Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.5 CrAccepted-AOC 35 B BHERU VILLAS SARDAR CLUB SCHEME AIR FORCE JODHPUR 342001 RAJ | JODHPUR | JODHPUR | RAJASTHAN | 342001 | L1 | Accepted-AOC Being lowest bidder | |
| 2 | L2₹15.5 Cr+₹3.4 L (0.22%)Rejected-Finance 184 MAIN STREET NASIRABAD AJMER RAJASTHAN 305601 | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹15.8 Cr+₹31.6 L (2.04%)Rejected-Finance | L3 | Rejected-Finance Other than lowest bidder | |
| 4 | L4₹17.1 Cr+₹1.7 Cr (10.9%)Rejected-Finance | L4 | Rejected-Finance Other than lowest bidder | |
| 5 | L5₹18.4 Cr+₹2.9 Cr (18.9%)Rejected-Finance RAMBHAWAN MOUNT ABU SADAR BAZAR MOUNT ABU PIN 307 501 | MOUNT ABU | SIROHI | RAJASTHAN | 307501 | L5 | Rejected-Finance Other than lowest bidder |
| Sl No | Description | Qty | Unit | RAGHUSONS INFRA ENGINEERING PVT. LTD L1 |
|---|---|---|---|---|
| 1.00 | Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 27(R) | 1 | LUMP SUM | 11,96,86,565 ₹11,96,86,565 Lowest |
| 2.00 | Lump sum price worked out by the contractor for "SITE CLEARANCE, EXCAVATION & EARTHWORK" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 28 | 1 | LUMP SUM | 13,80,428.37 ₹13,80,428.37 Lowest |
| 3.00 | Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY " as listed in Schedule ‘A’ Part-III representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 29 | 1 | LUMP SUM | 2,06,167.28 ₹2,06,167.28 Lowest |
| 4.00 | Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 32(R) | 1 | LUMP SUM | 16,92,949.05 ₹16,92,949.05 Lowest |
| 5.00 | Lump sum price worked out by the contractor for "ROAD, PATH & CULVERT" as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 34(R) | 1 | LUMP SUM | 83,43,278.01 ₹83,43,278.01 Lowest |
| 6.00 | Lump sum price worked out by the contractor for "SEWAGE DISPOSAL" as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 36 | 1 | LUMP SUM | 9,38,860 ₹9,38,860 Lowest |
| 7.00 | Lump sum price worked out by the contractor for "AREA DRAINAGE" as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES B/F from Sl page No. 38(R) | 1 | LUMP SUM | 21,43,875 ₹21,43,875 Lowest |
| 8.00 | Lump sum price worked out by the contractor for "FENCING, GATE & DEVELOPMENT" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 41 | 1 | LUMP SUM | 12,36,195.4 ₹12,36,195.4 Lowest |
| 9.00 | Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 42 | 1 | LUMP SUM | 4,57,850 ₹4,57,850 Lowest |
| 10.00 | Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 46 | 1 | LUMP SUM | 35,35,205.23 ₹35,35,205.23 Lowest |
Tender Value
₹14.0 Cr
EMD Value
₹10.2 L
Closing Date
19 Mar 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
HQ CEJZ JODHPUR
HQ CEJZ JODHPUR
PROVN OF OTM ACCN AT GANDHIDHAM MIL STN (JOB NO.004/AMWP/12C/2020-21)
2022_MES_505906_1
800533/BHUJ/E8
Open Tender
Civil Works
Lump-sum
730 days
GANDHIDHAM
AS PER TENDER DOCMENTS
9 documents required · 9 mandatory
₹3,000
GE (A) BHUJ
₹10.2 L
Yes
5 Apr 2022
4 Feb 2022
21 Mar 2022
4 Feb 2022
19 Mar 2022
7 Mar 2022
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lump sum price worked out by the contractor for "BUILDING WORKS" as listed in Schedule ‘A’ Part-I representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 27 | 1 | LUMP SUM | 7,36,86,900 | ₹7,36,86,900 |
| - | Lump sum price worked out by the contractor for "SITE CLEARANCE, EXCAVATION & EARTHWORK" as listed in Schedule ‘A’ Part-II representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 28 | 1 | LUMP SUM | 34,51,070.92 | ₹34,51,070.92 |
| - | Lump sum price worked out by the contractor for "INTERNAL WATER SUPPLY " as listed in Schedule ‘A’ Part-III representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 29 | 1 | LUMP SUM | 2,06,167.28 | ₹2,06,167.28 |
| - | Lump sum price worked out by the contractor for "INTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-IV representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 32 | 1 | LUMP SUM | 26,92,101.24 | ₹26,92,101.24 |
| - | Lump sum price worked out by the contractor for "ROAD, PATH & CULVERT" as listed in Schedule ‘A’ Part-V representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 34 | 1 | LUMP SUM | 1,19,18,153.58 | ₹1,19,18,153.58 |
| - | Lump sum price worked out by the contractor for "SEWAGE DISPOSAL" as listed in Schedule ‘A’ Part-VI representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 36 | 1 | LUMP SUM | 15,19,090.31 | ₹15,19,090.31 |
| - | Lump sum price worked out by the contractor for "AREA DRAINAGE" as listed in Schedule ‘A’ Part-VII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price of prepriced by the MES B/F from Sl page No. 38 | 1 | LUMP SUM | 35,76,321.5 | ₹35,76,321.5 |
| - | Lump sum price worked out by the contractor for "FENCING, GATE & DEVELOPMENT" as listed in Schedule ‘A’ Part-VIII representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 41 | 1 | LUMP SUM | 14,94,603.93 | ₹14,94,603.93 |
| - | Lump sum price worked out by the contractor for "EXTERNAL WATER SUPPLY" as listed in Schedule ‘A’ Part-IX representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 42 | 1 | LUMP SUM | 2,53,667.38 | ₹2,53,667.38 |
| - | Lump sum price worked out by the contractor for "EXTERNAL ELECTRIFICATION" as listed in Schedule ‘A’ Part-X representing percentage ( + or - denomination) derived under last column of this schedule above/below the lump sum price prepriced by the MES B/F from Sl page No. 46 | 1 | LUMP SUM | 41,59,064.98 | ₹41,59,064.98 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_565308.xls
BOQ Document • 0.38 MB
91983520.pdf
Tender Document • 0.09 MB
Drawings.pdf
Tender Document • 20.82 MB
TENDERDOC.pdf
Tender Document • 0.66 MB
91983522.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .