Loading…
Loading…
Tender Value
₹1.8 Cr
EMD Value
₹2.4 L
Closing Date
10 Mar 2026, 3:00 pmClosed
Vijayawada Division - Provision of Auxiliary Transformers (25KVA) in Krishna Canal Junction(KCC) - Tsunduru (TSR) ABS works.
B-E29-TRD-TNDR-42-2025-26~SCR
B-E29-TRD-TNDR-42-2025-26
Open
Works - General
12 Months
Krishna, Andhra Pradesh
₹0
₹2.4 L
10 Mar 2026
9 Feb 2026
24 Feb 2026
A2-FOUNADATION ITEMS (incl. Supply & Erection) 1615250.00 Below/P
Item Breakup - A1-(OHE & PSI Items)
ERECTION/LABOUR Total 23380.00 Item- 2 3(a) Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 86625.00 Item- 3 3(b) Erection of TTCs, Portals and Small Parts Steel (SPS). S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 305340.00 Item- 4 11 (a) (ii)Supply (without Insulator) and Erection of 25 kV Solid Core Suspension Insulator. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 100640.00 Item- 5 11(b)Supply (without Insulator) and Erection of 25 kV Post Insulator S No. Item Description of Item Unit Qty Rate Amount No VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 11860.00 15(a) Supply and Erection of 50 sq.mm Copper Jumper (C-Jumper, F-Jumper, Anti-Theft Jumper) Item- 6 (excluding copper jumper supply). S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR Total 38920.00 Item- 7 16(a) Supply and Erection of Structure Bond S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 113700.00 Item- 8 16(aa)Drilling of Holes on Rails S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 21400.00 Item- 9 17(a)Supply and Erection of Single Earth Electrode at COP/FOB/PTFE/Steel Girder etc. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 340060.00 Item- 10 17(b) Supply and Erection of Earth Bus. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 289300.00 Item- 11 17( c)Supply and Erection of Single Earth Electrode TSS/SP/SSP/AT S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 211645.00 Item- 12 17(d)Supply and Erection of Copper Strips (25 mm x 3 mm) for Equipment Earthing S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 522000.00 Item- 13 17(g)Supply and Erection of Earth leads 50 mm x 6 mm mild steel laid in the ground. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 52000.00 Item- 14 17(h) Supply and Erection of Earth leads 50 mm x 6 mm mild steel laid exposed. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 149400.00 Item- 15 27(a)Erection of 25 kV/240 V, 5/10/25/50 KVA Auxiliary Transformer. VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 253190.00 28 Supply (without Insulators) and Erection of 25 kV Drop Out Fuse switch for all oil type Auxiliary Item- 16 Transformer of all capacities. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 377370.00 Item- 17 30(b)(ii)Supply and Erection of Anti-climbing device for Auxiliary Transformer. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 76230.00 Item- 18 31(j)(i) Dismantling of Suspension Insulator S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 17290.00 Item- 19 31(m)Releasing of Pole mounted LT supply transformer. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 126595.00 Item- 20 31 (t)(iv)Dismantling of all types of Copper Jumpers S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 4900.00 32/3 (a) Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations Item- 21 under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 85932.00 Item- 22 32/ 3(b) Erection of TTCs, Portals and Small Parts Steel (SPS) under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 141983.10 32/15(a) Erection of 50 sq.mm Copper Jumper (C-Jumper, F-Jumper, Anti-Theft Jumper) (excluding Item- 23 copper jumper supply) under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 12460.00 Item- 24 32/31(j)(i) Dismantling of Suspension Insulator under power block S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 17290.00 Item- 25 32/31(m)Releasing of Pole mounted LT supply transformer under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 126595.00 VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Item- 26 32/31 (t)(iv)Dismantling of all types of Copper Jumpers under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 4900.00 41(h)Supply and Erection of Vitreous Enameled 25 kV Danger Board with skull & bones for Overline Item- 27 Structure (OLS) and Auxiliary Transformer. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR Total 18585.00
Item Breakup - A2-FOUNADATION ITEMS (incl. Supply & Erection)
MATERIAL/ERECTION Total 1615250.00
Item Breakup - B1-STEEL SUPPLY
SUPPLY /MATERIAL Total 3304350.00 3(cs)Supply of Fabricated and Galvanized Small Parts Steel (SPS) other than Masts, TTCs and Item- 30 Portals. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL Total 2945120.00
Item Breakup - B2-COPPER SUPPLY
SUPPLY /MATERIAL Total 405000.00 Item- 32 15(as)Supply of 50 sq.mm Annealed Stranded Copper Jumper Wire S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL Total 504400.00
Item Breakup - B3-INSULATOR SUPPLY
SUPPLY /MATERIAL Total 165800.00 Item- 34 11(bx)Supply of Post Insulator for Item no. 11(b). S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL Total 55580.00 Item- 35 28(x)Supply of Post Insulators for Item No. 28 S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL Total 389060.00 VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
Item Breakup - B4-GENERAL SUPPLY
SUPPLY /MATERIAL Total 4635925.00 Item- 37 28(s)Supply of 25 kV Operating Rod For Drop Out Fuse Switch. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL Total 145635.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].