Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18 LAccepted-AOC | L1 | Accepted-AOC L1 bidder. Total contract amount entered. But it is distributed to user department. | |
| 2 | L2₹18 LSame as L1Accepted-AOC | L2 | Accepted-AOC L2 bidder. Matched their rate with L1 bidder. Total contract amount entered. But it is distributed to user department. |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
17 Dec 2022, 3:00 pmClosed
DGM TOS and DISPOSALS
TOS KAGITHAPURAM
Standardized rate for Painting of MS Structurals, Pipelines and Equipments at TNPL Main Site for the year 2023
2022_TNPL_265243_1
TNPL/TOS/U1/222313004994
Open Tender
Painting works
Tender cum Auction
365 days
TOS, Kagithapuram
As per prequalification criteria document uploaded
3 documents required · 3 mandatory
₹0
₹10,000
15 Mar 2023
19 Nov 2022
19 Dec 2022
19 Nov 2022
17 Dec 2022
19 Nov 2022
Taking delivery of paint, erection of scaffolding if necessary,cleaning the existing surfaces, applying One coat of Red Oxide Primer paint conforming to IS with brush.Cost includes labour and other incidental charges etc at all levels.
Taking delivery of paint, erection of scaffolding if necessary,cleaning the existing surfaces, applying Two Coats of Red Oxide Primer paint conforming to IS with brush.Cost includes labour and other incidental charges etc at all levels.
Taking delivery of paint,erection of scaffolding if necessary,cleaning the existing surfaces, applying one coat of Synthetic Enamel paint conforming to IS with brush.Cost includes labour and other incidental charges etc at all levels.
Taking delivery of paint,erection of scaffolding if necessary,cleaning the existing surfaces, applying Two Coats of Synthetic Enamel paint conforming to IS with brush.Cost includes labour and other incidental charges etc at all levels.
Taking delivery of paint,erection of scaffolding if necessary,cleaning the surfaces, applying One Coat of Aluminium paint conforming to IS 2932-1974 to withstand heat 60-120 Degree centigrade.Cost includes labour&incidental at all levels.
Taking delivery of paint,erection of scaffolding if necessary,cleaning the surfaces, applying Two Coats of Aluminium paint conforming to IS 2932-1974 to withstand heat 60-120 Degree centigrade.Cost includes labour&incidental at all levels.
KBR ENGG & PAINTING
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .