Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.0 LAccepted-AOC 98 H 2 NARIKELDANGA MAIN ROAD KOLKATA 700 054 | KOLKATA | WEST BENGAL | 700054 | ₹60.0 L | L1 | Accepted-AOC STANDS LOWEST AND AWARDED. |
| 2 | L2₹73.5 LRejected-Finance IA 284 MAZZANINE FLOOR SEC III SALT LAKE CITY KOLKATA 700 092 | KOLKATA | KOLKATA | WEST BENGAL | 700092 | ₹73.5 L | L2 | Rejected-Finance STANDS 2ND LOWEST AND REJECTED |
| 3 | L3₹89.3 LRejected-Finance VILL P O MASHILA P S SANKRAIL DIST HOWRAH PIN 711302 | MASHILA | HOWRAH | WEST BENGAL | 711302 | ₹89.3 L | L3 | Rejected-Finance STANDS 3RD LOWEST AND REJECTED |
| Sl No | Description | Qty | Unit | RAJKUMAR NURSERY L1 | SKYLAND SECURITY ORGANISATION L3 | A J HOUSEKEEPING AND MANAGEMENT SERVICES PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00 | Daily Sweeping, Washing, Cleaning (except Sunday & Holiday) of in side office Rooms, Corridors, Staircase, Stair rooms etc. at all floors of the entire building, collecting litter in bins from G. Floor to 7th Floor daily morning except 1st Floor Enquiry in the afternoon as & when required including providing washing powder, Phenyl, detergent disinfactant and all other required materials which to be supplied by the agency at his own cost.
9890m2 x 23 day x 12 Months = 2729640 m2 | 27,29,640 | Sqm | 1.25 ₹34,12,050 | 1.85 ₹50,49,834 | 1.5 ₹40,94,460 |
| 2.00 | Daily (except Sunday & Holiday) sweeping, cleaning, brooming walls, tables, chairs, glasses, sofa, computer, almirahs, inside glass panels etc. including easing, oiling steel windows, collapsible gates including scraping all member & fitting as to make those easily operable and maintaining of door closer, door stoper, door lock etc. (Cleaning materials as required which is to be supplied by the agency at his own cost).
5650 m2 x 23 days x 12 Months = 155940 m2 | 15,59,400 | Sqm | 1 ₹15,59,400 | 1.55 ₹24,17,070 | 1.3 ₹20,27,220 |
| 3.00 | Daily Cleaning of all Lavatory blocks including attached toilets to the Chamber of higher officers, cleaning of floor walls, W.C. / Commode, basin, urinal, Flushing Cisteran and all necessary including supply of phenyl, washing powder and Deodorant Cake, Odonil twice in a month. Changing naphthalene balls from urinals once in a week as per direction of E.I.C.
688.543 m2 x 23 days x 12 Months =190038 m2 | 1,90,038 | Sqm | 1 ₹1,90,038 | 1.88 ₹3,57,271.44 | 1.3 ₹2,47,049.4 |
| 4.00 | Cleaning Compound Premises and roof of the building of shrubs, jungles dust etc. Including sweeping, brushing with supply of required materials at agencies own cost. Work to be executed at least twice in a week or as and when required as per direction of Engineer-in-charge.
4117.74 m2 x 4 days x 12 Months = 197652 m2 | 1,97,652 | Sqm | 1 ₹1,97,652 | 1.78 ₹3,51,820.56 | 1.3 ₹2,56,947.6 |
| 5.00 | Cleaning & disinfecting U.G. Reservoir & O.H. Tank including masonry reservoir to be executed quarterly in a year with bleaching power, detergent etc. Photographs to be submitted against proof of cleaning works.
3.142 x (11.84 x 11.84)/4 x 2.5 x 3 Times=825.57 m3 | 825.57 | Cum | 7.5 ₹6,191.78 | 11 ₹9,081.27 | 10 ₹8,255.7 |
| 6.00 | Labour charges for maintaining i.e., cleaning, repairing & desilting of Master pit, Master Trap etc. within the compound of premises.
6 Nos. in a year. | 6 | Nos. | 1,500 ₹9,000 | 1,650 ₹9,900 | 1,630 ₹9,780 |
| 7.00 | Cleaning silt of inspection pit and disposal outside thecompound pemises.
87 Nos. x 3 Times = 261 Nos. in a year. | 261 | Nos. | 300 ₹78,300 | 360 ₹93,960 | 350 ₹91,350 |
| 8.00 | Rmoving chokage of H.C.I. or S.W. pipe with split bamboo under ground.
544 m x 3 Times = 1632 RM in a year. | 1,632 | Meter | 11 ₹17,952 | 18 ₹29,376 | 15 ₹24,480 |
| 9.00 | Disposal of out coming water from A.C. Duct from each room of the building where AC exists in Schedule office time and closing of stop cock for urinals at different floors before and after scheduled office time. At least two nos. dedicated manpower to be deployed daily for this purpose. | 12 | Month | 13,000 ₹1,56,000 | 14,400 ₹1,72,800 | 14,300 ₹1,71,600 |
| 10.00 | Engagement of 1 no carpenter for repairing works for 312 days in a year as skilled worker.(Rate of skilled worker should not be less than daily wages as per WB GOVT LABOUR COMMISSIONER current wages release). | 312 | Day | 600 ₹1,87,200 | 700 ₹2,18,400 | 675 ₹2,10,600 |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
5 Mar 2026, 2:00 pmClosed
GENERAL MANAGER (ENGG.)-I, WBHIDCO LTD.
HIDCO BHABAN, 2nd Floor, Premises No. - 35-1111, Biswa Bangla Sarani, 3rd Rotary, New Town, Kolkata-700156
Daily Maintenance (cleaning, washing, sweeping, brooming etc.) of HIDCO BHABAN including guard room and compound premises in Newtown, Kolkata For 1(one)year.
2026_HIDCO_1010539_1
HIDCO/GM(E)-I/NIQ-45/2025-26
Open Tender
Support/Maintenance Service
365 days
NEW TOWN, KOLKATA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹80,000
22 May 2026
19 Feb 2026
9 Mar 2026
19 Feb 2026
5 Mar 2026
21 Feb 2026
Daily Sweeping, Washing, Cleaning (except Sunday & Holiday) of in side office Rooms, Corridors, Staircase, Stair rooms etc. at all floors of the entire building, collecting litter in bins from G. Floor to 7th Floor daily morning except 1st Floor Enquiry in the afternoon as & when required including providing washing powder, Phenyl, detergent disinfactant and all other required materials which to be supplied by the agency at his own cost. 9890m2 x 23 day x 12 Months = 2729640 m2
Daily (except Sunday & Holiday) sweeping, cleaning, brooming walls, tables, chairs, glasses, sofa, computer, almirahs, inside glass panels etc. including easing, oiling steel windows, collapsible gates including scraping all member & fitting as to make those easily operable and maintaining of door closer, door stoper, door lock etc. (Cleaning materials as required which is to be supplied by the agency at his own cost). 5650 m2 x 23 days x 12 Months = 155940 m2
Daily Cleaning of all Lavatory blocks including attached toilets to the Chamber of higher officers, cleaning of floor walls, W.C. / Commode, basin, urinal, Flushing Cisteran and all necessary including supply of phenyl, washing powder and Deodorant Cake, Odonil twice in a month. Changing naphthalene balls from urinals once in a week as per direction of E.I.C. 688.543 m2 x 23 days x 12 Months =190038 m2
Cleaning Compound Premises and roof of the building of shrubs, jungles dust etc. Including sweeping, brushing with supply of required materials at agencies own cost. Work to be executed at least twice in a week or as and when required as per direction of Engineer-in-charge. 4117.74 m2 x 4 days x 12 Months = 197652 m2
Cleaning & disinfecting U.G. Reservoir & O.H. Tank including masonry reservoir to be executed quarterly in a year with bleaching power, detergent etc. Photographs to be submitted against proof of cleaning works. 3.142 x (11.84 x 11.84)/4 x 2.5 x 3 Times=825.57 m3
Labour charges for maintaining i.e., cleaning, repairing & desilting of Master pit, Master Trap etc. within the compound of premises. 6 Nos. in a year.
Cleaning silt of inspection pit and disposal outside thecompound pemises. 87 Nos. x 3 Times = 261 Nos. in a year.
Rmoving chokage of H.C.I. or S.W. pipe with split bamboo under ground. 544 m x 3 Times = 1632 RM in a year.
Disposal of out coming water from A.C. Duct from each room of the building where AC exists in Schedule office time and closing of stop cock for urinals at different floors before and after scheduled office time. At least two nos. dedicated manpower to be deployed daily for this purpose.
Engagement of 1 no carpenter for repairing works for 312 days in a year as skilled worker.(Rate of skilled worker should not be less than daily wages as per WB GOVT LABOUR COMMISSIONER current wages release).
Engagement of 1 no plumber for plumber & repairing works for 312 days in a year as skilled worker.(Rate of skilled worker should not be less than daily wages as per WB GOVT LABOUR COMMISSIONER current wages release). NOTE : 1) THE RATE SHALL BE INCLUSIVE OF GST @ 18%, LABOUR CESS @ 1% AND ALL OTHER TAXES.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_2481225.xls
BOQ • 0.36 MB
2911.pdf
Additional Documents • 0.09 MB
Download all tender documents and submit your bid