Tender Value
₹1.5 Cr
EMD Value
₹2.3 L
Closing Date
27 Feb 2026, 3:00 pmClosed
TDD: Electrification of proposed new lines in connection with "Proposal for converting goods shed siding as running line with CSR of 720m at Tadepalligudem(TDD) station".
B-E29-TRD-TNDR-40-2025-26~SCR
B-E29-TRD-TNDR-40-2025-26
Open
Works - General
12 Months
West Godavari, Andhra Pradesh
₹0
₹2.3 L
27 Feb 2026
29 Jan 2026
13 Feb 2026
A2-FOUNADATION ITEMS (incl. Supply & Erection) 2425580.00 Below/P
Item Breakup - A1-(OHE & PSI Items)
Per Track ERECTION/ LABOUR KM VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Total 40132.00 Item- 2 1(d) Supply and Installation of Traction Working Rule Diagram Boards. S No. Item Description of Item Unit Qty Rate Amount No
Square ERECTION/LABOUR Foot Total 45756.00 Item- 3 3(a) Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 97020.00 Item- 4 3(b) Erection of TTCs, Portals and Small Parts Steel (SPS). S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 213738.00 Item- 5 3(e) Supply and Erection of Guy Rod Assembly S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 104510.00 Item- 6 4(a)(i)Supply (without Insulators) and Erection of Single Cantilever Assembly for Conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR Total 923580.00 Item- 7 4(a)(ii) Erection of Two Cantilever Assemblies on same structure or support for Conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 32380.00 Item- 8 4(b)(i)Supply (without Insulator) and erection of a pull off arrangement for Conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR Total 114780.00 Item- 9 6(a) Supply and Erection of Regulated Conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No
Per Track SUPPLY/MATERIAL KM
Per Track ERECTION/LABOUR KM Total 159792.60 Item- 10 7(c) Erection of Large Span Wire (130 Sq. mm). S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 16560.00 8(a)(v)Supply and Erection of Regulating Equipment With Counter-Weight assembly for Item- 11 Conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Total 596664.00 8(a)(xii) Marking/Painting of temperature and 'Y' - Measurement on OHE Structures at BWA Item- 12 locations. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 1480.00 Item- 13 8(b)(ii) Supply (without Insulator) and Erection of Materials for Termination of Conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR Total 74568.00 9(a) Supply (without Insulators) and Erection of Anti-creep with galvanized steel wire for Item- 14 Conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR Total 76116.00 10(a) Extra on item 6(a) or 6(c) for Supply and Erection of additional fittings required at a turnout, Item- 15 cross-over or over-lap S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 13966.00 Item- 16 11(a)(i) Supply (without Insulator) and Erection of 25 kV Solid Core Cut-in Insulator. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 30840.00 Item- 17 11 (a) (ii)Supply (without Insulator) and Erection of 25 kV Solid Core Suspension Insulator. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 15096.00 Item- 18 11(b)Supply (without Insulator) and Erection of 25 kV Post Insulator S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 7116.00 12(a) Supply(without Insulators) and Erection of 25 kV Section Insulator Assembly for Conventional Item- 19 OHE. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR Total 220188.00 13 (a)Supply (without Insulators) and Erection of 25 kV Single Pole Isolator without earth contact Item- 20 assembly S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 172076.00 VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Item- 21 13(c) Supply and Erection of Earth Contact Assembly for an Isolator. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR Total 27538.00 Item- 22 13(d) Supply and Erection of an Interlocking device. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR Total 19616.00 15(a) Supply and Erection of 50 sq.mm Copper Jumper (C-Jumper, F-Jumper, Anti-Theft Jumper) Item- 23 (excluding copper jumper supply). S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR Total 11120.00 15(b) Supply and Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper) Item- 24 (excluding copper jumper supply) S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 28060.00 Item- 25 16(a) Supply and Erection of Structure Bond S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 68220.00 Item- 26 16(aa)Drilling of Holes on Rails S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 14980.00 Item- 27 16(b)Supply and Erection of Longitudinal Bond S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 17560.00 Item- 28 16(c) Supply and Erection of Transverse & Special Bond S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 25540.00 Item- 29 17(a)Supply and Erection of Single Earth Electrode at COP/FOB/PTFE/Steel Girder etc. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 9716.00 Item- 30 17(b) Supply and Erection of Earth Bus. S No. Item Description of Item Unit Qty Rate Amount No VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 5260.00 Item- 31 26(a)(ii) Supply and Erection of 18 mm Copper Bus Bar. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL
ERECTION/ LABOUR Total 57504.00 31(a) Transfer of Overhead Equipment from one Mast or Support to another, including removal of Item- 32 Cantilever Assembly from old Mast or Support. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 18700.00 Item- 33 31(b) Provision of additional bracket assembly/assemblies on a mast or support. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 18528.00 Item- 34 31(d) Dismantling of Along Feeder Wire (Aluminium or Copper) S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 6028.00 Item- 35 31(e) Splicing and Extension of Anchored OHE. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 7674.00 Item- 36 31(f) Dismantling of Section Insulator. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 10488.00 Item- 37 31(h) Dismantling of an Isolator. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 5340.00 Item- 38 31(k)(i) Dismantlement of OHE Mast or structure by cutting S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 30620.00 Item- 39 31 l(i)Retrieval of Traction Masts, Main Masts of Switching Station, TTC Uprights etc S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 115200.00 Item- 40 31(n) Dismantling of Guy Rod. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 4192.00 Item- 41 31(p) Dismantling of Drop Arms/Booms/ Temporary Masts. S No. Item Description of Item Unit Qty Rate Amount No VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
ERECTION/LABOUR Total 16077.00 Item- 42 31 (r) Dismantling of Cantilever Assembly including Insulators S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 9600.00 Item- 43 31(s) Dismantling of Fabricated Steel or Small Parts Steel (SPS) S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 354.50 31(t)(i) Dismantling of a Regulating Equipment (Three-pulley type) with counter weight assembly Item- 44 for Conventional OHE. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 10168.00 Item- 45 31(t)(iv) Dismantling of all types of Copper Jumpers S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 1400.00 Item- 46 31(t)(v) Dismantling of Termination for Conventional type Overhead Equipment S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 3090.00 32/3 (a) Erection of Traction Masts, Feeder Masts, AT Mast and Main Masts of Switching Stations Item- 47 under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 97020.00 Item- 48 32/ 3(b) Erection of TTCs, Portals and Small Parts Steel (SPS) under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 213738.00 Item- 49 32/3(e) Erection of Guy Rod Assembly under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 11200.00 Item- 50 32/4(a)(i) Erection of Single Cantilever Assembly for Conventional OHE under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 75600.00 Item- 51 32/6(a) Erection of Regulated Conventional OHE under power block. S No. Item Description of Item Unit Qty Rate Amount No
Per Track ERECTION/ LABOUR KM Total 106396.40 Item- 52 32/7(c)Erection of Large Span Wire (130 Sq. mm) under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY Total 16560.00 32/8(a)(v) Erection of Regulating Equipment With Counter-Weight assembly for Conventional OHE Item- 53 under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 32000.00 Item- 54 32/11(b)Erection of 25 kV Post Insulator under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 2016.00 Item- 55 32/12(a) Erection of 25 kV Section Insulator Assembly for Conventional OHE under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 12468.00 32/15(a) Erection of 50 sq.mm Copper Jumper (C-Jumper, F-Jumper, Anti-Theft Jumper) (excluding Item- 56 copper jumper supply) under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 3560.00 32/15(b)Erection of 160 or 105 sq.mm Copper Jumper (Isolator Jumper, G-Jumper) (excluding Item- 57 copper jumper supply) under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 6800.00 Item- 58 32/26(a)(ii) Erection of 18 mm Copper Bus Bar under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 3504.00 32/31(a) Transfer of Overhead Equipment from one Mast or Support to another, including removal Item- 59 of Cantilever Assembly from old Mast or Support under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 18700.00 32/31(b) Provision of additional bracket assembly/assemblies on a mast or support under power Item- 60 block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 18528.00 Item- 61 32/31 (d) Dismantling of Along Feeder Wire (Aluminium or Copper) under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 3014.00 Item- 62 32/31(e) Splicing and Extension of Anchored OHE under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 7674.00 Item- 63 32/31 (f) Dismantling of Section Insulator under power block. S No. Item Description of Item Unit Qty Rate Amount No VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
ERECTION/ LABOUR Total 10488.00 Item- 64 32/31 (k)(i)Dismantlement of OHE Mast or structure by cutting under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 30620.00 32/31 l(i)Retrieval of Traction Masts, Main Masts of Switching Station, TTC Uprights etc under power Item- 65 block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 115200.00 Item- 66 32/31 (p)Dismantling of Drop Arms/Booms/ Temporary Masts under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 16077.00 Item- 67 32/31 (r) Dismantling of Cantilever Assembly including Insulators under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 9600.00 Item- 68 32/31 (s)Dismantling of Fabricated Steel or Small Parts Steel (SPS) under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 354.50 Item- 69 32/31 (t)(iv)Dismantling of all types of Copper Jumpers under power block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/ LABOUR Total 1400.00 32/ 31(t)(v)Dismantling of Termination for Conventional type Overhead Equipment under power Item- 70 block. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 3090.00 Item- 71 34(j) Providing and Laying Pitching with Stone Boulders. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 199770.00 Item- 72 38 Transportation of OHE structures/Materials/Equipments S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 464000.00 Item- 73 40(b)Supply and Erection of Number Plate (Retro-Reflective Type). S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR Total 47920.00 Item- 74 41(b)Supply and Erection of Enamel type Public Caution board S No. Item Description of Item Unit Qty Rate Amount No VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY
SUPPLY/MATERIAL
ERECTION/LABOUR Total 23450.00 Item- 75 42 Supply and Erection of Shock Treatment Chart S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL
ERECTION/LABOUR Total 9198.00
Item Breakup - A2-FOUNADATION ITEMS (incl. Supply & Erection)
ERECTION/ LABOUR Total 2307500.00 Item- 77 2(i) Breaking of foundation up to 200 mm below track formation and drain / PF surface etc. S No. Item Description of Item Unit Qty Rate Amount No
ERECTION/LABOUR Total 118080.00
Item Breakup - B1-STEEL SUPPLY
SUPPLY /MATERIAL Total 3965220.00 Item- 79 3(bs)Supply of Fabricated and Galvanized structures such as TTCs, Portals, other than masts. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL Total 2165920.00 3(cs)Supply of Fabricated and Galvanized Small Parts Steel (SPS) other than Masts, TTCs and Item- 80 Portals. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL Total 589024.00
Item Breakup - B2-COPPER SUPPLY
SUPPLY /MATERIAL Total 250000.00 Item- 82 7(cs)Supply of 130 sq.mm Cadmium Copper Large Span Wire. S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL Total 280000.00
Item Breakup - B3-INSULATOR SUPPLY
SUPPLY/MATERIAL Total 375300.00 8(bx)Supply of Porcelain 9-ton Insulator for item no. 8(b)(ii)/8(b)(iii)/8(b)(vi)/8(b)(ix)/9(a)/9(b)/ Item- 84 9(c)/9(d)/11(a)(i)/11(a)(ii). VIJAYAWADA DIVISION-ELECTRICAL/SOUTH CENTRAL RLY S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL Total 87045.00 Item- 85 11(bx)Supply of Post Insulator for Item no. 11(b). S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL Total 33348.00 Item- 86 12(ax)Supply of Sectioning and 9-ton Insulators for Item no. 12(a) S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL Total 42872.00 Item- 87 13(ax)Supply of Post and Operating Rod Insulators for Item no. 13(a). S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY /MATERIAL Total 56944.00 Item- 88 13 (bx) Supply of Post and Operating Rod Insulators for Item no. 13(b) S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL Total 56944.00
Item Breakup - B5-OTHER ITEMS - I
SUPPLY/MATERIAL Total 4672.80 Item- 90 Supply of Catenary wire splice Part No. 1091-1094 S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL Total 6112.40 Supply of steel wire Ending clamp (90) (1131,1361 & 1362) with fastners as per RDSO Spec: Item- 91 TI/SPC/OHE/Fittings/0130-10/13-Rev-1 & as per RDSO Drg.No.ETI/OHE/P/1361,1362,1131 latest S No. Item Description of Item Unit Qty Rate Amount No
SUPPLY/MATERIAL Total 4809.68
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ACS7.pdf
ATTACHMENT
ACS8.pdf
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
ACS12022_CE-I_CT_GCC-2022Policy14.07.20223.pdf
ATTACHMENT
ACS2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.2022.pdf
ATTACHMENT
ACS32023_04_26RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_3ACS-3.pdf
ATTACHMENT
ACS4toGCC.pdf
ATTACHMENT
2023_10_20RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_5ACS-53.pdf
ATTACHMENT
ACS9.pdf
ATTACHMENT
2025_03_04RBCE_CE-I-CTIndianRailwaysStandardGeneralConditionsofContractApril-2022AdvanceCorrectionSlipNo_10ACS-10.pdf
ATTACHMENT
ACS6GCC.pdf
ATTACHMENT
MASTERDOCUMENT1-T-4025-26.pdf
ATTACHMENT
MASTERDOCUMENT2T-4025-26_1.pdf
ATTACHMENT
PRICESCHEDULET-4025-26_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].