Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹14.8 L (8.72%)Admitted-Finance | ₹1.8 Cr+₹14.8 L (8.72%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | S N MARKETING L2 | Simen Tech (India) Pvt. Ltd. L1 |
|---|---|---|---|---|---|
| 1.00 | Arrangement of specialized equipment such as high pressure water jetting system air compressor, hoses, complete unit of air line with heating system, surface cutting, chipping set with rubber suit, flood light, pneumatic grinders, cutters, underwater welding set with communication/videography system with to and fro carriage and transportation. (Any other essential materials/tools required for actual execution of the above work shall be arranged by the contractor as per site requirement) | 1 | JOB | 5,00,000 ₹5,00,000 Lowest | 6,50,000 ₹6,50,000 |
| 2.00 | Under water cleaning of debris, loose mud, sand, dismantling,chipping of damaged concrete obstructions if any to expose the cill beam and surrounding areas to commence further work by using pneumatic chippers/breakers/suctions dredging equipment of stoplog grooves of Ichari dam with men, material & with complete T&P. | 2 | JOB | 9,50,000 ₹19,00,000 Lowest | 12,15,000 ₹24,30,000 |
| 3.00 | Under water dismantling of damaged cill beam of spillway stoplogs of Ichari Dam by using pneumatic tools like chippers/brekers, removal of debris, digging out from the foundation & also clearing surrounding areas by breaking of concrete, exposing up to the bottom face, preparing the area to fix the new cill beam fabricated with stainless steel cladding in two pieces, making sure fixed in absolutely in straight horizontally.(Checked with spirit level). Provided with suitable stiffeners,lugs etc for proper anchoring at the bottom face of the spill way. After aligning of cill beam, Micro concreting (M-40) to be done with all cost of material labour & T&P required for proper completion of the work. | 2 | JOB | 37,25,000 ₹74,50,000 Lowest | 40,25,000 ₹80,50,000 |
| 4.00 | Under water removal of old damaged T guide both the sides of spillway stoplog of Ichari dam by using pneumatic chippers/breakers/grinders/under water BROCO cutting rods. Also exposing the deep cracks in concrete on the upstream face of the vertical grooves.Under water fixing of new T-Guide insertion piece in true vertical alignment of spillway stoplog gate by using under water welding, cutting equipment, using BROCO cutting & welding rod. (One Job means replcement of T Guide in 25 feet length in each side (total 50 feet) of spillway stop log groove) | 2 | JOB | 18,50,000 ₹37,00,000 | 12,50,000 ₹25,00,000 Lowest |
| 5.00 | Under water removal of old damaged back guides, only bottom piece approx. Length of 1.5 mtr of spillway stop log gate of Ichari dam by using under water pneumatic tools/ cutters/grinders etc.Dressing up in smooth finish, to fix the new guides in proper vertical alignment. Installation of new seal guide with perfect allignment,fixing of anchor bolt/spot welding securing anchor bolts,finally cementitious grouting beneath the seal guides. Loose bolts of other guides are to tightened where ever necessary and spot welded. Trial operation of lowering & hoisting of stop log gates to confirm the smooth operation of gates. (One job means replacement of one number of bottom back guide of each side (total two back guide) of spillway stoplog groove) | 2 | JOB | 13,50,000 ₹27,00,000 | 8,95,500 ₹17,91,000 Lowest |
| 6.00 | Under water repairing of pier nose of Spillway gate , after excavation of all loose material, fixing of reinforcement, MS jacket, M-40 micro concrete in 3 mtr height x 0.25 mtr deepx 6.4 mtr in length using pressure grouting cementious pumps, under water cutting & welding equipments, materials with complete T&P.(One Job means repair of one pier of spillway gate.) | 1 | JOB | 14,75,000 ₹14,75,000 | 11,35,000 ₹11,35,000 Lowest |
| 7.00 | To Ensure free movement of spillway stoplog gate after completion of repairing work and clips of videography report conducted at different levels of work, submission of its report in soft copy form (CD along with completion report of spillway stop log gate. | 2 | JOB | 3,55,000 ₹7,10,000 | 2,00,000 ₹4,00,000 Lowest |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
26 Dec 2025, 4:00 pmClosed
Executive Engineer (E M) Ichari Dam
Executive Engineer (E M) Ichari Dam, UJVNL, Dakpathar
Under water replacement of sill beam, t-guide and bottom back guide of spillway stop log gates no-05 and 07 of Ichari dam
2025_UJVN_89534_1
07/EE(E M)/Ichari dam/2025-26
Open Tender
Miscellaneous Works
Item Rate
180 days
Ichari Dam
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
DGM HGC Dakpathar UJVNL
₹3.4 L
9 Jan 2026
5 Dec 2025
31 Dec 2025
5 Dec 2025
26 Dec 2025
10 Dec 2025
Amount
Arrangement of specialized equipment such as high pressure water jetting system air compressor, hoses, complete unit of air line with heating system, surface cutting, chipping set with rubber suit, flood light, pneumatic grinders, cutters, underwater welding set with communication/videography system with to and fro carriage and transportation. (Any other essential materials/tools required for actual execution of the above work shall be arranged by the contractor as per site requirement)
Under water cleaning of debris, loose mud, sand, dismantling,chipping of damaged concrete obstructions if any to expose the cill beam and surrounding areas to commence further work by using pneumatic chippers/breakers/suctions dredging equipment of stoplog grooves of Ichari dam with men, material & with complete T&P.
Under water dismantling of damaged cill beam of spillway stoplogs of Ichari Dam by using pneumatic tools like chippers/brekers, removal of debris, digging out from the foundation & also clearing surrounding areas by breaking of concrete, exposing up to the bottom face, preparing the area to fix the new cill beam fabricated with stainless steel cladding in two pieces, making sure fixed in absolutely in straight horizontally.(Checked with spirit level). Provided with suitable stiffeners,lugs etc for proper anchoring at the bottom face of the spill way. After aligning of cill beam, Micro concreting (M-40) to be done with all cost of material labour & T&P required for proper completion of the work.
Under water removal of old damaged T guide both the sides of spillway stoplog of Ichari dam by using pneumatic chippers/breakers/grinders/under water BROCO cutting rods. Also exposing the deep cracks in concrete on the upstream face of the vertical grooves.Under water fixing of new T-Guide insertion piece in true vertical alignment of spillway stoplog gate by using under water welding, cutting equipment, using BROCO cutting & welding rod. (One Job means replcement of T Guide in 25 feet length in each side (total 50 feet) of spillway stop log groove)
Under water removal of old damaged back guides, only bottom piece approx. Length of 1.5 mtr of spillway stop log gate of Ichari dam by using under water pneumatic tools/ cutters/grinders etc.Dressing up in smooth finish, to fix the new guides in proper vertical alignment. Installation of new seal guide with perfect allignment,fixing of anchor bolt/spot welding securing anchor bolts,finally cementitious grouting beneath the seal guides. Loose bolts of other guides are to tightened where ever necessary and spot welded. Trial operation of lowering & hoisting of stop log gates to confirm the smooth operation of gates. (One job means replacement of one number of bottom back guide of each side (total two back guide) of spillway stoplog groove)
Under water repairing of pier nose of Spillway gate , after excavation of all loose material, fixing of reinforcement, MS jacket, M-40 micro concrete in 3 mtr height x 0.25 mtr deepx 6.4 mtr in length using pressure grouting cementious pumps, under water cutting & welding equipments, materials with complete T&P.(One Job means repair of one pier of spillway gate.)
To Ensure free movement of spillway stoplog gate after completion of repairing work and clips of videography report conducted at different levels of work, submission of its report in soft copy form (CD along with completion report of spillway stop log gate.
S N MARKETING (BID ID -411239)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_106156.xls
BOQ • 0.28 MB
TD_07.pdf
Tender Documents • 1.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .