Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.7 CrAccepted-AOC | ₹13.7 Cr | 1 | Accepted-AOC L1 bidder, performance guarantee sumitted. |
| 2 | 2₹17.5 CrRejected-Finance | ₹17.5 Cr | 2 | Rejected-Finance Higher qouted amount |
Tender Value
₹15.2 Cr
EMD Value
₹10.8 L
Closing Date
9 Aug 2023, 6:00 pmClosed
425(I) FD COY BHUJ
425(I) FD COY BHUJ
CONSTRUCTION OF BERTHING FACILITY AT LAKKI NALLAH KUTCH-BHUJ
2023_ARMY_608843_1
1370/GEN/OP WKS
Open Tender
Civil Works
180 days
LAKKI NALLAH KUTCH BHUJ
REFER TENDER
6 documents required · 6 mandatory
₹3,000
425(I)FD COY
₹10.8 L
Yes
6 Sept 2023
14 Jul 2023
10 Aug 2023
14 Jul 2023
9 Aug 2023
4 Aug 2023
15 Jul 2023 - 3 Aug 2023
Amount
Note: (i) Please refer schedule 'A' notes before quoting the tender.
SCHEDULE 'A' PART-I
Lump sum price to be workout by the contractor for removal/ disposal of Earth work comprising Creek Bed Material from two water channels and areas of two slipways. The disposal is to be done upto 300m and the technical details are specified in technically vetted design, GAD and as listed in Schedule 'A' Part-I(As per design)
Lump sum price worked out by the Contractor for Earthwork Excavation including dressing and pruning down of the entire length of earthen Embankment and disposal of this earthwork as per the site condition upto the distance of 300m. as per specfications in technically vetted design, GAD and as listed in Schedule 'A' Part-II (As per design)
Lumpsum price worked out for M & L by the contractor for Construction of an Embankment involving Hybrid Stone Pitched Wall with foundation using geo textile material such as geo cells, geo grid materials as per technically vetted design, GAD and as listed in Schedule 'A' Part-III (As per design)
Lumpsum price worked out for M & L by the contractor for Construction and fixing of Carriage ways of Embankments involving Spreading, Levelling, Compaction of existing sub base and fix required murram as per technical specifications and as indicated in Schedule 'A' Part-IV (As per design)
Lumpsum price worked out for M & L by the contractor for Construction of an Installed Toe Wall and rivet mattress (Part-V) as listed in Schedule 'A' Part-V (As per design)
Lumpsum price worked out for M & L by the contractor for Provision of an External Electrification and related amenities as listed in Schedule 'A' Part-VI (As per design)
Lumpsum price to be worked out by contractor for M&L for construction of two Slipways (02 Nos) and related additional works involving spreading of earthwork, compaction, preparation of reinforcement and execution of work during the construction of the two Slipways, Pavement and other Construction activity indicated in the technical design,GAD and as listed in Schedule 'A' Part - VII (As per design)
Sterling Infrastructure Company
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid