Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance SECTOR 40 10TH FLOOR L T SEAWOODS TOWER 1 B WING 46 KONKAN RAIL VIHAR ROAD SEAWOODS THANE MAHARASHTRA 400706 | THANE | MAHARASHTRA | 400706 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
10 Sept 2020, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM
NR ROUTINES ON CPP SYSTEM AND SHAFTING COMPONENTS - IN SHIP
2020_NAVY_373176_1
COM/OFF/MGS/20-21/152
Single
Marine Services
Turn-key
220 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2.1 L
Yes
11 Sept 2020
31 Aug 2020
11 Sept 2020
31 Aug 2020
10 Sept 2020
31 Aug 2020
31 Aug 2020 - 10 Sept 2020
180 days
Propeller Blades.(a) Removal of blades and renewal of seals. 05 blades per shaft. (b) Inspection and in-situ DP on propeller blades for cracks if any. (c) NDT checks on propeller blade bolts. (d) Inspection of blade feet for grooves if any. Metal build up and machining of blade feet for removal of grooves.Blade bolt spanner :- 80+0.85mm socket Blade bolts tightening torque: 8600 Nm Surface finish: 0.8 µm or better. Max rake of shaft: 9 deg Perpendicularity with shaft: 3mm. Resistance not greater than 0.001 Ohms. Pressure in each brush: 50 gm/kW Clearance between silver track and brush holder: 3 mm System pressure (not activated) 20 bar System pressure (activated) 50 bar
Propeller Blade Bolts.(a) Inspection of external bolts on hub, blades etc and locking strip/wire. (b) Check and renewal of OD box feedback unit potentiometers. (c) Renewal of OD Box sealing rings (d) Check CPP safety valves with in-situ pressure setting as required.As per OEM Manual
Bulk Head Glands.(a) Overhauling of bulkhead seals and renewal of diaphragm assembly on both shaft lines.As per OEM Manual
SKF Coupling.Inspection of SKF couplings and repair as requiredAs per OEM Manual
CPP System.) Both CPP hydraulic power packs including valve block and pressure relief/ regulating valves to be dismantled cleaned and overhauled. CPP hydraulic power pack tanks are to be inspected and cleaned. All leakages to be arrested. Power packs to be installed in-situ and both CPP systems to be proved during sea trial to Naval trial agencies. The Tuning and calibration of all CPP system relief, regulating and check valves is firm’s responsibility.As per OEM Manual
Underwater Bearings.(a) Measurement of underwater clearances at ‘A’ bracket, ‘P’ bracket and stern tube. Renew railko bearings if clearances are beyond permissible limits. Machining values are to be provided by firm, Assistance for machining will be provided by the Yard.As per OEM Manual
Deep Sea Seal.Overhauling of both deep sea seals to be undertaken as part of NR routines. Replace following components:- (a) Inflatable Seal (b) Seat Assembly (c) Face Assembly (d) O cords (e) Sealing Strip (f) Bellow Assembly The inflatable seal is required to be hot bonded using special tool and pressure testing to be undertaken post completion.As per OEM Manual
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .