Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | ₹2.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.4 L+₹93,400 (38.1%)Rejected-AOC | ₹3.4 L+₹93,400 (38.1%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically rejected |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically rejected |
| Sl No | Description | Qty | Unit | INNOVUS ENERGIEZ L3 | PNEUMATICS INDIA L1 | ENPRO TECK L2 | MCEES TRADING L4 |
|---|---|---|---|---|---|---|---|
| 2.00HIRING OF COMPRESSOR 02 NOS AS PER SCOPE OF WORK | |||||||
| 3.00 | Hiring of Compressor with operator -No. 1
Daily Running Charges (Maintenance and Consumables required for operation to be included in the cost). Anticipated Daily Running Hours = 16 hrs for 25 Days | 25 | Days | 5,140 ₹1,28,500 | 4,900 ₹1,22,500 Lowest | 5,000 ₹1,25,000 | 6,900 ₹1,72,500 |
| 4.00 | Daily stand by Charges for compressor No. 1 ( Including operator charges) for 5 Days | 5 | Days | 5,140 ₹25,700 | - | 5,000 ₹25,000 Lowest | 6,900 ₹34,500 |
| 5.00 | Hiring of Compressor with operator - No. 2
Daily Running Charges (Maintenance and Consumables required for operation to be included in the cost). Anticipated Daily Running Hours = 16 hrs for 25 Days | 25 | Days | 5,140 ₹1,28,500 | 4,900 ₹1,22,500 Lowest | 5,000 ₹1,25,000 | 6,900 ₹1,72,500 |
| 6.00 | Daily stand by Charges for compressor No. 2 ( Including operator charges) for 5 Days | 5 | Days | 5,140 ₹25,700 | - | 5,000 ₹25,000 Lowest | 6,900 ₹34,500 |
| 7.00 | One time Mobilisation Charge (including lifting arrangement, man power for loading, unloading, commissioning/ de-commissioningof Compressor and any other miscellaneous requirements) | 1 | LS | 30,000 ₹30,000 Lowest | - | 30,000 ₹30,000 Lowest | 36,000 ₹36,000 |
Tender Value
Refer Docs
Closing Date
23 Apr 2026, 2:00 pmClosed
DGM SRM
Ship Repair Materials Department Cochin Shipyard LTD Perumanoor PO
HIRING OF COMPRESSOR FOR THE VESSEL RM0834
2026_CSL_275130_1
SR1/0834/48323
Open Tender
Marine Services
Works
30 days
CSL KOCHI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
24 Aug 2026
18 Apr 2026
24 Apr 2026
18 Apr 2026
23 Apr 2026
18 Apr 2026
18 Apr 2026 - 23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | HIRING OF COMPRESSOR 02 NOS AS PER SCOPE OF WORK | - | - | - | - |
| 3 | Hiring of Compressor with operator -No. 1
Daily Running Charges (Maintenance and Consumables required for operation to be included in the cost). Anticipated Daily Running Hours = 16 hrs for 25 Days | 25 | Days | - | - |
| 4 | Daily stand by Charges for compressor No. 1 ( Including operator charges) for 5 Days | 5 | Days | - | - |
| 5 | Hiring of Compressor with operator - No. 2
Daily Running Charges (Maintenance and Consumables required for operation to be included in the cost). Anticipated Daily Running Hours = 16 hrs for 25 Days | 25 | Days | - | - |
| 6 | Daily stand by Charges for compressor No. 2 ( Including operator charges) for 5 Days | 5 | Days | - | - |
| 7 | One time Mobilisation Charge (including lifting arrangement, man power for loading, unloading, commissioning/ de-commissioningof Compressor and any other miscellaneous requirements) | 1 | LS | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TD.pdf
Tender Documents • 1.04 MB
BOQ_321354.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .