as directed by the Engineer-in-Charge including carriage materials of within all leads, lifts and other incidentals.The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 38.56 | Square metre | 372.5 | ₹14,363.6 |
| 6 | Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in Columns, pillars, posts and struts, (square, rectangular/ polygonal in plan), up to all floor level, and as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 15.14 | Square metre | 372.5 | ₹5,639.65 |
| 7 | Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in Circullar and covered in plan up to all floor level, and as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals.The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 93.24 | Square metre | 356.85 | ₹33,272.69 |
| 8 | Providing and laying mechanically mixed and vibrated cement concrete 1:4:8 (one cement isto four sand isto eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) and curing complete, in or under water, including pumping or bailing out water/dewatering, removal of slush which may arise at the time of laying under water complete excluding the cost of form work in foundation and plinth in all depths/heights as per HPPWD specifications and as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 66.82 | Cubic metre | 3,300 | ₹2,20,506 |
| 9 | Providing and laying mechanically mixed and vibrated plain cement concrete work Grade M-20 (Twenty) nominal mix with cement contents not less than 320 kg (three hundred twenty) Killogram per cubic meter and curing complete excluding the cost of form work in foundation and plinth etcetera and the like mass concrete complete as per HPPWD specification and as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals.The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 48.51 | Cubic metre | 5,450 | ₹2,64,379.5 |
| 10 | Providing and laying mechanically mixed and vibrated reinforced concrete work Grade M-20 (Twenty) design mix to obtain the minimum compressive strength of 20 N/mm2 (twenty newton) per square millimeter with cement contents not less than 330 kg (three hundred thirty) Killogram per cubic meter and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in foundation footings, bases of columns etcetera and the like mass concrete complete as per HPPWD specification and as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rates inclusive of octori, royality, Malkhana, toll taxes and any other taxes imposed excluding GST by the Government. | 18.44 | Cubic metre | 5,650 | ₹1,04,186 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
5.pdf
Tender Documents • 2.37 MB
BOQ_216263.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .