Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹13.2 LAccepted-AOC 189 TEACHEARS COLONY THAKUR PLOT TAJBAG NAGPUR 440024 | NAGPUR | MAHARASHTRA | 440024 | L-1 | Accepted-AOC Being L-1 | |
| 2 | L-2₹14.9 L+₹1.7 L (12.5%)Rejected-Finance 04A 1112 1117 4 1115 MOTI TALKIES BUILDING DANAPIT BEGAMPURA SURAT SURAT GUJARAT 395003 | SURAT | GUJARAT | 395003 | L-2 | Rejected-Finance Being L-2 | |
| 3 | L-3₹15.1 L+₹1.9 L (14.0%)Rejected-Finance 146 CP COLONY 7 NO CHOURAHA KALPANA NAGAR MORAR GWALIOR 474006 | GWALIOR | MADHYA PRADESH | 474006 | L-3 | Rejected-Finance Being L-3 | |
| 4 | L-4₹16.6 L+₹3.3 L (25.2%)Rejected-Finance PLOT NO 37 BADANPUR OLD SER NO 34658 NEAR SAI BARAT PALACE PAWAN BHUMI SHAKTI NAGAR JABALPUR MADHYA PRADESH 482001 | JABALPUR | MADHYA PRADESH | 482001 | L-4 | Rejected-Finance Being L-4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Does not meet NIT Criteria. |
Tender Value
₹16.6 L
EMD Value
₹33,166
Closing Date
18 Sept 2020, 6:00 pmClosed
Sr.Manager(E-E)
Sr.Manager (E-E), Airports Authority Of India, Regional Head Quarter, Western region, Operational office building, 5th floor, Parsiwada, Vile Parle (East), Mumbai-400099
As per BOQ
2020_AAI_57075_1
AAI/ENG/WR/SM/BHA/NIT-02/20-21
Open Tender
AMC/ Maintenance Contracts
Item Rate
730 days
Bhavnagar
As per NIT
2 documents required · 2 mandatory
₹1,120
Yes
Airports Authority Of India
₹33,166
Yes
2 Nov 2020
8 Sept 2020
24 Sept 2020
9 Sept 2020
18 Sept 2020
9 Sept 2020
9 Sept 2020 - 16 Sept 2020
Amount
Annual Comprehensive Maintenance of following Air-conditioner i/c providing and fixing all necessary consumable and spares i/c replacing of faulty compressor, carrying out periodical preventive maintenance as per maintenance schedule, attending faults/compliants and maintenaing records/complaint register etc for below mentioned period as per special condition of contract.( For 1st Year)
Split Type, 1.5 TR, Single Phase [ 37 Nos x 12 Months = 444 JOB ]
Split Type, 2.0 TR, Single Phase [ 19 Nos x 12 Months = 228 JOB ]
Cassette Type, 3 TR, Three phase [ 3 Nos x 12 Months = 36 JOB ]
Tower Type, 4.5 TR, Three Phase [ 24 Nos x 12 Months = 288 JOB ]
Annual Comprehensive Maintenance of following Air-conditioner i/c providing and fixing all necessary consumable and spares i/c replacing of faulty compressor, carrying out periodical preventive maintenance as per maintenance schedule, attending faults/compliants and maintenaing records/complaint register etc for below mentioned period as per special condition of contract.( For 2nd Year)
Split Type, 1.5 TR, Single Phase [ 37 Nos x 12 Months = 444 JOB ]
Split Type, 2.0 TR, Single Phase [ 19 Nos x 12 Months = 228 JOB ]
Cassette Type, 3 TR, Three phase [ 3 Nos x 12 Months = 36 JOB ]
Tower Type, 4.5 TR, Three Phase [ 24 Nos x 12 Months = 288 JOB ]
Annual comprehensive maintenance of following Inverter Type Air-conditioner i/c providing and fixing all necessary consumable and spares i/c carrying out periodical preventive maintenance etc. as per maintenance schedule and attending faults/compliants and maintenaing records/complaint register etc for below mentioned period as per special condition of contract. (Compressor Under Warranty)( For 1st Year)
Split Type, 1.5 TR, Single phase [ 10 Nos x 12 Months = 120 JOB ]
Annual comprehensive maintenance of following Inverter Type Air-conditioner i/c providing and fixing all necessary consumable and spares i/c carrying out periodical preventive maintenance etc. as per maintenance schedule and attending faults/compliants and maintenaing records/complaint register etc for below mentioned period as per special condition of contract. (Compressor Under Warranty)( For 2nd Year)
Split Type, 1.5 TR, Single phase [ 10 Nos x 12 Months = 120 JOB ]
Annual comprehensive maintenance of water cooler of capacity 40/80 Ltr/Hr i/c providing and fixing all necessary consumable and spares i/c replacing of faulty compressor as and when required, carrying out servicing, cleaning of Water Tank, fault finding, rectification, gas charging etc. as per maintenance schedule and attending faults/compliants and maintenaing records/complaint register etc for below mentioned period as per special condition of contract.(For 1st Year)
10 Nos x 12 Month = 120 JOB
Annual comprehensive maintenance of water cooler of capacity 40/80 Ltr/Hr i/c providing and fixing all necessary consumable and spares i/c replacing of faulty compressor as and when required, carrying out servicing, cleaning of Water Tank, fault finding, rectification, gas charging etc. as per maintenance schedule and attending faults/compliants and maintenaing records/complaint register etc for below mentioned period as per special condition of contract.(For 2nd Year)
10 Nos x 12 Month = 120 JOB
Annual Comprehensive Maintenance of RO Water purifier of following capacity i/c providing and fixing all necessary consumable items and all spare parts i/c membrane, Filter etc. as per OEM recommendations maintenance schedule for below mentioned period as per special condition of contract.(For 1st Year)
25 LPH [ 4 Nos x 12 Month = 48 JOB ]
50 LPH [ 6 Nos x 12 Month = 72 JOB ]
Annual Comprehensive Maintenance of RO Water purifier of following capacity i/c providing and fixing all necessary consumable items and all spare parts i/c membrane, Filter etc. as per OEM recommendations maintenance schedule for below mentioned period as per special condition of contract.(For 2nd Year)
25 LPH [ 4 Nos x 12 Month = 48 JOB ]
50 LPH [ 6 Nos x 12 Month = 72 JOB ]
Dismantling of following Capacity Split type Air Conditioner from different locations in Airport etc. as required. (Job includes dismantling the indoor, outdoor unit, piping etc. safely and handed over to Site-In-Charge) [ Vehicle will be provided by AAI for Transporting the units up to Store ]
1.5 - 2.0 TR, Single Phase
3.0 - 4.5 TR, Three Phase
Installation of following Capacity Split type Air Conditioner in different locations of Airport etc. as required. (Job includes Installating the indoor, outdoor unit, copper piping maximum up to 15 feet, gas topup etc.) [ Vehicle will be provided by AAI for Transporting the units upto installing location ]
1.5 - 2.0 TR, Single Phase
3.0 - 4.5 TR Three Phase
Testing of Water for its potability from Govt. Lab/NABL accredited Laboratory of 03 Samples ones in a year and submit the test report etc. as required.
VIKAS ENGINEERING CO
Manish Electricals
Zamzam Refrigeration and airconditioning
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .