Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance D NO 37 8 1 MANCHUKONDA GARDENS INDUSTRIAL ESTATE VISAKHAPATNAM 530007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | Admitted-Finance |
| 4 | Admitted-Finance 13 THAKKAR PLOT DEEPAK KUNJ PORBANDAR 360575 | PORBANDAR | GUJARAT | 360575 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
19 May 2022, 10:00 amClosed
ASD
Naval Dockyard, Visakhapatnam. 530014
CARRY OUT REMOVAL SHIFTING, LOADING, UNLOADING, CLEANING, OILING AND PAINTING OF GT/ GTG/ RG AUXILIARIES, LUB-OIL COOLERS AND SYSTEM PIPELINES ONBOARD IN SHIP
2022_NAVY_520237_1
COM/OFF/GTR/21-22/140
Open Tender
Marine Services
Turn-key
320 days
Naval Dockyard, Visakhapatnam.
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
Naval Dockyard, Visakhapatnam.
17 Jun 2022
27 Apr 2022
20 May 2022
27 Apr 2022
19 May 2022
9 May 2022
27 Apr 2022 - 19 May 2022
4 May 2022
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .(a)GT lub oil cooler removal and shifting
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .(b) Removal and shifting of GT sea water system pipes to shop floor
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .(c) Shifting and placement of GT SV mounts. 2400kgs
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and placement of Top distance piece with compensator
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and placement of Conical ring with compensator
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and placement of Gas collector casings 9600kgs
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and placement of Gas collectors
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and placement of Exhaust end covers, drum covers and cordon shaft
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and placement of Bottom trays
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and lowering HI casings onboard
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and lowering main cooling pipes onboard
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and lowering intake casings onboard
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and lowering lub oil breather system pipes onboard
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and lowering de- icing system onboard
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and lowering GT lub oil cooler onboard
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and lowering GT lub oil system pipes onboard
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and lowering GT sea water system pipes onboard
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Removal of chain blocks from ship and shifting to the shop floor
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Lifting and shifting of generator air coolers
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting of TC components for assembly
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and placement of chain-blocks for TCs lowering in E/Rs.
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting of TC from shop-floor to jetty followed by lowering in Engine rooms
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and placement of GTG SV mounts
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting, lowering of lub oil, fuel, anti-surge pipe bottom drain pipes
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and lowering of bottom drain pipes and removal of RG to TC covers to shop floor
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and lowering of Generator air Cooler
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Removal of chain blocks and shifting to shop floor
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Removal of RG to generator covers and coupling and shifting to shop-floor
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting of lub oil, fuel and SW system pipes to shop floor
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting of RG components for assembly
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and lowering of RG to generator covers and coupling
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .) Removal and shifting of RG cooler S/W pipeline
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Lifting and shifting of RG coolers to shop-floor
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Removal and shifting of all gears
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Removal and shifting of all bearings
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and fitment of side covers and end covers of RGs
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and placement of RG SV mounts
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and lowering of chain pulley blocks onboard
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and lowering of L/O coolers in E/Rs.
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and Fitment of L/O coolers S/W and L/O lines
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting of auxiliaries in E/R
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting of foundation bolts
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Shifting and fitment of cordon shafts and HI casings
Shifting/Loading/Un-Loading of components inside the ship, from ship to shop floor, inside the shop-floor and shop-floor to ship .Removal and shifting of chain blocks to shop floor
Cleaning/ degreasing/ painting .GT lub oil cooler cleaning and painting 40m2
Cleaning/ degreasing/ painting .GT frames degreasing and painting
Cleaning/ degreasing/ painting .Cleaning of TC components
Cleaning/ degreasing/ painting .Cleaning of compressor blades and stator blades
Cleaning/ degreasing/ painting .Painting of TCs
Cleaning/ degreasing/ painting .Cleaning of RG components
Cleaning/ degreasing/ painting .Painting of RG
Cleaning/ degreasing/ painting .Cleaning and preparation of L/O coolers
Cleaning/ degreasing/ painting .Cleaning of internal components
Cleaning/ degreasing/ painting .Cleaning and preparation of all gears
Cleaning/ degreasing/ painting .Cleaning of RG L/O sump 10m2
SRI PARVATHI ENTERPRISES
KRISHNA ENGINEARING
JAGAN ELECTRICALS
sowmya enterprises
zenith engineers
OM ENGINEERING
Royal Engineering
KAUSHIK MECHELECTRO PVT. LTD.
shine industries
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .