Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.2 CrAccepted-AOC 825 GANDHI CHOWK RANIKHET ALMORA | ₹3.2 Cr | L-1 | Accepted-AOC bid accepted |
| 2 | L-2₹3.2 CrRejected-AOC | ₹3.2 Cr | L-2 | Rejected-AOC bid accepted |
| 3 | L-3₹3.2 CrRejected-AOC | ₹3.2 Cr | L-3 | Rejected-AOC bid accepted |
| 4 | L-4₹3.3 CrRejected-AOC | ₹3.3 Cr | L-4 | Rejected-AOC bid accepted |
| 5 | L-5₹3.3 CrRejected-AOC | ₹3.3 Cr | L-5 | Rejected-AOC bid accepted |
Tender Value
₹3.4 Cr
EMD Value
₹6.9 L
Closing Date
30 Sept 2023, 5:00 pmClosed
EE UJS RANIKHET
EE UJS RANIKHET
Rising Main Work and supply of transformer
2023_UKJS_63601_1
2185/E-tender/158 date 15-9-2023
Open Tender
Civil Works - Water Works
180 days
Block Dwarahat
Rising Main Work Under Dwarahat Punargathan Pumping water supply
2 documents required · 2 mandatory
₹4,720
EE UJS RANIKHET
₹6.9 L
EE UJS RANIKHET
5 Feb 2024
18 Sept 2023
2 Oct 2023
18 Sept 2023
30 Sept 2023
18 Sept 2023
26 Sept 2023
DWARAHAT PUNARGATHAN (RISING MAIN) PUMPING Water Supply Scheme .Block- Dawrahat, District – Almora
Rising Main
Providing of all materials, Carting from site store to site of work, Lowering into trenches with true to alignment, Laying of MS ERW Pipes grade Yst 210, Jointing by electric welding process with proper grade of eletrodes suitable for jointing of water supply pipe lines (Ador, L&T or equivalent electrodes) by cutting of pipes and making required bends by welding, completion of work with testing of pipe line etc complete. 200 mm dia 7.9 mm Thickness
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 90%pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock Soil mixed with boulder and bajri
Soft rock
Cartage of following pipes, specials, valves and fittings from rail head Kathgodam up to site of work including loading, unloading and stacking complete.
Dismantling of Flexible Pavements by manual meansBituminous Courses
Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202.
Supply & Fixing with installation of NRV Valve (Dia 200mm)
Supply of all materials, labour, T&P etc. and Construction of Anchor Block as per type design complete. (Size 1.0mx1.0mx1.0m.)
Transformer 250KVA including Supply & installation for Pan Pump House
Transformer 100KVA for Berti Pump House
GIRISH BHAGAT
Arvind associates
M/S BUDDHA CONSTRUCTION
SHIV SHARDA ENTERPRISES
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid