| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 CrAccepted-AOC N 65 MIDC HINGNA INDUSTRIAL AREA HINGNA NAGPUR MAHARASHTRA 440016 UDYAM MH 20 0029592 27AADCM7418C1ZN R M MII STATUS AS VERIFIED | NAGPUR | MAHARASHTRA | 440016 | ₹24.7 Cr Quoted ₹21.5 Cr | L1 | Accepted-AOC SIGLE TECHNICALLY QUALIFIED AND FINANCIALLY QUALIFIED BID 14.88 PERCENT ABOVE |
Tender Value
₹21.5 Cr
EMD Value
₹21.5 L
Closing Date
6 Jan 2020, 3:00 pmClosed
CEO, ASCL
Office of the Chief Executive Officer Agartala Smart City Limited City Centre Agartala
DESIGN, SUPPLY, CONSTRUCTION, INSTALLATION, TESTING AND COMMISSIONING OF SEWAGE TREATMENT PLANT OF CAPACITY 8 MLD AT AKHAURA CHANNEL NEAR ICP BASED ON OPEN TECHNOLOGY AND POST COMPLETION OPERATION AND MAINTENANCE FOR ONE YEAR INCLUDING DLP OF 3 YRS
2019_CEO_7012_1
ASCL/RFP/06/30
Open Tender
Composite Works
730 days
AGARTALA
AS PER DNIeT
7 documents required · 7 mandatory
₹2,500
Agartala Smart City Limited
₹21.5 L
Office of the Chief Executive Officer
4 Mar 2020
7 Dec 2019
6 Jan 2020
7 Dec 2019
6 Jan 2020
7 Dec 2019
7 Dec 2019 - 12 Dec 2019
16 Dec 2019
Amount
DESIGN, SUPPLY, CONSTRUCTION, INSTALLATION, TESTING AND COMMISSIONING OF SEWAGE TREATMENT PLANT OF CAPACITY 8 MLD WITH THREE MONTH’S TRIAL RUN
Design & Drawing Submission and approval of Surveys, Soil Investigations, Designs, Working Drawings including all layout, sections, typical details, Shop Drawings, as Built drawings etc. complete for all components of works like 8 MLD near ICP based on open technology and all contingent works like Diversion Channel at Akhaura Canal, Intake Pump House, Sewage Water Pipeline from Pumping station to STP along with civil, electrical, mechanical, piping and instrumentation works near ICP including all auxillary buildings / structures and all allied works as mentioned in Tender document. Contractor shall submit working Drawing and Implementation schedule as per Priority given by Engineer-In-Charge for approval. Payment shall be released on Pro-rata basis only after approval of working Drawings as per implementation schedule.
Flow Diversion Unit and Intake Pump House along with Sewer Pipeline upto STP Designing, construction including land filling, piling (Including necessary routine vertical and horizontal pile load tests as per the stipulation of IS 2911) for modification in channel bed, diversion channel, Pump House, valve chambers etc as per schematic drawing no. TCE.10918A-CV-3008-UF-30000 and TCE.10918A-CV-3008-UF-30001, Site development, hydraulic testing, commissioning and giving satisfactorily trials of Flow diversion unit and intake pump house along with Sewer pipeline upto STP process unit. Works includes All electromechanical work including instrumentation work mainly : - Trash Screens. - Sluice gates including structures and operating system complete. - Sewage pumps of required capacity as per specifications (W+S) incl. Pumps, Motors, valves, allied piping etc.; Hoisting equipment all as per schematic drawing no. TCE-10918A-ME-6177-60002 and TCE.10918A-CV-3008-UF-30001 Electrical connection from Supply main to DB of Flow diversion unit. Providing, Lowering, Laying, Jointing, Testing & Commissioning of Sewer pipeline of suitable dia from the Sewer Pump House to Sewage Treatment Plant approx. Length 650 M Away : Schematic plan on Survey drawing is attached) inclding road crossings as when required; all land filling in water bodies, pipe supports, excavation, backfilling complete as per attached survey drawings. (TCE.10918A-CV-3008-SL-30000) necessary piping work with required valves, gates, drains, complete as turnkey job with all involved Civil, electrical, Instrumentation and mechanical works Inclusive of above Items, units as per detailed specifications for civil, electrical, Instrumentation and mechanical components as mentioned in Tender Document.
Sewage Treatment Plant of 8 MLD Capacity based on Open Technology Designing, construction, Site development, hydraulic testing, commissioning and giving satisfactorily trials of 8 MLD STP based on open technology which can be accommodated in limited identified land space consisting of Primary, Secondary and Tertiary Treatment Units as per the requirement of Tender document / designed CPHEEO norms relevant IS codes etc. necessary piping work with required valves, gates, drains, path Ways, Administration Block cum Laboratory, Laboratory Equipments, Internal Roads, Pathways, Compound Wall, Tools and plants, Treated effluent arrangements complete as turnkey job with all involved Civil, electrical, Instrumentation and mechanical works Inclusive of following Items, units as per detailed specifications mentioned in Tender Documents for civil, electrical, Instrumentation and mechanical components complete to achieve desired outlet parameters mentioned in the tender document. All units shall be interconnected with administration building by suitable or RCC overhead walkways at the STP component as per the scope and confirming norms as mentioned above. The plant should be completely automated with PLC - SCADA etc. complete.
OPERATION & MAINTENANCE
Operation and Maintenance of 8 MLD Sewerage Treatment Plant, Diversion Channel Units at Akhaura Canal, Intake Pump House, Sewage Water Pipeline etc complete for First Year Comprehensive Operation and Maintenance including cost against fixed charges, maintenance repair charges, replacement charges and all miscellaneous charges for 8 MLD Sewerage Treatment Plant, Diversion Channel Units at Akhaura Canal, Intake Pump House, Sewage Water Pipeline etc. complete.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid