Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹29.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Govind Singh Negi L1 |
|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. in all kind of soil | 113.21 | cum | 220 ₹24,906.2 Lowest |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinthsides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, leadup to 50 m and lift upto 1.5 m. | 22.22 | cum | 166 ₹3,688.52 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level in 1:4:8 (1 Cement : 4 Fine sand : 8 graded stone aggregate 40 mm nominal size). | 18.38 | cum | 5,772 ₹1,06,089.36 Lowest |
| 4.00 | Providing and laying in position cement concrete of 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.35 | cum | 6,675 ₹2,336.25 Lowest |
| 5.00 | Random rubble masonry with hard stone in foundation and plinth including levellingup with cement concrete 1:6:12 (1 cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level withCement mortar 1:6 (1 cement : 6 coarse sand) | 20.58 | cum | 6,195 ₹1,27,493.1 Lowest |
| 6.00 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) | 7.11 | cum | 6,044 ₹42,972.84 Lowest |
| 7.00 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth inCement mortar 1:4 (1 cement : 4 coarse sand) | 4.91 | cum | 6,246 ₹30,667.86 Lowest |
| 8.00 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) | 32.23 | cum | 7,716 ₹2,48,686.68 Lowest |
| 9.00 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 19.2 | cum | 7,665 ₹1,47,168 Lowest |
| 10.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 28.5 | cum | 9,197 ₹2,62,114.5 Lowest |
Tender Value
₹29.5 L
EMD Value
₹85,000
Closing Date
29 May 2026, 12:00 pmClosed
EE RWD RUDRAPRAYAG
EE RWD RUDRAPRAYAG
Construction of anganwadi kendra marora block agustyamuni
2026_RES_95473_1
284/RES/14-05-2026
Open Tender
Civil Works
Item Rate
240 days
RUDRAPRAYAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
EE RWD RUDRAPRAYAG
₹85,000
11 Jun 2026
15 May 2026
29 May 2026
15 May 2026
29 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. in all kind of soil | 113.21 | cum | - | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinthsides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, leadup to 50 m and lift upto 1.5 m. | 22.22 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level in 1:4:8 (1 Cement : 4 Fine sand : 8 graded stone aggregate 40 mm nominal size). | 18.38 | cum | - | - |
| 4 | Providing and laying in position cement concrete of 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 0.35 | cum | - | - |
| 5 | Random rubble masonry with hard stone in foundation and plinth including levellingup with cement concrete 1:6:12 (1 cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level withCement mortar 1:6 (1 cement : 6 coarse sand) | 20.58 | cum | - | - |
| 6 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) | 7.11 | cum | - | - |
| 7 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth inCement mortar 1:4 (1 cement : 4 coarse sand) | 4.91 | cum | - | - |
| 8 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) | 32.23 | cum | - | - |
| 9 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 19.2 | cum | - | - |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 28.5 | cum | - | - |
stage.html
html • 0.02 MB
finance_112878.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.72 MB
BOQ_112878.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .