Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance TNT NO 8 WARD 10 BC PLOT NO 12 13 GANDHIDAM KUCHCHH KACHCHH GUJARAT 370201 | KACHCHH | GUJARAT | 370201 | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.4 Cr+₹1.9 Cr (117.9%)Admitted-Finance | ₹3.4 Cr+₹1.9 Cr (117.9%) | L2 | Admitted-Finance |
| 3 | L3₹3.8 Cr+₹2.2 Cr (139.8%)Admitted-Finance | ₹3.8 Cr+₹2.2 Cr (139.8%) | L3 | Admitted-Finance |
| 4 | L4₹3.9 Cr+₹2.3 Cr (147.4%)Admitted-Finance 1410 TO 1425 COMMERCIAL A WING THE EPICENTER OFF EASTERN FREEWAY BEST COLONY CHEMBUR MUMBAI MAHARASHTRA 400071 | MUMBAI SUBURBAN | MAHARASHTRA | 400071 | ₹3.9 Cr+₹2.3 Cr (147.4%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PATEL ENGINEERING WORKS L3 | SSR Marine Services Pvt. Ltd. L1 | ELECTROTECH L2 | SHM SHIPCARE PVT LTD L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | WEATHER DECK ITEMS(A) Parts to be replaced with new(Srl No.1 to 05)Door (Port & Stbd) rubber gaskets required to be replaced- 02 Nos | 1 | Job | 1,35,000 ₹1,41,750 | 82,000 ₹86,100 | 2,80,000 ₹2,94,000 | 15,000 ₹15,750 Lowest |
| 2.00 | All round Rubber fender required to change with new.( 70 Mtrs) | 1 | Job | 4,72,500 ₹4,96,125 | 56,000 ₹58,800 Lowest | 2,10,000 ₹2,20,500 | 7,00,000 ₹7,35,000 |
| 3.00 | Front side (Port) SS Railing pillar bend required to be renewed. (Approx 2 feet length and 1.5 inch dia) - 01 No | 1 | Job | 6,750 ₹7,087.5 Lowest | 8,000 ₹8,400 | 1,20,000 ₹1,26,000 | 80,000 ₹84,000 |
| 4.00 | All vent heads on deck found corroded, same to be renewed.-03 No | 1 | Job | 81,000 ₹85,050 | 24,000 ₹25,200 Lowest | 60,000 ₹63,000 | 90,000 ₹94,500 |
| 5.00 | Door handle required to be replaced- 06 Nos | 1 | Job | 16,200 ₹17,010 Lowest | 24,000 ₹25,200 | 36,000 ₹37,800 | 1,20,000 ₹1,26,000 |
| 6.00 | MONKEY ISLAND ( Parts to be replaced with New : Srl No.06 to 09) Police siren required to be replaced-01 No | 1 | Job | 13,500 ₹14,175 Lowest | 45,000 ₹47,250 | 45,000 ₹47,250 | 45,000 ₹47,250 |
| 7.00 | Both hatch cover rubber gasket required renewed- 02 Nos | 1 | Job | 27,000 ₹28,350 | 16,000 ₹16,800 Lowest | 35,000 ₹36,750 | 30,000 ₹31,500 |
| 8.00 | Front Glass (port and Stbd) found cracked required to be renewed-03 Nos | 1 | Job | 1,62,000 ₹1,70,100 | 75,000 ₹78,750 Lowest | 2,40,000 ₹2,52,000 | 4,00,000 ₹4,20,000 |
| 9.00 | Wiper rubber blade required replace-02 Nos | 1 | Job | 21,600 ₹22,680 | 30,000 ₹31,500 | 20,000 ₹21,000 Lowest | 62,000 ₹65,100 |
| 10.00 | Parts to be Serviced ( Srl No.10 & 11)
Public address (PA) system not working properly required to be serviced. -( 01 No) | 1 | Job | 27,000 ₹28,350 Lowest | 45,000 ₹47,250 | 1,20,000 ₹1,26,000 | 3,00,000 ₹3,15,000 |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
15 Apr 2025, 5:00 pmClosed
OC WATER WING BHUJ
HQ WW BSF Bhuj, Mundra Road,Bhuj-Kutch,Gujarat
1st dry dock repair of MC Saraswati
2025_BSF_853536_1
WW/Bhuj/Marine/883/DDR-MC Saraswati/2025/2199 dtd 17.03.2025
Open Tender
Job Works
Item Rate
120 days
HQ OC WW BSF BHUJ
As per tender documents- NIT
15 documents required · 15 mandatory
₹0
₹3.6 L
Yes
HQ WW BSF Bhuj, Mundra Road,Bhuj-Kutch,Gujarat,
7 Jul 2025
18 Mar 2025
17 Apr 2025
19 Mar 2025
15 Apr 2025
1 Apr 2025
19 Mar 2025 - 25 Mar 2025
29 Mar 2025
WEATHER DECK ITEMS(A) Parts to be replaced with new(Srl No.1 to 05)Door (Port & Stbd) rubber gaskets required to be replaced- 02 Nos
All round Rubber fender required to change with new.( 70 Mtrs)
Front side (Port) SS Railing pillar bend required to be renewed. (Approx 2 feet length and 1.5 inch dia) - 01 No
All vent heads on deck found corroded, same to be renewed.-03 No
Door handle required to be replaced- 06 Nos
MONKEY ISLAND ( Parts to be replaced with New : Srl No.06 to 09) Police siren required to be replaced-01 No
Both hatch cover rubber gasket required renewed- 02 Nos
Front Glass (port and Stbd) found cracked required to be renewed-03 Nos
Wiper rubber blade required replace-02 Nos
Parts to be Serviced ( Srl No.10 & 11) Public address (PA) system not working properly required to be serviced. -( 01 No)
Fresh water tank required separate inlet and outlet system.- ( 01 Set)
ACCOMMODATION/ ELECTRIC SYSTEM : Parts to be replaced with New ( Srl No.12 to 15) Halogen light 100 Watt required to be replaced (Engine Room, Weather deck, Tiller deck) - 12 Nos
Door lock with handle required to replace - 01 Nos
Wall fan 55 Watt, required to be replace with reputed brand.-11 Nos
RO system required replaced, with same capacity - 01 No
Parts to be serviced ( Arl No.16 to 18 ) Quick closing valves along with closing mechanism to be Overhauled - 01 Set
Sewage tank required to be cleaning -1 No
MAIN ENGINE Both Main engine, (Make- Cater Piller, 2x CAT 32 ACERT, 1600 BHP) (Port & Stbd) Both Main engines required servicing as per OEM service schedule. Port Main Engine 1223.55 Hrs (SL. No. RNY 02804) Stbd Main Engine 1223.55 Hrs (SL. No. RNY 02803) (**New spare parts to be replaced from OEM/Authorised dealer spare parts) (A)PARTS TO BE REPLACED WITH NEW ( SRL NO.18 TO 22) i) All lub Oil, Gear Oil, Hydraulic Oil, low/ high pressure pipes required to pressure testing and if required replaced - 01 Job
Both Main engine heat exchanger sea water cooling water outlet pipe connection found with soft patch, same to be renewed- 02 Nos
Engine room blower housing/mounting, mesh/fan guard required to be replaced with high quality laminated material so that highly durable in saline water- (02 Nos)
Both main engine servicing as per OEM recommended schedule to be carried out along with periodic maintenance in which Engine Oil, Oil filters, Gear oil, Coolant etc must be replace with OEM recommended Spare Parts/Lube oil. (Parts to be replaced with OEM/Authorized dealer spare as per manufacturer schedule)- ( 02 Nos)
Mounting Pad required to be replaced- ( 08 Nos)
B) Parts to be service ( Srl No.23 to 28 ) Main engine (Port and Stbd) both gear oil cooler and lub oil cooler to be Servicing and pressure testing- ( 02 Sets)
Main engine (Port & Stbd) attached Fresh Water pump required Overhauling- ( 02 Nos)
Both main engine heat exchanger required servicing-02 Nos
All gauges, sensors and accessories to be check and calibrated-02 Sets
Both Self starter and alternator need to be serviced- 02 Nos
Both Main engine Turbo-Charger need to be serviced -02 Nos
PROPULSION SYSTEM Marine Jet Propulsion, 2x Water Jet, Doen DJ 200-IWJ, (MJP System),Complete system required Major Overhauling and all Seals, Bushes, Hydraulic pistons, Hose, Anode required to replaced & OEM recommended oil filling by the firm with spares from OEM/authorized dealer..-(02 Sets)
Steering hydraulic system and pump to be servicing and replace all seals.-(01 Job)
DG SET ( 02 Nos ) DG Set, (Make- NANNI, QL547T Model 47T, 37.1 KW & 40 KVA). Port side DG Set – 2679 Run Hrs STBD side DG Set -2709 Run Hrs (**New spare parts to be replaced from OEM/Authorised dealer spare parts) (A) Parts to be replaced with new DG Set all Hose pipe various size required to be replaced -02 Sets
DG Set Servicing as per OEM Manual and parts as per maintenance schedule to be replaced- 02 Nos
Mounting Pad required to be replaced- ( 08 Nos)
(B) Parts to be service All gauges, sensors and accessories to be check and calibrated after DG Set services as per maintenance schedule of OEM and pare to be replaced as per maintenance schedule with spare parts from OEM/ authorized dealer.- 02 Nos
Both Alternator required to be complete service -02 Nos
GEAR BOX Both main engine gear box required servicing as per OEM schedule-02 Nos
AC PLANTS Self-Contained Air Conditioning System (Make- DOMETIC) (VIP, Captain, Wheel House, Crew Cabin and Dining area) total 05 Nos required to be servicing - 05 Nos
MAST REPAIR WORK: - Mast wire rope required to be replaced with SS hook -08 Nos
NAVIGATIONAL EQUIPMENTS (i) Parts to be replaced with new Anemometer not working required to be Replace-01 Nos
(B)Parts to be Service Complete RADAR system {Quantum Q24C Radome (-90576)} required Servicing and calibration-01 No
Magnetic Compass (Plastimo, Off Shore 95) required servicing and calibration- (01 No)
Echo sounder required servicing and calibration- (01 No)
Raymarine Axiom & AXIOM Pro Variant Multi-functional display, Class-10 or VHS (Model – E70368, AXIOM 12, Sl. No. 1280427 required to be serviced and updated with chart- 01 No
Barometer (HTC Instruments Sl. No. L-2019-05-903)-01 required to be calibrated- 01 No
VALVES AND PIPE LINES All sea water pipe line required replacement- 01 Job
Fresh water, gray water and fuel line) all fitting, Pipes required to cleaning/ Pressure testing and replace if required- ( 01 Job)
Engine room sea water suction and sewage valve to be replaced-(05 Nos)
Engine room, all hose pipes required to be replaced and new clamp to be fitted along with all hoses and rubber hoses need to be replaced.-(01 Job)
Fuel valve required to be servicing -02 Nos
PUMP AND MOTORS (A) Parts to be replaced with new Fire pump complete assembly required to be renewed- 01 No
Sewage transfer pump required to be replaced with new & one additional sewage pump provided in running line.-02 Nos
An additional 0.75 HP mono block pump set up required along with 20 mtr flexible pipe required for engine oil draining purpose-(01 No)
Engine Room exhaust blower motor required to be replaced -05 Nos
Wiper motor required replaced -01 Job
B) Parts to be service Bilge pump motor required servicing-01 No
Domestic fresh water pump (AC & DC) both required to be servicing-(02 Nos)
Fuel Oil transfer pump required to be servicing-01 No
DD Fire pump with full accessories required complete repair-(01 No)
Bathroom exhaust blower motor required to be servicing-(04 Nos)
Anchor winch motor required to be servicing-(01 No)
Galley sink drainage system not proper working repair and servicing-(01Nos)
Galley exhaust blower motor required complete repair-(01 Nos)
AWAINING FITTING Canopy required to be replaced with heavy duty water proof canopy-02 No
Canvas cover of search light required to be replaced- 01 No
BOLLARD AND CLEAT:- Middle bollard both side railing required to be modified so that railing stand do not cover the bollard-02 Nos
DAVIT AND BOAT CRADLES. Davit wire rope required to be replaced- 01 Nos
Boat cradle rubber required to be replaced-01 Set
ANCHOR WINCH AND CHAIN CABLE (A) Parts to be replaced with new Anchor chain (SS) 95 Mtr. With short link chain cable (2 Mtr.) required to replace with same capacity. (thickness- 12mm)-01 No
Anchor chain stopper (SS) with roller required to be replaced-01 No
One additional anchor with chain (SS) 95 Mtr required for reserve purpose -(01 No)
One no. Graphenal anchor 20 Kg (MS) required to be provide for mooring at shore-01 No
BATTERIES: (A) Parts to be replaced with new ( Srl No.68 to 72) Both DG Set, Exide Battery 12V x 13 Plate (88 Ah) required to be replaced. (Maintenance free battery)-02 Nos
Both Main engine, Exide Battery 12V x 25 Plate (200 Ah) required to be replace. (Maintenance free battery)-(04 Nos)
Emergency Motive Service Battery, Exide Battery 12V x 25 Plate (200 Ah) required to be replaced. (Maintenance free battery)-(08 Nos)
Battery charger required to replace-(03 Nos)
Both DG Set battery charging via one battery charger only, required separate battery charger connection, so required 01 No. additional battery charger with same existing capacity-01 No
BATH ROOM (A) Parts to be replaced with new All Bath room shower to be replaced-04 Nos
Bathroom all tap and jet spray need to replaced -(03 Nos)
Port side Crew bath room ply defective required to be replaced-(01 No)
Geyser 05 Ltr. capacity required to be provided in place of existing geyser-(04 Nos)
Additional 02 nos toilet motor (flush system) to be provided for OBS stores-02 Nos
(B_) Parts to be service - Crew cabin bath room (Port & STBD) side water drainage system not working properly required to be servicing.-(02 Nos)
VIP (Stbd) side bath room water drainage system not working properly required to be servicing. ( 01 No)
All Bath room flush system to be serviced- (04 Nos)
LIFE SAVING APPLIANCES:-(A) parts to be replaced with new . Life buoys with self-Ignition light 02 Nos. to be replaced & 02 Nos. newly to be provided. As per plan required to replace.-(04 Nos
Smoke signal, (Orange) 02 Nos. to be replaced-02 Nos
Launching lights 01 Nos. required to be replaced-(01 No)
Rocket parachute flares required to be replaced-(04 Nos)
Hand flares required replaced-06 Nos
New life jackets (SOLAS) to be provided-25 Nos
Life raft required to be serviced-02 Nos
FIRE FIGHTING APPLIANCES:- Fire extinguisher 50 Ltr. foam type required to be refill/replaced as per plan with hydro testing report- (01 No)
Fire extinguisher (9 Ltr. Capacity CO2 water type 05 Nos, 9 Ltr Mechanical foam type 03 Nos, 06 Kg DCP type 02 Nos, 4.5 Kg CO2 type 01 No) total 11 Nos. required to be servicing with hydro testing report- ( 01 Set)
Automatic NOVAC 65 Kg. 1230 Bottle, required to be serviced-(01 No)
Water sprinkler system requires to be servicing-(01 No)
General/Fire alarm required to be servicing-(04 No)
General alarm without hooter required to be servicing-(01 No)
Heat & Smoke detector required to be servicing-07 Nos
Pressure testing of Fire line to be carried out by authorized firm -01 No
Fire hose and fire box need to be replacement-01 Set
Fire fighting equipment (Nozzle, Hydrant) need servicing -01 Job
MISCELLANEOUS:- (A)Parts to be replaced with new Semi rotary hand pump recommended for renewed.-01 No
Pneumatic fender required to be replaced. ( size F-7)-06 Nos
Firm to inspect sacrificial anodes fitted to underwater hull, inlets and outlets sea tubes bilges and void spaces. Renewed those consumed 50% or more and clean remaining sacrificial anodes.-01 Job
(B)Parts to be service . Fuel tank (Reserve 01 Nos, Service tank 02 Nos.) required to be cleaning and pressure testing-03 Nos
All sensors like bilge, water tank fill auto cut off sensor etc check and replace if required-01 Job
4.2 m Life boat with 40 HP OBM to be serviced, OBM spare parts during maintenance/servicing to be replaced with OEM/authorized dealer supplied spares- (01 Job)
TVRO system required servicing & to make operational.-01 No
PAINTING (AS PER PAINTING SCHEME):- Panting Scheme i. Pen guard HB Primer (Epoxy primer) 01 Coat – 100 Micron (DFT) ii. Safe guard universal ES grey tie coat 01 Coat - 100 Micron (DFT) iii.Sea quantum pro-u light red-01 Coat- 150 Micron (DFT) (Silyl Acrylate Anti-fouling self- polishing paint) Sea quantum pro-u light red-01 Coat- 150 Micron (DFT) (Silyl Acrylate Anti-fouling self- polishing paint) Metal oxide paint & primer to jet units. Under water portion anti-fouling paint (Safe Guard Universal ES Grey, Pen Guard HB Primer, Sea Quantum Pro-U, Light Red, Sea Quantum Pro-U Dark Red) to be required. Painting Work required as per painting scheme _ ( 01 JOB) 1. Under water hull surface cleaning and painting. 2. Above water level complete cleaning surface finishing and painting as per vessel Requirement. 3. Vessel outer body cleaning and complete painting in disruptive pattern as per original painting scheme. 4. Firm to check draught marks are in position and carry out paining. 5. Firm to clean and repaint the sea side surface of MJP Units
ANTICIPATED SCOPE OF WORK FOR UNDER WATER HULL PORTION i)Firm to schedule and present ship to coordinate to conduct post dry docking repair trials one week prior to completion of dry docking repairs to prove the water tightness of WT compartments. Defects if any to be rectified. (ii)Firm to scrap and clean water and boot topping area (including water areas ) to remove all loose paint film, rust etc. Wind and water area is to be painted with paint as per paint scheme. (iii)Firm to be examined under water structure, paying particulars attention to hull portion in the vicinity of Marine Jet Unit (iv)Firm to examine both (Bucket and full Jet Propulsion Unit) and take long trial after repair. (v)Firm to carry out the visual survey of inlets and discharges. Clean and examine grating of inlets and discharges. Examine coating of inlets and discharges and areas adjacent to them carry out repairs as required. (vii)Sea tubes not accessible for preservation by painting to be spray coated with tie coat and anti fouling paint. (viii)Firm to examine structure for deterioration of paint, not covered by lagging or deck coverings paying particulars attention to decks, deck boundaries, lower areas of ship sides and bulkhead. Portable or semi portable fittings that obscure structure area to be removed for examination of structure behind. Structure revealed by the removal of semi-portable fittings is to be recoated before the fittings are replaced
Charges for Dry docking/Piloting/Inspection and Insurance.- 01 Job
ELECTROTECH (BID ID -3201776)
PATEL ENGINEERING WORKS (BID ID -3201105)
SHM SHIPCARE PVT LTD (BID ID -3201104)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 12.20 MB
BOQ_897318.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .