| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹3 Cr
Closing Date
10 Jan 2024, 3:00 pmClosed
THE ADMIRAL SUPERINTENDENT
NSRY KOCHI
NORMAL REFIT (NR/24) OF INS SAGARDHWANI
2023_NAVY_628437_1
PP/06/3480/SAG/NR/23
Limited
Marine Services
240 days
KOCHI
1. SHIPYARD SHOULD HAVE SUCCESSFULLY UNDERTAKEN ATLEAST 03 REFITS OF IN/CG SHIPS (WORK COMPLETION CERTIFICATES REQUIRED) IN LAST 02 YEARS
9 documents required · 9 mandatory
₹0
₹3 Cr
Yes
NSRY KOCHI
23 Feb 2024
16 Nov 2023
11 Jan 2024
16 Nov 2023
10 Jan 2024
13 Dec 2023
17 Nov 2023 - 24 Nov 2023
28 Nov 2023
Amount
SUMMARY OF QUOTATION
Services Total Cost of Dry dock hire charges and other Admin & general services quoted in the BoQ
Cost of repair part :- (a) Total cost of Hull work Package
(b) Total cost odf Engineering Work Package
(c ) Total cost of Electrical work Package
(d) Total cost of NPOL work Package
GST on serial 1.01 to 1.05
Total Budgeary Cost of Spares
GST applicable for 1.07
Any other taxes & Duties
Miscellaneous (not includedin any of the serial above)
GST if any on serial 1.10
Description of Work / Item(s)
Amount
INSTRUCTIONS TO SHIPYARDS
(A) SHIPYARD TO QUOTE FOR ALL SERIALS. BULK/LUMPSUM COSTING IS NOT ALLOWED. ALL PAYMENTS WILL BE ON ACTUALS ON NOT EXCEEDING BASIS. (B) ALL SPARES ARE TO BE SOURCED THROUGH OEM AND OEM SUPERVISION IS TO BE ENSURED FOR ROUTINE/REPAIRS OF ALL EQUIPMENT. (C) IF SHIP REFIT AT SHIPYARD CONTINUES BEYOND 240 DAYS FOR ANY REASON INCLUDING FORCE MAJEURE, ALL ADMIN/GENERAL SERVICES ARE TO BE EXTENDED WITHOUT ADDITIONAL COST. (D) SPARES FOR MAJOR MACHINERIES INCLUDED. QUOTE FOR SPARES SEPERATELY FOR BOTH MANDATORY AND ANTICIPATORY SPARES. (PAYMENT AT ACTUALS FOR ANTICIPATORY SPARES) (E) HULL SURVEY WILL BE UNDERTAKEN BY NSRY (KOC) - NOT TO BE QUOTED.
SHIPYARD IS REPONSIBLE FOR THE SAFETY OF THE VESSEL AND THE VESSEL'S PROPERTY FROM INCLEMENT AND ADVERSE WEATHER, FOR SAFETY AND SECURITY OF ALL ITEMS/ MATERIAL/EQUIPMENT THAT IS DEGUTTED/REMOVED FROM ONBOARD THE SHIP AND THE SAME ITEM IS TO BE FITTED ONBOARD, WITHIN THE QUOTED COST. SHIPYARD IS TO ESTABLISH A SECURITY PERIMETER AROUND THE VESSEL WITH 2 SENTRIES ROUND THE CLOCK. SHIPYARD EXECUTIVES/ STAFF/WORKERS/CONTRACTORS SHALL STRICTLY ABIDE BY ALL NAVAL PROCEDURES / INSTRUCTIONS INTIMATED VERBALLY OR IN WRITING BY SHIP'S OFFICERS AND PROJECT MONITORING OFFICERS. ALL SHIPYARD WORKERS /CONTRACTORS / STAFF ENTERING ONBOARD FOR WORK SHALL BE IN POSSESSION OF VALID ID CARDS AND SHALL SHOW THE SAME WHILE ENTERING/LEAVING OR AS DIRECTED. THE PASSES FOR OFFICERS, PMT AND SAILORS TO BE ISSUED ON ARRIVAL OF THE VESSEL WITH VALIDITY TILL ONE MONTH POST COMPLETION OF REFIT. THE ENTRY/ EXIT TO SHIPYARD WILL CONTINUE EVEN IN ABSENCE OF SHIPYARD PASSES AGAINST GOVT ISSUED I CARDS. PRIORITY ENTRY TO ALL NAVAL OFFICERS FOR ENTRY/EXIT TO SHIPYARD, SAILORS OF THE SHIP AND PROJECT MONITORING TEAM TO BE GIVEN SPECIAL CHANNEL FOR UNINTERRUPTED MOVEMENT.
SHIPYARD TO PERMIT UNRESTRICTED ENTRY /EXIT OF MATERIAL/ SPARES/ ITEMS/ EQUIPMENTS ON SHIP'S AND PROJECT MONITORING OFFICER'S LETTER AT ANY HOUR OF THE DAY. IMMEDIATE CLEARANCE (WITHIN 05 MIN) TO BE GIVEN BY SHIPYARD ON VERBAL INTIMATION/EMAIL/LETTER FROM SHIP AND PROJECT MONITORING TEAM.SHIPYARD TO PERMIT ENTRY/EXIT OF INDIVIDUALS OF ANY FIRM /COMPANY/ ORGANIZATION /GUESTS ONBOARD THE VESSEL ON SHIPS AND PROJECT MONITORING OFFICERS LETTER. PREFERENTIAL /IMMEDIATE CLEARANCE(WITHIN 05 MIN) TO BE GIVEN BY SHPYARD BY VERBAL INTIMATION /EMAIL/LETTER FROM SHIP OR PROJECT MONITORING TEAM. ALL SHIPYARD WORKERS/ SUBCONTRACTORS ETC TO BE CHECKED/SCANNED PRIOR ENTRY ONBOARD THE SHIP AND ALSO ALL ITEMS/BAGS TO BE X-RAYED. ENSURE ALL SKILLED AND UNSKILLED PERSONNEL BEING HIRED ARE PROPERLY TRAINED AND QUALIFIED BY A CERTIFIED AGENCY/ INSTITUTE/ ORGANISATION. CCTV RECORD (WITH NIGHT VISION) OF THE ENTIRE SHIP'S PERIMETER TO BE MAINTAINED FOR THE DURATION OF REFIT. ALL PERSONNEL BEING DEPLOYED ON BEHALF OF SHIPYARD/ OEM REPS/ CONTRACTS ARE TO BE DONNING PERSONNEL PROTECTION EQUIPMENT AND SAFETY GEARS. THEY ARE TO BE EQUIPPED WITH APPROPRIATE TOOL KITS.
ADMIN SERVICES
TWO SEPARATE SHORE TOILETS AND WASHROOMS FOR SHIP'S OFFICERS AND CREW SUITABLE FOR 20 OFFICERS AND 185 SAILORS. PAYMENT AT ACTUALS.
(A) ONE AC DINING HALL WITH SOFA SET AND ADEQUATE CUTLERY, DINING TABLE AND CHAIRS FOR DINING OF 20 OFFICERS AT A TIME NEAR SHIPS BERTH (WITHIN 200 MTRS). PAYMENT AT ACTUALS
(B) ONE AC DINING HALL EACH FOR DINING OF JUNIOR SAILORS AND SENIOR SAILORS AT A TIME WITH SOFA SET, SUITABLE DINING TABLE AND CHAIRS, NEAR SHIPS BERTH. PAYMENT AT ACTUALS
PROVISION OF SHORE GALLEY WITH 08 LPG BURNERS/ ELECTRIC HOT PLATES, INCLUDING COST OF GAS/ ELECTRICITY AND SINK WITH WATER CONNECTION FOR WASHING OF PLATES, UTENSILS ETC. FRESH WATER RO PURIFIER/ HEAVY DUTY AQUA GUARD TO BE FITTED FOR MEETING GALLEY AND SHIPS CREW WATER REQUIREMENT (AT TWO LOCATIONS VIZ GALLEY AND DINING HALL). PAYMENTS AT ACTUALS.
AC SPACE FOR STORAGE SPACE (12 FEET X 12 FEET) FOR FRESH RATION. PAYMENT AT ACTUALS
AC SPACE FOR STORAGE SPACE (12 FEET X 12 FEET) FOR DRY RATION. PAYMENT AT ACTUALS
SUPPLY 500 LITRES OF DRINKING WATER PER DAY ONBOARD. PAYMENT AT ACTUALS
(A) PROVIDE FULLY FURNISHED OFFICE SPACE( 400 SQFT) FOR OI/C PROJECT MONITORING TEAM OF NSRY(KOC) WITH ACs, WORK STATION, LOCKERS, STORAGE, ATTACHED TOILET, WASHROOM, CHANGING ROOM, LAND LINE TELEPHONE WITH STD AND 01 BROAD BAND CONNECTION AND TV (44INCH ATLEAST WITH DISH CONNECTION). ONE(01) ALL-IN-ONE-PCs BRANDED /NOT ASSEMBLED, MINIMUM i5 PROCESSOR, SCREEN SIZE ATLEAST 20 INCHES, ATLEAST 8GB SINGLE RAM, WITH ORIGINAL WINDOWS 10 AND ABOVE AND ORIGINAL MS OFFICE WITH ONE(01) MULTIFUNCTION COLOUR LASER PRINTER(4-IN-1) WITH ADDITIONAL SIX COMPLETE SETS OF PRINTER CARTRIDGES AND PAPER SHREDDER (NOTE: ALL PCs/IT PERIPHERALS PROVIDED TO PROJECT MONITORING TEAM WILL BE RETURNED TO SHIPYARD POST DEGAUSSING BY IN TEAM ON COMPLETION OF DELIVERY PERIOD). PAYMENT AT ACTUALS
(B) FULLY OPERATIONAL PANTRY WITH DAILY HOUSEKEEPING, CLEANING AND HYGIENE UPKEEP TO BE PROVIDED WITH BELL AND ATTENDENT(16 HOURS PER DAY). TEA, COFFEE AND SNACKS WITH SUITABLE CROCKERY AND CUTTLERY TO BE PROVIDED AS REQUIRED DURING THE PERIOD OF 16 HRS PER DAY. PAYMENT AT ACTUALS
(C) PROVIDE FULLY FURNISHED OFFICE SPACE( 400 SQFT) WITH FOR OFFICERS AND STAFF OF RMT(COMMERCIAL DEPARTMENT, NSRY(KOC) WITH ACs, TWO WORK STATIONS, TWO LOCKERS AND STORAGE, WITH REFURBISHED TOILET, WASHROOM, CHANGING ROOM, LAND LINE TELEPHONE WITH STD AND 01 BROAD BAND CONNECTION AND TV (MINIMUM 42 INCH ATLEAST WITH DISH CONNECTION). TWO(02) ALL-IN-ONE-PCs BRANDED/NOT ASSEMBLED, MINIMUM i5 PROCESSOR, SCREEN SIZE ATLEAT 20 INCHES, ATLEAST 8GB SINGLE RAM, WITH ORIGINAL WINDOWS 10 AND ABOVE AND ORIGINAL MS OFFICE WITH TWO(02) MULTIFUNCTION COLOUR LASER PRINTER (3-IN-1) ONE FOR EACH PC WITH ADDITIONAL SIX COMPLETE SETS OF PRINTER CARTRIDGES ONE SET FOR EACH PRINTER (TOTAL 12 SETS OF CARTRIDGES)AND PAPER SHREDDER (NOTE: ALL PCS/IT PERIPHERALS PROVIDED TO PROJECT MONITORING TEAM WILL BE RETURNED TO SHIPYARD POST DEGAUSSING BY IN TEAM ON COMPLETION OF DELIVERY PERIOD). PAYMENT AT ACTUALS
PROVIDE REFIT DATA ENTRY OPERATORS WITH ADEQUATE COMPUTER KNOWLEDGE WITH EXPERIENCE IN MS PROJECT, OFFICE (PPT, WORD, EXCEL, ACCESS, PROJECT ETC) AND MINIMUM 02 YEARS OF WORKING EXPERIENCE IN SHIP REPAIR YARD. QTY - 02. PAYMENT AT ACTUALS (ADDITIONAL DAYS INCLUDED FOR PRE-REFIT AND POST-REFIT ACIVITIES).
PROVIDE REFIT COORDINATORS EACH WITH MINIMUM B.TECH (MECH/ ELECTRICAL/ELECTRONICS/NAVAL ARCHITECTURE) AND DIPLOMA IN MANAGEMENT (PREFERABLY) WITH MINIMUM 02 YEARS OF WORKING EXPERIENCE IN SHIP REPAIR YARD. QTY - 01. PAYMENT AT ACTUALS (ADDITIONAL DAYS INCLUDED FOR PRE-REFIT AND POST-REFIT ACIVITIES).
PROVIDE REFIT TECHNICAL SUPERVISOR [PREFERABLY RETIRED SAILORS (ERA/EAP)] FOR PLANNING & COMMERCIAL DIVISION OF NSRY. ALTERNATELY, PERSONAL WITH MINIMUM B.TECH (MECH/ ELECTRICAL/ELECTRONICS/NAVAL ARCHITECTURE) AND DIPLOMA IN MANAGEMENT (PREFERABLY) WITH MINIMUM 02 YEARS OF WORKING EXPERIENCE IN SHIP REPAIR YARD. QTY - 01. PAYMENT AT ACTUALS (ADDITIONAL DAYS INCLUDED FOR PRE-REFIT AND POST-REFIT ACIVITIES).
PROVIDE REFIT ACCOUNTANT-CUM-AUDITORS FOR COMMERCIAL DEPARTMENT OF NSRY, KOCHI WITH AT LEAST MCOM DEGREE AND HAVING ACCOUNTING AND AUDIT EXPERIENCE IN SHIP REPAIR CONTRACTS AND BILLS. MINIMUM 02 YEARS OF WORKING EXPERIENCE IN SHIP REPAIR YARD REQUIRED. QTY - 01. (ADDITIONAL DAYS INCLUDED FOR PRE-REFIT AND POST-REFIT ACIVITIES). PAYMENT AT ACTUALS
PROVIDE TWO FIVE SEATER AC CARS ONE EACH FOR FOR PROJECT OFFICER AND COMMERCIAL DEPT OFFICER (12 HRS/120 KMS PER DAY) (CAR REGISTRATION NOT TO BE OLDER THAN 2019, WHITE COLOUR WITH NO FANCY STICKERS, FITTED WHITE SPOTLESS COTTON SEAT COVERS, SANITISATION DAILY). DRIVER OF THE VEHICLES SHOULD POSSES VALID POLICE CLEARENCE CERTIFICATE. PAYMENT AT ACTUALS
ONE SEVEN SEATER CARS FOR VISITING OFFICERS/ RMT STAFF ON AS REQUIRED BASIS AT SHIPYARD/AS REQUIRED (10 HRS/ 80 KM PER DAY). (CAR REGISTRATION NOT TO BE OLDER THAN 2019, WHITE COLOUR WITH NO FANCY STICKERS, FITTED WHITE SPOTLESS COTTON SEAT COVERS, SANITISATION DAILY). DRIVER OF THE VEHICLES SHOULD POSSES VALID POLICE CLEARENCE CERTIFICATE. PAYMENT AT ACTUALS
PROVIDE A 25 TONNER TRUCK (WITH TRANSIT INSURANCE, PACKING AND LOADING) FOR TRANSPORTING SHIPS MATERIAL/ SPARES FROM SHIPYARD TO MO(K)/ NSRY(K) REQUIREMENT FOR TRANSPORT WILL BE INTIMATED ONE DAY IN ADVANCE. PAYMENT AT ACTUALS.
(A) PROVIDE ONE AC SEDAN CAR FOR CAPTAIN (12 HRS/120 KMS PER DAY).
(C) PROVIDE TWO AC 7-SEATER CAR FOR SHIPS OFFICERS (12 HRS/120 KMS PER DAY).
(C) PROVIDE TWO 25-SEATER AND ONE 50 SEATER BUS (12 HRS/120 KMS PER DAY) FOR SHIP’S COMPANY.
SHIPYARD TO ENSURE MOVEMENT OF STEEL FROM MO (KOC) / NSRY (KOC) TO SHIPYARD INCLUDING LOADING / UNLOADING, MANPOWER (04 MEN), TRAILER (CAPACITY 40 TON) AND CRANE (CAPACITY 15 TON). COST PER KM TO BE INDICATED TOO. PAYMENT AT ACTUALS.
(H) AC DELUXE SUITES FOR OFFICERS OF PROJECT (REFIT) MONITORING TEAM OF DOCKYARD WITH ATTACHED TOILETS AND BATHROOMS DURING REFIT DURATION. CABLE TV WITH DISPLAY UNIT AT EACH ACCOMMODATION. QTY - 01. PAYMENT AT ACTUALS.
(J) AC ROOMS FOR 02 SAILORS/ PERSONNEL OF NSRY(KOC) DEPUTED FOR MONITORING OF REFIT ON TWIN SHARING BASIS WITH ATTACHED TOILETS AND BATHROOMS , CABLE TV AND DISPLAY UNITS DURING REFIT DURATION. PAYMENT AT ACTUALS.
AC DELUXE SUITS FOR CO AND 03 HODS. WITH ATTACHED TOILETS AND BATHROOMS DURING REFIT DURATION, CABLE TV WITH DISPLAY UNIT AT EACH ACCOMODATION. TOTAL QTY - 04. PAYMENT AT ACTUALS.
AC DELUXE ROOMS FOR 10 OFFICERS WITH ATTACHED TOILETS AND BATHROOMS DURING REFIT DURATION, CABLE TV WITH DISPLAY UNIT AT EACH ACCOMODATION. QTY - 20. PAYMENT AT ACTUALS.
AC ROOMS FOR 50 SENIOR SAILORS OF SHIP ON TWIN SHARING BASIS WITH ATTACHED TOILETS AND BATHROOMS, CABLE TV AND DISPLAY UNITS DURING REFIT DURATION. PAYMENT AT ACTUALS. QTY-30
AC DORMITORY FOR JUNIOR SAILORS (80 MEN) OF SHIP WITH ATTACHED TOILETS, BATHROOMS, CABLE TV AND DISPLAY UNITS DURING REFIT DURATION. PAYMENT AT ACTUALS.
(K) PROVIDE STATIONARY / OFFICE ITEMS FOR REFIT MONITORING TEAM FOR ENTIRE REFIT DURATION PERIOD. CATER FOR SUPPLY OF ITEMS WORTH RS. 10000/- (TEN THOUSAND RUPEES ONLY) PER MONTH. REQUIREMENT WILL BE INTIMATED BY COA / NSRY(KOC). PAYMENT AT ACTUALS.
(A) AIR CONDITIONED & FULLY FURNISHED OFFICE SPACE (400 SQ FEET) ATTACHED TOILET FOR COMMANDING OFFICER.
(B) L- SHAPED TABLE AND HIGH BACK EXECUTIVE CHAIR, FIRMLY MOUNTED GODREJ SAFE AND ONE STRONG LOCKER, WITH INTERNET, LED TV, DTH WITHIN 200 M OF SHIP'S BERTH.
(C) PANTRY AREA TO BE PROVIDED WITH BELL.
(A) THREE AIR-CONDITIONED OFFICE SPACES FOR SHIP’S OFFICERS (ALONG WITH SOFA SET)
(B) ONE OFFICE SPACE FOR REFIT OFFICE. WORK STATIONS FOR TEN SAILORS WITH TELEPHONE EXTENSION LINES.
(C) ONE MULTI FUNCTIONAL PRINTER
PROVIDE ONE CHANGING ROOM WITH LOCKERS AND ATTACHED WASH ROOM FOR 10 NSRY(K) WORKERS.
DAILY HYGIENE MAINTENANCE/ UPKEEP/ CLEANSHIP OF ALL ABOVE MENTIONED ROOMS/ HALLS/ OFFICE SPACES/ WASH ROOMS.
PROVIDE FIVE CONTAINERS/ LAY-APART STORE FOR STOWAGE AND PRESERVATION OF ITEMS DURING REFIT TIME.
PROVIDE TWO AC PORTABLE CABINS (ONE EACH) FOR OOD AND DUTY WATCH DURING NIGHT ADJACENT TO SHIP IN JETTY FOR THE FULL REFIT DURATION.
PROVIDE PORTABLE 06 WC's ON JETTY (02 FOR SHIPS OFFICERS AND 04 FOR CREW)
PROVIDE TWO LAND LINE STD TELEPHONE CONNECTION WITH FAX (01) FACILITY FOR SHIP STAFF.
PROVISIONING OF REFIT MONITORING SOFTWARE AND REQUISITE HARDWARE VIZ STANDALONE PCS (QTY – 3), SERVER (QTY - 01), OFC (AS REQUIRED) ETC FOR MONITIORING OF REFIT. SOFTWARE SHOULD BE ABLE TO MONITOR THE REAL TIME PROGRESS OF REFIT IN A MULTIPLE REFIT ENVIRONMENT AND INDICATE CHANGES IN REFIT TIMELINES AS AS RESULT OF VARYING DYNAMICS IN REFIT VIZ ALLOCATION OF PRODUCTION RESOURCES, MANPOWER, INCREASE IN SOW WARRANTING MORE MANDAYS AS AGAINST ORIGINALLY ENVISAGED ETC. TRAINING IS TO BE IMPARTED ON OPERATION/ MAINTENANCE OF SOFTWARE TO YARD/ IN PERSONNEL. THE SOFTWARE ON COMPLETION OF REFIT TO BE HANDED OVER TO IN. HARDWARE WILL BE RETURNED TO SHIPYARD POST DEGAUSSING BY IN TEAM ON COMPLETION OF DELIVERY PERIOD. THE FIRM TO RENDER AFTER SALES SERVICES UNDER WARRANTY CLAUSE FOR 01 YEAR.
PROVISIONING OF 01 AC SEDAN CAR (NOT MORE THAN 3 YEARS OLD FROM THE YEAR OF REGISTRATION) FOR THE ENTIRE DURATION OF MR WITH A DAILY LIMIT OF 120 KM AND 12 HOURS.
PROVISIONING OF FULLY FURNISHED OFFICE SPACE (300 & 120 SQUARE FEET) WITH ATTACHED BATHROOMS. FOR 04 OFFICERS AND 03 STAFFS OF NPOL IN THE SHIPYARD PREMISES FOR NR DURATION. THE OFFICE SPACE SHOULD HAVE OPTIMUM AIR CONDITIONING, LIGHTING AND SEATING ARRANGEMENTS, 55 INCH DISPLAY FOR TELE CONFERENCING AND PRESENTATION, TWO DESK TOP COMPUTERS WITH 17 PROCESSOR OR ABOVE CONFIGURATION, ONE LANDLINE TELEPHONE WITH STD & HIGH-SPEED INTERNET FACILITY WITH A DAILY LIMIT OF 6GB, 0LPC, 0LMULTIFUNCTION MACHINE (FAX, COPIER/SCANNER/COLOUR PRINTER), OFFICE STATIONARY ITEMS, MICROWAVE, REFRIGERATOR, COFFEE MAKER, DRINKING WATER & REFRESHERS, HAND SANITIZING LIQUIDS. PROVISION OF STATIONARY ITEMS AS PER REQUIREMENT DURING REFIT TIME.
PROVISION OF ONE PC / LAPTOP / TABLET ALONG WITH ALL ACCESSORIES FOR THE PROJECT HEAD AT NPOL TO BE USED FOR THE MONITORING/PRESENTATION OF THE PROJECT AT NPOL, CSL AND AT OTHER CONCERNED OFFICES.
PROVISIONING OF LUNCH AND REFRESHMENTS AT SHIPYARD CANTEEN FOR THE DEPUTED NPOL OFFICERS (04 NOS), STAFF (04 NOS) ON AS REQUIRED BASIS FOR THE DURATION OF REFIT OR ACTUAL DURATION OF NR WHICH EVER IS HIGHER
01 FULLY FURNISHED AC DELUXE SUITE (TWIN ROOMS) FOR HEAD, VESSEL MANAGEMENT OF NPOL WITH ATTACHED BATHROOM AND TOILET (SUITE SHOULD HAVE FACILITY FOR DTH, LED TV WITH HOME THEATRE, WIFI, STD PHONE, FRIDGE, GYSER). THE PACKAGE INCLUDES BREAKFAST, DINNER, ALONG WITH TEA AND SNACKS &LAUNDRY FACILITY.(REQUIRED IN CASE REFIT YARD IS OUT OF KOCHI.)
03 FULLY FURNISHED AC SUITES (TWIN ROOMS) FOR SCIENTIST /OFFICER'S WITH ATTACHED BATHROOM AND TOILET SUITE SHOULD HAVE FACILITY FOR DTH, LED TV WITH HOME THEATRE, WIFI, STD PHONE, FRIDGE, GYSER). THE PACKAGE INCLUDES BREAKFAST (REQUIRED IN CASE REFIT YARD IS OUT OF KOCHI.)
02 FULLY FURNISHED AC ROOM FOR OFFICER INCLUDING ATTACHED BATHROOM AND TOILET (ROOM SHOULD HAVE FACILITY FOR DTH, LED TV, WIFI, GYSER). THE PACKAGE INCLUDES BREAKFAST, DINNER,ALONG WITH TEA AND SNACKS &LAUNDRY FACILITY (REQUIRED IN CASE REFIT YARD IS OUT OF KOCHI.)
RECREATION ROOM, LEATHER SOFA SET, LARGE FULL HDLED TV, BLU- RAY PLAYER HOME THEATRE, SATELLITE HD CABLE CONNECTION. (REQUIRED IN CASE REFIT YARD IS OUT OF KOCHI.)
PROVISION OF PPE TO 08 NOS OF NPOL REFIT' MONITORING TEAM THIS INCLUDE OF SAFETY OVERALL (02 NOS EACH) ,SAFETY SHOE, GLOVES(LOT),EAR BUDS(LOT),GOGGLES, HELMETS & SAFETY HARNESS (EACH) (THE SIZES WILL BE PROVIDED BY NPOL)
THE PASSES FOR OFFICERS, PROJECT MONITORING TEAM AND SAILORS TO BE ISSUED TWO DAYS PRIOR TO ARRIVAL OF THE VESSEL WITH VALIDITY TILL COMPLETION OF REFIT. THE ENTRY/ EXIT TO SHIP YARD WILL CONTINUE EVEN IN ABSENCE OF SHIP YARD PASSES.
GENERAL SERVICES
(A) PROVIDE QA COVERAGE FOR ENTIRE WORK PACKAGE BY A REGISTERED OUTSIDE INSPECTING AGENCIES EX - LRS, IRS, ABS ETC.
(B) SHIPYARD TO SUBMIT QAP AND QIP 2 WEEKS PRIOR COMMENCEMENT OF REFIT.
(C) A DETAILED PERT / GANTT CHART TO BE SUBMITTED TO SHIP AND NSRY 15 DAYS PRIOR COMMENCEMENT OF REFIT. THE PERT/ GANTT CHART TO BE UPDATED ON FORTNIGHTLY BASIS AS PER THE PROGRESS OF REFIT AND SUBMITTED TO RMT.
DOCK BLOCK PREPARATION FOR DOCKING OF SHIP IN VERSION - I & II, BOTH CENTRE LINE AND SIDE BLOCKS. SHIPYARD TO ARRANGE FOR THIRD PARTY INSPECTION AND HAND OVER DULY RECOMMENDED CERTIFICATE FOR DOCK BLOCK PREPARATION TO NAVY POST INSPECTION. SPECIAL ATTENTION TO DETAILS OF GANDOLA AND ADEQUATE CLEARANCES FOR UNDERWATER FITTINGS.
(A) DOCKING AND UNDOCKING OF THE VESSEL IN VERSION- I &II. (DURATION 40 DAYS). SHIPYARD TO PLAN AND COMPLETE ALL DRY DOCK RELATED WORK WITH IN DRY DOCK TIME. ELSE SHIPYARD TO CONTINUE DOCKING OF SHIP ALONG WITH ALL ALLIED SERVICES TILL COMPLETION OF WORK WITH OUT ANY EXTRA COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD OF CONTRACT.
(B) MOVEMENT OF VESSEL DURING COURSE OF REFIT FOR DOCKING/UNDOCKING OR ANY OTHER PURPOSE. (PAYMENT AT ACTUALS)
(C) MOORING/ UNMOORING AND LINE HANDLING FOR EACH OPERATION ESTIMATED FOR FOUR OPERATIONS. (PAYMENT AT ACTUALS)
PROVIDE WHARFAGE / WET BASIN FACILITIES (WITH 7 M DEPTH AT ALL CONDITIONS) AS REQUIRED FOR COMPLETION OF WORK PACKAGE. MAXIMUM DURATION OF WHARFAGE WILL BE 15 DAYS. ANY DREDGING REQUIRED TO BE CARRIED OUT PRIOR TO COMMENCEMENT OF REFIT AT SHIPYARD'S COST.
(A) PROVISION OF SHORE POWER 3 PHASE, 415V, 50HZ, FOR 40 DAYS IN DRY DOCK & FOR THE DURATION OF STAY FOR COMPLETE REFIT (RATES AS PER ACTUAL READING ON BOARD/ ENERGY METER READING INSTALLED BY SHIPYARD) POWER SUPPLY CABLE AND METER TO BE PROVIDED BY SHIPYARD. QUOTE FOR 5000 KWH/DAY. PAYMENT AT ACTUALS AS PER FINAL READING. SHIPYARD TO INSTALL POWER METER/ ENERGY METER IN SUPPLY LINE
(A) PROVISION OF STABILIZED POWER 250 KW SUPPLY (3 PHASE, 415V,50HZ) FOR ENERGISATION OF ELECTRICAL EQUIPMENT PRIOR TO AVAILABILITY OF ONBOARD DAs (PAYMENT AT ACTUALS)
(B) QUOTE FOR CONNECTION/ DISCONNECTION TAKEN FOR 4 TIMES). PAYMENT AT ACTUALS
(C) SHIP SHOULD BE EARTHED AT 04 POINTS WHILE IN DRY DOCK. EARTHING CABLE TO BE SUPPLIED BY SHIPYARD.
(A) PROVIDE SIX SEA WATER FIRE MAINS WITH 08 BAR PRESSURE DURING DRY DOCK WITH CONTROL VALVES AND NECESSARY SUPPLY HOSES. SHIPYARD TO CONNECT REFERENCE PRESSURE GAUGE AT DISCHARGE LINE. CALIBRATION CERTIFICATE OF PRESSURE GAUGES TO BE SUBMITTED.
(B) CONNECTION AND DISCONNECTION OF LINES.
SHIPYARD TO PROVIDE TWO PORTABLE AC UNITS (MINIMUM CAPACITY 30 TR EACH) WITH 04 AIR HOSES AND VENT PIPES TO SHIP DURING THE PERIOD OF WHARFAGE AND DRY DOCKING. ADEQUATE FLEXIBLE HOSES TO CARRY CHILLED AIR FROM PORTABLE AC UNITS TO ACCOMMODATION AREAS, IN SHIP'S SUPERSTRUCTURE AND BELOW DECKS AND ELECTRONICS/ CONTROLS/ SENSOR COMPARTMENTS OF THE SHIP TO BE CATERED BY SHIP YARD. PAYMENT AT ACTUALS. RIGGING OF REQUIRED HOSES WIL BE RESPONSIBILITY OF THE SHIPYARD.
PROVOSIONING, INSTALLATION, COMMISSIONING & MAINTENANCE OF 6 NOS SPLIT AC PLANTS OF 2 TR EACH IN SPECIFIC LOCATIONS OF ONBOARD SHIP IN THE LOCATIONS INDICATED BY SS CATERING FOR DUTY WATCH PERSONNAL STAYING ONBOARD DURING REFIT PERIOD. SHIPYARD TO MAINTAIN ALL 10 NOS SPLIT ACS THROUGHT THE DURATION FO THE REFIT. PROVISIONING/FITMENT ON APPROVAL OF COA.
(A) PROVIDE FRESH WATER 5 TONS PER DAY. PAYMENT AT ACTUALS.
(B) CONNECTION AND DISCONNECTION OF FRESH WATER SUPPLY.
PROVIDE FACILITIES FOR GARBAGE COLLECTION AND DISPOSAL ARRANGEMENTS (150 KG EACH) TWICE PER DAY FROM SHIP PAYMENT AT ACTUALS.
(A) PROVIDE JETTY CRANE 10-25 TON CAPACITY DURING THE REFIT (FOR NAVY'S REQUIREMENT) PAYMENT AT ACTUALS
(B) PROVIDE SERVICES OF 02 LISTERS AND 01 FORKLIFT FOR DURATION OF REFIT. PAYMENT AT ACTUALS
CLEANING OF ALL TANKS, VENTILATION AND OBTAINING GAS FREE CERTIFICATE IS THE RESPONSIBILITY OF SHIPYARD (PAYMENT ON ACTUALS).
PROVIDE 30 TRAINED FIRE FIGHTING HOT WORK SENTRIES WITH 15 SUPERVISORS FOR 16 HRS EACH DAY FOR THE DURATION OF REFIT. NUMBER OF SENTRIES REQUIRED WILL BE INTIMATED BASED ON SHIP YARD'S REQUISITION FOR HOT WORK RECEIVED THE PREVIOUS DAY. PAYMENT AT ACTUALS. NO SMARTPHONES TO BE USED BY FIRE/ HOT WORK SENTRIES.
TEMPORARY LIGHTING AND VENTILATION ONBOARD FOR THE ENTIRE DURATION OF REFIT TO BE PROVIDED IN ALL MACHINERY COMPARTMENTS, COMPARTMENTS WITHIN SUPERSTRUCTURE, ALL ALLEYWAYS/ PASSAGE WAYS, CARGO SPACE, BALLAST TANKS MUST BE WELL LIT WITH 24V DC LAMPS. PROVISION OF MAXIMUM 20 LIGHT POINTS PER DAY. PAYMENT AT ACTUALS. PROVISION OF FIVE PORTABLE INTAKE/ EXHAUST BLOWERS OF MINIMUM 05 KW RATING WITH ADEQUATE HOSING ARRANGEMENT. ARRANGEMENT ON AS REQUIRED BASIS. PAYMENT AT ACTUALS..
(A) PROVIDE TWO INDUCTIVE AND LOAD BANK 500/1000 KW FOR LOAD TRIALS OF DA INCLUDING HIRE CHARGES WITH OPERATOR CREW . PAYMENT AT ACTUALS.
(B) SHIFTING/CONNECTION.
(A) PROVIDE 01 RESISTIVE LOAD BANK 150 KW FOR LOAD TRIALS OF HELO STARTING RECTIFIER. HIRE CHARGES WITH OPERATOR CREW. PAYMENT AT ACTUALS.
(B) PROVIDE ONE M-LOAD BANK FOR CARRYING OUT OF DYNAMIC CHECKS TRIALS OF HELO STARTING CONVERTOR (200V, 400HZ,3PH) AND DIESEL ALTERNATORS INCLUDING HIRE CHARGES WITH OPERATOR CREW. PAYMENT AT ACTUALS.
(C) SHIFTING/ CONNECTION.
SULLAGE BARGE TO BE PROVIDED ON THREE OCCASIONS FOR SHIP'S OWN REQUIREMENT. ONCE PRIOR COMMENCEMENT OF REFIT, ONCE AFTER DOCKING AND ONCE AFTER TRIALS. PAYMENT AT ACTUALS.
ANALYSIS OF LUBE OIL, COOLANT, HYDRAULIC OIL AND PORTABLE WATER OF ALL MAIN ENGINES, DAs, GEAR BOXES, AUXILIARY MACHINERY, DECK HANDLING GEAR TO BE CARRIED OUT THROUGH NABL CERTIFIED LABORATORY AND TWO COPIES OF EACH REPORT TO BE SUBMITTED WITHIN 24 HOURS OF TEST UNDERTAKEN. PAYMENT AT ACTUALS. (A) LUB OIL TESTS BY USING METHOD OF ASTM D445:- (I) VISCOSITY @ 400C(cSt) (II) VISCOSITY @ 1000C DEGREE (cSt) (III) VISCOSITY INDEX (CALCULATED)
(B) WATER CONTENT (% VOLUME) BY ASTM D 95 METHOD.
(C) FLASH POINT (DEGREE CELSIUS) BY ASTM D92 METHOD.
(E) TAN (Mg KOH/g) BY ASTM D644 METHOD.
(F) COOLANT TEST/FRESH WATER ADDITIVE TEST. FOLLOWING TO BE ANALYSED: - (I) PH VALUE. (II) CHLORIDE CONTENT. (III) PERCENTAGE OF INHIBITOR. (IV) HARDNESS. (V) ANY OTHER TEST REQUIRED.
(G) POTABLE WATER TEST TO BE CARRIED OUT TO ASCERTAIN SUITABILITY FOR DRINKING WATER
PROVIDE MEDICAL/ AMBULANCE COVER FOR SHIP’S ENTIRE DURATION IN SHIPYARD. AMBULANCE TO BE IN SHORT NOTICE (WITHIN 2 MINS) AND CONTACT NUMBER OF DUTY STAFF TO BE MADE AVAILABLE TO SHIP.
PROVIDE FIRE FIGHTING ENGINE/ TRUCK SERVICE FOR THE ENTIRE DURATION OF SHIP’S STAY IN SHIPYARD AND TO BE MADE AVAILABLE IN SHORT NOTICE.
TBN (MG KOH/G)) BY ASTM D644 METHOD
TAN (MG KOH/G)) BY ASTM D644 METHOD
ADVANCE TEST :- THE ADVANCE TEST OF LUB OIL SHOULD COVER THE FOLLOWING BY USING ASTM D5185 METHOD (150 SAMPLES)
METALIC PARTICALS OF FE, CR, NI, AL, CU, SN, PB AND AG TO BE ANALISED IN TERMS OF PPM IN THE GIVEN SAMPLES OF LUB OIL.
CONTAMINANTS OF SI, NA AND MG TO BE ANALISED IN TERMS OF PPM IN THE GIVEN SAMPLES OF LUB OIL.
COOLENT TEST / FRESH WATER ADDITIVE TEST:- THE FOLLOWING PARAMETERS TO BE ANALYSIS FOR GIVEN SAMPLE (75 SAMPLES)
PH VALUE
CHLOLORIDE CONTENT
PERCENTAGE OF INHIBITOR
HARDNESS
ANY OTHER TEST REQUIRED.
POTABLE WATER TEST TO BE CARRIED OUT TO ACERTAIN THE SUITABLITY FOR DRINKING WATER (50 SAMPLES)
VISCOSITY @ 20% IN TERMS OF CST BY USING METHOD OF ASTM D445
VISCOSITY @ 50% IN TERMS OF CST BY USING METHOD OF ASTM D446
VISCOSITY INDEX RESULTS BY CALICULATIONS BY USING METHOD OF ASTM D447
TESTING BY VISUAL / APPREARANCE
WATER CONTENT TEST BY CRACKLE
WATER CONTENT TEST IN TERMS % VOL BY USING METHOD OF ASTM D95
BASIC TEST:- THE BASIC TEST OF LUB OIL TO BE UNDERTAKEN TIIMES AS INDICATED BELOW:-
PENTANE INSOLUBLE TEST IN TERMS OF % WT BY USING METHOD OF ASTM D893
TOLUENE INSOLUBLE TEST IN TERMS OF % WT BY USING METHOD OF ASTM D893
HYDRAULIC ADVANCE TEST SHOULD BE CARRIED OUT TO FIND OUT THE MEASUREMENT OF CONTAMINATION (SIZE OF QUANTITY OF MECHANICAL IMPURITIES) BY USING THE METHOD OF DEFSTAN 5-56/ ISSUE 2 (1982) TO MEET THE ISO 11500.(SHIP YARD TO CATER FOR 150 SAMPLES)
PROVISION OF CONTAINERS/ SAMPLE BOTTLES:- STANDARD CONTAINERS/ SAMPLE BOTTLES (CAPACITY OF 250 ML) TO BE PROVIDED BY SHIPYARDS FOR LANDING THE SAMPLES OF LUB OILS, COLLENTS, HYDRAULIC OILS ETC FOR ANYLASIS.
BY USING METHOD OF ASTM D445
VISCOSITY @ 40 DEGREE C (CST)
VISCOSITY @ 100 DEGREE C (CST)
VISCOSITY INDEX (CALCUATED)
WATER CONTENT (% VOL) BY ASTM D95 METHOD.
FLASH POINT ( DEGREE CENTIGRADE) BY ASTM D92 METHOD
THIRD PARTY INSPECTION FOR DOCK BLOCK PREPARATION - SHIPYARD TO ARRANGE THE NAVY APPROVED THIRD PARTY INSPECTION AGENCY (IRS/ ABS) FOR CHECKING THE ARRANGEMENT OF DOCK BLOCKS PREPARED BY SHIPYARD AS PER THE IHQ, MOD(N) APPROVED DOCKING PLAN. POST INSPECTION OF DOCK BLOCK PREPARATION, DULY RECOMMENDED CERTIFICATE BY THIRD PARTY INSPECTION AGENCY (IRS/ ABS) TO BE HANDED OVER TO NAVY.
COOLING WATER CONNECTION PROVISION OF COOLING WATER (ONE LINE) FOR RUNNING SHIPS AC PLANTS WITH FLANGE CONNECTION FOR A MAXIMUM DURATIONOF 100 DAYS. PAYMENT AT ACTUALS
HULL - PART I
NR 1. TANKS/ TANK TOPS. DRY COMPARTMENTS WITHOUT DECK COVERING:- TO BE SUBJECTED TO VISUAL SURVEY.
NR 1. TANKS/ TANK TOPS. DRY COMPARTMENTS WITH DECK COVERING: - THE SURVEY OF THE CONDITION OF THE DECK COVERING IS TO BE CARRIED OUT. THE DECK COVERING BE INSPECTED FOR CRACKS, BULGING/ UNDULATIONS, MECHANICAL DAMAGE ETC. DECK COVERING TO BE REMOVED FOR SURVEY.
PRE REFIT TRIALS. NR 1 CONDUCT APT WITH YARD ASSISTANCE AND IDENTIFY THE DEFECTS (APT MAY BE CARRIED OUT EITHER BY VACUUM OR PRESSURE METHOD DEPENDING ON THE LOCATION/ACCESSIBILITY OF THE COMPARTMENT / CLUSTER)
INTERNAL TANKS. NR 2. CARRY OUT PRESSURE TESTING OF TANKS AND SEA TUBES TO 0.2 KG/CM2 IN ACCORDANCE WITH NO 01/15. TANKS- 32. SEA TUBES - 12.
POST REFIT TRIALS. NR 3. CONDUCT APT WITH YARD ASSISTANCE AND IDENTIFY THE DEFECTS (APT MAY BE CARRIED OUT EITHER BY VACUUM OR PRESSURE METHOD DEPENDING ON THE LOCATION/ACCESSIBILITY OF THE COMPARTMENT / CLUSTER). APT OF WATERTIGHT COMPARTMENTS /CLUSTERS ARE TO BE SCHEDULED AT LEAST 08 WEEKS PRIOR TO DCD TO PROVE THE WATERTIGHT INTEGRITY OF THE COMPARTMENTS/ CLUSTERS /TANKS.
NR 1. CARRY OUT 100% ULTRASONIC GAUGING AND 100 % VISUAL SURVEY OF UNDERWATER HULL ( UNDERWATER AREA SHALL INCLUDING AREA 500 MM ABOVE BOOT TOP LINE) 1500 SQM USG POINTS-4000
SR 2. CHECK CLEARANCE OF LOWER AND UPPER BEARINGS.
SR 3. EXAMINE RUDDER PINTLE BEARING TO ENSURE THAT THEY ARE FULLY LUBRICATED BEFORE UNDOCKING
NR- 1. RUDDER STOCK HOUSING TUBE TO BE SURVEYED, REPAIRED AND PRESSURE TESTED TO A PRESSURE OF 0.2 KG/CM2.
NR- 2. EXAMINE RUDDER AND HULL PLATING IN VICINITY OF RUDDER SHAFT AND BRACKETS, RUDDER FITTINGS UP TO RUDDER HEAD AND KEEL. RECOAT RUDDER AND SHAFT BRACKET IAW NO 53/16
SR- 1. CARRY OUT PRE DOCKING CHECKS ON ANODES, REFERENCE ELECTRODES AND AUTO CONTROL UNITS AND PROVIDE CERTIFICATE. INERT ANODE- 04. RE- 02.
SR- 4. INSPECT ICCP ANODES /ELECTRODES AND THE DIELECTRIC SHIELD FOR ANY MECHANICAL DAMAGE IN DRY DOCK. CARRY OUT REPAIRS/REPLACEMENT OF ANODES AS NECESSARY, I.A.W WITH NO 53/16 AND LATEST POLICY GUIDELINES. ANODE- LEAD ALLOY ANODES, QTY- 04, REFERENCE ELECTRODE- ZINC REFERENCE ELECTRODE- 02 NOS
SR- 5. OPEN/ INSPECT AND CLEAN THE ICCP COFFERDAMS DURING DRY DOCKING OF THE SHIP TO PREVENT SEEPAGE OF WATER INTO COFFERDAM, THE CABLE ENTRY GLAND AND CABLE EXISTING GLAND AND COFFERDAM LID SHOULD BE MADE WATER TIGHT. AS AN ADDITIONAL MEASURES PUTTING WITH IHQ APPROVED / NMRL DEVELOPED SILICON COMPOUND IS TO BE CARRIED OUT AS PER PARA 26 OF 03/21.
SR- 14. SCRAP THE SURFACE OF ARALDITE PUTTY FILLED IN RECESS IN SECURING BOLTS/ ANODES/ RE WITH EMERY PAPER TO MAKE IT ROUGH AND APPLY FRESH COAT OF ARALDITE PUTTY IN THE RECESS AS A SAFE GUARD AGAINST AN INSULATION FAILURE
NR 1. REMOVE , CLEAN AND EXAMINE ALL THE GRATINGS. EXAMINE PLATING OF COATING AND ZINC OF INLET AND DISCHARGE AND AREA ADJACENT TO THEM, REPLACE GRATING ON COMPLETION OF ANY REPAIR AND RECOATING WORK ON INLETS, DISCHARGE AND GRATINGS. INLETS, DISCHARGE AND GRATING TO BE COATED IAW NO 53/16 AND POLICY ISSUED BY IHQ/ DNA FROM TIME TO TIME.
NR 2. OPEN UP / REMOVE ALL UNDERWATER INLETS AND OUTLETS . EXAMINATION OF ALL VALVES AND SEA TUBES TO BE UNDERTAKEN
NR 3. VISUAL SURVEY AND USG OF 50% OF SEA TUBES (AS INDICATED BY SS) POST REMOVAL OF VALVES. ENDOSCOPIC SURVEY OF REMAINING 50 % OF SEA TUBES MAY BE CARRIED OUT. SEA TUBES- 12 USG POINTS- 800
SR 1. SURVEY ALL UNDERWATER APPENDAGES/ FITTINGS FOR PITTING, CORROSION OR ANY DAMAGE TO PAINT. PARTICULAR ATTENTION TO BE PAID TO PAINT FAILURE/ DAMAGE TO AREA AROUND KEEL PLATE IAW. NO 01/15 AND UNDERTAKE REPAIR AS NECESSARY.
SR 2. CLEAN TO BARE METAL ALL CORRODED AREA AND AREA OF PAINT FAILURE OF UNDERWATER APPENDAGES AND PRESERVED IAW NO 53/16 AND POLICY ISSUED BY IHQ/ DNA FROM TIME TO TIME.
SR 4. EXAMINE UNDER WATER APPENDAGES FOR ROUGHNESS & UNFAIRNESS OR ANY DAMAGE PAYING PARTICULAR ATTENTION TO SHAFT BRACKETS, EDDY PLATE, ROPE GUARD, ETC. RENEW/ REPAIR THE UNFAIRED/ DAMAGED FAIRING FOR THEIR SMOOTHNESS.
SR 7. RECOAT SHAFT BRACKET IN ACCORDANCE WITH NO 53/16.
SR 9. CARRY OUT 100 % NDT OF THE WELD JOINT OF BILGE KEEL
NR 3. CARRY OUT ABRASIVE BLASTING OF COMPLETE DECK STRUCTURE AND APPLY FULL PAINT SCHEME AS PER NO 53/16.
SR 1. EXAMINE MAST STRUCTURE, WHIP AERIAL PLATFORMS AND THE SURROUNDING STRUCTURE ON DECK, EYE PLATES, LOAD CARRYING MEMBERS FOR SIGNS OF CORROSION. EXAMINE BOLTED, RIVETED AND INTERMITTENT WELDED STRUCTURE CONNECTIONS FOR SIGNS OF FRACTURE. PORTABLE AND SEMI PORTABLE FITTINGS TO BE REMOVED FOR CLOSER EXAMINATION OF STRUCTURE UNDERNEATH AND CARRYOUT REPAIRS AS PER SURVEY
SR 3. SURVEY AND TEST ALL STANDING & RUNNING RIGGINGS FITTED ON MAST STRUCTURE ALONG WITH ASSOCIATED FITTINGS. RENEW ASSOCIATED FITTINGS AS NECESSARY.
SR 4. CARRY OUT LOAD TESTING OF EYE PLATES.
NR 2. CARRY OUT COMPLETE SURVEY OF STRUCTURE AS PER NO 01/15 AND REPAIR/RENEW AS NECESSARY. PAINT THE MAST IN ACCORDANCE WITH NO 53/16, NCD 1493 AND POLICY DIRECTIVES ISSUED BY IHQ/ DNA FROM TIME TO TIME.
NR 2. CARRY OUT VISUAL SURVEY OF PLATING ABOVE WATER.
NR 1. CARRYOUT SAMPLE VISUAL SURVEY PAYING PARTICULAR ATTENTION TO DADOE AREA IN WET COMPARTMENTS AND RECTIFY DEFECTS.
NR 2. RENEWAL OF DEFECTIVE DECK COVERING AND RENEWAL OF DECK PLATES UNDERNEATH THE DECK COVERING TO BE UNDERTAKEN .DECK COVERING- FULL SCHEME
NR 2. DISMANTLE ALUMINUM PANELING AND EXAMINE CONDITION OF LAGGING. CUT LAGGING AT SAMPLE LOCATIONS ON LOWER PORTION OF BULKHEADS AND CHECK FOR CORROSION OF BULKHEADS AND DECK PLATING. CARRY OUT REPAIRS OF STRUCTURE, LAGGING AND PANELING AS NECESSARY AND RE-PAINT.
NR 3. CARRY OUT CONSTANT HEAT INPUT TEST AND NATURAL COOLING TEST.
NR 2. DECK COVERING. REMOVED FOR THE PURPOSE OF SURVEY TO BE RENEWED.
DECK LAGGING ETC. REMOVED FOR THE PURPOSE OF SURVEY TO BE RENEWED.
NR 4. DOCKYARD TO CARRY OUT VISUAL SURVEY AND UNDERTAKE REPAIR OF ACCESSIBLE INTERNAL SURFACES OF UNDERWATER HULL (TANK TOP BILGES, SHELL AND FRAME UPTO AND INCLUDING AREA 500 MM ABOVE BOOT TOPPING LINE ). DYD TO UNDERTAKE SAMPLE INTERNAL USG SURVEY INCLUDING STIFFENERS. USG POINTS -1200
SR 3.DISMANTLE TURNING OUT MECHANISM FOR SIGN OF CORROSION AND WEAR. REPAIR/RENEW AS NECESSARY. LOAD TESTING TO BE UNDERTAKEN POST REPAIRS. CERTIFICATE FOR LOAD TEST TO BE ISSUED TO SS FOR LOAD TEST RECORDS. SWL - 250KG, RUNNING – 375KG, STATIC – 500KG
SR 4.FIT BACK AND CHARGE WITH FRESH GREASE.
SR 7. UNDERTAKE IN -SITU VISUAL INSPECTION INCLUDING DIMENSIONAL CHECKS OF ASSOCIATED CONNECTING HOOK AND OTHER FASTENINGS.
NR 3. RENEW THE STEEL WIRE ROPE AND DESTRUCTION TEST CERTIFICATE TO BE ISSUED. 08 MM DIA , 30 MTR LENGTH
SR 1. EXAMINE ENTIRE BRAKE ASSEMBLY INCLUDING BRAKE LINING, BRAKE SHOE, BRAKE DISC AND ASSOCIATED FITTINGS. RENEW BRAKE LINING AND SHOE IF EXCESSIVELY WORN DOWN.
SR 2. SURVEY ALL WIRE ROPES, SPARE GEAR AND OTHER ASSOCIATED LIFTING GEARS. RENEW AS NECESSARY. (EFSWR OF 18 MM DIA X 30 MTR LENGTH EACH - 4 NOS)
SR 3. RECORD VOLT/AMPS/SPEED PARAMETERS OF DAVIT AND ASSOCIATED SYSTEM DURING LOAD TEST.
SR 4. LOAD TEST, EXAMINE THE COMPLETE DAVIT STRUCTURE AND ASSOCIATED LIFTING GEARS FOR FLAWS, DISTORTION, DEFLECTION ETC. FLAWS MUST BE EXAMINED BY NDT TECHNIQUES, CARRY OUT REPAIRS AS NECESSARY.
SR 5. UNDERTAKE IN-SITU VISUAL SURVEY AND EXAMINATION OF LIFTING AND ASSOCIATED CONNECTING HOOK/ FASTENING INCLUDING DIMENSIONAL CHECKS
NR 2. CARRYOUT COMPLETE OVERHAULING AND LOAD TESTING OF BOAT DAVIT. RENEW DEFECTIVE PART AS NECESSARY. CERTIFICATE FOR LOAD TEST TO BE ISSUED TO SS. SWL- 3.795 T, RUNNING- 5.175 T, STATIC- 7.590 TONS
NR 1. CARRY OUT FULL LOAD TRIALS AND OBSERVE FOR ANY ABNORMAL NOISE. DEFECT TO BE RECTIFIED IF ANY
NR 2. REMOVE GEAR CASES AND EXAMINE SECONDARY AND PRIMARY WORM AND WORM WHEEL DRIVE. STRIP AND EXAMINE ALL THRUST AND ROLLER BEARINGS. EXAMINE SLIPPING CLUTCH AND MAGNETIC BRAKES. EXAMINE FLEXIBLE COUPLINGS BETWEEN MOTOR AND CLUTCHES. ADJUST THE SLIPPING CLUTCH AS NECESSARY. RECTIFY THE DEFECTS, RENEW AS REQUIRED.
NR 3. ADJUST THE ELECTROMAGNETIC BRAKE IN ACCORDANCE WITH EQUIPMENT MANUAL. ADJUST CLUTCH AND AIR GAP OF ELECTROMAGNETIC BRAKE (AIR GAPSHOULD BE 0.5 MM - 1 MM). RENEW FRICTION DISC IF LINES ARE WORN OUT. EXAMINE FERRODO BRAKE LINING. RENEW IF WORN OUT.
NR 4.OVERHAUL CAPSTAN MOTOR, SUBJECT TO SPM CHECKS. RENEW BEARINGS AND APPLY FRESH GREASE
SR 3.REPLACE HAND BRAKE LINING
NR 1.CARRY OUT COMPLETE OVERHAUL AND TRIALS TO ENSURE SATISFACTORY PERFORMANCE ON COMPLETION OF OVERHAUL.
SR 1. CHECK THE BOLTS BY TIGHTENING THEM WITH THE SPECIFIED TORQUE. DURING THE OPERATION THE BOLTED CONNECTION MUST BE RELIEVED OF ALL TENSILE STRESSES COMING FROM EXTERNAL LOADS.
SR 2. CARRY OUT SLEW RING WEAR TEST BY MEASURING INSTRUMENTS WITH AN EXACTNESS OF AT LEAST 1/10 MM.
SR 3. HYDRAULIC OIL IN THE HYDRAULIC SYSTEM IS TO BE LABORATORY TESTED. THE LAB REPORT WILL HELP IN DETERMINING THE LIFE SPAN OF THE OIL.
SR 4. KEEP THE SYSTEM CLEAN. CHANGE FILTER ELEMENTS REGULARLY. CHANGE HYDRAULIC FLUID WHEN RECOMMENDED BY LAB OR ONCE EVERY YEAR.
SR 5. SLEW/WINCH/TRAVEL GEAR BOX (WITH OIL IMMERSED MULTI-PLATE BRAKE) TO BE CHANGED AS PER SPECIFIED GRADE OIL:- AGIP BLASIA 150. MAKE: HOMWORTHY.
SR 6 REPLACE THE FILTER ELEMENT OF THE IN-BUILT FILTERS.
SR 7. CARRY OUT ELECTRICAL CHECKS SUCH AS IR AND HV ON STARTER PANELS/ARMATURE WINDINGS. IF NECESSARY APPLY VARNISH BY BRUSH AND ALLOW TO DRY.
SR 8. CHECK SERVICEABILITY OF BEARING. IF NECESSARY OVERHAUL/REPAIR THE MOTOR.
SR 9. LOAD TEST OF CRANE AND ASSOCIATED FITTINGS IS TO BE CARRIED OUT AS PER NCD 3910. LOAD TEST CERTIFICATE TO BE PROVIDED TO SS. SWL- 1.76 T AT 10.4 MTR RADIUS. STATIC LOAD - 5 TONS.
NR 1. CARRYOUT LOAD TEST AND CERTIFICATE TO BE ISSUED TO SS. (A) TRACTION WINCH, SWL- 04 TONS (B) CTD WINCH, SWL-0.5 TONS, RUNNING-0.7 TONS (C) HYDROGRAPHIC WINCH, SWL-1.3 TONS, RUNNING-2.0 TONS (D) A FRAME, STATIC-150 KG (E) STERN GALLOW, SWL-08 TONS
NR 1. CARRY OUT OPERATIONAL TEST.
SR 1. SURFACE PREPARATION BY HYDRO BLASTING OF FOLLOWING ANCHORS ,CHAIN CABLE AND ASSOCIATED ACCESSORIES IS TO BE CARRIED OUT PRIOR TO UNDERTAKING VISUAL SURVEY. (A) FULL SHACKLES -14.
(B) HALF SHACKLES - 04.
(C) ANCHORS- 02.
(D) BOTTLE SCREW SLIP - 02.
(E) BLAKE SLIP - 02.
(F) SWIVEL PIECE - 04.
(G) LUGLESS JOINING SHACKLES - 22.
SR 4. CARRY OUR SURVEY OF ALL STOPPER ASSEMBLIES BY REMOVING THE JOINING SHACKLE AND OPENING UP THE PELICAN HOOK. HAMMER TEST ALL PARTS OF THE STOPPER ASSEMBLY, INCLUDING EACH CHAIN CABLE LINK AND THE PELICAN HOOK. VISUALLY EXAMINE ALL PARTS OF THE STOPPERS ASSEMBLY FOR CRACK AND DISTORTION .CHECK PELICAN HOOK ,BUCKLER LINK FOR OPERATION AND EASE OF MOVEMENT AND ABILITY TO SECURE THE PELICAN HOOK .IF THE BUCKLER LINK IS DIFFICULT TO OPERATE, IT MUST BE MADE WORKABLE BY CLEANING AND GREASING THE PIN. EXAMINE FOR CORROSION, PARTICULARLY IN STRESS AREAS. (A) FULL SHACKLES -14
(B) HALF SHACKLES - 04
(C) ANCHORS- 02
(D) BOTTLE SCREW SLIP - 02
(E) BLAKE SLIP - 02
(F) SWIVEL PIECE - 04
(G) LUGLESS JOINING SHACKLES - 22
SR 5. UNSCREW BOTTLE SLIP WHERE FITTED TO ITS FULLEST EXTENT AND THOROUGHLY CLEAN GREASE THREADS BEFORE ASSEMBLY
SR 6. UNDERTAKE SURVEY OF ADAPTOR PIECE FOR CRACKS OR WEAR AND UNDERTAKE REPAIR AS PER NO 2/21
SR 7. SURVEY ALL DECK FITTINGS ASSOCIATED WITH ANCHOR CHAIN CABLE ARRANGEMENT AND DECK EYES/EYE PLATES INCLUDING GUILLOTINE LINE ROLLER COMPRESSOR WITH COMPLETE STRUCTURE WHERE FITTED PAYING PARTICULAR ATTENTION EYE PLATE/EYE BOLTS ETC FOR WEAR ,CORROSION / DETERIORATION AND OVALITY OF HOLE .UNDERTAKE REPAIR /RENEWAL IAW NO 2/21
SR 9. SURVEY ANCHOR, CHAIN CABLE, SWIVEL ADAPTOR ,SHACKLES AND ALL ACCESSORIES FITTINGS. BREAK, CLEAN AND GREASE ALL JOINING SHACKLES. UNDERTAKE REPAIR /RENEWAL AS APPLICABLE IAW NO 02/21. A SURVEY REPORT ON IN 305 TO BE ISSUED TO SS. (A) FULL SHACKLES -14
(B) HALF SHACKLES - 04
(C) ANCHORS- 02
(D) BOTTLE SCREW SLIP - 02
(E) BLAKE SLIP - 02
(F) SWIVEL PIECE - 04
(G) LUGLESS JOINING SHACKLES - 22
NR 2. RETEST AND EXAMINATION OF CABLE IAW BR 367,ARTICLE 13 AND NO 02/21. FULL SHACKLES -14
RETEST AND EXAMINATION OF CABLE IAW BR 367,ARTICLE 13 AND NO 02/21. HALF SHACKLES - 04
NR 1. INSPECT ALL SAFETY NET FRAMEWORKS, FITTINGS AND STAYS. ROUTINES TO BE UNDERTAKEN FOR CORROSION REMOVAL.
NR 2. OVERHAUL /REPAIR 100 % OF VALVES
NR 3. EXAMINE ALL TOILETS ARE FIRMLY FITTED TO BASE .CHECK FOR DAMAGES TO BOWL ,SEAT COVERS, RUBBER COMPONENTS, FLUSH AND DISCHARGE VALVES FOR DEFECTS/DAMAGES. REPAIR AS NECESSARY.
NR 4. CARRY OUR CALIBRATION OF LOW AND HIGH LEVELS SWITCHES ,PRESSURE SWITCHES AND VACUUM GAUGE. RENEW IF DEFECTIVE.
NR 5. CARRYOUT CLEANING/ SURVEY OF COLLECTING TANKS AND REPAIR AS NECESSARY.
NR 7. OVERHAUL EVAC DISCHARGE PUMP. RENEW MECHANICAL SEALS ,BEARINGS ON PUMP AND FANS SIDE .RENEW IF WORN OUT.
NR 8. CHECK ALL FLEXIBLE HOSES AND REPLACE IF CRACKED AND DAMAGED.
NR 9. CARRY OUT FOLLOWING ROUTINES ON VACUUM INTERFACE VALVE:- (A) CLEAN THE TANK. (B) REMOVE/REPLACE MEMBRANES AND VENTILATOR DIAPHRAGMS. (C) REPAIR/REPLACE MINI CHECKS VALVES.
NR 10. UNDERTAKE CLEANING OF ALL SYSTEM/ SEWAGE PIPE LINE AND PRESSURE TESTING REPAIR/ RENEW AS NECESSARY.
NR 3. CARRY OUT INTERNAL CLEANING OF 50 % VENTILATION TRUNKING AND 100% TRUNKING OF GALLEY EXHAUST TRUNKING AS PER BR 2203 AND CHECK WATERTIGHT SLUICE VALVES FOR AIR TIGHTNESS AS PER BR 2170.
NR 5. OVERHAUL MOTORS AND BLOWERS
NR 6. GREASE FILTERS OF EXHAUST TRUNKING IN GALLEYS TO BE CLEANED AND PRESERVED
NR 8. VENTILATION VALVES AND GEARINGS TO BE EXAMINED, DEFECTS MADE GOOD. ALSO REPLACE GLANDS AS NECESSARY AND SURVEY THE AREA IN VICINITY.
NR 9. CARRYOUT TRIALS OF A/C & VENTILATION SYSTEM TO ENSURE SATISFACTORY PERFORMANCE
NR 1. EXAMINE AND TEST REDUCING VALVES WHERE FITTED AND CHECK WORKING PRESSURE . EXAMINE AND TEST RELIEF VALVES AND RESET TO DISCHARGE AT 10 P.S.I. ABOVE THE NORMAL PRESSURE OF THE F.W. SYSTEM
NR 1. STRIP, CLEAN AND REPLACE 50% OF SOIL PIPES, RE-GALVANIZING WHERE NECESSARY.
NR 2. STRIP, CLEAN AND REPLACE 50% OF URINAL PIPES, RE-GALVANIZING WHERE NECESSARY.
NR 3. REFIT 50% OF WC AND URINAL FLUSHING VALVES AND STOP COCKS
SR 1. SURVEY THE EQUIPMENT STRUCTURES AND LOAD TEST OF THE SAME. AFTER COMPLETION OF LOAD TEST, EXAMINE THE COMPLETE STRUCTURES AND ASSOCIATED FITTING FOR FLAWS, DEFLECTION AND DISTORTION. FLAWS MUST BE EXAMINED BY NDT TECHNIQUES, CARRY OUT REPAIR AS NECESSARY
SR 2. UNCOIL SURVEY AND RECOIL THE FULL LENGTH OF WIRE ROPE AND APPLY PREVENTIVE COATING OF GREASE & GRAPHITE MIXTURE TO THE WIRE ROPE IF THERE ARE SIGNS OF WEAR AND TEAR.
NR 1. STRIP, EXAMINE AND REFIT 50 % OF DISCHARGE VALVES (ALL VALVES ARE TO BE EXAMINED DURING THREE YEARS PERIOD
NR 2. EXAMINE AND REFIT PORTABLE PUMP DISCHARGE OVERBOARD VALVES AND CONNECTION.
NR 3. STRIP, EXAMINE AND REFIT 50 % OF GEARED STORM VALVES. RENEW WORN LEATHER SEATING, WHERE NECESSARY
NR 4. STRIP, EXAMINE AND REFIT 50 % OF NON-GEARED STORM VALVES. RENEW WORN LEATHER SEATING WHERE NECESSARY
NR 5. STRIP, EXAMINE AND REFIT 50 % OF PLUG COCK VALVES
NR 6. PRESSURE TEST (WORKING PRESSURE) BEFORE AND AFTER REPAIR. THOROUGHLY INSPECT ALL THE JOINTS, FITTINGS, FIRE PLUGS AND SPRAYERS
NR 7. REMOVE, REFIT AND ADJUST THE FAULTY FITTINGS. AFTER REPAIR TEST THEM FOR TIGHTNESS.
NR 1. STRIP EXAMINE AND REFIT 50% OF FOLLOWING:- (A) DISCHARGE VALVES (B) GEARED STORM VALVES (C) NON GEARED STORM VALVES (D) PLUG COCK VALVES (E) RENEW WORN OUT LEATHER SEATING
NR 1. (I) CLEAN 50% OF TANKS BY APPROVED CHEMICAL METHOD AND OFFER FOR SURVEY. (II) EXAMINE INTERIOR SURFACES FOR CORROSION POST CLEANING AND BEFORE RECOATING. CHECK THAT LUB. OIL SEPARATOR SUCTION PIPES ARE CLEAR. CLEAN AND EXAMINE SUCTION STRAINER FOR CORROSION AND TO BE PRESERVED IN ACCORDANCE WITH NO 53/16 , RELEVANT NCDS AND POLICY DIRECTIVES AS APPLICABLE.
NR 2. SURVEY POST CLEANING AND DAMAGED / DETERIORATED AREAS OF PAINT WORK TO BE RENEWED AS NECESSARY
NR 3. (A) DRY COMPARTMENTS WITH DECK COVERING: - SURVEY DECK COVERING AND INSPECT FOR CRACKS, BULGING / UNDULATIONS, MECHANICAL DAMAGE ETC. IN CASE OF DAMAGE, THE DECK UNDERNEATH TO BE VISUALLY SURVEYED POST RENEWAL OF AFFECTED AREA. (B) DRY COMPARTMENTS WITHOUT DECK COVERING: - TO BE SUBJECTED TO 100 % VISUAL SURVEY AND SAMPLE USG SURVEY.
NR 4. RESTORE / RENEW PAINT SCHEME IN ACCORDANCE WITH NCD 1491, NO 53/16 AND POLICY DIRECTIVE ISSUED BY IHQ/DNA AS APPLICABLE
NR 2. CARRYOUT 100 % VISUAL SURVEY AND 50 % USG OF FW TANKS. SURVEY FOR CORROSION AND EXTERNAL SURFACES OF ALL TANKS TO IDENTIFY STRUCTURAL DEFECTS AND SURVEY TANKS AS PER NO 01/15. REPAIR PLATING, STRUCTURES AND FITTINGS OF TANKS AS FOUND NECESSARY. DURING INSPECTION / SURVEY.
NR 3. (A) DRY COMPARTMENTS WITH DECK COVERING: - SURVEY DECK COVERING AND INSPECT FOR CRACKS, BULGING / UNDULATIONS, MECHANICAL DAMAGE ETC. IN CASE OF DAMAGE, THE DECK UNDERNEATH TO BE VISUALLY SURVEYED POST RENEWAL OF AFFECTED AREA. (B) DRY COMPARTMENTS WITHOUT DECK COVERING: - TO BE SUBJECTED TO 100 % VISUAL SURVEY AND SAMPLE USG SURVEY.
NR 4. RESTORE / RENEW PAINT SCHEME IN ACCORDANCE WITH NCD 1491, NO 53/16 AND POLICY DIRECTIVE ISSUED BY IHQ/DNA AS APPLICABLE
SR 1. CLEAN OUT AND EXAMINE STRUCTURE, PAYING PARTICULAR ATTENTION TO THE JUNCTIONS OF LONGITUDINAL/ TRANSVERSE FRAMES, OUTER BOTTOM PLANTINGS, RIVETS AND SPECIALLY AREAS NOT READILY VISIBLE SUCH AS THE BACK OF FRAMING AND STIFFENERS.
SR 3. CARRY OUT 100 % VISUAL SURVEY OF BALLAST AND TRIMMING TANKS. REPAIR / REFIT AND PRESSURE TEST AS NECESSARY. RENEW SACRIFICIAL ANODES CONSUMED BEYOND 50 %.
NR 2. CARRY OUT SURVEY OF TANK TOPS AS FOLLOWS;- (A) VISUAL SURVEY OF DRY COMPARTMENTS WITHOUT DECK COVERING. (B) DRY COMPARTMENTS WITH DECK COVERING: - THE SURVEY OF THE CONDITION OF THE DECK COVERING IS TO BE CARRIED OUT. IN CASE OF CRACKS, BULGING/ UNDULATIONS, MECHANICAL DAMAGE ETC DECK COVERING TO BE REMOVED FOR SURVEY.
SR 3. CLEAN ALL COFFERDAMS AND VOID SPACES TO REMOVE DIRT, SLUDGE AND DEBRIS AND LOOSE PAINT. SCRAP/ CLEAN CORRODED RUSTED AREAS TO BARE METAL AND PREPARE STRUCTURE
SR 4. CARRY OUT 100% VISUAL SURVEY OF COFFERDAMS AND VOID SPACES. REPAIR/ REFIT AND PRESSURE TEST AS NECESSARY. RENEW SACRIFICIAL ANODE CONSUMED BEYOND 50%.
NR 2. CARRY OUT SURVEY OF TANK TOPS AS FOLLOWS;- (A) DRY COMPARTMENTS WITHOUT DECK COVERING: - 100 % VISUAL SURVEY AND SAMPLE USG SURVEY (B) DRY COMPARTMENTS WITH DECK COVERING: - THE SURVEY OF THE CONDITION OF THE DECK COVERING IS TO BE CARRIED OUT. IN CASE OF CRACKS, BULGING/ UNDULATIONS, MECHANICAL DAMAGE ETC DECK COVERING TO BE REMOVED FOR SURVEY.
NR 1. (A) DRY COMPARTMENTS WITHOUT DECK COVERING: - VISUAL SURVEY. (B) DRY COMPARTMENTS WITH DECK COVERING: - THE SURVEY OF THE CONDITION OF THE DECK COVERING IS TO BE CARRIED OUT. THE DECK COVERING BE INSPECTED FOR CRACKS, BULGING/UNDULATIONS, MECHANICAL DAMAGE ETC. IN CASE OF DAMAGE OBSERVED THE DECK UNDERNEATH TO BE VISUALLY SURVEYED POST RENEWAL OF AFFECTED AREA.
SR 1. TEST BOAT SLINGS, BRIDLES AND STRONG BACKS
SR 2. TEST DISENGAGING GEAR AND BOAT FALLS
SR 3. CARRY OUT SURVEY OF BOAT HULL AND ASSOCIATED HULL FITTINGS. CARRY OUT REPAIRS AS NECESSARY.
SR 2. CARRY OUT CHALK TEST OF ALL W.T DOORS.
NR 1. CHECK CLIPS AND HINGES FOR LOOSENESS AND SIGNS OF WEAR. RENEW WORN OUT PARTS AS NECESSARY
NR 1. SURVEY WINDOW/ SCUTTLE STRUCTURE AND FRAME FOR DETERIORATION. INSPECT TOUGHENED GLASS, GLASS RAILS SECURING ARRANGEMENTS FOR INTACTNESS AND CORRECT ALIGNMENT. REPAIR/ RENEW AS NECESSARY.
NR 1. RENEW WORN OUT PARTS AS NECESSARY. HATCHES - 30
RENEW WORN OUT PARTS AS NECESSARY. MANHOLES - 42
SR 1. VISUAL SURVEY OF ENTIRE GUARD RAIL ASSEMBLY (GUARD RAIL STANCHIONS, PVC COATED WIRE ,SS FITTINGS, EYE PLATES AND GUARD RAIL STANCHIONS HEEL FITTINGS). RENEWAL /REPAIR AS NECESSARY JOB INVOLVES:- (A) DEGUTTING OF OLD GUARDRAIL WITH SHOE. (B) MANUFACTURING AND WELDING OF NEW SHOE AT INDICATED LOCATION. (C) DEGUTTING AND RE-GUTTING OF LAGGING, PANELING, CABLES IN ADJACENT COMPARTMENT FOR WELDING. .
GUARDRAIL LENGTH- 300 RMT
STANCHION - 100 NOS
SR 6. REPLACE /RENEW DEFECTIVE /BROKEN/CORRODED EARTHING CONNECTIONS AS PROJECTED BY SS
NR 1. INSPECT TUBULAR GUARD RAILS AND STANCHIONS FOR CORROSION AND DISTORTION, PAYING PARTICULAR ATTENTION TO WELDED JOINTS AND HEEL FITTINGS. RENEWAL /REPAIR AS NECESSARY
NR 2. LOAD TEST OF FOLLOWING RAS ARRANGEMENTS TO BE CARRIED OUT AND VALID CERTIFICATE TO BE PROVIDED :- (A) TOWING HAWSER VOID LINK,QTY-02,10 TONS
(B) TOWING CLENCH, QTY-01,10 TONS
(C) TOWING SLIP,QTY-01,10 TONS
(D) SWIVEL PIECE FOR TOWING, QTY-01,10 TONS
(E) TOWING PENDENT, QTY-02,10 TONS
(F) TOW ROPE, QTY- 01
(G) VISUAL INSPECTION SNATCH BLOCK 16 MM FOR INHAUL AND OUTHAUL, QTY- 02, SWL- 01 TONS, STATIC LOAD- 02 TONS
(H) RIGGING SLIP FOR LIGHT JACK STAY, QTY-01,10 TONS
(J) D SHACKLE FOR SNATCH BLOCK (INHAUL AND OUTHAUL) , QTY- 02, 03 TONS
(K) WOODEN BLOCK WITH SHACKLE FOR LIGHT JACKSTAY, QTY- 02, SWL- 04 TONS
(L) STATIC-08 TONS RAS STIRRUP, QTY- 02 , 2.5 TONS
(M) WIRE GROMMET WITH THIMBLE FOR LIGHT JACKSTAY, QTY-01, 2.5 TONS
(N)TRAVELER BLOCK WITH EYES FOR LIGHT JACKSTAY, QTY-02, SWL- 250 KG
(P) D SHACKLE FOR TRAVELER BLOCK. QTY-02
(Q) RAS WELLING SPRING HOOK (USED FOR INHAUL AND OUTHAUL), QTY- 02, SWL- 0.75 TONS
(R) RAS STRAIGHT SCREW SHACKLE, SWL – 3.68 TONS INHAUL AND OUTHAUL - VISUAL INSPECTION ONLY,
(S) EYE PLATE FOR LIGHT JACKSTAY ON HIGH POINT, QTY- 04, 4 TONS
(T) TOWING SHACKLE, QTY- 02, 12 TONS
(U) HIGH POINT RINGS FOR LIGHT JACKSTAY, QTY-04. SWL- 4 TONS
(V) ADAPTOR PIECE FOR TOWING, QTY-01. SWL – 10 TONS
(W) JOINING SHACKLE FOR TOWING, QTY-01. SWL- 10 TONS
(X) JOGGLE SHACKLE,QTY-01, 15 TONS
(Y) D SHACKLE FOR RAS WELLING HOOK QTY-02,
NR 1. CARRY OUT LOAD TESTING OF ACCOMMODATION LADDER AND ASSOCIATED FITTINGS AS PER NCD 3910 AND INBR 1552
NR 2. DIS MANTLING OF LADDER AND SURFACE PREPARATION BY SWEEP BLASTING FOR VISUAL AND USG SURVEY
NR 3. CARRY OUT VISUAL SURVEY OF ENTIRE STRUCTURE OF LADDERS AND FITTINGS FOR DAMAGE / DEFORMATION AND USG SURVEY OF ALL WELDINGS JOINTS. RENEW ALL WORN OUT/ DEFECTIVE PARTS INCLUDING WHEEL/PULLEYS.
NR 4. CARRYING OUT TESTING OF ALL STARTERS AND MOTOR INSULATION. OVERHAUL THE STARTER AND MOTOR ,RENEW BEARING OF THE MOTOR.
NR 5. RENEW ALL LIMIT SWITCHES
NR 6. DRAIN AND FLUSH THE OIL OF SLIDING AND HOISTING GEAR BOX. COMPLETE OVERHAULING OF ALL GEAR BOXES AND RENEWAL OF ALL WORN OUT/ DEFECTIVE SEAL AND BEARING .RENEW GEAR OIL.
NR 7. RENEW THE STEEL WIRE ROPE AND DESTRUCTION CERTIFICATE TO BE ISSUED. EFSWR OF 14 MM DIA X 80 MTR LENGTH
NR 1. INSPECT AND RENEW TREADS - DECK LADDERS. INSPECT AND RENEW AS NECESSARY, PORTABLE ALUMINUM TREADS OF BETWEEN DECK LADDERS.
NR 2. RE-GALVANIZE LADDERS. TREADS OF GALVANIZED BETWEEN DECK LADDERS TO BE RENEWED AND LADDERS RE-GALVANIZED.
SR 1. BROWS ARE TO BE EXAMINED, REPAIRED AS NECESSARY.
SR 3. EXAMINE ENTIRE ASSEMBLY INCLUDING BRAKE LINING ,BRAKE SHOE, BRAKE DISC AND ASSOCIATED FITTINGS. RENEW BRAKE LINING AND SHOE OF EXCESSIVELY WORN DOWN AREAS. NEW BRAKE LINER TO BE CATERED BY SHIPYARD.
SR 4. SURVEY ALL WIRE ROPES, SPARE GEAR AND OTHER ASSOCIATED LIFTING GEARS. RENEW AS NECESSARY. (EFSWR OF 18 MM DIA X 40 MTR LENGTH )
SR 6. OVERHAUL/REPAIR ELECTRIC MOTOR SUBJECT TO QC CHECK. CARRY OUT TRIALS ON COMPLETION OF REPAIRS.
SR 7. OPEN SLEWING ASSEMBLY BEARING HOUSING AND INSPECT BEARING FOR PLAY. RENEW IF NECESSARY
SR 8. INSPECT THE WORM WHEEL ASSEMBLY FOR ANY WEAR AND PRESENCE OF METALLIC PARTICLES.
SR 9. CHECK OIL IN GEAR CASE AND EXAMINE GEAR TEETH FOR BREAKAGE AND PRESENCE OF FOREIGN MATTER. CHECK BEARINGS FOR COLLAPSE AND SHAFT FOR RUST AND CORROSION. RENEW/REPAIR AS NECESSARY. OIL- EP-90 QTY- 20 LTRS, GREASE- BHARAT UNIVAX-A, 10 KGS
SR 10. RECORD VOLT/AMPS/SPEED PARAMETERS OF DAVIT AND ASSOCIATED SYSTEMS DURING LOAD TEST. RECORD LOAD TEST DETAILS.
SR 11. CHECK BRAKE LINING ON WINCH AND CHANGE LINER IF DAMAGED.
SR 12. CHECK ALL ROTATING PARTS, LEVER FOR FREE MOVEMENT. LOAD TEST OF THE DAVIT TO BE UNDERTAKEN AND CERTIFICATE FOR THE SAME TO BE ISSUED AS PER LOAD DETAILS. (SWL- 1.2 TONS, RUNNING- 1.8 TONS, STATIC- 2.4 TONS).
NR 2. DISMANTLE COMPLETE STRUCTURE AND CARRY OUT COMPLETE OVERHAULING OF ALL DAVIT PARTS INCLUDING MOTORS, STARTERS, RENEW DEFECTIVE PARTS AS NECESSARY.
NR 3. EXAMINE WIRE ROPE AND CHANGE THE WIRE ROPE END TO END. EFSWR OF 14 MM DIA X 40 MTR LENGTH
SR 1. WEIGH THE RIB AND COMPARE WITH IDEAL WEIGHT. RECORD THE SAME IN BOAT LOG BOOK. UNDUE INCREASE OF WEIGHT, IF ANY BE REPORTED FOR DETAILED EXAMINATION.
SR 2. CARRY OUT LEAK TEST OF FUEL TANK BY LP AIR
27 M 1. SURVEY OF FOUR POINT LIFTING PLATE FITTED ON DECK AS PER PARA 5 OF APPENDIX B OF NO 03/18.
HULL - PART II
AUTHORITY - HQSNC/ CCONO LETTER NC/3000/01 (ABER) DATED 28 MAR 18. ABER REPLACEMENT OF ANCHOR WINDLASS AS ABER CAT-I REPLACEMENT.AS PER APPROVED BPs TO BE UNDERTAKEN. MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
AUTHORITY - HQSNC/ CCONO LETTER NC/3000/01 (ABER) (ii) DATED 28 MAR 18. ABER REPLACEMENT OF MOORING CAPSTAN AS ABER CAT-I REPLACEMENT AS PER APPROVED BPs TO BE UNDERTAKEN. MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
AUTHORITY - HQSNC/ CCONO LETTER NC/3000/33B DATED 28 FEB 23. ABER REPLACEMENT OF HEAT EXCHANGERS AS PER APPROVED BPs TO BE UNDERTAKEN. MAIN EQUIPMENT BOM AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
SHIPYARD TO UNDERTAKE PAINTING OF INTERNAL STRUCTURE OF DRY COMPARTMENTS VIZ., STORES, LIVING SPACE, OFFICES, MACHINERY SPACES TO BE PAINTED. AREA TO BE SURFACE PREPARED TO THE REQUIRED STANDARD (MECHANICAL CLEANING BY POWER TOOLS) TO THE SATISFACTION OF NAVAL AUTHORITIES.(ST 3). SHIPYARD TO PROVISION PAINTS FROM NAVY APPROVED PAINT SUPPLIERS [M/S AKZO NOBEL COATINGS PVT LTD (BANGALORE) M/S SIGMA MARINE & PROTECTIVE COATINGS PVT LTD (MUMBAI) M/S JOTUN (SINGAPORE) PVT LTD(CHENNAI)]. PAINTING TO BE CARRIED OUT UNDER SUPERVISION OF PAINT MANUFACTURER AND GUARANTEE FOR 10 YEARS TO BE GIVEN TO NAVY. QUOTE INCLUDE COST FOR STAGING AND OTHER REQUIRED SERVICES. PAINT SCHEME : (I) 02 COAT OF PRIMER - DFT - 150 MICRONS EACH (II) 02 COATS WHITE EXTERIOR FIRE RETARDANT PAINT- DFT -150 MICRON EACH (III)TOTAL DFT -600 MICRONS
SHIPYARD TO UNDERTAKE PAINTING OF INTERNAL STRUCTURE OF WET COMPARTMENTS VIZ., BATHROOMS AND GALLEY. AREA - 700 SQ.M INTERNAL AREA. AREA TO BE SURFACE PREPARED TO THE REQUIRED STANDARD (MECHANICAL CLEANING BY POWER TOOLS) TO THE SATISFACTION OF NAVAL AUTHORITIES.(ST 3). SHIPYARD TO PROVISION PAINTS FROM NAVY APPROVED PAINT SUPPLIERS [M/S AKZO NOBEL COATINGS PVT LTD (BANGALORE) M/S SIGMA MARINE & PROTECTIVE COATINGS PVT LTD (MUMBAI) M/S JOTUN (SINGAPORE) PVT LTD(CHENNAI)]. PAINTING TO BE CARRIED OUT UNDER SUPERVISION OF PAINT MANUFACTURER AND GUARANTEE FOR 10 YEARS TO BE GIVEN TO NAVY. QUOTE INCLUDE COST FOR STAGING AND OTHER REQUIRED SERVICES. PAINT SCHEME : (I) 02 COAT OF PRIMER - DFT - 150 MICRONS EACH (II) 02 COATS WHITE EXTERIOR FIRE RETARDANT PAINT- DFT -150 MICRON EACH (III)TOTAL DFT -600 MICRONS
REMOVAL OF LAGGING AND PANELING (I) FOR COMPARTMENT BULKHEADS POST INSULATIONS 02 COATS OF WHITE FIRE RETARDANT PAINT TO BE UNDERTAKEN. (II) FOR DECKS 01 COAT OF PRIMER.
PROVIDE GAS FREE CERTIFICATE FOR ALL TANKS.
CARRY OUT ULTRASOUND SURVEY OF THE TANKS WHERE INDICATED BY VISUAL SURVEY. CATER FOR MAX 600 USG READINGS IN TANKS.TANK-32 NOS
RENEWAL OF RUBBER GASKETS OF ALL TANKS
PROVIDE GAS FREE CERTIFICATE FOR ALL TANKS.
07 FRESH WATER TANKS TO BE 100 % ABRASIVE BLASTED TO SA 2 ½ STANDARDS.
RENEWAL OF RUBBER GASKETS OF ALL FRESH WATER TANKS
PROVIDE GAS FREE CERTIFICATE FOR ALL TANKS.
CARRY OUT ULTRASOUND SURVEY OF THE TANKS WHERE INDICATED BY VISUAL SURVEY. CATER FOR MAX 500 USG READINGS IN TANKS.
CARRY OUT 100 % ABRASIVE BLASTING OF ALL 04 NOS BALLAST TANKS TO SA 2 ½ SWEDISH STANDARDS.
BALLAST TANKS TO BE PRESERVED WITH 10 YEAR LONG LIFE PAINT SCHEME AS MENTIONED BELOW. SHIPYARD TO ASCERTAIN CLEARANCE FROM ALL SECTIONS FOR COMPLETION OF HOT WORK PRIOR TO COMMENCEMENT OF PAINTING, TO AVOID BURNING OF FRESH PAINT. SHIPYARD TO PROVISION PAINTS FROM NAVY APPROVED PAINT SUPPLIERS [M/S AKZO NOBEL COATINGS PVT LTD (BANGALORE), M/S JOTUN (SINGAPORE) PVT LTD(CHENNAI), M/S SIGMA INTERNATIONAL PVT LTD, (MUMBAI)]. SHIPYARD TO GIVE PERFORMANCE GUARANTEE FOR 10 YEARS TO NAVY. PAINT SCHEME FOR BALLAST TANKS (I) 01 COAT PRIMER - DFT 50 MICRONS EACH COAT. (II) 02 COAT ANTI CORROSIVE - DFT 150 MICRONS EACH COAT. TOTAL DFT - 350 MICRONS. QUOTE TO CATER FOR STAGING WITHIN THE TANKS. HEIGHT OF EACH TANK IS 18 METERS
RENEWAL OF RUBBER GASKETS OF ALL TANKS
PROVIDE GAS FREE CERTIFICATE FOR ALL TANKS.
CARRY OUT ULTRASOUND SURVEY OF THE TANKS WHERE INDICATED BY VISUAL SURVEY. CATER FOR MAX 20 USG READINGS IN TANKS.
COMPARTMENTS TO BE 100 % ABRASIVE BLASTED TO SA 2 ½ STANDARDS
COMPARTMENTS TO BE PRESERVED WITH PAINT SCHEME AS MENTIONED BELOW. SHIPYARD TO ASCERTAIN CLEARANCE FROM ALL SECTIONS FOR COMPLETION OF HOT WORK PRIOR TO COMMENCEMENT OF PAINTING, TO AVOID BURNING OF FRESH PAINT. SHIPYARD TO PROVISION PAINTS FROM NAVY APPROVED PAINT SUPPLIERS [M/S AKZO NOBEL COATINGS PVT LTD (BANGALORE), M/S JOTUN (SINGAPORE) PVT LTD(CHENNAI), M/S PPG PVT LTD, (MUMBAI)] . SHIPYARD TO GIVE PERFORMANCE GUARANTEE FOR 10 YEARS TO NAVY. PAINT SCHEME AND MANUFACTURER'S NAME ARE LISTED BELOW (M/S AKZO NOBEL) (I) 01 COAT INTERGUARD 269 - DFT 50 MICRONS EACH . (II) 02 COAT ANTI CORROSIVE - DFT 150 MICRONS EACH COAT. (III) TOTAL DFT - 350 MICRONS.
CLEAN UNDERWATER PORTION OF HULL USING HYDRO JET WITH MAXIMUM PRESSURE NOT EXCEEDING 3000 PSI TO BARE METAL AND SCRAP MARINE GROWTH. THIS INCLUDES BOOT TOPPING AREA, SHAFT BRACKETS, ROPE GUARDS, EDDY PLATES, RUDDERS, SEA CHESTS/ TUBES AND OTHER OPENINGS, TRANSDUCER, LOG, UNDERWATER FITTINGS, ETC. QUOTE TO INCLUDE COST FOR SCAFFOLDING/ STAGING AND OTHER REQUIRED SERVICES.
REMOVE, CLEAN AND REFIT 23 NOS. DRAIN PLUGS OF ALL TANKS
HYDRO JET BLASTING OF U/W HULL TO SA 2 ½ STANDARDS BEFORE COMMENCEMENT OF PAINTING
CARRY OUT FULL RENEWAL OF UNDERWATER HULL PAINTING 2000 SQ.M INCLUDING 200 SQ.M OF BOOT TOP ON COMPLETION OF ALL HOT WORK AND BLASTING OF UNDERWATER HULL. PAINT WITH 15 YEAR LONG LIFE PAINT SCHEME (LLPS). SHIPYARD TO PROVISION PAINTS FROM NAVY APPROVED PAINT SUPPLIERS [M/S AKZO NOBEL COATINGS PVT LTD (BANGALORE) M/S SIGMA MARINE & PROTECTIVE COATINGS PVT LTD (MUMBAI) M/S JOTUN (SINGAPORE) PVT LTD (CHENNAI)] (I) 01 COAT PRIMER - DRY FILM THICKNESS- 50 MICRONS. (II) 02 COATS OF ANTI CORROSIVE - DRY FILM THICKNESS- 150 MICRONS EACH COAT (III) 01 COAT TIE COAT - DRY FILM THICKNESS- 125 MICRONS. (IV) 03 COATS OF ANTI FOULING- DRY FILM THICKNESS- 150 MICRONS EACH COAT. (V) TOTAL DFT 925 MICRONS UPTO BOOT TOP AREA AND IN ADDITION 01 COAT OF ANTI FOULING - DFT 150 MICRON FOR BOOT TOP AREA. TOTAL DFT FOR BOOT TOP AREA IS 1075 MICRONS. (VI) REDEFINING OF BOOT TOP AREA AND PAINTING OF UPPER BOOT TOP LINE TO BE CARRIED OUT
DRAUGHT MARKS TO BE RENEWED AND PAINTED WITH PAINT SCHEME AS UNDER WATER AREA AND TOP COAT TO BE PAINTED WITH BLACK AND WHITE PAINT.
CARRYOUT 100% VISUAL HULL SURVEY OF INTERNAL AND EXTERNAL STRUCTURES PAYING PARTICULAR ATTENTION TO PLATING IN THE VICINITY OF PROPELLERS, SHAFT AND SHAFT BRACKETS, ROPE GUARDS, EDDY PLATES, RUDDERS, UNDERWATER FITTINGS, KEEL AND HULL PLATING REST ON CLOSELY SPACED DOCKING BLOCKS, MOON POOL AREA PLATES, PEAK TANK, DEEP TANKS, MACHINERY FOUNDATIONS, BILGES , ENGINE, WET SPACES AND AUXILIARY MACHINERY SPACES, FITTINGS IN WEATHER DECK, OPENINGS, DISCONTINUITIES, SUPER STRUCTURE.
REMOVAL OF COMPLETE LAGGING THROUGHOUT THE SHIP.
REMOVAL OF COMPLETE PANELING THROUGHOUT THE SHIP.
REMOVAL OF COMPLETE UNDERLAY THROUGHOUT THE SHIP.
RENEWAL OF STEEL INCLUDING PLATES AND STRUCTURAL SECTIONS OF ENTIRE SHIP INCLUDING FOLLOWING LOCATIONS. NEW PLATES / STIFFENERS TO BE HYDRO JET BLASTED TO SA 2 ½ AND PRIMER SHOULD BE APPLIED BEFORE ERECTION. ANTICIPATED 100 TONS OF STEEL RENEWAL PERTAINING TO HULL SHIP'S STRUCTURE STEEL INCLUDING FOLLOWING LOCATIONS:- (I) UNDERWATER HULL (II) UNDERWATER COMPARTMENTS (III) WEATHER DECK AND DECK FITTINGS (IV) INTERNAL COMPARTMENTS
ALL MACHINERY / EQUIPMENT, SWITCHBOARD/ CONTROL PANELS, ELECTRONIC AND COMMUNICATION EQUIPMENT AND WEAPON EQUIPMENT, ALL LIGHT FITTINGS, PIPE LINES, VALVES, ELECTRIC CABLES, JUNCTION BOXES, METALLIC COVERS, LAGGING, PANELING, OBSTRUCTIONS, PROTRUSIONS, FOUNDATION ETC IN WAY OF STEEL RENEWAL WILL BE REMOVED AND REFITTED BY THE SHIPYARD AT ITS COST, EXCEPT FOR WHERE SPECIFICALLY QUOTED FOR BY THE SHIPYARD. ELECTRICAL CABLES IN WAY OF STEEL RENEWAL ARE TO BE WRAPPED WITH ASBESTOS CLOTH AND PROTECTED BY THE SHIPYARD. DAMAGES TO EQUIPMENT AND ELECTRICAL CABLES CAUSED BY THE SHIPYARD IN EXECUTION OF THE WORK ARE TO BE MADE GOOD BY THE SHIPYARD AT ITS COST. NAVY WILL PROVIDE STEEL OF APPROVED SPECIFICATION (DMR 249 'A').
RENEWAL OF ALUMINUM PLATE BETWEEN 08-12 MM THICKNESS INCLUDING PLATES AND STRUCTURAL SECTIONS OF APPROX WEIGHT 10 TONS
DOOR COAMING OF 10 NOS DOORS CORRODED/ THINNED. TO BE RENEWED.
RENEW ALL WORN OUT WEDGES (QTY-50 NOS) AND MAT- MS/AL,
DOOR CLIPS (QTY- 70 NOS).CLIPS TO BE PROVISIONED BY SHIPYARD.
OVERHAUL/REPAIR ALL WT DOORS-23 NOS, CLIPS, TOROIDAL SEALING-150NOS AND AIR INDICATOR TEST PLUG-23 NOS. OVERHAUL INVOLVES REMOVAL OF SPLIT PINS- 150 NOS AND O RINGS-150, WASHERS-200 NOS AND GREASING OF ALL PARTS, REPLACEMENT OF DAMAGED PARTS AND GREASING NIPPLES- 200 NOS. B. IF UNSERVICEABLE THEN RENEW THE DOOR.
RENEWAL OF RUBBER BEADINGS. RUBBER BEADING (200 RMT) OF ALL (23 NOS) WT DOOR PERISHED/ DETERIORATED. TO BE RENEWED AND CHALK TEST TO BE CARRIED OUT. WORK INVOLVES REMOVAL OF OLD RUBBER COAMING, CLEANING OF MS COAMING, APPLICATION OF PRIMER ON THE COAMING, RE-FITMENT OF NEW SILICON RUBBER. NOTE- SILICON RUBBER BEADING TO BE PROVISIONED BY SHIPYARD THROUGH NAVY APPROVED VENDOR. SHIPYARD TO PROVISION SILICON RUBBER BEADING FROM NAVY APPROVED VENDOR.
REPAIR/ RENEWAL OF NWT DOORS ALL METALLIC NWT DOOR ACCOMMODATION SPACES IS TO BE INSPECTED . DOOR FRAMES CORRODED/ THINNED. TO BE RENEWED SHIPYARD TO PROVISION NWT DOORS FROM NAVY APPROVED VENDORS VIZ., M/S LARSEN & TOUBRO, (CHENNAI), M/S LLOYS STEEL INDUSTRIES LIMITED (MUMBAI), M/S ARVICO MARINE INDUSTRIES PVT LTD. (MUMBAI), M/S GODREJ & BOYCE MFG CO., LTD, (MUMBAI).
10 NOS OF NWT DOORS DEFORMED, DOOR FRAMES CORRODED/ THINNED. TO BE RENEWED
RENEWAL OF MORTISE LOCKS WITH HANDLE (QTY-80 NOS)
RENEWAL OF HYDRAULIC DOOR CLOSER (QTY-50NOS)
RENEWAL OF DOOR FRAMES (QTY-05 NOS)
RENEWAL OF RUBBER GASKET OF NWT DOORS (80 NOS)
OVERHAUL/REPAIR ALL WT HATCHES-30 NOS, CLIPS-150 NOS AND AIR INDICATOR TEST PLUG -30 NOS. OVERHAUL INVOLVES REMOVAL OF SPLIT PINS - 200 NOS ,O RINGS-100 NOS AND GREASING OF ALL PARTS, REPLACEMENT OF DAMAGED PARTS AND GREASING NIPPLES- 100 NOS. WORK INVOLVES REMOVAL OF OLD RUBBER COAMING, CLEANING OF MS COAMING, APPLICATION OF PRIMER ON THE COAMING BEFORE RE-FITMENT OF NEW RUBBER COAMING
RENEW RUBBER BEADING WITH SILICON RUBBER OF ALL WT HATCH
CHALK TEST TO BE CARRIED OUT.(RUBBER BEADING SIZE 2 INCH FOR HATCHES.) TO BE PROVED TO NAVAL INSPECTION AGENCY
RENEWAL OF CLIPS, MAT - SS,
TOROIDAL SEALING
WORN OUT WEDGES.
HATCH RETAINING CLIPS(QTY-15)
RENEWAL OF SPRING MECHANISM OF ALL 30 WT HATCHES. SHIPYARD TO PROVISION SPRING MECHANISM FROM NAVY APPROVED VENDORS
OVERHAULING/REPAIR OF VENTILATION TRUNKING WATER TIGHT SLUICE VALVE TO BE UNDERTAKEN. REMOVAL AND FITMENT TO BE UNDERTAKEN BY SHIPYARD. CATER FOR REPLACEMENT OF 10 WTSV VALVES IN CLUSTER SHIPYARD PROVISION 10 WTSV VALVES.
OVERHAULING/ REPAIR OF DECK CRANE.
OVERHAULING/ REPAIR OF A FRAME.
OVERHAULING/ REPAIR OF CTD WINCH PULLEYS, GEARBOX AND OTHER MOVING PARTS INCLUDING REPLACEMENT OF EXISTING THIMBLE WITH SS THIMBLE OF WIRE ROPE(QTY- 03 NOS.) AND FABRICATION AND FITMENT OF METALLIC STAND FOR FIXING OF CTD WINCH DISPLAY UNIT NEAR A FRAME. QTY- 01 NO
OVERHAULING/ REPAIR OF HYDROGRAPHIC WINCH PULLEYS, GEARBOX AND OTHER MOVING PARTS. (MAKE - H&H)
OVERHAULING/ REPAIR OF STERN GALLOW PULLEYS, GEARBOX AND OTHER MOVING PARTS.
OVERHAULING/ REPAIR OF TRACTION WINCH PULLEYS, GEARBOX AND OTHER MOVING PARTS.
OVERHAULING/REPAIR OF ALTAS. PULLEYS, GEARBOX AND OTHER MOVING PARTS
SACRIFICIAL ANODES TO BE RENEWED WHICH HAS CONSUMED MORE THAN 50%. WORK INVOLVES FOLLOWING: CUTTING OF OLD ANODES FROM HULL AND GRINDING THE SURFACE. ENSURE SACRIFICIAL ANODES ARE NOT PAINTED ON OUTER SIDE BY COVERING WITH GREASE ALSO ENSURE GREASE IS CLEANED FROM SACRIFICIAL ANODES PRIOR UNDOCKING. QUOTE TO BE INCLUSIVE OF STAGING.
REQUIRED SURFACE PREPARATION AND WELDING OF NEW SACRIFICIAL ANODES ON THE LOCATION OF OLD ANODES
INNER SIDE OF SACRIFICIAL ANODES TO BE PAINTED WITH UNDERWATER PAINT SCHEME.
POST COMPLETION OF 100% HOT WORK/PLATE RENEWAL PROVIDE A COMPLETE FINAL HULL SURVEY REPORT CONTAINING CERTIFICATE OF HULL SURVEY REPORT, NOTES OF HULL SURVEY REPORT, PARTICULARS OF UNDERWATER HULL SURVEY REPORT, PARTICULARS OF INTERNAL& ABOVE WATER STRUCTURE SURVEY REPORTS, K% FACTOR FORMS (SHELL & INTERNAL) SUMMARY OF RENEWALS (SHELL & INTERNAL), MAP OF SURVEY SHEETS ON SHEEL EXPANSION, PART OF SHELL EXPANSION SHEETS AND ANY INFORMATION SOUGHT BY NSRY(KOC)/COA ETC. IN EIGHT SETS OF HARD (SPRIAL BINDING) & SOFT COPIES TO PROJECT MONITORING TEAM FOR FORWARDING TO VARIOUS NAVAL AUTHORITIES.
DECK SCUPPERS TO BE RENEWED. NEW SCUPPER TO BE WELDED WITH RUBBER EXTENDED PIECE TO PREVENT WATER DROPPING ON SHIP SIDE. JOB INVOLVES:- DEGUTTING OF OLD DECK SCUPPERS
RUBBER EXTENSION PIECES TO BE FITTED AND RIVETED WITH ALUMINUM/SS STRIPS. RUBBER EXTENSION PIECES AND BONDING STRAPS TO BE PROVISIONED BY SHIPYARD.
DISMANTLE ALL WT FLAPS AND OVERHAUL/REPAIR FOR CORRECT OPERATION
RENEW RUBBER BEADINGS OF ALL VENTILATION FLAPS AND CHALK TEST OF THE SEATINGS. SHIPYARD TO PROVISION SILICON RUBBER BEADING FROM NAVY APPROVED VENDOR-IRMRA, THANE (MUMBAI) AND LENGTH OF RUBBER BEADING REQUIRED -75 RMTRS
RENEW ALL BRASS BUTTERFLY NUTS AND TUMBLER BOLTS. (QTY-200 NOS)
120 NOS OF DIFFUSERS IN WAY OF TRUNKING TO BE RENEWED.
TRUNKING TO BE PAINTED WITH 02 COATS OF YELLOW ZINC CHROMATE AND WHITE EXTERIOR PAINT.
TRUNKING TO BE REFITTED WITH NOISE ABSORBING CONNECTIONS.
TRUNKING TO BE RE-LAGGED WITH 32 MM OF CLOSED CELL ELASTOMERIC NITRILE RUBBER LAGGING TO AVOID CONDENSATION, UNEVEN GAPS TO BE FILLED WITH 9MM ELASTOMERIC SHEET, TOP SURFACE TO BE COVERED WITH POLYMERIC CLADDING
RENEWAL OF DAMAGED/PERISHED NITRILE RUBBER. NITRILE RUBBER TO BE PROVISIONED BY SHIPYARD.
RENEWAL OF DAMAGED AND CORRODED VENTILATION GRILL AT VARIOUS COMPARTMENT AND WEATHER DECK. MAT- GI AND WIRE MESH
OVERHAULING/REPAIR, PRESSURE TESTING AND CHEMICAL CLEANING OF HEAT EXCHANGER TO BE UNDERTAKEN. SYSTEM TO BE PROVED POST OVERHAULING. QTY- 02. RENEWAL AND REPOSITIONING OF SICK BAY HEAT EXCHANGERS OR FITMENT OF FSU TO BE CONSIDERED
FOLLOWING WORKS TO BE UNDERTAKEN ON ATU NO1 TO 5:- (A) CHEMICAL CLEANING OF COOLING COIL. QTY-05 (B) RENEWAL AND REPAIR OF ALL PURGING COCK VALVE, PRESSURE GAUGES AND TEMPERATURE GAUGES. QTY - 03 EACH ON ALL ATU (C) INSPECTION AND RENEWAL OF ATU MOUNTS. QTY- 50 NOS (D) CLEANING OF ATU FILTERS. QTY- 05 ATU. (E) IMPELLER BALANCING OF ALL ATUS. (F) RENEWAL OF PEDESTAL BEARING OF ATU.QTY-15 SYSTEM TO BE PROVED POST OVERHAULING. NOTE- ALL DEFECTIVE GAUGES, VALVE AND MOUNTS TO BE PROVISIONED BY SHIPYARD. CERTIFICATION OF ALL VALVES AND GAUGES TO BE SUBMITTED TO THE NAVY.
LOAD TESTING/VISUAL SURVEY OF THE FOLLOWING :- CARRYOUT LOAD TESTING OF FOLLOWING FITTED EQUIPMENTS AS PER INBR 1552 :- (A) PORT CRANE - 1.75 TON
(B) STBD FWD CRANE- 1.9 TON
(C) STBD AFT CRANE - 1.9 TON
(D) A-FRAME - 03 TON
(E) STERN GALLOW - 04 TON
(F) TRACTION WINCH - 10 TON
(G) DEEP WINCH - 10 TON
SUBMIT LOAD TEST CERTIFICATES TO SHIP STAFF, LOAD TEST DETAILS WILL BE PROVIDED BY THE SHIP STAFF. IF THE EQUIPMENT FAILS THE TEST/ ANY DEFECT/ DEFORMATION IS OBSERVED, SHIPYARD TO RECTIFY THE DEFECT AND CARRY OUT THE LOAD TEST AGAIN. ALL EQUIPMENT TO BE PROVED AS PER DESIGNED SPECIFICATIONS TO NAVAL TRIAL AGENCY.
PANELING, VARIOUS MODULAR FITTINGS, VINYL FLOORING, ELECTRICAL FITTINGS AND FURNITURE OF WARDROOM BROKEN/ PERISHED. TO BE RENEWED AS PER SAMPLE. THE JOB INVOLVES (A) REMOVAL/ DEGUTTING OF ALL PANELING, LAGGING, MODULAR FITTINGS, VINYL FLOORING AND FURNITURE. (B) RE-GUTTING/ RENEWAL/FITMENT OF LAGGING, PANELING, MODULAR FITTINGS, ELECTRICAL FITTINGS AND VINYL FLOORING. (C) MANUFACTURE AND FITMENT OF FURNITURE. AREA OF LAGGING- 130 SQM, VINYL FLOORING- 80 SQM, PANELING- 130 SQM , CHAIRS- 15 NOS.
PANELING OF JS ,SS BATHROOM SHIPS GALLEY SCULLERY PERISHED AND DAMAGED .TO BE RENEWED AS PER SAMPLE.
LEAKAGE OBSERVED FROM WASH BASIN AT VARIOUS OFFICERS CABIN AND SCIENTIST CABIN. BOTTLE TRAP TO BE CHECKED AND REPLACED.
RENEWAL OF INSPECTION WINDOW IN JS BATHROOM, SS BATHROOM, LADY SCIENTIST WASHROOM, OFFICER'S BATHROOM, CO WASHROOM, EXO WASHROOM AND CHIEF SCIENTIST WASHROOM. MAT- CRCA PANEL AS PER DRAWING.
OVERHAULING/REPAIR OF ROLLERS AND FAIRLEADS TO BE UNDERTAKEN. INSPECTION OF ROLLERS AND FAIRLEADS ALSO TO BE CARRIED OUT BY CSL AND NSRY IF DEFECTIVE SAME TO BE REPLACED. RENEWAL AND PROVISIONING OF DAMAGED ROLLERS AND FAIRLEADS TO BE UNDERTAKEN BY THE SHIPYARD.
OVERHAULING/REPAIR OF MUSHROOM HEADS AND RENEWAL OF RUBBER JOINTS OF INSPECTION WINDOW OF MUSHROOM HEADS. RENEWAL OF NUT BOLTS OF INSPECTION WINDOWS. MUSHROOM HEAD TALLIES TO BE RENEWED.
SECURING OF PLATE WITH DECK AND ELECTROPLATING OF NELSON PLATE AT PORT AND STBD CATWALK.
BREATHER PIPE- RENEWAL AND WELDING OF SECURING SS CHAIN TO ALL BREATHER CAPS ON UPPER DECK. MAT- SS CHAIN, LENGTH-100 RMT, DIA OF CHAIN- 03 MM
RENEWAL OF DAMAGED AND CORRODED DRAIN LINE AT VARIOUS LOCATIONS. MAT- MS PIPE, DIA- 80 MM AND 100 MM
DRAUGHT INDICATOR SYSTEM IF MALFUNCTIONING TO BE CHECKED AND REPAIRED.
RENEWAL OF FOOTSTEPS OF VARIOUS CABINS, WARDROOM AND MESSES. MAT- RUBBER, WOOD. CATER FOR RENEWAL OF UNDERLAY WHILE RENEWAL OF FOOTSTEPS. QTY- 35 NOS
VISUAL SURVEY AND LOAD TEST OF FOLLOWING RAS ARRANGEMENTS TO BE CARRIED OUT AND LOAD TEST CERTIFICATE PROVIDED TO SS:- (A) HELO SECURING RINGS,QTY-23, 2.5TONS
(B) RHIB LIFTING EYE - QTY- 04, 02 TONS
(C) LEADSMAN PLATFORM QTY-02,0.3 TONS
(D) ANCHOR STROP,QTY-02
(E) ACCOMMODATION LADDER (STBD),QTY-01,2.55 TONS
(F) ACCOMMODATION LADDER ( PORT) ,QTY-01,2.55 TONS
(G) SCRAMBLE NET WOODEN BARS,QTY-02,.5 TONS
(H) SCRAMBLE NET IRON BARS,QTY-02,01 TONS
(J) DECK EYE FOXLE (FOR GENERAL PURPOSE ,QTY-07,03 TONS
(K) DECK EYE FOXLE (FOR STBD. CATWALK) QTY-05,03 TONS
(L) DECK EYE FOXLE (FOR PORT. CATWALK,QTY-01,03 TONS
(M) DECK EYE (SCATTERED) QTY-10,02 TONS
(N) DECK EYE FOXLE (FOR JACKSTAY) QTY-04,04 TONS
(P) DECK EYE QUARTER DECK (FOR GENERAL PURPOSE) QTY-08,03 TONS
(Q) DECK EYE QUARTER DECK (FOR GENERAL PURPOSE) QTY-03,02 TONS
(R) A-FRAME SAFETY NET,QTY-01,150KGS
(S) GEMINI SLING, QTY- 01 NOS, 500 KG
VISUAL SURVEY AND LOAD TEST OF FOLLOWING RAS ARRANGEMENTS TO BE CARRIED OUT AND LOAD TEST CERTIFICATE PROVIDED TO SS:- (A) GUARDRAIL, QTY-500 MTRS, 0.75 TONS
(B) BOTTLE SCREW FOR GUARDRAIL QTY-150, 0.75 TONS
(C) ENGINE ROOM EYES, QTY- 05, 02 TONS
(D) W SMALL, QTY- 02, 0.8 TONS
(E) TWO FOLD PURCHASE,QTY-02,10 TONS
(F) SAFETY HARNESS, QTY- 25, VISUAL SURVEY ONLY
(G) GUARDRAIL STANCHION, 0.76 TONS
(H) SKBDL LINE, QTY- 01 VISUAL SURVEY ONLY
(J) HELO NYLON LASHING, QTY- 06, 1.4 TONS
(K) JUMPING LADDER, QTY- 25, 500 KG
(L) WIRE STROP FOR LOAD LIFTING- 03
(M) EMERGENCY ESCAPE LADDERS, QTY-07, 500 KG
(N) SAFETY PREVENTER FOR RIB, QTY- 01
(P) SCRAMBLE NET,QTY-02, VISUAL SURVEY
(Q) HELO DECK RINGS, QTY- 23
(S) GEMINI SLING : 2
(T) FRAME FOR SCRAMBLE NET. QTY- 06. SWL – 600 KG EACH
RENEWAL OF DAMAGED/PERISHED FRAME STATION MARKING TALLIES AT WEATHER DECK AS PER SAMPLE. MAT- BRASS.
RENEWAL OF DAMAGED/PERISHED DECK MACHINERIES TALLIES AS PER SAMPLE. MAT- BRASS.
RENEWAL OF DECK DRAIN STRAINERS ON WEATHER DECK, SS BATHROOM, JS BATHROOM, LADY SCIENTIST CABIN TO BE UNDERTAKEN. MAT-BRASS.
(A) REPAIR AND RENEWAL OF SHOE RACK AND PERSONNEL CUPBOARD IN JR SAILORS MESS NO 1, JR SAILORS MESS NO 2, SR SAILORS MESS NO 1, SR SAILORS MESS NO 2, SCIENTIST CABINS, OFFICERS CABIN, CO CABIN AND CHIEF SCIENTIST CABIN. QTY- 200 NOS. NOTE- ALL FITTINGS TO BEPROVISIONED BY SHIPYARD.
(B) RENEWAL OF CUPBOARD LOCKS. QTY- 100 NOS
(C) RENEWAL OF CLOTH HOOKS AT VARIOUS CABIN, MESS AND OFFICES, QTY- 100 NOS
(D) RENEWAL OF SS MIRROR AT VARIOUS CABIN AND BATHROOMS. QTY-20 NOS.
REPAIR AND RENEWAL OF BUNK CLIMB SUPPORT BRACKET JR SAILORS MESS NO 1, JR SAILORS MESS NO 2, SR SAILORS MESS NO 1, SR SAILORS MESS NO 2, SCIENTIST CABINS,
PAINTING OF LOCKERS AND SHOE RACK TO BE CARRIED OUT.
RENEWAL OF FOLLOWING ITEMS IN JS BATHROOM, SS BATHROOM, OFFICERS BATHROOM , CO BATHROOM, EXO BATHROOM AND CHIEF SCIENTIST CABIN. ALL FITTINGS TO BE PROVISIONED AS PER SAMPLE:- (A) HEALTH FAUCET- 30 NOS
(B) HEAD SHOWER- 10 NOS
(C) HAND SHOWER- 10 NOS
(D) SOAP TRAY- 50 NOS
(E) TOWEL HANGING ROD- 30 NOS
(F) MIXTURE TAPS-20
(G) WASH BASIN TAPS-50
(H) CLOTH HANGING HOOK- 50 NOS
(J) SOAP DISPENSER- 10 NOS
(K) URINAL PAN- 02 NOS
RENEWAL OF ROPE REEL AT WEATHER DECK TO BE UNDERTAKEN.
(H) REPAIR/ RENEW ROLLER OF THE BROW. ROLLERS TO BE PROVISIONED BY SHIPYARD. QTY- 06
MANUFACTURE AND FITMENT OF ADDITIONAL BOLLARD ON QUARTER DECK STBD SIDE AS PER SAMPLE.
MANUFACTURE OF GEMINI CHOCKS AS PER SAMPLE.
MANUFACTURE OF CANVAS COVERS FOR FOLLOWING EQUIPMENT AS PER DIMENSIONS:- MAT- CANWAS. (A) GEMINI -02
(C) ROPE REEL- 03
MANUFACTURE OF METALLIC COVERS FOR FOLLOWING EQUIPMENT AS PER DIMENSIONS:- MAT- SHEET METAL. (A) COMPRESSOR- 02
(B) DD PUMP - 01
(C) CAPSTAN OPERATING PANEL- 01
(D) DECK WASHING MACHINE - 01.
MANUFACTURE OF RAT GUARD AS PER SAMPLE. MAT-SHEET METAL.
REPAIR OF DETONATOR LOCKER AT QUARTER DECK PORT VIEW DAMAGED. MAT-MS.
MANUFACTURE AND FITMENT OF STORAGE LOCKER IN SCIENTIFIC STORE AS PER DIMENSIONS. MAT-MS.
MANUFACTURE OF WOODEN LOG FOR CRANE REST AT QUARTERDECK AS PER DIMENSIONS. MAT- WOOD.
MANUFACTURING AND FITMENT OF FOLLOWING SECURING BRACKETS AT VARIOUS LOCATIONS:- (A) FB 5(X) - 02
(B) 10 KG DCP EXTINGUISHER- 02.
REPAIR OF FOLLOWING SECURING BRACKETS AT VARIOUS LOCATIONS:- (A) AFFF EXTINGUISHER - 20
(B) CO 2 EXTINGUISHER - 20
(D) BASCCA -12
(E) DCP EXTINGUISHER - 03
MANUFACTURING AND FITMENT OF RACK FOR DC TORCHES IN DCHQ. MAT-MS.
RENEWAL OF LOCKING ARRANGEMENT OF DRAWERS IN DCHQ VIEW DAMAGED.
MANUFACTURE OF NBCD MARKING BOARDS AS PER SAMPLE IN DCHQ. MAT- WOOD/ AL.
MANUFACTURE OF HOT WORK CONTROL BOARD AS PER SAMPLE IN DCHQ. MAT- WOOD/ AL.
REPAIR OF FWD AND AFT DC LOCKERS VIEW DAMAGED. MAT-MS.
RENEWAL OF STORAGE RACKS IN NBCD STORE AS PER DIMENSIONS VIEW DAMAGED. MAT- MS.
FITMENT OF FIXED SECURING ARRANGEMENT OF BA COMPRESSOR AND WATER BALLAST TANK AT QUARTER DECK. MAT-MS.
MANUFACTURE AND STICKERING OF NBCD STICKERS AS PER SAMPLE.
SECURING ARRANGEMENT/RACK FITMENT OF SPARE BASCCA, WOODEN SHORE, THREE LEGS GRIPS, SPLINTER BOX, GRID SHORE, FIXED SHORE, CO2 AND AFFF BRACKETS IN NBCD STORE.
DB/ JB PERISHED ON UPPER DECK. REPLACEMENT AS PER SAMPLE. MAT - SS.
FITMENT OF NEW EARTHING POINT PORT & STBD SIDE ON FOXLE AND QUARTER DECK FOR UTILIZATION DURING DOCKING EVOLUTIONS.
SOLAS BOAT STARTER BOX PORT AND STBD PERISHED. REPLACEMENT AS PER SAMPLE. MAT - SS.
BOAT DAVIT STARTER BOX ON FOXLE PERISHED. REPLACEMENT AS PER SAMPLE. MAT - SS.
CABLE CHANNEL TRAY DETERIORATED AT VARIOUS LOCATIONS TO BE RENEWED WITH SECURING CLAMPS. WORK INVOLVES WELDING, CUTTING, DEGUTTING, RE-GUTTING, LAGGING JOBS, STAGING AND FITMENT.
230V DB ON BRIDGE TOP PERISHED VIEW FWT. RENEWAL AS PER SAMPLE. MAT- SS.
EK 896 WOODEN RACK BROKEN, TO BE REPLACED WITH METALLIC RACK AS PER DIMENSIONS.
RENEWAL OF SPEAKERS MOUNTING PLATE AT VARIOUS LOCATIONS VIEW CORRODED/ DAMAGED. MAT- MS.
BOX COVER FOR MIC AND ACTION ALARM POSITION RUSTED AT VARIOUS LOCATIONS,TO BE REPLACED.
BOX COVER FOR TELEPHONE AT VARIOUS LOCATIONS ON UPPER DECK BROKEN, TO BE REPLACED. MAT- SS.
SPEAKERS MOUNTING PLATE AND BOX COVER FOR MIC RUSTED AT VARIOUS LOCATIONS, TO BE REPLACED. WORK INVOLVE WELDING, CUTTING, DEGUTTING, REGUTTING, LAGGING JOBS, STAGING AND FITMENT.
MANUFACTURE AND FITMENT OF METALLIC RACKS IN WINE STORE AS PER DIMENSIONS. MAT- CRCA.
FITMENT OF NEW GARBAGE DISPOSAL UNIT IN SHIP'S GALLEY.
MANUFACTURE AND FITMENT OF METALLIC COVER FOR HEATING ELEMENT OF BAIN MARY IN SHIP'S GALLEY. MAT- PERFORATED SHEET.
MANUFACTURE AND FITMENT OF PIGEON HOLES RACK IN SHIPS OFFICE. MAT- CRCA.
RE-LOCATION OF RADAR / ECDIS DISPLAY IN BRIDGE.
RENEWAL OF BRIDGE WINDOW GLASSES AND PASTING OF PHOTO-CHROMATIC LAYERS.
MANUFACTURE AND FITMENT OF STORAGE LOCKERS IN BRIDGE. MAT- CRCA
MANUFACTURE AND FITMENT OF WORKING TABLES FOR COMPUTER/ MDA & LINK PCS IN BRIDGE. MAT- CRCA
MANUFACTURE AND FITMENT OF BRIDGE WING AWNING (P & S)
HYDRO BLASTING AND RENEWAL OF HELO DECK FULL PAINT SCHEME.
REPAIR AND RENEWAL OF AWNING SECURING POINTS
REPAIR AND RENEWAL OF FOUNDATION OF L CLAMP AND LIGHT FITTING CLAMP
MANUFACTURE OF FLEXIBLE LADDER FROM FOXLE TO HELO DECK
HELO DECK MARKING TO BE CARRIED OUT.
SERVICEABILITY CHECKS OF GUARD RAIL AND LIP PIN(SHOES)
REPOSITIONING OF GSE BOX
RENEWAL OF PVC COATED HELO DECK AWNING
MANUFACTURING OF CEREMONIAL AWNINGS, MAT - PVC GREY CLOTH
MANUFACTURE OF WOODEN GRATINGS FOR ROPES. MAT - WOOD
MANUFACTURE OF WOODEN GRATINGS FOR SRCG, MMG & LMG POST (PORT AND STBD). MAT - WOOD
MANUFACTURE OF RHIB OBM TANK. MAT- AL.
RENEWAL OF RHIB CHOCKS AND CUSHION SHEET. MAT - WOOD
CUTTING ASSISTANCE FOR REMOVAL OF GANGWAY BRACKETS FROM FOXLE TO SOLAS BOAT DECK (PORT)
RUBBER BEADING OF 50 SCUTTLES TO BE RENEWED. RUBBER BEADING TO BE PROVISIONED BY SHIPYARD AS PER SAMPLE.WORK INVOLVES REMOVAL OF OLD RUBBER BEADING, MAINTENANCE / PAINTING OF SCUTTLES FRAME AND FITMENT OF NEW RUBBER BEADING WITH SILICA GEL COATING AND PROVING OF WATERTIGHTNESS BY CHALK TEST.
RENEWAL OF BRACKETS, SS CHAINS AND HOOKS FOR SECURING OF SCUTTLE.
INSPECTION AND REPLACEMENT OF CRACKED TEAK WOOD PLANKS AT QUARTER DECK AT INDICATED LOCATIONS. NOTE- INSPECTION TO BE UNDERATKEN IN PRESENCE OF NSRY REP AND CSL REP. REPLACEMENT OF WOODEN PLANKS TO BE UNDERTAKEN WITH WARANTEE PERIOD. WORK INVOLVES REMOVAL OF OLD CRACKED WOODEN PLANKS, RENEWAL OF STUDS, AND REPLACEMENT OF NEW WOODEN PLANKS WITH APLLICATION OF SILICA JEL.INSPECTION OF WOOD BEFORE INSTALLATION TO BE UNDERTAKEN BY NSRY REP, CSL REP AND SS. WOODEN PLANKS TO BE PROVISIONED BY SHIPYARD THROUGH NAVY APPROVED VENDOR. THIRD PARTY INSPECTION (LRS, IRS OR OTHER FIRM) OF WOOD TO BE UNDERTAKEN PRIOR OFFERING TO THE NSRY AND GUARANTEE CERTIFICATE FOR THE WOODEN PLANKS TO BE SUBMITTED TO THE NAVY.
RENEWAL OF SPRING MECHANISM OF ALL 07 EMERGENCY ESCAPE HATCHES. SHIPYARD TO PROVISION SPRING MECHANISM FROM NAVY APPROVED VENDORS
RENEW RUBBER BEADING WITH SILICON RUBBER OF ALL EMERGENCY ESCAPE HATCHES (QTY- 30 RMT).
CHALK TEST TO BE CARRIED OUT (RUBBER BEADING SIZE 2 INCH FOR HATCHES.) AND PROVEN TO NAVAL INSPECTION AGENCY
OVERAULING OF EMERGENCY ESCAPE HATCH SPINDLE.
ALL THE FASTENING OF THE RUDDER TO BE SEALED WITH ARALDITE & PUTTY (M-SEAL AND CEMENT NOT TO BE APPLIED)
REMOVE LOOSE SCALES, SLIME AND MARINE GROWTH ON ZINC REFERENCE ELECTRODES BY SCRAPPING WITH WIRE BRUSH. CHECK INSULATION OF ANODES AND REFERENCE ELECTRODES TO HULL. RECTIFY DEFECTS IF ANY.
ALL SEA TUBE NOT ACCESSIBLE FOR SURVEY AND PAINTING BECAUSE OF SMALL DIA ARE TO BE RENEWED WITH SEA TUBE MADE OF DMR249A STEEL AND APT POST RENEWAL
CARRY OUT 100% HYDRO JET BLASTING/ COPPER GRIT BLASTING OF ABOVE WATER AREA INCLUDING SUPERSTRUCTURE TO SA 2 ½ STANDARD.
CARRY OUT FRESH WATER WASHING. APPLY ONE COAT OF PRIMER IMMEDIATELY ON COMPLETION OF DRYING AS PER NCD FOR PAINT SCHEME SPECIFIED AS PER LATEST POLICIES
CARRY OUT COPPER GRIT BLASTING OF SHELL PLATING UP TO BARE METAL (SA2 1/2) OF FREE BOARD AREA OF HULL AND CARRY OUT 100% VISUAL SURVEY.
ULTRASONIC GAUGING OF FREEBOARD AREA AT SCATTERED LOCATIONS AS INDICATED BY INSPECTION AGENCY/PROJECT TEAM. JOB INVOLVES: DEGUTTING AND RE-GUTTING OF LAGGING, PANELING, SYSTEM PIPE LINES/ ELECTRICAL CABLE WORK, HULL OUTFITTING ETC.
RENEWAL OF FULL PAINT SCHEME OF SHELL PLATING POST APPROPRIATE SURFACE PREPARATION. RENEWAL OF PAINT SCHEME TO BE CARRIEDOUT I.A.W NO 53/16. NOTE : PRIOR TO PAINTING THE SHIP SIDE TO BE WASHED WITH FRESH WATER.
CARRY OUT SURVEY AND INSPECTION OF BOLLARDS/ FAIRLEADS AND THE HULL STRUCTURE INCLUDING STIFFENING MEMBERS IN THE VICINITY WITH NON-DESTRUCTIVE TECHNIQUES AND MENTION IN SURVEY REPORT/ CERTIFICATE BE PROVIDED. EFFICACY OF TOWING AND DECK CLENCH TO BE INSPECTED BY NDT AND REPORT TO BE FORWARDED. PRIOR TO SURVEY ALL THE DECK FITTINGS TO BE COPPER GRIT BLASTED UP TO BARE METAL.
REPLACEMENT OF SACRIFICIAL ANODES.
CRACK OBSERVED ON BOOK CELL OF FWD STP. BOOK CELL TO BE CLEANED AND CHECKED, RENEW IF DEFECTIVE.
CALIBRATION OF CIRCUIT BREAKER.
MACERATOR IMPELLER CASING DAMAGED AND CORRODED, COVER TO BE RENEWED.
RENEWAL OF CORRODED VENT LINE OF FWD AND AFT STP.
CALIBRATION OF PRESSURE GAUGE.
TEST PIPES AND CONNECTIONS FOR LEAKAGE SPECIALLY AT THE BACK OF THE FEEDING PANNEL AND INDICATOR. TEST LEAKAGE IN THE AIR TUBE.
CHECK THE CALIBRATION AND ADJUSTMENT. CHECK THE CAPILLARY ON AIR FILTER OF THE PNEUMERSTAT.
SURVEY THE HULL PENETRATOR, AIR TUBING, SEA VALVES PNEUMERSTAT AND STRING IN INDICATOR.
HULL - PART III
AUTHORITY - HQSNC/CCONO LETTER NC/3000/01 (ABER) (i) DATED 28 MAR 18. ABER REPLACEMENT OF ACCOMMODATION LADDER (P & S) AS TO BE UNDERTAKEN AS PER APPROVED BPs. MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
AUTHORITY - HQSNC/ CCONO LETTER NC/3000/01 (ABER) DATED 02 APR 18). ABER REPLACEMENT OF ICCP SYSTEM AS PER APPROVED BPs TO BE UNDERTAKEN. MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF EXISTING WOODEN ITEMS IN COMPARTMENT AND THE SAME TO BE REPLACED WITH CRCA. QTY- 30 ( APPROVED BPS OF HQSNC VIDE LETTER NC/3000/33A DATED 19 MAY 22)
FITMENT OF VALVES IN DRAIN LINES OF COLD AND COOL ROOM. (APPROVED BPS OF HQSNC VIDE LETTER NC/3000/33A DATED 13 AUG 21)
AUTHORITY - HQSNC FAX NC/3000/33A DATED 10 MAR 23 REPLACEMENT OF NON STANDARDISED 'THREE ROLLER FAIRLEADS' AT FOXLE AND QTR DECK. WORK INVOLVES DEGUTTING AND REGUTTING OF GUARDRAIL STANCHIONS, LAGGING AND PANELLING. ITEM TO BE SUPPLIED BY MO(KOC).
AUTHORITY - HQSNC FAX NC/3000/33A DATED 10 MAR 23 REPLACEMENT OF NON STANDARDISED EMERGENCY ESCAPE SCUTTLES (EES) WITH STANDARDISED EES.
ENGINEERING - PART I
3M6-(A) CHECKS OF ALL SAFETY DEVICES (SDCS) . (B) JOB REQUIRE REMOVAL OF FOLLOWING CUT OUTS. CALIBRATION/REPAIR/RENEWAL AND FITMENT IN THE SYSTEM AND PROVING OF SAME TO NAVAL TRIAL TEAM AS PER DESIGN SPECIFICATION. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
(1) LUB OIL PRESSURE SWITCH QTY-01
(2) LUB OIL SCAVENGE PUMP PRESSURE QTY-01
(3) GEAR BOX LUB OIL PR SWITCH-QTY-01
(4) CONTROL AIR PR SWITCH-QTY-01
(5) OVERSPEED TRIP INCLUDING TACHOMETER- QTY-01
(6) HIGH FRESH WATER TEMP ALARM-QTY-01
(7) LOW G/B LUB OIL PR ALARM QTY-01
(8) LOW G/B OIL PR TRIP QTY-01
(9) LOW CONTROL AIR PR ALARM QTY-01
(10) LOW EXPANSION LEVEL ALARM FLOAT SWITCH QTY-01
(11) HIGH CONTAMINATION ALARM QTY-01
(12) HIGH BILGE LEVEL ALARM QTY-01
(13) HIGH G/B OIL TEMP ALARM QTY-01
(14) LOW G/B OIL PR ALARM QTY-01
(15) LOW G/B OIL PR TRIP QTY-01
(16) LOW ME LUB OIL PR ALARM QTY-01
(17) LOW ME LUB OIL PR TRIP QTY-01
(18) EXHAUST THERMOCOUPLE QTY-13
(19) TURNING GEAR LIMIT SWITCH - 02
(20) SHAFT LOCKING LIMIT SWITCH-01
(21) STARTING AIR INTERLOCK SOLENOID - 01
(22) HIGH LUB OIL TEMP ALARM QTY-01
1000H10- CALIBRATE FUEL INJECTORS
3000H1- FIP CALIBRATION (I) CHECK AND SET TIMING AND INJECTION PRESSURES. (II) CARRY OUT CALIBRATION ON TEST BENCH.
3000H2- CHECK THE OPERATION OF OVER SPEED DEVICE AND RESET IF REQUIRED.
3000H3- CHECK ALL WARNING AND EMERGENCY STOPPING DEVICES FOR PROPER FUNCTIONING.
3000H4- REMOVE AND CLEAN ALL STARTING AIR INJECTION VALVE.
3M6- (A)CHECKS OF ALL SAFETY DEVICES (SDCS) . (B) JOB REQUIRE REMOVAL OF CUT OUTS CALIBRATION/REPAIR/RENEWAL AND FITMENT IN THE SYSTEM AND PROVING OF SAME TO NAVAL TRIAL TEAM AS PER DESIGN SPECIFICATION. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
(1) LUB OIL PRESSURE SWITCH QTY-01
(2) LUB OIL SCAVENGE PUMP PRESSURE QTY-01
(3) GEAR BOX LUB OIL PR SWITCH-QTY-01
(4) CONTROL AIR PR SWITCH-QTY-01
(5) OVERSPEED TRIP INCLUDING TACHOMETER- QTY-01
(6) HIGH FRESH WATER TEMP ALARM-QTY-01
(7) LOW G/B LUB OIL PR ALARM QTY-01
(8) LOW G/B OIL PR TRIP QTY-01
(9) LOW CONTROL AIR PR ALARM QTY-01
(10) LOW EXPANSION LEVEL ALARM FLOAT SWITCH QTY-01
(11) HIGH CONTAMINATION ALARM QTY-01
(12) HIGH BILGE LEVEL ALARM QTY-01
(13) HIGH G/B OIL TEMP ALARM QTY-01
(14) LOW G/B OIL PR ALARM QTY-01
(15) LOW G/B OIL PR TRIP QTY-01
(16) LOW ME LUB OIL PR ALARM QTY-01
(17) LOW ME LUB OIL PR TRIP QTY-01
(18) EXHAUST THERMOCOUPLE QTY-13
(19) TURNING GEAR LIMIT SWITCH - 02
(20) SHAFT LOCKING LIMIT SWITCH-01
(21) STARTING AIR INTERLOCK SOLENOID - 01
(22) HIGH LUB OIL TEMP ALARM QTY-01
3000H2- CHECK THE OPERATION OF OVER SPEED DEVICE AND RESET IF REQUIRED.
3000H3- CHECK ALL WARNING AND EMERGENCY STOPPING DEVICES FOR PROPER FUNCTIONING.
3000H4- REMOVE AND CLEAN ALL STARTING AIR INJECTION VALVE.
6000H1- TAKE CRANK SHAFT DEFELECTION ON ALL WEBS AND RECORD IN SERVICE LOG.
6000H2- REMOVE CYLINDER HEADS, INSPECT ALL VALVES, GUIDES AND OPERATING MECHANISM. GRIND VALVE AND VALVE SEATS.
6000H3- DECARBONISE CYLINDER HEAD AND PISTON CROWN. EXAMINE CYLINDER HEADS FOR CRACK AND PITTINGS.
6000H4- GAUGE ALL CYLINDER BOX WITH PISTON AT BDC AND RECORD.
6000H5- REFIT INDICATOR VALVES AND CYLINDER RELIEF VALVES.
6000H6- REMOVE TWO PISTONS AND CONNECTING RODS. EXAMINE PISTONS, PISTON RINGS AND SCRAPPER RING. MEASURE WEAR DOWN OF RINGS AND PISTON. EXAMINE BIG END AND SMALL END BEARINGS AND PISTON PIN FOR WEAR AND RECORD IN SERVICE LOG.
6000H7- EXAMINE CAM SHAFT DRIVE GEAR FOR SIGN OF WEAR.
6000H8- EXAMINE ALL ROLLERS AND CAMS FOR SIGN OF WEAR AND HARD MARK.
6000H9- STRIP AND EXAMINE FUEL INJECTION PUMP AND CARRY OUT PHASING CALIBRATION ON ASSEMBLY.
6000H10- REMOVE AND CLEAN FOLLOWING STARTING AIR LINE AND RELIEF STARTING VALVE AND OTHER ASSOCIATED VALVES IN THE SYSTEM. (A) STARTING AIR VALVE - 08 NOS
(B) MASTER STARTING VALVE - O1 NOS
(C) RELIEF VALVE - 01 NOS
6000H11- CHECK CLEARANCES OF CONNECTING ROD BEARINGS WITH FEELER GAUGE.
6000H12- REFIT SEA WATER AND FRESH WATER COMBINED PUMP.
6000H13- REMOVE AND DISMANTLE ALL FUEL INJECTERS AND SERVICE/ RESET PRESSURE ON COMPLETION.
6000H14- REMOVE AND BLOW THROUGH FUEL AND LUB OIL PIPES WITH COMPRESSED AIR.
6000H15- EXAMINE CORROSION PLUG ON CYLINDER HEAD AND RENEW IF EXCESSIVELY EATEN AWAY.
6000H16- EXAMINE COOLING WATER SPACE OF CYLINDER HEAD AND REMOVE DIRT ANDDEPOSITS (DEGREASING).
6000H17- EXAMINE SEA WATER SIDE OF LUB OIL AND FRESH WATER COOLER, SIGHT TUBES AND PRESSURE TEST ON ASSEMBLY, QTY - 02 NOS. CHECK CORROSION PLUG FOR WEAR DOWN. RENEW CORROSION PLUG - 12 NOS.
6000H18- EXAMINE INTAKE AIR COOLER ON SEA WATER SIDE AND PRESSURE TEST, QTY - 01 NOS. EXAMINE CORROSION PLUGS. REPLACE CORROSION PLUGS IF WASTED MORE THAN 50%. QTY - 04 NOS.
6000H19- CALIBRATE FOLLOWING PRESSURE AND TEMPERATURE GAUGES OF THE ENGINE. (A) RANGE - 0-7 BAR, QTY- 05 NOS
(B) RANGE - 0-10 BAR, QTY- 10 NOS
(C) RANGE - 0-4 BAR, QTY- 02 NOS
(D) RANGE - 0-2.5 BAR, QTY- 01 NOS
(E) RANGE - 0-40 BAR, QTY- 01 NOS
(E) RANGE - 0-650º C, QTY- 01 NOS
(F) RANGE - 0-100º C, QTY- 29 NOS
6000H21- REFIT CIRCULATING WATER PUMPS SUCTION AND DISCHARGE VALVES. (A) SIZE - 100 MM, QTY - 01 NOS. (B) SIZE - 65 MM, QTY - 01 NOS.
6000H22- REFIT LUB OIL PUMP AND ASSOCIATED RELIEF VALVES. (A) LUB OIL PUMP - 02 NOS. (B) RELIEF VALVE - 04 NOS.
6000H23- UNDERTAKE CLEANING AND OVERHAULING OF TURBO CHARGER.
12000H1- REMOVE ALL PISTONS AND CONNECTING RODS, MEASURE WEAR DOWN OF SMALL AND BIG END BEARINGS AND PISTON PIN. TAKE LINER WEAR DOWN, CHECK PISTON WEAR DOWN ALSO. MEASURE CLEARANCE OF PISTON RINGS AND SCRAPPER RINGS. ENTER THESE READINGS IN SERVICE LOG.
12000H2- PULL OUT TWO IN NO. CYLINDER HEAD FOR RANDOM CHECK. INSPECT LINER AND SEALING RINGS. EXAMINE JACKETS FOR WEAR AND CRACK.
6000H1- REPLACE AFTER COOLER CORE.
SR4- CHECK NON-METALIC PARTS, PIPES, MUFFLER AND EXHAUST LINE FOR CRACKS AND DISTORTION.
SR5- EXAMINE 25% OF LAGGING WORK. RENEW IF REQUIRED.
SR6- CHECK ALIGNMENT OF COMPENSATOR. ADJUST AS NECESSARY (DURING FITMENT)
SR7- INSPECT MAIN ENGINE EXHAUST TRUNKING SUPPORT (SLIDING AND FIXED) ARRANGEMENT FOR FOLLOWING (AS APPLICABLE):- (I) LOOSE/BROKEN SUPPORT BRACKET BOLTS. (II) INADEQUATE CLEARANCE BETWEEN SUPPORT FLANGES FOR THERMAL EXPANSION (6MM SPECIFIED). (III) VISIBLE MISALIGNMENT BETWEEN THE TRUNKING SECTIONS.
SR9- REMOVE AND INSPECT THE LUB OIL DRAIN COCK OF THE EXHAUST GAS EXPANSION PIECE AND CLEAN IT BY BLOWING THROUGH COMPRESSED AIR.
SR10- CHECK AND GREASE ALL SUPPORT HANGERS OF AIR INDUCTION AND EXHAUST SYSTEM.
SR12- CALIBRATE FOLLOWING THERMO COUPLES AND TEMPERATURE INDICATORS. (I) THERMOCOUPLE, QTY -26 ,
(II) TEMP INDICATOR 0-600*C, QTY - 04
(III) THERMOMETERS 0-100*C, QTY - 06
SR13- APPLICATION AND RESTORATION OF RECOMMENDED PAINT SCHEME ON ALL COMPONENTS OF THE AIR INTAKE SYSTEM.
SR14- (A) INSPECT AND CLEAN ALL COMPONENTS OF AIR INDUCTION SYSTEM FROM WEATHER DECK OPENING TO TC RUBBER BELLOW. QTY - 02 SETS
(B) REPLACE AIR FILTER. QTY - 04 NOS
NR1- CARRY OUT CHEMICAL CLEANING AND PRESSURE TEST OF EXHAUST SYSTEM (INSITU). RENEW DAMAGED/ DEFECTIVE PART.
NR2- RENEW CORROSION PROTECTORS.
NR3- REMOVE EXHAUST GAS COMPENSATOR, SEPARATOR. REMOVE ALL CARBON DEPOSITS FROM THE COMPENSATOR AND CLEAN IT.
NR4- CHEMICAL CLEANING OF FUNNEL TOP DRAIN LINE INCLUDING STRAINER. SIZE - 32 MM, QTY - 10 MTRS
NR5- DISMANTLE/ INSPECT ALL COMPONENTS OF THE MAIN ENGINE AIR INTAKE TRUNKING FROM CATCHMENT POT TO TC INLET RUBBER BELLOW. INSPECT AND CLEAN ALL COMPONENTS OF THE AIR INDUCTION SYSTEM FROM WEATHER DECK OPENING TO TC RUBBER BELLOW.
NR6- SURVEY AIR INDUCTION AND EXHAUST SYSTEM INCLUDING SILENCERS, COMPENSATOR. RENEW 50% PIPELINES
NR7- REPLACE COMPENSATORS/ VALVES/ NRVS AND EXHAUST DOUBLE JACKETS IN THE SYSTEM.
SR1- DRAIN EXPANSION TANK. CLEAN AND REFILL WITH DEMINERALISED WATER. ADD CORRSION INHIBITORS TO CORRECT CONCENTRATION
SR2- CALIBRATE FOLLOWING GAUGES ON SYSTEM NOTE- CALIBRATION CERTIFICATES TO BE PROVIDED (I) THERMOMETER 0-100*C, QTY - 14
(II) PRE GAUGE 0-7 BAR, QTY - 02
(III) PRE GAUGE 0-7 KG/CM2, QTY - 02
(IV) PRE GAUGE 0-10 BAR, QTY - 02
(V) PRE GAUGE (-1) - 04 BAR, QTY - 01
NR1- REFIT ALL SYSTEM VALVES. SIZE- 125 MM QTY 06, SIZE- 65 MM QTY 02.
NR2- REMOVE, CHEMICALLY CLEAN AND PRESSURE TEST HEAT EXCHANGER.
SR1- CALIBRATE ALL PRESSURE GAUGES OF SYSTEM. RANGE - 0 TO 40 BAR
5A1- CARRY OUT PROOF TEST OF HP AIR BOTTLES (BR 3000 ART 2341.8 REFERS).
5A2- CARRY OUT ON BOARD SURVEY OF ATLEAST 25% AIR PIPES.
SR2- CALIBRATE SUCTION AND DISCHARGE PRESSURE GAUGES (I) 0-6 BAR, QTY -01 (II) 1-3 BAR, QTY-01
NR1- STRIP PUMP COMPLETELY AND EXAMINE ALL PARTS FOR WEAR. REFIT PUMP AS NECESSARY
NR2- RENEW SHOCK AND VIBRATION MOUNTINGS.
PRR1- CARRY OUT CBPM CHECKS(VIBRATION TRIALS/NARROW BAND ANALYSIS)DURING PRE-REFIT TRIALS WITH MTU ASSISTANCE AND UNDERTAKE DEFECT RECTIFICATION AS NECESSARY.
A1- CHECK SECURITY OF THREADED CONNECTIONS AND FOUNDATION.
A2- CHECK ENGINE TO R/G AND R/G TO OUTPUT SHAFT COUPLING BOLTS FOR LOOSENESS. TIGHTEN IF NECESSARY.
A3- CHECK HEAT EXCHANGER FOR LEAKAGE AND REPLACE SEALS, .
NR1- CLEAN HEAT EXCHANGER AND PRESSURE TEST.
10A1- COMPLETELY DISMANTLE THE GEAR BOX. CHECK AND GAUGE FOLLOWING AND REPLACE IF NECESSARY:- (I) SHAFTS FOR RUN-OUT. (II) BEARING SHEETS FOR DAMAGE. (III) CARRIERS. (IV) GEAR AND PINION TEETH. (V) ANNULAR PISTON. (VI) CARRIER PINS. (VII) OIL DISTRIBUTOR. (VIII) CALIBRATE PRESSURE/ TEMPERATURE GAUGES.
10A2- REPLACE FOLLOWING PARTS:- (I) RECTANGULAR RINGS. (II) CLUTCH DISCS, SCREWS AND RETURN SPRINGS FOR ANNULAR PISTON (ROUTINE APPLICABLE FOR WGV SERIES ONLY). (III) 'O' RINGS AND SNAP RINGS. (IV) ALL CLUTCH HOUSING SCREWS(K 107.07/W 101.04). (V) ANTI FRICTION BEARINGS. (VI) SHAFT SEALS AND BUSHES. (VII) THRUST BEARING SCREWS AND SPRINGS (VII) OIL PUMP, FILTER ELEMENTS AND SEALS. (VIII) INSPECTION COVER GASKETS, 'O' RINGS FOR CONTROL VALVES, PRESSURE LIMITING VALVE. (IX) CLEAN THE COMPLETE GEAR BOX.
10A3- CHECK ALIGNMENT BETWEEN ENGINE/RG AND RG/OUTPUT SHAFT ON COMPLETION OF MAJOR OVERHAUL
PRR1 - CARRY OUT CBPM CHECKS(VIBRATION TRIALS/NARROW BAND ANALYSIS)DURING PRE-REFIT TRIALS WITH MTU ASSISTANCE AND UNDERTAKE DEFECT RECTIFICATION AS NECESSARY.
A1- CHECK SECURITY OF THREADED CONNECTIONS AND FOUNDATION.
A2- CHECK ENGINE TO R/G AND R/G TO OUTPUT SHAFT COUPLING BOLTS FOR LOOSENESS. TIGHTEN IF NECESSARY.
A3- CHECK HEAT EXCHANGER FOR LEAKAGE AND REPLACE SEALS, IF NECESSARY.
NR1- CLEAN HEAT EXCHANGER AND PRESSURE TEST.
10A1- COMPLETELY DISMANTLE THE GEAR BOX. CHECK AND GAUGE FOLLOWING AND REPLACE IF NECESSARY:- (I) SHAFTS FOR RUN-OUT. (II) BEARING SHEETS FOR DAMAGE. (III) CARRIERS. (IV) GEAR AND PINION TEETH. (V) ANNULAR PISTON. (VI) CARRIER PINS. (VII) OIL DISTRIBUTOR. (VIII) CALIBRATE PRESSURE/ TEMPERATURE GAUGES.
10A2- REPLACE FOLLOWING PARTS:- (I) RECTANGULAR RINGS. (II) CLUTCH DISCS, SCREWS AND RETURN SPRINGS FOR ANNULAR PISTON (ROUTINE APPLICABLE FOR WGV SERIES ONLY). (III) 'O' RINGS AND SNAP RINGS. (IV) ALL CLUTCH HOUSING SCREWS(K 107.07/W 101.04). (V) ANTI FRICTION BEARINGS. (VI) SHAFT SEALS AND BUSHES. (VII) THRUST BEARING SCREWS AND SPRINGS (VII) OIL PUMP, FILTER ELEMENTS AND SEALS. (VIII) INSPECTION COVER GASKETS, 'O' RINGS FOR CONTROL VALVES, PRESSURE LIMITING VALVE. (IX) CLEAN THE COMPLETE GEAR BOX.
10A3- CHECK ALIGNMENT BETWEEN ENGINE/RG AND RG/OUTPUT SHAFT ON COMPLETION OF MAJOR OVERHAUL
4000H1- CHECK THE FOULING CONDITION OF THE CONDENSER TUBES. CLEANINING OF THE CONDENSER TO BE CARRIED OUT.
4000H2- CHECK ALL THE SHOCK MOUNTS FOR POSSIBLE DAMAGE. RENEW IF REQUIRED. REFITING YARD TO QUOTE FOR RENEWAL OF MOUNTS. (MOUNTS WERE LAST REPLACED IN NR 18)
4000H3- CARRY OUT FUNCTIONAL CHECK OF ALL PROTECTIVE DEVICES (REFER CHAPTER 3 -START UP OF NEW INSTALLATION OF OEM, OPERATION AND MAINTENANCE MANUAL).
4000H4- REPLACE PARTS AS INDICATED OF OEM MANUAL AT ANNEXURE-A
8000H2- CLEAN STRAINERS THROUGHOUT THE SYSTEM. RENEW THE COMPRESSOR SUCTION STRAINER.
8000H3- RENEW THE REFRIGERANT FILTER/DRIER CORES.
8000H4- CHECK THE TIGHTNESS OF ALL THE FASTENERS MOUNTED IN THE PLANT AS PER TORQUE SHEET AT CHAPTER-6 OF OEM OPERATION AND MAINTENANCE MANUAL.
8000H5- CHECK FOR AIR/NON-CONDENSABLE GASES IN THE SYSTEM.
8000H6- REPLACE PARTS AS INDICATED OF OEM MANUAL AT ANNEXURE-A.
8000H7- CARRY OUT VIBRATION MEASUREMENT AND ANALYSIS.
24000H1- RENEW THE SYSTEM OIL COMPLETELY.
24000H2- REPLACE PARTS AS INDICATED OF OEM MANUAL AT ANNEXURE-A.
4000H1- CHECK THE FOULING CONDITION OF THE CONDENSER TUBES. CLEANINING OF THE CONDENSER TO BE CARRIED OUT.
4000H3- CARRY OUT FUNCTIONAL CHECK OF ALL PROTECTIVE DEVICES (REFER CHAPTER 3 -START UP OF NEW INSTALLATION OF OEM, OPERATION AND MAINTENANCE MANUAL).
4000H4- REPLACE PARTS AS INDICATED OF OEM MANUAL AT ANNEXURE-A
8000H1- CHECK THE CONDITION OF THE SYSTEM OIL. RENEW IF NECESSARY.
8000H2- CLEAN STRAINERS THROUGHOUT THE SYSTEM. RENEW THE COMPRESSOR SUCTION STRAINER.
8000H3- RENEW THE REFRIGERANT FILTER/DRIER CORES.
8000H4- CHECK THE TIGHTNESS OF ALL THE FASTENERS MOUNTED IN THE PLANT AS PER TORQUE SHEET AT CHAPTER-6 OF OEM OPERATION AND MAINTENANCE MANUAL.
8000H5- CHECK FOR AIR/NON-CONDENSABLE GASES IN THE SYSTEM.
8000H6- REPLACE PARTS AS INDICATED OF OEM MANUAL AT ANNEXURE-A.
8000H7- CARRY OUT VIBRATION MEASUREMENT AND ANALYSIS.
4000H1- CHECK THE FOULING CONDITION OF THE CONDENSER TUBES. CLEANINING OF THE CONDENSER TO BE CARRIED OUT.
4000H3- CARRY OUT FUNCTIONAL CHECK OF ALL PROTECTIVE DEVICES (REFER CHAPTER 3 -START UP OF NEW INSTALLATION OF OEM, OPERATION AND MAINTENANCE MANUAL).
4000H4- REPLACE PARTS AS INDICATED OF OEM MANUAL AT ANNEXURE-A
8000H1- CHECK THE CONDITION OF THE SYSTEM OIL. RENEW IF NECESSARY.
8000H2- CLEAN STRAINERS THROUGHOUT THE SYSTEM. RENEW THE COMPRESSOR SUCTION STRAINER.
8000H3- RENEW THE REFRIGERANT FILTER/DRIER CORES.
8000H4- CHECK THE TIGHTNESS OF ALL THE FASTENERS MOUNTED IN THE PLANT AS PER TORQUE SHEET AT CHAPTER-6 OF OEM OPERATION AND MAINTENANCE MANUAL.
8000H5- CHECK FOR AIR/NON-CONDENSABLE GASES IN THE SYSTEM.
8000H6- REPLACE PARTS AS INDICATED OF OEM MANUAL AT ANNEXURE-A.
8000H7- CARRY OUT VIBRATION MEASUREMENT AND ANALYSIS.
SR1- CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETERS CHECKS, VIBRATION TRIALS, INSULATION/SPM CHECKS ON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFOMANCE AND DEFECTS, IF ANY. OVERHAUL PUMP IF PERFORMANCE IS SUBOPTIMAL.OVERHAULING INCLUDES DISMANTLING OF THE PUMP AND RENEWAL OF ANICIPATED /MANDATORY SPARES SEALS, PUMP GEARS, STUDS, COUPLING, SEALING RING AND GASKETS. SPARES TO BE SUPPLIED BY REFITING YARD.
SR2- INSPECT CONDITION OF SUCTION/DISCHARGE COMPENSATORS. RENEW AS NECESSARY.
SR3- CALIBRATE ALL INSTRUMENTATION
SR4- CARRY OUT FUNCTIONAL TEST OF RELIEF VALVE. RESET TO SPECIFIED LIFTING PRESSURE. PRESSURE VALUE - 25 BAR
SR6- CHECK CONDITION OF RUBBER INSERTS, METAL SHIMS ETC IN COUPLING AND RENEW, IF REQUIRED.
SR7- REFIT SUCTION AND DISCHARGE VALVES. SIZE-80MM SD VALVE
SR8- CHECK CONDITION OF COUPLING GUARDS. REPLACE I COUPLING GUARDS.
5A1- RENEW SV MOUNTS. NOTE - REPLACEMENT ACTIVITY TO BE PLANNED COINCIDING WITH NEAREST REFITS.
NR1- CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. REPAIR/ RENEW DETERIORATED FOUNDATION STIFFENERS AND SUPPORTING RIBS.
NR2- REPLACE SUCTION STRAINER.
NR3- UNDERTAKE OVERHAULING OF 50% PUMPS.
SR1- CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETERS CHECKS, VIBRATION TRIALS, INSULATION/SPM CHECKS ON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFOMANCE AND DEFECTS, IF ANY. OVERHAUL PUMP IF PERFORMANCE IS SUBOPTIMAL.OVERHAULING INCLUDES DISMANTLING OF THE PUMP AND RENEWAL OF ANICIPATED /MANDATORY SPARES SEALS, PUMP GEARS, STUDS, COUPLING, SEALING RING AND GASKETS. SPARES TO BE SUPPLIED BY REFITING YARD.
SR2- INSPECT CONDITION OF SUCTION/DISCHARGE COMPENSATORS. RENEW AS NECESSARY.
SR3- CALIBRATE ALL INSTRUMENTATION
SR4- CARRY OUT FUNCTIONAL TEST OF RELIEF VALVE. RESET TO SPECIFIED LIFTING PRESSURE. PRESSURE VALUE - 25 BAR
SR6- CHECK CONDITION OF RUBBER INSERTS, METAL SHIMS ETC IN COUPLING AND RENEW, IF REQUIRED.
SR7- REFIT SUCTION AND DISCHARGE VALVES. SIZE-80MM SD VALVE
SR8- CHECK CONDITION OF COUPLING GUARDS. REPLACE I COUPLING GUARDS.
5A1- RENEW SV MOUNTS. NOTE - REPLACEMENT ACTIVITY TO BE PLANNED COINCIDING WITH NEAREST REFITS.
NR1- CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. REPAIR/ RENEW DETERIORATED FOUNDATION STIFFENERS AND SUPPORTING RIBS.
NR2- REPLACE SUCTION STRAINER.
NR3- UNDERTAKE OVERHAULING OF 50% PUMPS.
SR1- SURVEY PROTECTIVE COATING OF TAIL SHAFT AND REPAIR AS NECESSARY.
SR2- CARRY OUT VISUAL CHECKS OF ALL EXTERNAL BOLTS LOCKING STRIPS AND WIRE. RENEW AS NECESSARY. (64 BOLTS ON EACH SHAFT)
SR3- CHECK CONDITION OF ANODES. RENEW IF ERRODED MORE THAN 50%.
PRE REFIT TRIALS NR1- CARRY OUT SHAFT VIBRATION TRIALS AS PART OF PRE-REFIT TRIALS.
POST REFIT TRIALS NR2- CARRY OUT SHAFT VIBRATION TRIALS AS PART OF PRE-REFIT TRIALS.
SR2- DRAIN OIL, CLEAN SUMP AND REFILL WITH FRESH OIL (WHERE APPLICABLE). IN CASE OF GREASE LUBRICATED BEARINGS, REMOVE OLD GREASE AND REPACK WITH FRESH GREASE.
SR4- CARRY OUT CALIBRATION OF REMOTE AND LOCAL TEMPERATURE INDICATOR (REMOTE TEMP INDICATOR 0-100*C , QTY - 10)
NR1- LIFT TOP HALF AND INSPECT TOP AND BOTTOM PADS FOR WEAR, SCORING OR DETERIORATION OF WHITE METAL. RENEW IF NECESSARY. RENEW OIL SEALS. CARRY OUT SHAFT LOADING CHECKS AND ADJUST TO REFERENCE VALUES, IF REQUIRED. ENTER ALL DETAILS IN SERVICE LOG/EMAP/KALAMAZOO.
NR2- TAKE BRIDGE GAUGE READINGS AND RECORD IT IN SERVICE LOG).
NR3- FOR ROLLING ELEMENT BEARINGS (WHERE APPLICABLE) OPEN BEARINGS AFTER JACKING THE SHAFT SLIGHTLY AND RENEW BEARINGS. REPACK WITH RECOMMENDED GREASE AFTER REMOVING OLD GREASE. CARRY OUT SHAFT LOADING CHECKS AND ADJUST LOADING AS PER REFERENCE VALUES. ENTER DETAILS IN EMAP/ KALAMAZOO.
SR1- AN INSPECTION BE CARRIED OUT EVERY TWO YEARS OR DURING THE SHAFT SURVEY PERIOD WHEN THE DIAPHRAGM EXAMINED FOR EVIDENCE OF WEAR. RECONDITIONING OF BEARING WOULD BE NECESSARY IF : (A) WEAR GROOVES IN THE HOUSING EXCEED 5.5 MM. (B) THE GAP BETWEEN DIAPHRAGM AND HOUSING EXCEED 1.0 MM. (C) THE GAP BETWEEN THE SHAFT AND THE BORE OF DIAPHRAGM AT ANYPOSITION EXCEEDS 1.8 MM.
SR1- OPEN THE TOP COVER AND INSPECT THE ROLLER BEARINGS FOR WEAR AND CORROSION. NOTE:- (A) NEVER ASSEMBLE THE BEARING DRY AND INJECT THE GREASE AFTER CLOSING THE CARTRIDGE. (B) CORRECT SHAFT LIMIT IS IMPORTANT. (C) PARTS SHOULD NOT BE INTER CHANGED. (D) FULLY TIGHTEN THE INNER RACE.
SR1- CHECK CLEARANCE OF THORDON BEARINGS. RENEW IF WEAR DOWN IS EXCESSIVE.
SR1-CHECK THE BEARING CLEARENCE OF FORWARD AND AFT END BEARINGS WITH THE HELP OF HDW WEAR DOWN GAUGE. COMPARE VALUES WITH THE REFERENCE READING. RENEW, IF REQUIRED.
SR2- CHECK THE ANODES ON AFT STERN TUBE SEAL LINER FLANGE AND RENEW IF NECESSARY AS PER SIMPLEX TECHNICAL INSTRUCTIONS CHAPTER 195-1
SR3- CHECK THE CONDITION OF STERN TUBE GLANDS.
SR4- PRESSURE TEST THE STERN TUBE AND OIL SEAL SYSTEM AS PER SIMPLEX TECHNICAL INSTRUCTIONS CHAPTER 195-1
SR2- REFIT FOLLOWING FUEL TANK SUCTION VALVES. ENSURE THAT ASSOCIATED ROD GEARING ARE IN GOOD WORKING CONDITION. VALVE TO BE RENEWED AND PRESSURE TESTED. (I) 80 MM SD VALVE, QTY - 12
(II) 50 MM SD VALVE, QTY - 04
(III) 32 MM SD VALVE, QTY - 06
SR4- REPLACE FUEL TANKS MANHOLE DOOR JOINTS.
SR5- SCREW OUT DRAIN PLUGS, LUBRICATE AND FIT BACK THE DRAIN PLUGS FITTED ON THE PIPE LINES
SR7- CHECK AND REPLACE ALL BELLOWS IN THE SYSTEM. SIZE - 80MM
SR8- CHECK AND CALIBRATE ALL INSTRUMENTATION IN THE SYSTEM.(I) PRE GAUGE - (-)1 TO 9 BAR, QTY -02 NOS
SR9- CHECK OPERATION OF HAND PUMPS IN THE SYSTEM AND OVERHAUL IF REQUIRED.
NR1- REFIT FOLLOWING VALVES IN THE SYSTEM (LIMITED TO 50% OF TOTAL VALVES IN THE SYSTEM). VALVES TO BE PRESSURE TESTED. QUOTE FOR RENEWAL OF 25 VALVES. (I) 125 MM GATE VALVE, QTY- 06
(II) 90 MM GLOBE VALVE, QTY -14
(III) 100 MM SDNR VALVE, QTY - 08
(IV) 80 MM QSV VALVE, QTY - 08
V) 20 MM QSV VALVE, QTY - 03
(VI) 20 MM SD VALVE, QTY - 18
(VII) 32 MM SD VALVE , QTY - 04
(VIII) 40 NB SD VALVE, QTY - 03
NR2- RENEW ALL THE DURITES IN THE SYSTEM
SR2- FUNCTIONAL TEST OF SAFETY VALVE TO BE CARRIED OUT. SET VALUE 3 BAR. QUOTE FOR RENEWAL OF 01 SAFETY VALVE.
SR8- CHECK OPERATION OF HAND PUMPS IN THE SYSTEM AND OVERHAUL, IF REQUIRED. OVERHAULING INCLUDES DISMANTLING OF THE PUMP AND RENEWAL OF WING PISTON WITH FLAP AND SHAFT ,COTTER PIN, , HANDLE,GLAND NUT, SUCTION DIVIDER WITH FLAP, FLAGE JOINT. SPARES TO BE SUPPLIED BY REFITING YARD.
NR1- REFIT FOLLOWING SYSTEM VALVES AND CARRY OUT PRESSURE TESTING OF SYSTEM VALVES. VALVE TO BE RENEWED AND PRESSURE TESTED. (I) 65 MM, QTY - 04 NOS
(II) 40 MM, QTY - 08 NOS
(III) 25 MM, QTY -08 NOS
(IV) VALVE CHEST VALVES 25MM, QTY - 06 NOS
NR2- RENEW ALL DURITES IN THE SYSTEM.
NR3- SURVEY 50% SYSTEM PIPES. RENEW DETERIORATED SYSTEM PIPES AS REQUIRED. ENSURE PIPE SUPPORTS/ CLAMPS ARE IN PLACE AS PER ORIGINAL DESIGN/ FIT POST ERECTION OF COMPLETE SYSTEM. PRESSURE TEST ON COMPLETION TO IDENTIFY LEAKS, IF ANY. DIA - 65/40/25 MM, LENGTH -120 MTRS. QUOTE FOR RENEWAL OF 30 MTRS PIPE LINES AND 50 IN NOS PIPE SUPPORTS/ CLAMPS.
NR4- CARRYOUT CALIBRATION OF ALL INSTRUMENTATION AND SENSORS. REPLACE DEFECTIVE ONES.(PRESSURE GAUGE-04 NOS, TEMP GAUGE - 02 NOS)
6M2- CHECK ALL REDUCERS FOR OPERATION. REPAIR DEFECTIVE REDUCERS.(PRE REDUCER 30 BAR TO 10 BAR, QTY - 10)
SR1- CALIBRATE ALL PRESSURE GAUGES. RANGE - 0 T0 80 BAR
SR2- CHECK ALL RELIEF VALVE FOR CORRECT SETTING. RESET IF REQUIRED. SET PRESSURE - 45 BAR
SR5- AFTER DEFECTS ARE ELIMINATED AND THE SAFETY VALVES AND PRESSURE GAUGE IS CALIBRATED, SUBJECT THE HP AIR SYSTEM TO TIGHTNESS TEST FOR 2 HOURS AT WORKING PRESSURE. DURING THE TEST, PRESSURE DROP SHOULD NOT EXCEED 10 %. RECTIFY DEFECTS , IF ANY. ( DL-2 AS A DEFECT OR PD)
NR1- REPLACE ALL FLEXIBLE HOSES.
NR2- REFIT FOLLOWING SYSTEM VALVES.VALVE TO BE RENEWED AND PRESSURE TESTED. (I) 50 MM SD VALVE, QTY - 10
(II) 40 MM SD VALVE, QTY - 06
(III) 32 MM SD VALVE, QTY - 10
(IV) 25 MM SD VALVE, QTY - 06
NR3- REFIT 50 % REDUCERS. (PRE REDUCER 30 BAR TO 10 BAR, QTY - 6).
6A1- PROOF TEST HP AIR RESERVOIR (INBR 3000 ARTICLE 2351 PARA 10 AND 11. APPLICABLE FOR NON-TRANSPORTABLE CYLINDERS INCLUDING ICE STARTING AIR RESERVOIRS RELEVANT)
6A2- PAINT THE CYLINDER EXTERNAL SURFACE. THE PLACE WHERE THE CERTIFICATE DATE IS PUNCHED SHOULD BE COATED WITH COLORLESS VARNISH.
1000H1- DECARBONISE PISTONS AND GRIND IN VALVES.
1000H2- CLEAN EXHAUST PIPE AND SILENCERS.
1000H3- EXAMINE FILTER FITTED WITH IN FUEL LIFT PUMP AND CLEAN IF NECESSARY.
1000H2- CHECK ALL THE PIPELINES FOR LEAKS AT JOINTS. RENEW PACKING AS NECESSARY.
1000H4- DECARBONISE THE INTERCOOLER AND AFTER-COOLER ASSEMBLY.
1000H6- LUBRICATE THE ELECTRIC MOTOR BEARINGS AND TO BE REPLACED VIEW BEARINGS IN YELLOW ZONE
1000H8- UNDERTAKE COMPLETE PERFORMANCE AND VIBRATIONS TRIALS INCLUDING CAPACITY TRIALS OF THE COMPRESSOR UNDER GIVEN LOADING CONDITIONS TO PROVE SATISFACTORY PERFORMANCE OF THE COMPRESSOR.
SR1- CALIBRATE ALL INSTRUMENTATION. RENEW IF DEFECTIVE AND PROVIDE CALIBRATION CERTIFICATE. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL. INSTRUMENTATION HOT CHECKS TO BE PROVED INSITU AS PER NAVAL STANDARDS. (I) AUTO CUTIN/CUT OFF PRESSURE SWITCH -02 NOS
(II) OIL LEVEL SWITCH-02 NOS
(III) LOADER/UNLOADER ASSEMBLY-02 NOS
(IV) AUTO DRAIN SWITCH-02 NOS
(V) TEMPERATURE SWITCH-02 NOS
CHECK ALL GAUGES FOR PROPER READING. (I) SET VALUE 0 TO 10 BAR - 02 NOS
(II) SET VALUE 0 TO 16 BAR - 02 NOS
(III) SET VALUE 0 TO 60 BAR - 02 NOS
(IV) SET VALUE 0 TO 200 DEG CEL - 02 NOS
SR2- CHECK ALL FLEXIBLE HOSES FOR CRACKS, EMBRITTLEMENT AND SIGN OF CRACKING. RENEW THEM AFTER ASSESSING THE CONDITION. (INSMA GENERAL ACQUAINT M6/59 DATED 15 JAN 13 ALSO RELEVANT). REFITING YARD TO QUOTE FOR RENEWAL OF 02 IN NOS FLEXIBLE HOSES.
SR3- CHECK WIRING/ CONTACTS OF THE PANELS FOR WEAR/ DETERIORATION. PROJECT SPECIFIC DEFECTS TO DOCKYARD FOR RENEWAL/ REPLACEMENT IF NECESSARY.
NR1- CARRY OUT OVERHAUL OF THE PANEL IF REQUIRED.
2500H1- CARRY OUT FOLLOWING:- (A) DISMANTLE THE COMPRESSOR FROM FOUNDATION AND SHIFT IT TO THE SHOP FLOOR. (B) CARRY OUT DECARBONISING AND DEGREASING WHILE COMPLETELY DISMANTLING THE COMPRESSOR TO COMPONENT LEVEL. (C) UNDERTAKE GAUGING OF EACH COMPONENT TO CONFIRM THE DIMENSIONS. CARRY OUT NDT CRACK DETECTION TEST ON PISTON, CONNECTING ROD, CONROD PINS, LINERS, VALVE PLATES AND CRANKSHAFT BEFORE REUSING THE SAME. IN CASE OF ANY DEFECT, RENEW THE COMPONENT. (D) RENEW ALL GASKETS/ JOINTS/ O RINGS WHILE REASSEMBLING THE COMPRESSOR AND THE ASSOCIATED COMPRESSOR PIPES/ VALVES. (E) RENEW ALL THE FILTER ELEMENTS. (F) OVERHAUL AND RECALIBRATE ALL INSTRUMENTATION, SAFETY CUTOUTS AND ASSOCIATED CONTROLS/ PANELS. (G) CARRY OUT TEST BED TRIALS (IF AVAILABLE AT SHOP FLOOR) TO CONFIRM DESIGN SPECIFICATIONS. (H) INSTALLATION OF THE COMPRESSOR SHOULD BE UNDERTAKEN CORRECTLY AS FOLLOWS:- (I) RENEW WITH THE GROUPED SV MOUNTS AS PER PROCEDURE. (II) RENEW THE FOUNDATION BOLTS. CARRY OUT TORQUE TIGHTENING ONLY. (III) CARRYOUT ALIGNMENT OF COMPRESSOR WITH DRIVING MEMBER. (IV) ENSURE THERE IS NO RESIDUAL STAIN ON ANY ASSOCIATED FITTING. (V) TALLY THE PIPES AFTER FITMENT. (J) UNDERTAKE CAPACITY TRIAL OF THE COMPRESSOR UNDER GIVEN LOADING CONDITIONS.
SR1- EXAMINE AIR RESERVOIR FOR EXTERNALLY FOR CORROSION
SR2- STRIP AND EXAMINE FOLLOWING REDUCING VALVES AND RELIEF VALVES. (I) REDUCING VV 32 MM, SET VALUE 0 TO 6 BAR - 02 NOS
(II) RELIEF VV 32 MM, SET VALUE 7 BAR - 02 NOS
SR3- CALIBRATE ALL PRESSURE GAUGES. (I) SET VALUE 0 TO 40 BAR - 06 NOS
(II) SET VALUE 0 TO 12 BAR - 06 NOS
SR4- REFIT FOLLOWING AIR STOP VALVES. VALVE TO BE RENEWED AND PRESSURE TESTED. (I) 32 MM VALVE - 06 NOS
(II) 25 MM VALVE - 25 NOS
(III) 40 NB GLOBE VV - 15 NOS
(IV) 20 NB GLOBE VV - 05 NOS
(V) 10 NB VV - 05 NOS
(VI) 15 NB VV - 10 NOS
SR1- CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION /SPM CHECKSON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECTS, IF ANY.
SR3- CALIBRATE FOLLOWING INSTRUMENTATION (I) PRE GAUGE, 0-10 BAR, QTY - 02
(II) PRE GAUGE, (-1) -10 BAR, QTY - 02
SR4-INSPECT AND RENEW IF REQUIRED THE SUCTION STRAINER
SR5- CHECK CONDITION OF RUBBER INSERTS, METAL SHIMS ETC IN COUPLING AND RENEW.
NR1- UNDERTAKE OVERHAUL OF 50% OF TOTAL STANDALONE CENTRIFUGAL PUMPS INCLUDING THOSE RECOMMENDED BY TRIALS AGENCIES
NR2- REFIT SUCTION AND DISCHARGE VALVES. SIZE - 50 MM, QUANTITY - 06 NOS.
NR3- CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. REPAIR/RENEW DETERIORATED FOUNDATION STIFFENERS AND SUPPORTING RIBS.
NR4- RENEW SV MOUNTS OF PUMPS TAKEN UP FOR OVERHAUL.
NR5- RENEW SUCTION AND DISCHARGE COMPENSATORS.
SR1- REFIT AND PRESSURE TEST FOLLOWING VALVES. (SUCTION VALVE CHEST) (A) SD VALVES 65NB
(B) SD VALVES 90NB
(C) SD VALVES 50NB
(D) 65NB GATE VV- 02
(E) 65 NB SD VV QTY- 02
(F) 250MM, QTY-04
NR1- CARRY OUT SURVEY OF 25% OF THE SYSTEM PIPES. ENSURE THAT ATLEAST 10% OF THESE PIPES ARE SURVEYED ASHORE. SIZE- 50 MM, LENGTH - 50 MTRS
SR3- PROVE WATER AT FIRE HYDRANTS.
NR1- CALIBRATE ALL PRESSURE GAUGES OF THE SYSTEM. REFITING YARD TO QUOTE FOR RENEWAL OF 10 PRESSURE GAUGES. (I) PRESSURE GAUGE (0-10 BAR) - 11 NOS
(II) COMPOUND GAUGE (-1 - 4 BAR) - 04 NOS
(III) PRESSURE TRANSMETER - 03 NOS)
NR2- CARRY OUT SURVEY OF 25% OF SEA WATER SYSTEM PIPES FOR CORROSION AND EROSION. RENEW DEFECTIVE PIPING AS NECESSARY.
NR3- REFIT ALL REDUCING AND RELIEF VALVES ON THE SYSTEM. RESET ON COMPLETION.
NR4- REFIT ALL PRESSURE GAUGE COCKS. SURVEY ASSOCIATED PRESSURE GAUGE PIPES AND RENEW .
NR5- VALVE REFIT: REFIT FOLLOWING OF SYSTEM VALVES INCLUDING HYDRANT VALVES. (I) SUCTION VALVE CHEST OF MER COMPRISING 04 SD VALVES OF SIZES 100MM.
(II) SUCTION VALVE CHEST OF AER COMPRISING 03 SD VALVES OF SIZES 100 MM
(III) DISCHARGE VALVE CHEST OF MER COMPRISING 03 SD VALVES OF SIZES 100MM
(IV) DISCHARGE VALVE CHEST OF AER COMPRISING 03 SD VALVES OF SIZES 100 MM.
(V) 100 MM SDNR VALVES, 5 NOS
(VI) 65 MM HYDRANT, 23 NOS
(VII) 80 MM SD VALVE, 06 NOS
(VII) 65 MM SD VALVE, 06 NOS
NR6- MUD BOXES: CLEAN AND EXAMINE INCLUDING MUD BOXES FITTED ON PORTABLE PUMP SEA SUCTION STAND PIPES
NR7- EXAMINE SUCTION AND DELIVERY FLEXIBLE RUBBER BELLOWS INTERNALLY AND EXTERNALLY. RENEW IF NECESSARY
SR1- CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION /SPM CHECKSON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECTS, IF ANY.
SR3- CALIBRATE FOLLOWING INSTRUMENTATION. (I) PRESSURE SWITCH 0-10 BAR, QTY 02 (LOCATION- DCHQ)
(II) PRESSURE GAUGE (0-10 BAR) - 3 NOS
(III) COMPOUND GAUGE (-1 - 4 BAR) - 03 NOS. REFITING YARD TO QUOTE FOR RENEWAL OF 02 IN NOS GAUGES.
SR5- CHECK CONDITION OF RUBBER INSERTS, METAL SHIMS ETC IN COUPLING AND RENEW, IF REQUIRED.
NR1- UNDERTAKE OVERHAUL OF 50% OF TOTAL STANDALONE CENTRIFUGAL PUMPS INCLUDING THOSE RECOMMENDED BY TRIALS AGENCIES
NR3- CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. REPAIR/RENEW DETERIORATED FOUNDATION STIFFENERS AND SUPPORTING RIBS.
NR4- RENEW SV MOUNTS OF PUMPS TAKEN UP FOR OVERHAUL.
NR5- RENEW SUCTION AND DISCHARGE COMPENSATORS.
SR1- CHECK ALL SERVO MOTOR VALVE/ PRESSURE TRANSMITTER/ SOLENOID VALVES /FLOW AND LEVEL SWITCHES AND PLC FOR OPERATION. REPAIR/ REPLACE AS NECESSARY.
SR2- CHECK HP RELIEF VALVE FOR OPERATION.CALIBRATE /REPAIR /REPLACE AS REQUIRED. RELIEF VALVE PRESSURE SETTING - 85 BAR
SR3- CHECK ANTI VIBRATION MOUNTS OF THE HP PUMP FOR BULGING/ DETERIORATION. REPLACE AS REQUIRED
SR4- CHECK AIR REGULATOR FOR OPERATION. CALIBRATE / REPLACE AS REQUIRED. (REFER JIC : 42902/SR4 AND OEM MANUAL)
SR5- CHECK NON-RETURN VALVES OF SAND FILTER BACK WASH AND MODULE PERMEATE LINE. REPLACE AS NECESSARY.(REFER JIC : 42902/SR5 AND OEM MANUAL). QUOTE FOR RENEWAL OF NON-RETURN VALVE.
SR6- REMOVE CIS-80 (CONDUCTIVITY ELECTRODE) TIP.CLEAN AND CALIBRATE WITH ANOTHER CONDUCTIVITY METER. REPLACE AS REQUIRED
SR7- INSPECT FRICTION PADS FITTED ON THE MOTOR OF 'SERVO MOTOR CONTROL VALVE' FOR CONDITION OF WORKING SURFACE (CLEARANCE SHOULD NOT BE MORE THAN 2 MM).
SR8- CALIBRATE TORQUE WRENCH USED FOR TIGHTENING DT MODULE TIE ROD. (RANGE 25 NM TO 135 NM)
SR9- CHECK CONDUCTIVITY METER BY COMPARING READINGS OF PANELMOUNTED CONDUCTIVITY METER AND PORTABLE CONDUCTIVITY METER.CALIBRATE OR REPLACE AS NECESSARY.
3A1- OVERHAUL FRESH WATER DISTRIBUTION PUMP PK-80. CHECK WEAR DOWN OF PARTS AND REPLACE AS NECESSARY. REPLACE MECHANICAL SEAL.
5A1- OVERHAUL HIGH PRESSURE PUMP PP60 AND MOTOR. (REFER JIC :42902/5A1 AND CHAPTER 5.8.1.1 OF OEM MANUAL). PUMP QUANTITY - 02 NOS, MOTOR QUANTITY - 02 NOS.
5A2 - OVERHAUL FILTER PUMP PK30 AND MOTOR. FILTER PUMP PK30 QUANTITY - 02 NOS, MOTOR QUANTITY - 02 NOS.
5A3- OVERHAUL PRE FILTER PUMP PK20 AND MOTOR. PRE FILTER PUMP PK20 QUANTITY - 02 NOS, MOTOR QUANTITY - 02 NOS.
5A4- CHECK DT MODULES FOR SERVICEABILITY AND REPLACE WORN OUT MEMBRANE CUSHIONS. QUOTE FOR RENEWAL OF 02 NOS DT MODULE.
5A5- CHECK TRANSMISSION PULLEYS/ TAPER BUSHES FOR WEAR AND REPLACE IF REQUIRED.
5A6- REPLACE PULSATION DAMPER PD-60 / RELIEF VALVE.
NR2-- REFIT FOLLOWING SDNR VALVES. RENEW ALL RUBBERSED PARTS. VALVE TO BE RENEWED AND PRESSURE TESTED. (I) 80 NB SD VV - 36 NOS
(II) 65 NB SD VV - 04 NO
NR3- SURVEY ALL BILGE SUCTION PIPES. LINES TO BE PRESSURE TESTED. SIZE - 80 MM, MAT - Cu-Ni. (REFITING YARD TO QUOTE FOR RENEWAL OF 25 MTRS PIPE)
2000H12- CHECK CONDITION OF VULCAN COUPLING. (EZR 1426)
SR1- RENEWAL ALL MOUNTINGS SHOWING SIGNS OF DETERIORATION OF RUBBER AND/OR AS PER RECORDS OF 6M2,6M3,6M4 & PRR 1ROUTINES.
SR2- REMOVE,CHEMICALLY CLEAN AND PRESSURE TEST AND REFIT ON COMPLETION. (FRESH WATER SYSTEM AND LUB OIL COOLER) LO COOLER UPTO 9 BAR AND F/W COOLER UPTO 3 BAR.
SR3- REMOVE,CHEMICALLY CLEAN AND PRESSURE TEST ON COMPLETION OF FUEL COOLER AND AIR INTER COOLER (CLEAN INTERCOOLER AIR SIDE USING HOT WATER ONLY) (FUEL COOLER UPTO 7 BAR AND CHARGE AIR COOLER UPTO 2.5 BAR)
SR4- CALIBRATE ALL REDUCERS IN THE STARTING AIR SYSTEM. REPAIR/ REPLACE REDUCERS AS REQUIRED. SET PRESSURE - 10 BAR
6000H1- CHECK IN INSTALLED CONDITION (VISUAL INSPECTION).
6000H2- CHECK APPEARANCE OF CYLINDER LINERS. CHECK PISTON CROWNS (VISUAL INSPECTION
6000H3- (A) REMOVE CYLINDER HEADS, RECONDITION VALVES AND VALVE SEATS. QTY-08 (B) REPLACE CYLINDER HEAD GASKETS, COOLANT AND OIL TRANSFER SEALS.QTY-08 (C) REPLACE 'O' RINGS ON PROTECTIVE SLEEVES. QTY-16 (D) REPLACE VALVE STEM SEALS. QTY 16
6000H4- (A) REMOVE AND CHECK ROCKERS. QTY - 24 (B) CHECK VALVE TAPPETS FOR WEAR. {INLET 0.30MM EXHAUST 0.45MM}
6000H5- REMOVE, DISMANTLE CLEAN COMPONENTS, CHECK BEARING CLEARANCES QTY 02, AND CONDITION OF COMPRESSOR WHEELS OF TURBOCHARGER QTY 02, .REPLACE COMPONENTS AS REQUIRED.
6000H6- REMOVE, CLEAN AND REPLACE AIR SEALS OF AIR INTAKE DUCTING.
6000H8- REMOVE, CLEAN REPLACE GASKET AND PROTECTORS.
FUEL INJECTION PUMP 6000H9- (A) REMOVE AND CHECK FOR LEAKS. (B) CHECK DRIVE COUPLING,QTY 01 , REPLACE SEALING RINGS ON PLUG IN SLEEVE QTY 01,. (C) CHECK TIMING. (D) CARRY OUT CALIBRATION ON TEST BENCH.
INJECTION TIMER 6000H10- CHECK FUNCTION OF INJECTION TIMER.
ENGINE COOLANT PUMP 6000H11- DISASSEMBLE, CHECK PARTS, REPLACE GASKETS.QTY 03
SEA WATER PUMP 6000H12- DISASSEMBLE, CHECK PARTS AND REPLACE GASKETS WHILE ASSEMBLING.
ENGINE COOLANT COOLER 6000H13- REMOVE AND UNDERTAKE CHEMICAL CLEANING. CARRY OUT PRESSURE TESTING TO DETECT LEAKS IF ANY.
COOLANT THERMOSTAT 6000H14- REPLACE THE THERMAL ELEMENTS.
ENGINE OIL HEAT EXCHANGER 6000H15- (A) REMOVE AND CLEAN. CARRY OUT PRESSURE TEST TO DETECT LEAKS IF ANY. (B) CHECK PRESSURE RELIEF VALVE AND BY PASS VALVE.
ENGINE OIL FILTER 6000H16- REMOVE, CLEAN AND REPLACE THE GASKET.
CENTRIFUGAL OIL FILTER 6000H17- REMOVE, DISASSEMBLE AND REPLACE BEARING IF NECESSARY.
STARTING AIR SYSTEM 6000H18- (A) CHECK STARTING VALVES.QTY 01
(B) REMOVE AND CLEAN AIR PIPES.
(C) CHECK AIR BOTTLES/TANK FOR LEAKS. QTY 01
(D) REMOVE, CHECK AND READJUST STARTING AIR DISTRIBUTOR QTY 01
STARTER 6000H19- REMOVE AND CHECK FOR ANY DAMAGES/ SIGNS OF FATIGUE FAILURE. OVERHAUL/ REPLACE IF REQUIRED.
6000H20- ENGINE ALIGNMENT CHECK THE ENGINE ALIGNMENT. NOTE:- 1. LIMIT FOR ENGINE FITTED WITH VULCAN COUPLING (APPLICABLE TO IN SHIPS DELHI, MUMBAI, MYSORE, ADITYA, GHARIAL AND SAGARDHWANI). (A) ALIGNMENT LIMITS IN RESPECT OF 6V396 AND 8V396 ENGINES WITH COUPLING TYPE EZR 1226 AND 1426 S RESPECTIVELY ARE AS FOLLOWS:- (I) AXIAL ALIGNMENT : +/- 0.5 MM (II) ANGULAR ALIGNMENT : 0.3 MM (III) RADIAL ALIGNMENT (NEW ENGINE WITHOUT LUB OIL AND COOLANT:- (AA) VERTICAL :+0.2 MM TO +0.4 MM (AB) LATERAL :+/- 0.2 MM (IV) RADIAL ALIGNMENT (OPERATED ENGINE WITHOUT LUB OIL/ COOLANT):- (AA) VERTICAL : -0.4 MM (AB) LATERAL : +/- 0.2 MM (B) THE ALIGNMENT FIGURES AS PER 'ASSEMBLY & INSTALLATION INSTRUCTIONS - N60315/10E) ARE GENERAL IN NATURE AND MEANT FOR INTERPRETATION OF THE ALIGNMENT PROCEDURE.
ALTERNATOR 6000H21- (A) CHANGE BEARING LUBRICANT. (B) MEASURE INSULATION, IF NECESSARY DRY AND CLEAN ALTERNATOR.
ENGINE CONTROLS 6000H22- CARRY OUT THE FUNCTIONALITY CHECKS OF ENGINE CONTROLS AND ADJUST IF NECESSARY.
6000H23- CLEAN FUEL TANK, OIL SUPPLIMENTARY TANK AND INSPECT FUEL PIPE LINES AND SEALS.
6000H24- REPLACE RUBBER BUFFER IN GOVERNOR DRIVE.
6000H25- CARRY OUT CALIBRATION OF FOLLOWING MONITORING DEVICES:- (A) PRESSURE MONITOR, QTY - 06
(B) TEMPERATURE MONITOR, QTY - 05
(C) TEMPERATURE TRANSMITTER QTY - 02
(D) FUEL LEVEL MONITOR
(E) LEAK OFF FUEL INDICATOR
(F) SPEED MONITOR
(G) TACHOMETER
(H) FUEL RACK POSITION SENSOR
2000H12- CHECK CONDITION OF VULCAN COUPLING. (EZR 1426)
SR1- RENEWAL ALL MOUNTINGS SHOWING SIGNS OF DETERIORATION OF RUBBER AND/OR AS PER RECORDS OF 6M2,6M3,6M4 & PRR 1ROUTINES.
SR2- REMOVE,CHEMICALLY CLEAN AND PRESSURE TEST AND REFIT ON COMPLETION. (FRESH WATER SYSTEM AND LUB OIL COOLER) LO COOLER UPTO 9 BAR AND F/W COOLER UPTO 3 BAR.
SR3- REMOVE,CHEMICALLY CLEAN AND PRESSURE TEST ON COMPLETION OF FUEL COOLER AND AIR INTER COOLER (FUEL COOLER UPTO 7 BAR AND CHARGE AIR COOLER UPTO 2.5 BAR) (CLEAN INTERCOOLER AIR SIDE USING HOT WATER ONLY)
SR4- CALIBRATE ALL REDUCERS IN THE STARTING AIR SYSTEM. REPAIR/ REPLACE REDUCERS AS REQUIRED. SET PRESSURE - 10 BAR
6000H1- CHECK IN INSTALLED CONDITION (VISUAL INSPECTION).
6000H2- CHECK APPEARANCE OF CYLINDER LINERS. CHECK PISTON CROWNS (VISUAL INSPECTION
6000H3- (A) REMOVE CYLINDER HEADS, RECONDITION VALVES AND VALVE SEATS. (B) REPLACE CYLINDER HEAD GASKETS, COOLANT AND OIL TRANSFER SEALS. (C) REPLACE 'O' RINGS ON PROTECTIVE SLEEVES. (D) REPLACE VALVE STEM SEALS.
6000H4- (A) REMOVE AND CHECK ROCKERS. (B) CHECK VALVE TAPPETS FOR WEAR.
6000H5- REMOVE, DISMANTLE CLEAN COMPONENTS, CHECK BEARING CLEARANCES AND CONDITION OF COMPRESSOR WHEELS OF TURBOCHARGER.REPLACE COMPONENTS AS REQUIRED.
6000H6- REMOVE, CLEAN AND REPLACE AIR SEALS OF AIR INTAKE DUCTING.
6000H8- REMOVE, CLEAN REPLACE GASKET AND PROTECTORS.
FUEL INJECTION PUMP 6000H9- (A) REMOVE AND CHECK FOR LEAKS. (B) CHECK DRIVE COUPLING, REPLACE SEALING RINGS ON PLUG IN SLEEVE. (C) CHECK TIMING. (D) CARRY OUT CALIBRATION ON TEST BENCH.
INJECTION TIMER 6000H10- CHECK FUNCTION OF INJECTION TIMER.
ENGINE COOLANT PUMP 6000H11- DISASSEMBLE, CHECK PARTS, REPLACE GASKETS.
SEA WATER PUMP 6000H12- DISASSEMBLE, CHECK PARTS AND REPLACE GASKETS WHILE ASSEMBLING.
ENGINE COOLANT COOLER 6000H13- REMOVE AND UNDERTAKE CHEMICAL CLEANING. CARRY OUT PRESSURE TESTING TO DETECT LEAKS IF ANY.
COOLANT THERMOSTAT 6000H14- REPLACE THE THERMAL ELEMENTS.
ENGINE OIL FILTER 6000H16- REMOVE, CLEAN AND REPLACE THE GASKET.
CENTRIFUGAL OIL FILTER 6000H17- REMOVE, DISASSEMBLE AND REPLACE BEARING IF NECESSARY.
STARTING AIR SYSTEM 6000H18- (A) CHECK STARTING VALVES. (B) REMOVE AND CLEAN AIR PIPES. (C) CHECK AIR BOTTLES/TANK FOR LEAKS. (D) REMOVE, CHECK AND READJUST STARTING AIR DISTRIBUTOR
STARTER 6000H19- REMOVE AND CHECK FOR ANY DAMAGES/ SIGNS OF FATIGUE FAILURE. OVERHAUL/ REPLACE IF REQUIRED.
6000H20- ENGINE ALIGNMENT CHECK THE ENGINE ALIGNMENT. NOTE:- 1. LIMIT FOR ENGINE FITTED WITH VULCAN COUPLING (APPLICABLE TO IN SHIPS DELHI, MUMBAI, MYSORE, ADITYA, GHARIAL AND SAGARDHWANI). (A) ALIGNMENT LIMITS IN RESPECT OF 6V396 AND 8V396 ENGINES WITH COUPLING TYPE EZR 1226 AND 1426 S RESPECTIVELY ARE AS FOLLOWS:- (I) AXIAL ALIGNMENT : +/- 0.5 MM (II) ANGULAR ALIGNMENT : 0.3 MM (III) RADIAL ALIGNMENT (NEW ENGINE WITHOUT LUB OIL AND COOLANT:- (AA) VERTICAL :+0.2 MM TO +0.4 MM (AB) LATERAL :+/- 0.2 MM (IV) RADIAL ALIGNMENT (OPERATED ENGINE WITHOUT LUB OIL/ COOLANT):- (AA) VERTICAL : -0.4 MM (AB) LATERAL : +/- 0.2 MM (B) THE ALIGNMENT FIGURES AS PER 'ASSEMBLY & INSTALLATION INSTRUCTIONS - N60315/10E) ARE GENERAL IN NATURE AND MEANT FOR INTERPRETATION OF THE ALIGNMENT PROCEDURE.
ALTERNATOR 6000H21- (A) CHANGE BEARING LUBRICANT. (B) MEASURE INSULATION, IF NECESSARY DRY AND CLEAN ALTERNATOR.
ENGINE CONTROLS 6000H22- CARRY OUT THE FUNCTIONALITY CHECKS OF ENGINE CONTROLS AND ADJUST IF NECESSARY.
6000H23- CLEAN FUEL TANK, OIL SUPPLIMENTARY TANK AND INSPECT FUEL PIPE LINES AND SEALS.
6000H24- REPLACE RUBBER BUFFER IN GOVERNOR DRIVE IF REQUIRED.
6000H25- CARRY OUT CALIBRATION OF FOLLOWING MONITORING DEVICES:- (A) PRESSURE MONITOR (B) TEMPERATURE MONITOR (C) TEMPERATURE TRANSMITTER (D) FUEL LEVEL MONITOR (E) LEAK OFF FUEL INDICATOR (F) SPEED MONITOR (G) TACHOMETER (H) FUEL RACK POSITION SENSOR RENEW IF DEFECTIVE. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL. INSTRUMENTATION CHECKS TO BE PROVED INSITU AS PER NAVAL STANDARDS.
NR1- VISUAL SURVEY OF STRUCTURE EXTERNALLY FROM SURROUNDING COMPARTMENTS AND RAISE SPECIFIC DEFECTS TO DOCKYARD.
NR2-DISMENTLE ALUMINIUM PANELLING AND EXAMINE CONDITION OF LAGGING. CUT LAGGING AT SAMPLE LOCATIONS ON LOWER PORTION OF BULKHEADS AND CHECK FOR CORROSION OF BULKHEADS AND DECK PLAATING. CARRY OUT REPAIRS OF STRUCTURE, LAGGING AND PANELLING AS NECESSSARY AND RE-PAINT.
CHECK FOR HEAT INPUT TEST NR3- CARRY OUT CONSTANT HEAT INPUT TEST AND NATURAL COOLING TEST AT INTERVALS NOT GREATER THAN 6 YEARS. IN CASE PERIOD BETWEEN TWO SUCCESSIVE NR IS GREATER THAN 6 YEARS THE TEST IS TO BE UNDERTAKEN DURING SR.
SR4- CHECK NON-METALIC PARTS, PIPES, MUFFLER AND EXHAUST LINE FOR CRACKS AND DISTORTION.
SR5- EXAMINE 25% OF LAGGING WORK. RENEW IF REQUIRED.
SR6- CHECK ALIGNMENT OF COMPENSATOR. ADJUST AS NECESSARY (DURING FITMENT)
SR7- INSPECT MAIN ENGINE EXHAUST TRUNKING SUPPORT (SLIDING AND FIXED) ARRANGEMENT FOR FOLLOWING (AS APPLICABLE):- (I) LOOSE/BROKEN SUPPORT BRACKET BOLTS. (II) INADEQUATE CLEARANCE BETWEEN SUPPORT FLANGES FOR THERMAL EXPANSION (6MM SPECIFIED). (III) VISIBLE MISALIGNMENT BETWEEN THE TRUNKING SECTIONS.
SR9- REMOVE AND INSPECT THE LUB OIL DRAIN COCK OF THE EXHAUST GAS EXPANSION PIECE AND CLEAN IT BY BLOWING THROUGH COMPRESSED AIR.
SR10- CHECK AND GREASE ALL SUPPORT HANGERS OF AIR INDUCTION AND EXHAUST SYSTEM.
SR11-SURVEY EXHAUST AND AIR INDUCTION SYSTEM. RENEW 25% PIPELINES
SR12- CALIBRATE FOLLOWING THERMO COUPLES AND TEMPERATURE INDICATORS. (I) THERMOCOUPLE, QTY -13
(II) TEMP INDICATOR 0-600*C, QTY - 02
(III)THERMOMETERS 0-100*C, QTY - 03
SR13- APPLICATION AND RESTORATION OF RECOMMENDED PAINT SCHEME ON ALL COMPONENTS OF THE AIR INTAKE SYSTEM.
SR14- (A) INSPECT AND CLEAN ALL COMPONENTS OF AIR INDUCTION SYSTEM FROM WEATHER DECK OPENING TO TC RUBBER BELLOW. (B) REPLACE AIR FILTER. QTY 02
NR1- CARRY OUT CHEMICAL CLEANING AND PRESSURE TEST OF EXHAUST SYSTEM (INSITU). RENEW DAMAGED/ DEFECTIVE PART.
NR2- RENEW CORROSION PROTECTORS.
NR3- REMOVE EXHAUST GAS COMPENSATOR, SEPARATOR. REMOVE ALL CARBON DEPOSITS FROM THE COMPENSATOR AND CLEAN IT.
NR4- CHEMICAL CLEANING OF FUNNEL TOP DRAIN LINE INCLUDING STRAINER
NR5- DISMANTLE/ INSPECT ALL COMPONENTS OF THE MAIN ENGINE AIR INTAKE TRUNKING FROM CATCHMENT POT TO TC INLET RUBBER BELLOW. INSPECT AND CLEAN ALL COMPONENTS OF THE AIR INDUCTION SYSTEM FROM WEATHER DECK OPENING TO TC RUBBER BELLOW.
NR6- SURVEY AIR INDUCTION AND EXHAUST SYSTEM INCLUDING SILENCERS, COMPENSATOR. RENEW 50% PIPELINES
NR7- REPLACE COMPENSATORS/ VALVES/ NRVS AND EXHAUST DOUBLE JACKETS IN THE SYSTEM.
SR4- CHECK NON-METALIC PARTS, PIPES, MUFFLER AND EXHAUST LINE FOR CRACKS AND DISTORTION.
SR5- EXAMINE 25% OF LAGGING WORK. RENEW IF REQUIRED.
SR6- CHECK ALIGNMENT OF COMPENSATOR. ADJUST AS NECESSARY (DURING FITMENT)
SR7- INSPECT MAIN ENGINE EXHAUST TRUNKING SUPPORT (SLIDING AND FIXED) ARRANGEMENT FOR FOLLOWING (AS APPLICABLE):- (I) LOOSE/BROKEN SUPPORT BRACKET BOLTS. QTY08 (II) INADEQUATE CLEARANCE BETWEEN SUPPORT FLANGES FOR THERMAL EXPANSION (6MM SPECIFIED). (III) VISIBLE MISALIGNMENT BETWEEN THE TRUNKING SECTIONS.
SR9- REMOVE AND INSPECT THE LUB OIL DRAIN COCK OF THE EXHAUST GAS EXPANSION PIECE AND CLEAN IT BY BLOWING THROUGH COMPRESSED AIR.
SR10- CHECK AND GREASE ALL SUPPORT HANGERS OF AIR INDUCTION AND EXHAUST SYSTEM.
SR12- CALIBRATE FOLLOWING THERMO COUPLES AND TEMPERATURE INDICATORS. (I) THERMOCOUPLE, QTY -13
(II) TEMP INDICATOR 0-600*C, QTY - 02
(III)THERMOMETERS 0-100*C, QTY - 03
SR13- APPLICATION AND RESTORATION OF RECOMMENDED PAINT SCHEME ON ALL COMPONENTS OF THE AIR INTAKE SYSTEM.
SR14- (A) INSPECT AND CLEAN ALL COMPONENTS OF AIR INDUCTION SYSTEM FROM WEATHER DECK OPENING TO TC RUBBER BELLOW. (B) REPLACE AIR FILTER.
NR1- CARRY OUT CHEMICAL CLEANING AND PRESSURE TEST OF EXHAUST SYSTEM (INSITU). RENEW DAMAGED/ DEFECTIVE PART.
NR2- RENEW CORROSION PROTECTORS.
NR3- REMOVE EXHAUST GAS COMPENSATOR, SEPARATOR. REMOVE ALL CARBON DEPOSITS FROM THE COMPENSATOR AND CLEAN IT.
NR4- CHEMICAL CLEANING OF FUNNEL TOP DRAIN LINE INCLUDING STRAINER
NR5- DISMANTLE/ INSPECT ALL COMPONENTS OF THE MAIN ENGINE AIR INTAKE TRUNKING FROM CATCHMENT POT TO TC INLET RUBBER BELLOW. INSPECT AND CLEAN ALL COMPONENTS OF THE AIR INDUCTION SYSTEM FROM WEATHER DECK OPENING TO TC RUBBER BELLOW.
NR6- SURVEY AIR INDUCTION AND EXHAUST SYSTEM INCLUDING SILENCERS, COMPENSATOR. RENEW 50% PIPELINES
NR7- REPLACE COMPENSATORS/ VALVES/ NRVS AND EXHAUST DOUBLE JACKETS IN THE SYSTEM.
6000H2- FUEL SYSTEM: (A) CLEAN AND CALIBRATE INJECTORS AND RECORD TEST PRESSURES IN SERVICE LOG. ALSO CHANGE INJECTOR INLET SCREEN. (B) REPLACE ROCKER COVER GASKETS. (C) ADJUST VALVE TAPPET CLEARANCES WITHIN LIMITS AND RECORD IN SERVICE LOG. (D) REPLACE FUEL PUMP FILTER (SCREEN AND MAGNET). (E) CALIBRATE PT FUEL PUMP AND RECORD IN SERVICE LOG.
6000H3- AIR SYSTEM: (A) CLEAN TURBOCHARGER, COMPRESSOR WHEEL AND DIFFUSER (B) CHECK TURBO CHARGER RADIAL/END BEARING CLEARANCE IN-SITU. NOTE: RENEW 'O' RING AND TEFLON GASKET WHEN TURBOCHARGER IS OPENED FOR CHECKING CLEARANCES. (C) TORQUE MANIFOLD NUTS OR CAP SCREWS AS PER SPECIFICATIONS.
6000H4- CHARGE AIR COOLER & FRESH WATER COOLER: (A) CLEAN THE INTERNAL PASSAGES OF CHARGE AIR COOLER AND FRESH WATER COOLER COOLANT SIDE USING RESTORE PLUS AS LAID DOWN IN OPERATING MANUAL. (B) RENEW COOLANT IN THE SYSTEM (C) INSPECT CHARGE AIR COOLER AIR SIDE AND IF REQUIRED CLEAN USING HOT WATER AND PRESSURE TEST UP TO 2KG/CM2.
6000H5- OTHER MAINTENANCE: (A) CLEAN ENGINE WITH SOLVENT. (B) CARRYOUT FLUSHING THROUGH OF COOLANT SYSTEM AS PER JIC 410002/6000 H5 (TO BE UNDERTAKEN PRIOR TO 6000 H4)
6000H7- CHECK ALL SAFETY ALARMS AND TRIPS
6000H9- TIGHTEN MOUNTING BOLTS/NUT AS REQUIRED
SR1- CARRYOUT VISUAL INSPECTION OF SV MOUNTS. RENEW MOUNTS IF THEIR CONDITION IS DETERIORATED
SR2- UNDERTAKE ALIGNMENT CHECKS BETWEEN THE GENERATOR AND ENGINE AND RESTORE RADIAL/AXIAL INITIAL ALIGNMENT TO 25% OF THE MAX LIMIT.
SR3- RECORD CRANKSHAFT END CLEARANCES WITH A DIAL INDICATOR, ATTACHING AGAINST DAMPER MIN- 0.13 MM, MAX-0.51 MM WHEN IN COUPLED CONDITION.
SR4- CHECK TORQUE TIGHTENING OF COUPLING INNER/OUTER MEMBERS AS SPECIFIED IN THE MANUAL FOR DAS FITTED WITH HOLSET (REYNOLDS) OR CENTAMAX COUPLINGS. IN CASE OF VULCAN COUPLINGS, CHECK FOR CRACKS ON RUBBER AND IF WEAR MARK DOES NOT EXCEED LIMITS. CHECK TIGHTNESS OF ADAPTOR PLATE BOLTS (COUPLING BOLTS) IN CASE OF 743/855 ENGINES.
SR5- CHECK THICKNESS OF VIBRATION DAMPER AT 0, 90, 180 AND 270 DEGREE POSITIONS. REPLACE DAMPER IF VARIATION OF THE 4 READINGS EXCEEDS 0.010 INCH (0.25MM) OR EXCEEDS MAX ALLOWABLE THICKNESS. CHECKS TO BE UNDERTAKEN IN COUPLED CONDITION.
SR1- VISUALLY EXAMINE ENTIRE LENGTH OF COLD LAGGING AND RENEW AS NECESSARY
SR4- 1) REFIT AIR RELIEF VALVE OF EXPANSION TANK , RESET TO CORRECT LIFTING PRESSURE. SET PRESSURE - 02 BAR, QTY - 01 2) TEST AND RECALIBRATE EXPANSION TANK PRESSURE GAUGE. (RANGE-0 TO 10 KGF/CM2,QTY-01), NALVE TO BE RENEWED
SR5- CHECK AND CALIBRATE FOLLOWING INSTRUMENTATION AND SAFETY CUT OUTS IN THE SYSTEM THE INSTRUMENTATION SHOULD INCLUDE ALL PRESSURE/TEMP GAUGES, VENTURIMETER / ROTAMETERS IN THE SYSTEM. (I) PRESSURE GAUGES - 14 NOS
(II) TEMP GAUGES - 14 NOS
(III) ROTAMETERS - 05 NOS
(IV) DIFFERENTIAL PRSSURE GAUGESWITH SWITCH - 03 NOS
(V) THERMOSTATS - 07 NOS
NR1- REFIT FOLLOWING VALVES IN THE SYSTEM (LIMITED TO 50% OF TOTAL VALVES IN THE SYSTEM). VALVE SEAT, SPINDLE, VALVE DISC, GLAND PACKING, GLAND BUSHS, STUDS, GASKETS AND VALVE WHEEL IS TO BE RENEWED AND PRESSURE TEST OF VALVE IS TO BE CARRIED OUT. (I) 50 NB SD VALVES, QTY - 24
(II) 80 NB SD VALVES, QTY - 04 (II) 40 MM -20
NR2- REFIT 3-WAY BY-PASS VALVES ON HEAT EXCHANGERS IN ATU.
NR3- CLEAN EXPANSION TANK IN CW SYSTEM
SR1- VISUALLY EXAMINE ENTIRE LENGTH OF HOT LAGGING FOR DOMESTIC HOT WATER SYSTEM AND RENEW AS NECESSARY.
SR3- REFIT FRESH WATER PUMP NON-RETURN AND FLAP VALVE.
SR4- SCREW OUT DRAIN PLUGS, LUBRICATE AND FIT BACK THE DRAIN PLUGS FITTED ON THE PIPE LINES.
SR5- CALIBRATE AUTOMATIC CUT-IN AND CUT-OUT MECHANISM OF HYDROPHORE TANKS. (CUT-IN - 02 BAR AND CUT-OUT - 4.5 BAR )
SR6- REFIT AND CALIBRATE RELIEF VALVES IN THE HYDROPHORE TANK PNEUMATIC CHARGING SYSTEM. SET VALUE- 07 BAR
SR7- CHECK AND CALIBRATE ALL INSTRUMENTATION AND SAFETY CUT-OUTS IN THE SYSTEM. (I) PRESSURE GAUGE(0 T0 10 BAR) QTY -08 (II) PRESSURE GAUGE(-1 T0 4 BAR) QTY -04 (III) PRESSURE SWITCH - 02.
SR8- CLEAN HYDROPHORE TANK. CLEAN ASSOCIATED GAUGE GLASS. CARRY OUT PRESSURE TEST ON THE TANK TO TEST PRESSURE INDICATED IN THE OEM/SHIPYARD DOCUMENTS (IF APPLICABLE
SR9- CLEAN FRESH WATER STORAGE TANKS. EXAMINE CONDITION OF PAINT AND RESTORE PAINT IF REQUIRED. RENEW FRESH WATER TANK MANHOLE DOOR JOINT/RUBBER COAMING. PRIOR USAGE GET FRESH WATER SAMPLE TESTED AT A DESIGNATED LABORATORY.
SR10- CHECK CONDITION OF COLOR CODING ON PIPES AND REPAINT AS NECESSARY.
NR1- REFIT FOLLOWING VALVES IN THE SYSTEM (LIMITED TO 50% OF TOTAL VALVES IN THE SYSTEM). REFITING YARD TO QUOTE FOR RENEWAL OF 10 IN NOS VALVES. (I) 25 NB SD VV, QTY-08 NOS
(II) 32NB SD VV, QTY- 10 NOS
(III) 32NB MUD VALVE, QTY- 04 NOS
(IV) 80 NB GATE VV, QTY-06 NOS
(V) 80 NB SD VV, QTY- 06 NOS
NR2- RENEW ALL DURITES/ BELLOWS IN THE SYSTEM
NR3- CARRY OUT RANDOM SURVEY OF 50% OF THE SYSTEM PIPES AND RENEW DEFECTIVE PIPES IF ANY. REFITING YARD TO QUOTE FOR RENEWAL OF 40 MTRS OF SYSTEM PIPE. (I) DIA - 80 MM, LENGTH - 20 MTRS (II) DIA - 50 MM, LENGTH - 40 MTRS (III) DIA -32 MM, LENGTH -140 MTRS
O3- WHEN THE SYSTEM HAS BEEN ASSEMBLED AFTER REPAIRS/ MAJOR OVERHAUL CARRY OUT BLOWING THROUGH OF GAS SIDE WITH DRY NITROGEN FOLLOWED BY PRESSURE TEST TO CHECK INTEGRITY OF THE SYSTEM
O4- ON COMPLETION OF PRESSURE TEST, SYSTEM IS TO BE VACCUMISED AND DEHYDRATED.
SR1- EXAMINE S/W SIDE OF THE CONDENSER FOR CORROSION AND FOULING. SIGHT TUBES AND CARRY OUT MECHANICAL CLEANING AND WATER JET AS NECESSARY. RENEW CORROSION PLUGS AND CARRY OUT PRESSURE TESTING OF THE ASSEMBLED CONDENSER. (TEST PRESSURE - 20.5 KGF/CM² CONDENSERS- 01, CORROSION PLUGS - 03
SR2- REFIT FOLLOWING ISOLATING VALVES ON GAS SYSTEM AND COOLING WATER SYSTEM (RENEW ALL NYLON WASHER, SEALING, VALVE SEAT AND VALVE SPINDLE). (A) COOLINGWATER SYSTEM VALVES (32 MM SDVV) - QTY 08
(B) (25MM SDVV)- QTY-01
(C) GAS SYSTEM VALVES (5/8") - QTY 12
SR3- RENEW THE DRIER UNIT/ DRYING AGENT.
SR4- CALIBRATE FOLLOWING PRESSURE AND TEMPERATURE GAUGES IN THE SYSTEM (A) RANGE- -1 TO 16 BAR,QTY - 04NOS.
(B) RANGE- -1TO 21 BAR,QTY - 02 NOS.
(C) RANGE- 0-7 BAR,QTY - 06 NOS.
SR5- CHECK FUNCTION OF ALL PRESSURE RELIEF VALVE. REPAIR/ REPLACE IF DEFECTIVE. RELIEF PRESSURE - 350 PSI, QTY 02 NOS.
TOP OVERHAUL OF COMPRESSOR 6000H1- FOLLOWING COMPONENTS TO BE REPLACED MANDATORILY ON STRIPPING FOR TOH/MOH:- (A) NEOPRENE 'O'RINGS. (B) GASKETS. (C) DOWTY RINGS. (D) SEALING RINGS.
6000H2- OPEN CYLINDER HEAD AND CHECK FOR THE FOLLOWING : (A) VALVE RING PLATES, VALVE SPRING. REPLACE IF REQUIRED. (B) PISTON RING (COMPRESSION/OIL). REPLACE IF END GAP (CLOSED) IS 0.8 MM. (C) CHANGE GASKET.
6000H3- CHECK CLEARANCES OF MAIN BEARING AND HALF SECTION BEARINGS, IF AND ONLY IF, THERE IS A REPEATED OCCURRENCE/ABNORMAL TREND IN PERFORMANCE PARAMETERS DURING EXPLOITATION AND AFTER A DETAILED ANALYSIS OF THE DEFECT TO RULE OUT ALL OTHER SYSTEM RELATED POSSIBLE CAUSES PRIOR UNDERTAKING 6000H3 ROUTINE:- (A) DETERIORATION IN QUALITY OF LUB OIL W.R.T. ITS VISCOSITY AND EMULSIFICATION. (B) GRADUAL/UNDUE DROP IN LUB OIL PRESSURE. (C) INSTANCES OF LIQUID CARRY OVER IN THE SUCTION LINE LEADING TO HAMMER EFFECT OR DAMAGE TO INTERNALS. NOTE:- MAX. CLEARANCE PERMISSIBLE BETWEEN MAIN BEARING BUSH DIA SEAL END/PUMP END AND CRANKSHAFT JOURNAL DIA IS 0.2MM. REPLACE THE BEARING BUSH IF CLEARANCE EXCEEDS 0.12 MM.
6000H4- CHECK CYLINDER LINER DIA. OF BORE (65.03 - 65.00). REPLACE IF WEAR LIMIT EXCEEDS 0.2 MM
6000H5- CHECK SHAFT SEAL FOR OIL DROPLET / LEAK. REPLACE IF REQUIRED.
6000H6- CHECK OIL PUMP CLEARANCE / AXIAL PLAY. REPLACE IF CLEARANCE IS BEYOND 0.12MM.
6000H7- CHECK UNLOADING FRAMES, ROCKER ARM AND UNLOADING CYLINDER ASSEMBLY FOR FREE MOVEMENT. REPAIR / REPLACE IF REQUIRED.
6000H8- CHECK OIL PRESSURE REGULATOR. SET/REPAIR/REPLACE AS REQUIRED.
6000H9- CHECK CRANKCASE HEATER FOR NORMAL OPERATION.
6000H10- CHECK FUNCTIONING OF SOLENOID AND EXPANSION VALVES.
NR1- CARRY OUT INSULATION TEST ON COOL/COLD ROOM.
NR2- CARRY OUT CHEMICAL CLEANING OF CONDENSORS, HEAT EXCHANGER COILS AND ALL ASSOCIATED REFRIGERANT PIPE WORK.
NR3- SURVEY REFRIGERANT PIPE WORK AND REPLACE WHERE WASTED. MAT - BRASS, DIA -25 MM. REFITING YARD TO QUOTE FOR RENEWAL OF 10 MTRS OF PIPE.
NR4- OPEN AND CLEAN ALL SEPARATORS. REMOVE OIL DEPOSITS AND SLUDGE. BLOW THROUGH LUBRICATING OIL RETURN PIPES WITH DRY COMPRESSED AIR.
NR5- CALIBRATE EXPANSION VALVES, SOLENOID VALVES AND COMPRESSOR UNLOADING DEVICE.
SR1- CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION /SPM CHECKSON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECTS, IF ANY.
SR2- UNDERTAKE OVERHAUL OF 25% OF TOTAL STAND ALONE CENTRIFUGAL PUMPS (INCLUDING THOSE RECOMMENDED BY TRIAL AGENCIES). UNDERTAKE PERFORMANCE TRIALS OF OVERHAULED PUMPS.OVERHAULING INCLUDES DISMANTLING OF THE PUMP AND RENEWAL OF ANICIPATED/MANDATORY SPARES MECHANICAL SEALS, SHAFT, SHAFT KEY, IMPELLER, BEARINGS, STUDS, COUPLING, COUPLING ALLEN SCREW, IMPELLER SEALING RING AND GASKETS. DEFECTIVE SPARES TO BE SUPPLIED BY REFITING YARD.
SR3- CALIBRATE FOLLOWING INSTRUMENTATION (I) PRESSURE GAUGE (0-10 BAR) - 02 NOS
(II) COMPOUND GAUGE (-1 - 4 BAR) - 02 NOS
SR4- INSPECT AND RENEW IF REQUIRED THE SUCTION STRAINER
SR5- CHECK CONDITION OF RUBBER INSERTS, METAL SHIMS ETC IN COUPLING AND RENEW, IF REQUIRED.
NR1- UNDERTAKE OVERHAUL OF 50% OF TOTAL STANDALONE CENTRIFUGAL PUMPS INCLUDING THOSE RECOMMENDED BY TRIALS AGENCIES
NR2- REFIT FOLLOWING SUCTION AND DISCHARGE VALVES. VALVES TO BE RENEWED AND PRESSURE TESTED. (I) 100 MM SDNR VALVE, QTY - 04
(II) 100 MM SD VALVE, QTY - 06
NR3- CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. REPAIR/RENEW DETERIORATED FOUNDATION STIFFENERS AND SUPPORTING RIBS.
NR4- RENEW SV MOUNTS OF PUMPS TAKEN UP FOR OVERHAUL.
SR1- CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION /SPM CHECKSON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECTS, IF ANY.
SR3- CALIBRATE FOLLOWING INSTRUMENTATION. (I) COMPOUND GAUGE (-01) - 01 BAR, QTY - 02
(II) PRE GAUGE 0-10 BAR, QTY - 02
SR4- INSPECT AND RENEW THE SUCTION STRAINER
SR5- CHECK CONDITION OF RUBBER INSERTS, METAL SHIMS ETC IN COUPLING AND RENEW, IF REQUIRED.
NR1- UNDERTAKE OVERHAUL OF 50% OF TOTAL STANDALONE CENTRIFUGAL PUMPS INCLUDING THOSE RECOMMENDED BY TRIALS AGENCIES
NR2- REFIT SUCTION AND DISCHARGE VALVES. (32 MM SD VALVE, QTY - 06)
NR3- CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. REPAIR/RENEW DETERIORATED FOUNDATION STIFFENERS AND SUPPORTING RIBS.
NR4- RENEW SV MOUNTS OF PUMPS TAKEN UP FOR OVERHAUL.
NR5- RENEW SUCTION AND DISCHARGE COMPENSATORS.
SR1- CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION /SPM CHECKSON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECTS, IF ANY.
SR3- CALIBRATE FOLLOWING INSTRUMENTATION. (I) COMPOUND GAUGE (-01) - 01 BAR, QTY - 02
(II) PRE GAUGE 0-07 BAR, QTY - 02
SR4- INSPECT AND RENEW IF REQUIRED THE SUCTION STRAINER
SR5- CHECK CONDITION OF RUBBER INSERTS, METAL SHIMS ETC IN COUPLING AND RENEW, IF REQUIRED.
NR1- UNDERTAKE OVERHAUL OF 50% OF TOTAL STANDALONE CENTRIFUGAL PUMPS INCLUDING THOSE RECOMMENDED BY TRIALS AGENCIES. UNDERTAKE PERFORMANCE TRIALS OF OVERHAULED PUMPS.OVERHAULING INCLUDES DISMANTLING OF THE PUMP AND RENEWAL OF ANICIPATED/MANDATORY SPARES MECHANICAL SEALS, SHAFT, SHAFT KEY, IMPELLER, BEARINGS, STUDS, COUPLING, COUPLING ALLEN SCREW, IMPELLER SEALING RING AND GASKETS. DEFECTIVE SPARES TO BE SUPPLIED BY REFITING YARD.
NR2- REFIT FOLLOWING SUCTION AND DISCHARGE VALVES. VALVES TO BE RENEWED AND PRESSURE TESTED. (I) 100 MM SDNR VALVE, QTY - 02
(II) 100 MM SD VALVE, QTY - 02
NR3- CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. REPAIR/RENEW DETERIORATED FOUNDATION STIFFENERS AND SUPPORTING RIBS.
NR4- RENEW SV MOUNTS OF PUMPS TAKEN UP FOR OVERHAUL.
NR5- RENEW SUCTION AND DISCHARGE COMPENSATORS.
SR1- CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION /SPM CHECKSON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECTS, IF ANY.
SR3- CALIBRATE FOLLOWING INSTRUMENTATION (I) PRESSURE GAUGE(0 T0 10 BAR) QTY -04
(II) PRESSURE GAUGE(-1 T0 4 BAR) QTY -04
SR4- INSPECT AND RENEW IF REQUIRED THE SUCTION STRAINER
SR5- CHECK CONDITION OF RUBBER INSERTS, METAL SHIMS ETC IN COUPLING AND RENEW, IF REQUIRED.
NR1- UNDERTAKE OVERHAUL OF 50% OF TOTAL STANDALONE CENTRIFUGAL PUMPS INCLUDING THOSE RECOMMENDED BY TRIALS AGENCIES
NR2- REFIT SUCTION AND DISCHARGE VALVES. VALVES TO BE RENEWED AND PRESSURE TESTED. (I) 32 NB SD VALVE, QTY - 06 (II) 32 NB COCK VALVE, QTY - 02
NR3- CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. REPAIR/RENEW DETERIORATED FOUNDATION STIFFENERS AND SUPPORTING RIBS.
NR4- RENEW SV MOUNTS OF PUMPS TAKEN UP FOR OVERHAUL.
NR5- RENEW SUCTION AND DISCHARGE COMPENSATORS.
SR1- CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION /SPM CHECKSON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECTS, IF ANY.
SR3- CALIBRATEFOLLOWING INSTRUMENTATION (I) PRESSURE GAUGE(0 T0 10 BAR) QTY -04
(II) PRESSURE GAUGE(-1 T0 4 BAR) QTY -04
SR4- INSPECT AND RENEW IF REQUIRED THE SUCTION STRAINER
SR5- CHECK CONDITION OF RUBBER INSERTS, METAL SHIMS ETC IN COUPLING AND RENEW, IF REQUIRED.
NR1- UNDERTAKE OVERHAUL OF 50% OF TOTAL STANDALONE CENTRIFUGAL PUMPS INCLUDING THOSE RECOMMENDED BY TRIALS AGENCIES
NR2- REFIT SUCTION AND DISCHARGE VALVES. (I) 32 NB SD VALVE, QTY - 06 (II) 32 NB COCK VALVE, QTY -02
NR3- CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. REPAIR/RENEW DETERIORATED FOUNDATION STIFFENERS AND SUPPORTING RIBS.
NR4- RENEW SV MOUNTS OF PUMPS TAKEN UP FOR OVERHAUL. QUOTE FOR RENEWAL OF MOUNTS.
NR5- RENEW SUCTION AND DISCHARGE COMPENSATORS.
SR1- CARRY OUT PERFORMANCE TRIAL OF THE PUMP INCLUDING PARAMETER CHECKS (SUCTION/DISCHARGE PRESSURE), VIBRATION TRIALS, INSULATION /SPM CHECKSON MOTOR, MOTOR STARTING-RUNNING CURRENT CHECKS ETC. ASSESS FOR SATISFACTORY PERFORMANCE AND DEFECTS, IF ANY.
SR2- UNDERTAKE OVERHAUL OF 25% OF TOTAL STAND ALONE CENTRIFUGAL PUMPS (INCLUDING THOSE RECOMMENDED BY TRIAL AGENCIES). UNDERTAKE PERFORMANCE TRIALS OF OVERHAULED PUMPS. OVERHAULING INCLUDES DISMANTLING OF THE PUMP AND RENEWAL OF ANICIPATED/MANDATORY SPARES MECHANICAL SEALS, SHAFT, SHAFT KEY, IMPELLER, BEARINGS, STUDS, COUPLING, COUPLING ALLEN SCREW, IMPELLER SEALING RING AND GASKETS. DEFECTIVE SPARES TO BE SUPPLIED BY REFITING YARD.
SR3- CALIBRATE FOLLOWINGL INSTRUMENTATION (I) PRESSURE GAUGE(0 T0 10 BAR) QTY -02
(II) PRESSURE GAUGE(-1 T0 4 BAR) QTY -02
SR4- INSPECT AND RENEW IF REQUIRED THE SUCTION STRAINER
SR5- CHECK CONDITION OF RUBBER INSERTS, METAL SHIMS ETC IN COUPLING AND RENEW, IF REQUIRED.
NR2- REFIT SUCTION AND DISCHARGE VALVES. (250NB SDNR VALVE)
NR3- CARRY OUT VISUAL SURVEY OF PUMP FOUNDATION. REPAIR/RENEW DETERIORATED FOUNDATION STIFFENERS AND SUPPORTING RIBS.
NR4- RENEW SV MOUNTS OF PUMPS TAKEN UP FOR OVERHAUL.
NR5- RENEW SUCTION AND DISCHARGE COMPENSATORS.
PRR1- CARRY OUT COMPREHENSIVE PERFORMANCE TRIALS OF THE COMPRESSOR INCLUDING CAPACITY TRIALS, VIBRATION TRIALS. CST REPORT BE USED AS THE REFERENCE DOCUMENT FOR TRIALS. TAKE ASSISTANCE OF MTU AS REQUIRED. CARRY OUT OVERHAUL OF COMPRESSOR DURING REFIT, IF PERFORMANCE IS SUBOPTIMAL.
1000H1- INTERNAL CLEANING OF AIR FLOW OF INTERCOOLER/AFTERCOOLER (ONLY FOR 7T4 AND 251 COMPRESSOR MODELS).
2000H1- CARRYOUT CHEMICAL CLEANING OF AFTER COOLER. FLUSH THE TUBES WITH WARM WATER AND ALLOW THEM TO DRY AFTER FLUSHING.
2000H2- INSPECT, CLEAN COMPRESSOR VALVES. RENEW, IF NECESSARY.
NR1- CHECK ALL RELIEF VALVES AND SAFETY VALVES FOR ITS PROPER FUNCTIONING AND RESET IF NECSSARY.
SR2- EXAMINE ALL PARTS OF RUDDER MOTOR AND PUMP UNIT FOR WEAR/ DETERIORATION. REPLACE PARTS AS NECESSARY
PUMPS - 02
RUDDER MOTORS - 02
SR3- CHECK SAFETY VALVES AND VALVE CHEST S45P FOR CORRECT FUNCTIONING. REFIT AND RESET IF NECESSARY. (PUMP RELIEF VALVE PRESSURE-62.5 BAR ,QTY-02 RUDDER MOTOR RELIEF VALVES PRESSURE -50 BAR) .
SAFETY VALVES -04
MANEUVERING VALVES -02
SR4- CALIBRATE FOLLOWING PRESSURE AND TEMPERATURE GAUGES (A) RANGE- 0 TO 100 BAR,QTY 04NOS.
(B) RANGE- 0TO 220 KGF/CM2,QTY 02 NOS.
(C) RANGE- 0-300 DEG. CEL.,QTY 01 NOS.
(D) RANGE- 0-200 DEG. CEL.,QTY 02 NOS
SR5- RENEW RUDDER STOCK GLAND PACKING. 22X22MM. (MAKE- STOPLIK)
SR6- REPLACE RUDDER GLANDS WITH HEMP PACKING AND GREASE THE GLANDS.
SR8- GAUGE AND RECORD RUDDER CLEARANCES.
NR2- RENEW S.V. MOUNTING.
NR3- EXAMINE FLEXIBLE HOSES FOR DETERIORATION. RENEW IF NECESSARY.
NR4- CHECK ALIGNMENT BETWEEN PUMP AND MOTOR COUPLING.
NR5 -COMPLETELY REMOVE FAIRING EPOXY COMPOUND FROM THE RUDDER FASTENERS. RENEW THE RUDDER FASTENERS. RE-APPLY FAIRING EPOXY COMPOUND POST FASTENERS RENEWAL. NOTE - IN ADDITION TO POSITIVE LOCKING OF FASTENERS, ENSURED BY 'L' PLATES, SPLIT PINS/ LOCK WASHERS/ INTERLOCKING SEIZING WIRES ARE TO BE INTRODUCED.
SR9- CHECK RUDDER STUFFING BOX MOUNTING PLATE AND SECURING STUDS FOR CORROSSION AND LOOSENING. RENEW/REPLACE IF NECESSARY.
SR1- CHECK CONDITION OF PROPELLER FOR DAMAGE
SR2- CHECK MOUNTING BOLTS AND NUTS OF UNDERWATER PORTION FOR TIGHTNESS
SR3- CHECK CONDITION OF SACRIFICIAL ANODE, RENEW IF WEAR DOWN EXCEEDS 50%.
SR1- CHECK GASKET ON LOWER GEARBOX FOR LEAK,RENEW.
SR2- CHECK CONDITION OF PROPELLER FOR DAMAGE, IF DAMAGED CHECK LOWER GEARBOX GEAR TOOTH
SR3- CHECK SPACE BETWEEN PROPELLER HUB AND LOWER GEARBOX FOR FOREIGN MATTER. REMOVE PROPELLER AND RENEW SEALS IF FOREIGN MATTER PERSIST
SR4- CHECK MOUNTING BOLTS AND NUTS OF UNDERWATER PORTION FOR TIGHTNESS
SR5- CHECK CONDITION OF SACRIFICIAL ANODE, RENEW IF WEAR DOWN EXCEEDS 50%.
SR1- DECARBONISE PISTON.
SR2- CHECK TIMING AND IGNITION SYSTEM.
SR1-DECARBONISE PISTON.
SR2-CHECK TIMING AND IGNITION SYSTEM.
500H1- CARRY OUT MAJOR OVERHAULING OF OUT BOARD MOTOR. RENEW ALL NECESSARY PARTS.
3M4- SYSTEM CALIBRATION AS PER PROCEDURES IN MANUAL.
SR1- CHECK THE GAP BETWEEN ROTOR AND STATOR ASSEMBLIES. AND CHECK BOTH ARE ALIGNED PROPERLY.
SR2- INSPECT THE SYSTEM AND CARRY OUT ONBOARD OVERHAULING, QTY - 02. REFITING YARD TO QUOTE FOR RENEWAL OF FOLLOWING PARTS (A) STATOR INTERFERANCE MODULE- 01 (B) ROTOR MODULE I -01 (C) ROTOR MODULE II -01 (D) ROTOR MODULE III -01 (E) REMOTE DISPLAY UNIT
A1- CAPACITY TRIALS TO BE CARRIED OUT AND DEFECTS OBSERVED TO BE RECTIFIED.
A2- CHECK LEVEL AND CONDITION OF OIL IN SEAL PACKAGE. RENEW SEAL PACKAGE IF OIL IS EMULSIFIED
SR1- THE LUBRICATION OF MECHANICAL SEALS SHOULD BE CHECKED. THE LUBRICANT MIGHT GET CONTAMINATED WITH FOREIGN MATERIAL OR GET BLACKENED DUE TO OVERHEATING. IN SUCH CASES, OIL CHAMBER SHOULD BE FLUSHED AND FILLED WITH FRESH OIL. BEFORE FILLING, HEAT THE OIL TO 140 DEGREES C AND COOL IT TO 60 DEGREES C FOR REMOVAL OF MOISTURE IN OIL
(I) 40 TPH, QTY - 03 NOS
(II) 20 TPH, QTY - 02 NOS
NR1-OVERHAUL PUMP IN CONJUNCTION WITH RELEVANT ELECTRICAL MAINTENANCE SCHEDULES MT- 58000. NOTE :- ROUTINE MAINTENANCE OF ELECTRIC MOTOR PART OF SUBMERSIBLE PUMP IN ACCORDANCE WITH ELECTRICAL MAINTENANCE SCHEDULE MT- 58000.
500H1- CLEAN THE SEPARATOR, EMPTY THE CONDENSATE COLLECTOR.
500H2- CHANGE INTAKE FILTER-ELEMENT.
500H3- CHANGE SEALS/O-RINGS.
500H4- CHECK SETTING OF PRESSURE SWITCHES AND RELIEF VALVE, ADJUST IF NECESSARY.
500H5- CHANGE FINAL SEPARATOR FILTER CARTRIDGE.
500H6- CHECK FILTER CARTRIDGE OF DRYER SYSTEM, REPLACE IF NECESSARY
500H7- REPLACE OIL FILTER CARTRIDGE.
500H8- CHECK TERMINAL CLAMPS FOR TIGHTNESS.
500H10- CHECK FUNCTIONALITY OF AUTOMATIC CONDENSATE DRAIN, OVERHAUL IF NECESSARY.
500H11- CHECK V BELT AND FAN BLADES.
500H12- CHANGE OIL.
1000H1-CHECK SAFETY VALVE, REPLACE IF NECESSARY.
1000H2- REPLACE SUCTION PRESSURE VALVES OF ALL STAGES.
1000H3- REPLACE PISTON AND SLEEVE ASSEMBLY
3A1- CARRY OUT ALL ROUTINES LISTED IN INTERMEDIATE SERVICE. 3A2- CHECK HEIGHT POSITION FOR PAIRING DISC FOR MAB 206 TYPE SEPARATORS. 3A3- HORIZONTAL DRIVE (A) CHECK AXIAL PLAY OF COUPLING DISC. (B) RENEW BEARINGS OF WORM WHEEL SHAFT. 3A4- VERTICAL DRIVE (A) CLEAN AND CHECK BOWL SPINDLE AND NAVE FOR IMPACT MARKS. (B) CHECK RADIAL WOBBLE OF BOWL SPINDLE. (C) CLEAN AND CHECK BUFFER AND BALL BEARING HOUSING. RENEW IF REQUIRED. (D) RENEW BALL BEARINGS AND TOP BEARING SPRINGS. 3A5- CLEAN AND CHECK SPRING AND BRAKE SHOE. RENEW FRICTION PAD/BRAKE PLUG. 3A6- CLEAN AND CHECK FRICTION COUPLING. RENEW FRICTION PADS AND LIPSEAL RING. 3A7- DISMANTLE PUMP ASSEMBLY. CLEAN AND CHECK BUSHINGS, WEAR GASKETS, FLEXIBLE COUPLING, RELIEF/ SAFETY VALVE AND IMPELLER SHAFT. RENEW LIPSEAL RING. 3A8- RENEW FRAME FEET RUBBER CUSHIONS/VIBRATION DAMPERS. NOTE - TO BE CONJOINED WITH NEAREST REFITS.
3A1- CARRY OUT ALL ROUTINES LISTED IN INTERMEDIATE SERVICE. 3A2- CHECK HEIGHT POSITION FOR PAIRING DISC FOR MAB 206 TYPE SEPARATORS. 3A3- HORIZONTAL DRIVE (A) CHECK AXIAL PLAY OF COUPLING DISC. (B) RENEW BEARINGS OF WORM WHEEL SHAFT. 3A4- VERTICAL DRIVE (A) CLEAN AND CHECK BOWL SPINDLE AND NAVE FOR IMPACT MARKS. (B) CHECK RADIAL WOBBLE OF BOWL SPINDLE. (C) CLEAN AND CHECK BUFFER AND BALL BEARING HOUSING. RENEW IF REQUIRED. (D) RENEW BALL BEARINGS AND TOP BEARING SPRINGS. 3A5- CLEAN AND CHECK SPRING AND BRAKE SHOE. RENEW FRICTION PAD/BRAKE PLUG. 3A6- CLEAN AND CHECK FRICTION COUPLING. RENEW FRICTION PADS AND LIPSEAL RING. 3A7- DISMANTLE PUMP ASSEMBLY. CLEAN AND CHECK BUSHINGS, WEAR GASKETS, FLEXIBLE COUPLING, RELIEF/ SAFETY VALVE AND IMPELLER SHAFT. RENEW LIPSEAL RING. 3A8- RENEW FRAME FEET RUBBER CUSHIONS/VIBRATION DAMPERS. NOTE - TO BE CONJOINED WITH NEAREST REFITS.
1000H1 REMOVE THE CYLINDER HEADS AND INSPECT THE VALVE PLATES. DECARBONISE AND DEGREESE THEM. REPLACE THE WORN OUT PARTS WITH NEW PARTS
1000H2- CHECK ALL THE PIPELINES FOR LEAKS AT JOINTS. RENEW PACKING AS NECESSARY.
1000H3- DISMENTLE THE NON RETURN VALVE. EXAMINE THE SPRING FOR STIFFNESS AND CHECK ITS VALVE SEAT. RENEW THE SPRING AND VALVE SEAT IF REQUIRED.
1000H4- DECARBONISE THE INTERCOOLER AND AFTER-COOLER ASSEMBLY.
1000H5- CARRY OUT THE FOLLOWING: (A) CHECK THE FOUNDATION FRAME FOR ANY DEFORMATION (B) CHECK THE MOUNTS VISUALLY FOR ANY SIGNS OF DETERIORATION OF RUBBER AND METALIC COMPONENTS. REPLACE IF REQUIRED.
1000H6- LUBRICATE THE ELECTRIC MOTOR BEARINGS.
1000H7- RENEW SUCTION AIR FILTER ELEMENT.
1000H8- UNDERTAKE COMPLETE PERFORMANCE AND VIBRATIONS TRIALS INCLUDING CAPACITY TRIALS OF THE COMPRESSOR UNDER GIVEN LOADING CONDITIONS TO PROVE SATISFACTORY PERFORMANCE OF THE COMPRESSOR.
SR1- CALIBRATE FOLLOWING INSTRUMENTATION. (I) PRESSURE GAUGE - 01 NOS
(II) PRESSURE SWITCH - 01 NOS
(III) TEMP SWITCH - 01 NOS
(IV) LOADER/UNLOADER - 01 NOS
SR2- CHECK ALL FLEXIBLE HOSES FOR CRACKS, EMBRITTLEMENT AND SIGN OF CRACKING. RENEW THEM AFTER ASSESSING THE CONDITION. (INSMA GENERAL ACQUAINT M6/59 DATED 15 JAN 13 ALSO RELEVANT). SIZE - 40 MM
SR3- CHECK WIRING/ CONTACTS OF THE PANELS FOR WEAR/ DETERIORATION. PROJECT SPECIFIC DEFECTS TO DOCKYARD FOR RENEWAL/ REPLACEMENT IF NECESSARY.
NR1- CARRY OUT OVERHAUL OF THE PANEL IF REQUIRED.
PD2- HALON GAS IS TO BE STRICTLY CONSERVED AND RECYCLED BY UTILIZING HALON RECOVERY AND RECLAIMING FACILITY (HRRF) INSTALLED AT MUMBAI AND VISAKHAPATNAM. WHEREVER FITTED IN THE SYSTEM, THE CYLINDERS ARE TO BE RECHARGED ONLY ON 'AS REQUIRED' BASIS.
SR1- CARRY OUT ALL ANNUAL ROUTINES.
SR3- CARRY OUT HANDLING, STORING, TRANSPORTING & TESTING OF FOLLOWING HP CYLINDERS IN ACCORDANCE WITH NO 18/99 AND CHAPTER 23 PART III OF INBR 3000. (I) HALON BOTTLES - 09 NOS
(II) PILOT BOTTLES - 08 NOS
SR4- ASCERTAIN THE AVAILABLE QUANTITY OF HALON IN THE CYLINDERS EITHER BY USING LIQUID LEVEL INDICATOR OR BY WEIGHING THE CYLINDERS AS PER ARTICLE 3.2.5.4 OF TECHNICAL MANUAL.
SR5- REPLACE ALL LEAKING BUTTERFLY/BALL/PLUG VALVES.
SR6- REFIT 25% OF SYSTEM VALVES OTHER THAN BUTTERFLY/BALL/PLUG VALVES.
SR7- BLOW THROUGH AND CLEAN PIPES AND NOZZLES OF THE HALON FIRE FIGHTING SYSTEM FOR ANY OBSTRUCTION AND TO CHECK INTEGRITY OF THE SYSTEM. REMOVE CORROSION, PAINT. RENEW PAINT AS PER APPROVED PAINT SCHEME. ROUTINE TO BE UNDERTAKEN ESPECIALLY JUST PRIOR TO STARTING OF ENGINES/COMPLETION OF REFIT.
SR8- INSPECT ALL FLEXIBLE HOSES IN THE SYSTEM AND REPLACE IF REQUIRED.
5A1- UNDERTAKE INTERNAL/ EXTERNAL INSPECTION OF THE HALON BOTTLES FOLLOWED BY PRESSURE TESTING (ADDITIONAL ROUTINE VIEW VINTAGE OF BOTTLES). SERVICEABILITY CHECKS OF BOTTLE NRV TO BE CARRIED OUT.
NR1- REFIT 50% OF SYSTEM VALVES OTHER THAN BUTTERFLY/BALL/PLUG VALVES.
NR2- REPLACE THE CARTRIDGE IN THE ELECTRO PNEUMATIC ACTUATOR.
NR3- INSPECT ALL PCBS/ ELECTRICAL PARTS OF CONTROL PANEL. RENEW AS NECESSARY.
SR1- DISMANTLE AND CLEAN BOTH RECOVERED OIL VALVES. REFIT/RENEW COMPONENTS AS NECESSARY, PAYING PARTICULAR ATTENTION TO OPERATING AND LINE DIAPHRAGMS.
SR2- REMOVE CONTROL PROBES FROM VESSELS, CLEAN IMMERESED SURFACES, REPLACE AND RESET TO CORRECT OPERATING LEVELS.(NOTE:- DYD TO OPEN,REPLACE AND RESET TO CORRECT OPERATING LEVELS AND SS TO CLEAN IMMERSED SURFACE)
SR3- CHECK CONDITION OF 'DOWTY' SEALS ON COALESCER ELEMENT. RENEW SEALS IF DAMAGE IS EVIDENT.
NR1- DRAIN BOTH VESSELS. DISMANTLE, CLEAN AND EXAMINE CENTRAL COMPARTMENTS.
NR2- REFIT AND RESET RELIEF VALVES.
NR3- REFIT ALL VALVES ON THE SYSTEM.
NR1- REMOVE PUMP, DISMANTLE AND CLEAN PARTS. REPLACE WORN PARTS AS NECESSARY.
NR2- CARRY OUT PERFORMANCE TRIAL ON COMPLETION OF OVERHAUL.
NR1- LAND THE CONTROL UNIT AND SPINDLE VALVE TO SHOP FOR OVERHAULING
6000H23- UNDERTAKE CLEANING AND OVERHAULING OF TURBO CHARGER.
ENGINEERING - PART II
REMOVAL OF OLD M/E L/O STANDBY PUMPS. INSTALLATION AND COMMISSIONING OF NEW M/E L/O STAND BY PUMPS AS ABER CAT-I REPLACEMENT. (ABER PART-I FORWARDED TO HQSNC VIDE INS SAGARDHWANI LETTER 300/38/1e DATED 23 JUN 22). MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD F/O TRANSFER PUMPS. INSTALLATION AND COMMISSIONING OF NEW F/O TRANSFER PUMPS AS ABER CAT-I REPLACEMENT. (ABER PART-I FORWARDED TO HQSNC VIDE INS SAGARDHWANI LETTER 300/38/1f DATED 23 JUN 22). MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF FUEL OIL CENTRIFUGE. INSTALLATION AND COMMISSIONING OF NEW FUEL OIL CENTRIFUGE AS ABER CAT-I REPLACEMENT. (ABER PART-I FORWARDED TO HQSNC VIDE INS SAGARDHWANI LETTER 300/38/1c DATED 23 JUN 22).MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF LUB OIL CENTRIFUGE. INSTALLATION AND COMMISSIONING OF NEW LUB OIL CENTRIFUGE AS ABER CAT-I REPLACEMENT. (ABER PART-I FORWARDED TO HQSNC VIDE INS SAGARDHWANI LETTER 300/38/1d DATED 23 JUN 22). MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD G/B STAND BY L/O PUMPS. INSTALLATION AND COMMISSIONING OF NEW G/B STAND BY L/O PUMPS AS ABER CAT-I REPLACEMENT. (ABER PART-I FORWARDED TO HQSNC VIDE INS SAGARDHWANI LETTER 300/38/1g DATED 13 AUG 22). MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD RO PLANTS. INSTALLATION AND COMMISSIONING OF NEW RO PLANTS AS ABER CAT-I REPLACEMENT. (ABER PART-I FORWARDED TO HQSNC VIDE INS SAGARDHWANI LETTER 300/38/1b DATED 23 JUN 22). MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
OVERHAULING OF 50% OF UNDERWATER VALVES (ARTICLE 0559 OF INBR 3000 RELEVENT). FOLLOWING UNDERWATER TO BE OVERHAULED AND PRESSURE TESTED. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL. VALVE SEAT, SPINDLE,VALVE DISC, GLAND PACKING, GLAND BUSHS, STUDS, GASKETS AND VALVE WHEEL IS TO BE RENEWED AND PRESSURE TEST OF VALVE IS TO BE CARRIED OUT. (A) SIZE -250 MM, QTY-02
(B) SIZE -225MM, QTY- 03
(C) SIZE-125MM, QTY -04
(D) SIZE -100 MM, QTY -08
(E) SIZE -80 MM, QTY - 04
(F) SIZE -40MM, QTY- 06
(A) CALIBRATION OF ALL THE SENSORS. INCLUDING REMOVAL OF SENSORS, CLEANING, CALIBRATION , FITMENT, AND PROVING OF SYSTEM AS PER DESIGNERS SPECIFICATIONS TO NAVAL TRIAL TEAM TO BE CARRIED OUT. SOFTWARE TO BE UPGRADED BY OEM AND SOUNDING TABLE TO BE UPDATED. CALIBRATION CERTIFICATE OF SENSOR TO BE PROVIDED
CARRY OUT CALIBRATION OF FOLLOWING INSTRUMENTATION:- (A) PRESSURE GAUGES (0-40 KG/SQ.CM) QTY - 06
(B) PRESSURE GAUGES (0-10 KG/SQ.CM) QTY - 02
(C) PRESSURE GAUGES (0-60 KG/SQ.CM) QTY - 02
CARRY OUT CALIBRATION OF FOLLOWING MAIN PROPULSION INSTRUMENTATION:- (A) MAIN ENGINE RPM INDICATOR -06 NOS
(B) SHAFT RPM INDICATOR - 06
(C) PRESSURE INDICATORS - 30NOS
(D) TEMPERATURE INDICATOR -15NOS
(E) TACHOGENARATOR - 02 NOS
PIN HOLE OBSERVED IN STERN TUBE GRAVITY TANK PIPE FLANGE AT DECK. DAMAGED PIPE WITH FLANGE TO BE DE-GUTTED FROM DECK AND NEW PIPE TO BE FITTED. SIZE- 50 MM
FRESH WATER FILLING DECK CONNECTION COUPLING DAMAGED, COUPLING TO BE MANUKFACTURED AS PER SAMPLE. MAT-BRASS. QTY - 02 NOS
O8 IN NOS BULKHEAD CONNECTIONS OF MARINE AC SEA WATER SYSTEM DETERIORATED. BULKHEAD CONNECTIONS TO BE RENEWED.JOB INVOLVES DE-GUTTING OF OLD BULK HEAD CONNECTION, MANUFACTURING AND FITMENT OF NEW BULKHEAD CONNECTION. MAT - Cu-Ni, SIZE - 32 MM.
GAS FREE CERTIFICATES TO BE PROVIDED FOR FUEL OIL, LUB OIL, FRESH WATER AND MISC TANKS. JOB INCLUDES VENTILATION OF TANKS AS PER POLICY, CLEANING OF TANKS AND GAS FREE CERTIFICATION.
HIGH EXHAUST TEMPERATURE OBSERVED IN G1 AND G2 DA. MODIFICATION OF FLANGE NEAR TC TO BE CAARIED OUT.
VALVE WHEELS OF VARIOUS SIZES CORRODED AND DAMAGED. TO BE MANUFACTURED AS PER SAMPLE WITH OPEN/ CLOSE INDICATION DISC FITTED ON WHEEL AS PER PWSR. QTY-30, MAT.-MS
MER PUMPING OUT VALVES NOT HOLDING. SUSPECTING VALVE SEAT AND SPINDLE DETERIORATED. VALVES TO BE OVERHAULED. VALVE SEAT, SPINDLE,VALVE DISC, GLAND PACKING, GLAND BUSHS, STUDS, GASKETS AND VALVE WHEEL IS TO BE RENEWED AND PRESSURE TEST OF VALVE IS TO BE CARRIED OUT. 80MM SDVV QTY-04, 65MM SDVV QTY-04
BILGE PLATE SECURING FRAMES CORROED/DAMAGED AND RUBBER PADDING DETERIORATED IN MER, AER, STERN THRUSTER AND ASP COMPARTMENT TO BE REPLACED REPLACED BY SHIPYARD. APPROX LENGTH 100 MTRS. JOB INCLUDES CUTTING, DRILLING AND THREADING. 100 DZUS FASTENERS TO BE PROVISIONED AND REPLACED BY SHIPYARD.
EXHAUST GAS TEMPRATURE SENSOR AND COMBINED EXHAUST TEMP GAUGE MALFUNCTIONING TO BE REPAIRED/ REPLACED/ CALIBRATED
EXHAUST GAS TEMPRATURE ON CYLINDER NO 5 OBSERVED TO BE HIGH ON HIGHER RPM. SUSPECTING FAULTY INJECTOR, FIP AND TEMPERATURE SENSOR. DEFECT TO BE RECTIFIED. REFITTING YARD TO PROVIDE SPARES
ZINC PLUGS WITH ADAPTORS TO BE MANUFACTURED AS PER SAMPLE, MATERIAL BRASS, QTY - 200. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL
BRASS ADAPTORS OF VARIOUS SIZES TO BE MANUFACTURE AS PER SAMPLE, QTY- 50. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL
(A) 08 IN NOS OF MARINE AC REDUCERS ARE MALFUNCTIONING TO BE OVERHAULED AND CALIBERATED BY OEM, RANGE 8 BAR TO 2 BAR. CALIBRATION CERTIFICATE TO BE PROVIDED. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL
(B) RENEWAL OF 05 REDUCERS
SECURING ARRANGEMENTS TO BE MANUFACURED AND FITTED FOR T-HANDLES IN MER, QTY - 10
L/O COOLER THERMOSTATE IN ME L/O SYSTEM MALFUNCTIONING, THERMOSTATE TO BE CALIBRATED. QTY - 02. OPERATING RANGE - 53 TO 63 °C. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL
MARINE AC COOLING IS NOT EFFECTIVE. COIL CLEANING IS TO BE CARRIED OUT BY OEM. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL
MARINE AC SEA WATER COOLING FLEXIBLE HOSE DEERIORATED. TO BE RENEWED ALONG WITH ADAPTORS BY OEM. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL
SEA CHEST STRAINER OF MAIN ENGINE, AC SEA WATER PUMP, FIRE MAIN, REF SEA WATER PUMP CORRODED. TO BE MANUFACTURED AS PER SAMPLE. QTY- 35, MAT- BRASS
MANUFACTURING OF FOLLOWING TO BE CARRIED OUT(BRAZING/WELDING ASSISTANCE REQUIRED FOR FITMENT OF THE SAME ) (A) BUTTERFULY NUT AS PER SAMPLE, QTY-20
(B) STUDS FOR VALVE GLAND BUSH AS PER SAMPLE, QTY- 10
C) BRASS TALLIES WITH NAMES ENGRAVED FOR MACHINERIES AND VALVE AS PER SAMPLE , QTY-50.
CHEST VALVES OF AIR BOTTLES FITTED INSIDE MACHINERY COMPARTMENTS NOT HOLDING. STRIP, EXAMINE AND OVERHAUL VALVE CHEST(QTY-08 ) OF AIR BOTTLES AND 08 NOS SAFETY VALVES. WORK INCLUDES REMOVAL, OVERHAULING AND REFITMENT. PRESSURE TEST TO BE CARRIED OUT FOR 24 HRS AS PER NAVAL STANDARDS IN PRESENCE OF SHIP STAFF. PROVIDE TEST CERTIFICATES OF SAFTEY VALVES
(A)RENEW THE NON-RETURN VALVE(QTY-02) VIEW VALVE NOT HOLDING,
(B)SAFETY/ RELIEF VALVES TO BE CHECKED. DISMANTLE THE SAFETY VALVE(QTY-06), EXAMINE THE SPRINGS FOR STIFFNESS AND CHECK ITS VALVE SEAT. RENEW THE SPRING AND THE VALVE SEAT . PROVIDE TEST CERITIFACTES. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL
CHECK CONDENSOR RELIEF VALVES AS PER DESIGN SPECIFICATIONS AND PROVIDE TEST CERTIFICATES. GAS TO BE EXTRACTED BY OEM.
(A) TEST AND RESET 12 IN NO RELIEF VALVES. TEST CERTIFICATE TO BE PROVIDED. SET PR- 40 BAR. (B) QUOTE FOR REMOVAL, OVERHAULING OF VALVE, COCK AND REFITMENT WITH NEW TEFLON/ COPPER WASHER. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL
CALIBRATE ALL INSTRUMENTATION FITTED ON RHIB PANEL- RPM GAUGE, SPEED GAUGE, FUEL GAUGE, BATTERY GAUGE, TEMPERATURE GAUGE, HORN TO BE REPLACED. CALIBRATION CERTIFICATE TO BE PROVIDED. QUOTE FOR RENEWAL, IF FOUND FAULTY. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL
(A) CALIBRATE ALL GAUGES AND RELIEF VALVES. PROVIDE CALIBRATION CERTIFICATE.
(B) RENEWAL OF ALL GAUGES(10 NOS)
EMERGENCY STOP PUSH BUTTONS FOR BME MD LUB OIL PUMPS, BOTH GEAR BOX, MD LUB OIL PUMPS, BOTH FUEL OIL CENTRIFUGES AND FUEL OIL TRANSFER PUMPS NON-OPERATIONALS. SUSPECTING RELAY AND WIRING DEFECTIVE. DEFECT TO BE RECTIFIED
(A) SUBOPITMAL PERFORMANCE OBSERVED DURING TRIALS. SUSPECTING EXCESSIVE CARBON AND FAULTY FUEL/ IGNOTION SYSTEM. DECARBONISE PISTON. CHECK TIMING AND IGNITION SYSTEM. FULL POWER TRIALS TO BE CONDUCTED POST WORK AS PER NAVAL STANDARDS IN PRESENCE OF OEM. MAKE- MERCURY MARINER, CAPACITY- 90 HP
SPM READINGS OBSERVED IN YELLOW ZONE ON MD HP AIR COMPRESSOR OF MER AND AER. OEM TO CARRY OUT DEFECT RECTIFICATION AND BEARINGS TO BE RENEWED AND TRIALS TO BE UNDERTAKEN AS PER NAVAL STANDARDS
03 IN NOS FIREMAIN DISCHARGE BELLOWS DETERIORATED. TO BE REPLACED AS PER SAMPLE/DIMENSIONS. TEST CERTIFICATE TO BE PROVIDED. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL. DIA - 100 mm. MAT - RUBBER WITH Cu-Ni END FLANGES. TEST PRESSURE - 20 BAR
(A) 20 IN NO ROD GEARING ARRANGEMENT AT VARIOUS PLACES FOUND DEFECTIVE. REPAIR / RENEWAL OF THE GEARS, COTTER PIN, DECK HEAD GLANDS TO BE CARRIED OUT QTY - 20. APPROX LENGTH - 10 M EACH. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL
(B) RENEWAL OF 05 ROD GEARING
MACHINERY GUARDS OF VARIOUS SIZES OF ALL PUMPS, COMPRESSOR AND OTHER MACHINERIES DAMAGED. TO BE MANUFACTURED AS PER SAMPLE AND FITMENT TO BE CARRIED. GUARDS TO BE PAINTED WITH RED COLOUR. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL. QTY - 50 NOS. MAT - MS/AL
(A) HALON CONTROL PANEL INSTRUMENTATION MALFUNCTIONING INTERMITTENTLY. CALIBRATION OF PRESSURE SWITCHES, TRANSMITTERS FITTED IN HALON SYSTEM TO BE CARRIED OUT. (B) SYSTEM WIRING TO BE CHECKED FROM HALON COMPARTMENT TO DCHQ AND MCR FOR FUNCTIONING OF ALL ALARMS AND INDICATIONS. COLD CHECKS OF ALL INDICATIONS TO BE UNDERTAKEN POST COMPLETION OF JOB AS PER NAVAL STANDARDS
BELLOWS FOUND DETERIORATING. REPLACE SUCTION AND DELIVERY FLEXIBLE RUBBER BELLOWS. DIA - 50 MM. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL
08 IN NOS A/C SEA WATER SYSTEM BELLOWS TO BE MANUFACTURED VIEW LEAKAGES FROM BELLOWS. DIA - 100 mm. QTY - 08 NOS BELLOWS RUBBER WITH Cu-Ni END FLANGES. TEST PRESSURE - 10 BAR
CALIBRATE SENSORS OF FOLLOWING SAFETY DEVICES AND WARNINGS AND PROVIDE CALIBRATION CERTIFICATE. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL. INSTRUMENTATION CHECKS TO BE PROVED INSITU AS PER NAVAL STANDARDS. I) OVER SPEED TRIP II) LOW LUB OIL PRESSURE CUTOUT III) HIGH COOLANT TEMPERATURE CUTOUT IV) LOW COOLANT LEVEL V) SHUT DOWN AIR FLAPS CLOSED WARNING VI) HIGH EXHAUST GAS TEMPERATURE
(A) CARRY OUT FUNCTIONAL/HOT/COLD TEST OF SAFETY DEVICES AND WARNINGS FOR CORRECT OPERATION IN PRESENCE OF MTU REPS.
(B) RENEWAL OF SENSORS, SAFETY DEVICES
(A) 10 IN NOS PRESSURE GAUGES IN LOCAL CONTROL PANEL TO BE CALIBRATED AND PROVIDE CALIBRATION CERTIFICATE. SIZE- 2 INCH DIAL ,CENTRE MOUNTED ,QTY- 10 NOS.
(B RENEWAL OF 05 GAUGES.
CALIBRATE 08 IN NO PRESSURE AND TEMPERATURE SENSORS OF REMOTE INSTRUMENTATION PANEL (MCR) CALIBRATION CERTIFICATE TO BE PROVIDED. TEMP -40-120 DEG(QTY -04), TEMP 40-150 DEG(QTY-04) ,PRE. 0-10 KG/SQ CM(QTY-08)
FUEL SHUT OFF SOLENOIDS OF ALL FOUR DIESEL ALTERNATORS TO BE OVERHAULED/CALIBRATED. WORK INCLUDES REMOVAL ,OVERHAUL AND REFITMENT. SYSTEM TO BE PROVED POST FITMENT
(A) CALIBRATE PRESSURE AND TEMPERATURE GAUGES. PROVIDE CALIBRATION CERTIFICATE.
(B) QUOTE FOR RENEWAL OF PRESSURE AND TEMP GUAGES
FOLLOWING TEMPERATURE GAUGES TO BE REPLACED VIEW ERRATIC READINGS. TO BE PROVED INSITU. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL. I) RANGE 0-50 DEG CEL, QTY 09
II) RANGE 0-120 DEG CEL, QTY 03
III) RANGE 0-80 DEG CEL, QTY 06
FOLLOWING PRESSURE GAUGES TO BE REPLACED WITH COCKS VIEW ERRATIC READINGS AND PROVIDE CALIBRATION CERTIFICATE. TO BE PROVED INSITU. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL. I) RANGE 0-10 BAR, QTY 12
II) RANGE 0-15 BAR, QTY 6
III) RANGE 0-25 BAR, QTY 6
(A) 06 DIFFERENTIAL PRESSURE SWITCHES WITH FOLLOWING SETTINGS TO BE CALIBRATED AS PER SET DIFFERENTIAL PRESSURE AND CERTIFICATE BE PROVIDED. TO BE PROVED INSITU. (I) SET PRESSURE - 0.1 BAR, QTY 03
II) SET PRESSURE - 0.2 BAR, QTY 03
(A) 04 IN NO PRESSURE GAUGES OF A/C SEA WATER SYSTEM WITH FOLLOWING SETTINGS TO BE CALIBRATED AND CALIBRATION CERTIFICATE BE PROVIDED : (I) PRESSURE GAUGE (0-10 BAR) - 02 NOS
(II) COMPOUND GAUGE (-1 - 4 BAR) - 02 NOS
(B) QUOTE FOR RENEWAL OF PRESSURE GAUGES. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
(A)CALIBRATE PRESSURE GAUGE OF CHILLED WATER EXPANSION VALVE AND PROVIDE CALIBRATION CERTIFICATE .
CALIBRATE ALL PRESSURE GAUGES(12 IN NO) IN THE SYSTEM AND PROVIDE CALIBRATION CERTIFICATE. TO BE PROVED INSITU. RANGE- -1 TO 16 BAR,QTY 04NOS.
RANGE- -1TO 21 BAR,QTY 02 NOS.
RANGE- 0-7 BAR,QTY 06 NOS."
CALIBRATE ALL CUTOUTS AND PROVIDE CALIBRATION CERTIFICATE. TO BE PROVED INSITU. LP CUT OUT - 02 SET PRESSURE 0.3 BAR
HP CUT OUT - 02. SET PRESSURE 12 BAR
DOP CUT OUT - 02. SET PRESSURE 1.5 BAR
S/W PRESSURE CUT OUT - 01. SET PRESSURE 0.3 BAR
CALIBRATE THERMOSTATIC EXPANSION VALVES, SOLENOID VALVES AND COMPRESSOR UNLOADING DEVICE, EXPANSION VALVE AND PROVIDE CALIBRATION CERTIFICATE. TO BE PROVED INSITU. - DANFOSS TEN 2 TYPE. SOLENOID VALVE - DANFOSS 5/8 INCH
(A) 04 IN NO PRESSURE GAUGES OF DOMESTIC FRESHWATER SYSTEM TO BE CALIBRATED AND CALIBRATION CERTIFICATE BE PROVIDED : (a) PRESSURE GAUGE (0 TO 10 BAR) - 02 NOS
(b) COMPOUND GAUGE (-1 TO 4 BAR) - 02 NOS
04 IN NO PRESSURE GAUGES OF ANTIHEELING SYSTEM TO BE CALIBRATED AND CALIBRATION CERTIFICATE BE PROVIDED : (a) PRESSURE GAUGE (0-10 BAR) - 02 NOS
PRESSURE TRANSDUCER OF FIRE MAIN SYSTEM FITTED IN DCHQ TO BE CALIBRATED .
(A) "CALIBRATE FOLLOWING PRESSURE AND TEMPERATURE GAUGES AND PROVIDE CALIBRATION CERTIFICATE. (1) RANGE- 0 TO 100 BAR - QTY 04 NOS.
2) RANGE- 0TO 220 KGF/CM2 - QTY 02 NOS.
3) RANGE- 0-300 DEG. CEL - QTY 01 NOS.
4) RANGE- 0-200 DEG. CEL - QTY 02 NOS
(A) FOLLOWING PRESSURE TRANSMITTERS, SWITCHES TO BE CALIBRATED/REPAIRED/RENEWED- (JOB REQUIRE REMOVAL OF PR TRANSMITTERS AND CUT OUTS CALIBRATION/REPAIR/RENEWAL AND FITMENT IN THE SYSTEM AND PROVING OF SAME TO NAVAL TRIAL TEAM AS PER DESIGN SPECIFICATION. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL) (1) LUB OIL PRESSURE SWITCH QTY-12
(2)LUB OIL PRESSURE TRANSMITTERS PRESSURE QTY-04
(3)GEAR BOX LUB OIL DIFFERENTIAL PR SWITCH-QTY-02
(B) QUOTE FOR REPLACEMENT PRESSURE TRANSMITTER/PRESSURE SWITCH
CHILLED WATER PUMP INLET AND OUTLET VALVES NOT HOLDING VIEW BROKEN SPINDLES AND DETERIORATED VALVE SEATS, TO BE RENEWED AND PRESSURE TESTED. SCOPE OF WORK INCLUDES REMOVAL AND REFITMENT OF VALVES AND REMOVAL AND RELAGGING OF VALVES POST REFITMENT. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL. QTY - 2 VALVES. DIA - 100 mm TYPE - BUTTERFLY TYPE VALVES
FOLLOWING A/C CONDENSER PUMP SEA WATER SYSTEM VALVES NOT HOLDING VIEW BROKEN SPINDLES AND DETERIORATED VALVE SEATS. TO BE OVERHAULED. VALVE SEAT, SPINDLE,VALVE DISC, GLAND PACKING, GLAND BUSHS, STUDS, GASKETS AND VALVE WHEEL IS TO BE RENEWED AND PRESSURE TEST OF VALVE IS TO BE CARRIED OUT. MAT - GUN METAL I) 80MM GATE VALVE, QTY 06. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL. INSTRUMENTATION CHECKS TO BE PROVED INSITU AS PER NAVAL STANDARDS.
II) 80MM SD VALVE, QTY 02
III) 100MM SD VALVE, QTY 02 TEST PRESSURE - 6 BAR
(A) 13 IN NOS HAT SEA WATER SUCTION SYSTEM PIPE LINES FOR PUMPING OUT THE COMPARTMENTS ARE DETERIORATED. SURVEY AND REPAIR/ RENEWAL OF THE SYSTEM PIPE LINE TO BE CARRIED OUT. JOB INCLUDES REMOVAL OF ALL PIPES, INSPECTION, PRESSURE TESTING AND FITMENT WITH NEW GASKETS AND SS NUT-BOLTS. RENEW THE PIPES IF REQUIRED. SYSTEM TO PROVED IN-SITU. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
CUTTING/REMOVAL/FITMENT OF SECURING BRACKETS IN MACHINERY COMPARTMENT TO BE CARRIED OUT. JOB ALSO INCLUDE REMOVAL AND REFITMENT OF LAGGING, CUTTING AND BURNING OPERATIONS QTY - 100 IN NOS
(A) CALIBRATE AND REPLACE IF REQUIRED. 10 IN NO DIGITAL TEMP GAUGE AND 10 IN NO TEMP SENSORS IN THE SHAFTING SYSTEM . DIGITAL TEMP GAUGE:- 0-99*C. PROVIDE CALIBRATION CERTIFICATE. (B) CALIBRATE SHAFT APMERE METER AND PROVIDE CERTIFICATE. QTY - 02. (C ) SUITABLE ENCLOSURE FOR DIGITAL TEMPERATURE GAUGES BE MANUFACTURED (QTY -03)
DARK SPOTS WERE OBSERVED DURING ERGONOMIC CHECKS OF MACHINERY COMPARTMENT (MER , ASP) IN OST-22. ADDITIONAL LIGHTING ARRANGMENT INCLUDING CABLING & MOUNT IS TO BE MADE IN MACHINERY COMPARTMENTS. IN CONJUNCTION WITH SWITCHBOARD
CALIBRATE AND RENEW IF REQUIRED 05 IN NO INSTRUMENTATIONS. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL. INSTRUMENTATION CHECKS TO BE PROVED INSITU AS PER NAVAL STANDARDS. (I) PRESSURE GAUGE SET VALUE - 0 TO 40 BAR , QTY - 01 NO
(II) PRESSURE GAUGE SET VALUE - 0 TO 10 BAR, QTY - 01 NO
(III)AUTO CUTIN/CUTOFF SWITCH QTY-01
(IV) TEMP. GAUGE- 0-100*C QTY-01
(V) HIGH TEMP TRIP SWITCH-SET VALUE 120 DEG CEN,QTY-01
(A) CARRY OUT FUNCTIONAL TEST OF THE CONTROL SYSTEM BY OEM, BOTH RECOVERED OIL VALVES AND PURIMETER SENSOR. REPAIR / REPLACE DEFECTIVE PARTS. CALIBRATION OF PURIMETER TO BE CARRIED OUT. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL. INSTRUMENTATION CHECKS TO BE PROVED INSITU AS PER NAVAL STANDARDS. (B) QUOTE FOR REPLACEMENT OF 05 IN NOS 1/4 INCH COCKS AND 02 IN NOS PNEUMATIC VALVES.
CALIBRATION OF 02 IN NOS TORSION METERS TO BE CARRIED OUT BY OEM. TEST CERTIFICATES TO BE PROVIDED
PERFORMANCE OF 02 IN DD PUMPS OBSERVED TO BE SUBOPTIMAL. SUSPECTING FAULTY INJECTOR, EXCESSIVE CLEARANCE IN PUMP SIDE. FUNCTIONAL CHECKS AND REPAIRS TO BE CARRIED OUT. TEST RUN /PERFORMANCE TRIAL AFTER REPAIRS/ OVERHAUL IN PRESENCE OF NAVAL TRIAL TEAM/NAVAL REPRESENTATIVE AS PER DESIGNERS SPECIFICATIONS. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL AND FLOW RATE CERTIFICATES BE PROVIDED
BRAKE PADS OF SHAFT BRAKES DETERIORATED AND SLIPPING. TO BE RENEWED. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL. BRAKING TO BE PROVED DURING POST REFIT TRIALS.
(A) OWS BILGE PUMP OBSERVED TO BE PERFORMING SUBOPTIMALLY AND NOT DEVELOPING SUFFICIENT PRESSURE. CARRYOUT OVERHAULING OF PUMP (QTY 01) .OVERHAULING INCLUDES DISMANTLING RENEWAL OF MECHANICAL SEALS AND REPLACEMENT OF MANDATORY/DEFECTIVE SPARES FROM OEM BY SHIPYARD. TO BE PROVED AND TESTED POST OVERHAULING BY NAVALINSPECTION AGENCY.
COLD LAGGING OF CHILLED WATER LINES AT VARIOUS LOCATIONS DETERIORATED, TO BE RENEWED. SCOPE OF WORK INCLUDE REMOVAL OF PANELING, REMOVAL OF OLD LAGGING. POST REPAIR REFITMENT OF PANELING. QUOTE FOR APPROX LENGTH 500 RUNNING METER.
REPLACEMENT OF EDUCTOR NOZZLE OF FIXED EDUCTORS TO BE CARRIED OUT VIEW REDUCED PUMPING OUT CAPACITY. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL. QTY - 08. CAP - 33TPH
OVERHAULING/ REPLACEMENT OF EDUCTOR NOZZLE OF FIXED EDUCTORS INCLUSIVE OF SPARES TO BE CARRIED OUT. PUMPING OUT CAPACITY OBSERVED TO BE REDUCED. QTY - 01. CAP - 17 TPH
(A) CARRYOUT COMPLETE OVERHAULING OF QTY 01 PUMP VIEW SUBOPTIMAL PERFORMANCE.OVERHAULING INCLUDES DISMANTLING RENEWAL OF MECHANICAL SEALS AND REPLACEMENT OF MANDATORY/DEFECTIVE SPARES FROM OEM BY SHIPYARD.
5 IN NO. SOUNDING CAPS OF VARIOUS SIZES FOR FUEL/ L/O/ F/W SOUNDING PIPES TO BE MANUFACTURED AS PER SAMPLE TO AVOID INGRESS OF FOREIGN PARTICLE IN THE SOUNDING PIPES. MAT -BRASS/GUN METAL
(A) COMPLETE RENEWAL OF BILGE PLATES RUBBER COAMING IN MER, AER, STERN THRUSTER, ASP, BOW THRUSTER, AFT STP COMPT TO BE CARRIED OUT AS PER SAMPLE. JOB INCLUDES REMOVAL OF PLATES AND FITMENT OF PLATES WITH NEW RUBBER COAMINGS ALONG WITH DZUS NUT FOR SECURING.
CHECK UNDERWATER SEAL/ GASKET AND RENEW IF DEFECTIVE. RPM RESTRICTED TO 1200 RPM. DEFECT TO BE RECTIFIED AND TRIALS TO BE UNDERTAKEN AS PER DESIGN SPECS
TAKE BRIDGE GAUGE READINGS AND RECORD IT IN SERVICE LOG.
(A)PAINTING OF PANEL TO BE DONE(B)JOB REQUIRE REMOVAL REMOVAL OF EXISTING PAINT,REPAINTING.
MOUNTS OF BOTH RO PLANTS ENLOSURE TO BE REPLACED VIEW DETERIORATION.
OVERHAUL PNEUMATIC LINES AND RENEWAL OF 50% PNEUMATIC PIPES AND ADAPTORS/ UNION. MAT VIEW DETERIORATING CONDITIONS. MAT -SS
(B)RENEWAL OF DEFECTIVE PIPES.
(A) CARRY OUT OVERHAUL AND PRESSURE TESTING OF HP AIR SYSTEM PIPES UPTO 45 BAR VIEW DETERIORATION OF PIPES/ FLANGES IN PRESENCE OF NAVAL TRIAL AGENCY/SHIPS STAFF AS PER MTU TEST AND TRIAL DOCUMENT. MAT -SS
(B) RENEW PIPES WHERE DETERIORATED. QUOTE FOR LENGTH - 50 MTR PIPE. MAT -SS
MANUFACTURING OF MANHOLE DOOR JOINT TO BE CARRIED OUT AS PER SAMPLE. MAT-RUBBER, QTY 40. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
FOUR MAIN ENGINE INTAKE AIR FILTER CLOGGED. CHEMICAL CLEANING TO BE CARRIED OUT INSITU.
GAS FROM 03 AC AND 02 REF PLANTS TO BE EXTRACTED AND STORED IN BOTTLES.
THREE IN NO. SYSTEM VALVES OF OWS SYSTEM MALFUNCTIONING. TO BE OVERHAULED. VALVE SEAT, SPINDLE,VALVE DISC, GLAND PACKING, GLAND BUSHS, STUDS, GASKETS AND VALVE WHEEL IS TO BE RENEWED AND PRESSURE TEST OF VALVE IS TO BE CARRIED OUT. DIA - 80MM
FIVE IN NOS. QSV AT VARIOUS PLACES DEFECTIVE. WIRING AND PULLEYS FOUND BROKEN. TO BE REPLACED. APPROX LENGTH - 40 MTR. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
ALUMINIUM TALLIES WITH TANK NO EMBOSSED ARE TO BE MANUFACTURED AND FITTED ON TANK COVERS AS PER PWSR. QTY - 30. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES / MATERIAL.
MARINE AC SEA WATER VALVES NOT HOLDING. SUSPECTING SPINDLE AND VALVE SEAT DETERIORATED. TO BE RENEWED. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
PROPELLERS OF MAIN SHAFTS, BOW AND STERN THRUSTERS TO BE CLEANED OF MARINE GROWTH AND TO POLISHED WITH PRESERVATION DURING DRY DOCK
10 IN NOS U.W BLANKS TO BE MANUFACTURED AS PER SAMPLE
CALIBRATION OF FOLLOWING RO PLANT INSTRUMENTATION TO BE CARRIED OUT AND CERTIFICATES TO BE PROVIDED. QUOTE FOR REPLACEMENT OF 05 GAUGES AND 04 PRESSURE SWITCHES IF FOUND DEFECTIVE. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL. (A) RELIEF VALVES - 04
(B) FLOW METER - 02
(C) CONDUCTIVITY METERS - 03
(D) PULSATION DAMPER - 02
(E) GAUGES - 10
MECHANICAL SEALS OF TWO IN NOS FIRE PUMPS ARE LEAKING. SEALS TO BE REPLACED AND TRIALS TO BE UNDERTAKEN BY OEM AS PER NAVAL STANDARDS. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
OVERHAULING OF ONE IN NOS MAIN ENGINE REDUCING STATION TO BE CARRIED OUT VIEW MALFUNCTIONING OF THE SAME INTERMITTENTLY. QUOTE FOR REPLACEMENT OF SPARES
DECARBONISE PISTON TOP,CYLINDER HEAD AND VALVES ON A NEW ENGINE AS PART OF FIRST 1000 HOURS. REPLACE PARTS IF REQUIRED. CAPACITY TRIALS TO BE UNDERTAKEN AS PER MTU TEST AND TRIALS DOCUMENT. HIGH VIBRATION ARE ALSO OBSERVED. DEFECT TO BE RECTIFIED. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
FIVE IN NOS. FLOW METERS OF ATUS DETERIORATED. SAME TO BE RENEWED AND COCKS TO BE REPLACED
HEAT RESISTANCE PAINTING ON 03 AC PLANT, 02 REF PLANTS, 02 ME, 02 GB AND 04 DAS IS REQUIRED TO BE DONE. APPROX AREA - 200 SQ MTR
06 IN NOS AC PLANT GAS SYSTEM HOSES LEAKING. TO BE REPAIRED/ REPLACEDREFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
ONE IN NOS REF SEA WATER PUMPS DISCHARGE OBSERVED TO BE LOW. SUSPECTING INCREASED CLEARANCES AROUND IMPELLER AND FAULTY SEALS. DEFECT TO BE RECTIFIED AND TRIALS TO BE UNDERTAKEN INSITU BY OEM. MECHANICAL SEALS TO BE REPLACED VIEW LEAKAGE. SPARES TO BE PROVIDED BY OEM. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
AIR FLAPS OF BOTH THE THRUSTERS ARE MALFUNTIONING. SUSPECTING AIR LEAKAGE AND FLAPS ARE STUCK. DEFECT TO BE RECTIFIED.
RO FILTER IN MER TO BE PROVISIONED TO PROVIDE DRINKING WATER FOR WATCHKEEPERS. COOLER TO BE OPERATIONALISED. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
GAS SYSTEM PIPES OF BOTH REF PLANTS DETERIORATING. SYSTEM PIPES TO BE RENEWED AND PRESSURE TESTED. APPROX LENGTH-20 MTR
RENEWALOF10 IN NOS VALVES.
(A) AC PLANT GAS SYSTEM VALVES NOT HOLDING SATISFACTORILY. TO BE OVERHAULED/ REPLACED. OVERHAULING INCLUDES DISMENTLING OF VALVE AND RENEWEL OF ANTICIPATORY SPARES VALVE SEAT, SPINDLE, VALVE DISC, GLAND PACKING, GLAND BUSHS, STUDS AND GASKETS AND PRESSURE TEST OF VALVE IS TO BE CARRIED OUT
(B) RENEWAL OF 10 IN NOS VALVES
(A) SYSTEM INTEGRITY CHECKS OF HP AIR SYSTEM (AS PER MTU TEST AND TRIAL DOCUMENT) TO BE CARRIED OUT POST OVERHAULING OF HP AIR VALVES AND CHEST BY PRESSURISING THE SYSTEM UPTO 30 BAR. SYSTEM TO HOLD PRESSURE FOR 24 HRS. MAX ALLOWABLE PRESSURE DROP IS 0.375 BAR.
(B) QUOTE FOR RENEWAL OF 15 IN NOS GASKETS/ TEFLON SEATS IF FOUND DEFECTIVE DURING TRIALS
(A) SYSTEM INTEGRITY CHECKS OF CONTROL AIR SYSTEM (AS PER MTU TEST AND TRIAL DOCUMENT) TO BE CARRIED OUT BY PRESSURISING THE SYSTEM UPTO 30/7 BAR. SYSTEM TO HOLD PRESSURE FOR 24 HRS. MAX ALLOWABLE PRESSURE DROP IS 1.25%.
(B) QUOTE FOR OVERHAULING OF 05 AIR SYSTEM VALVES, RENEWAL OF 15 IN NOS GASKETS/ TEFLON SEATS AND 10 MTR PIPE LINE, IF FOUND DEFECTIVE DURING TRIALS. (A) AIR SYSTEM VALVES
(B) GASKETS/ TEFLON SEATS
(C) PIPE LINE
AC CHILLED WATER SYSTEM PIPE LINES AND FLANGES HAVE DETERIORATED AT SCATTERED LOCATIONS. SAME TO BE RENEWED AND FITTED WITH CU/NI PIPES. PT TO BE CARRIED OUT AND TRIALS TO BE UNDERTAKEN IN PRESENCE OF NAVAL REP. MAT-CU/NI. LENGTH - 20 RMT. FOR 80 MM DIA PIPE LINES, 15 RMT. FOR 65 MM DIA PIPE LINES AND 15 RMT. FOR 40 MM DIA PIPE LINES. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
(A) CHEMICAL CLEANING OF CHILLED WATER SYSTEM TO BE CARRIED OUT.
(B) QUOTE FOR REPLACEMENT OF 30 IN NOS GASKETS IF FOUND DEFECTIVE.
(A) 03 SPRINKLING SYSTEM VALVES NOT HOLDING AT PAINT STORE, MAGAZINE AND WINE STORE. TO BE OVERHAULED.
(B) RENEWAL OF 03 VALVES. .
07 IN NOS NOZZLES OF SPRINKLING SYSTEM AT PAINT STORE, MAGAZINE AND WINE STORE TO BE RENEWED. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
(A) 07 IN NOS FUNNEL FLAPS NOT CLOSING PROPERLY. DEFECT TO BE RECTIFIED.
(B) QUOTE FOR REPLACEMENT OF 07 IN NOS FLAPS.
(A) 10 IN NOS EXHAUST SYSTEM DRAIN COCKS STUCK IN POSITION AND NOT HOLDING. COCKS TO BE OVERHAULED AND PRESSURE TESTED.
(B) REPLACEMENT OF 06 IN NOS COCKS.
(A) 500 IN NOS NUT BOLTS AT VARIOUS PLACES CORRODED. SAME TO BE REPLACED. MAT - SS. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
(B) 300 IN NOS GASKETS OF FIREMAIN AND SEA WATER SYSTEM TO BE REPLACED. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
FUNCTIONAL CHECKS TO BE CARRIED OUT BY OEM IN PRESENCE OF NAVAL REPS. DEFECTS TO BE RECTIFIED IF FOUND.
ONE IN NO. FIRE PUMP IS DEVELOPING ABNORMAL SOUND AND NOT DEVELOPING DESIGNED PRESSURE. DEFECT TO BE RECTIFIED BY OEM. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
MARINE AC PIPE LINES AND FLANGES HAVE DETERIORATED AT SCATTERED LOCATIONS. SAME TO BE RENEWED AND FITTED WITH CU/NI PIPES. PT TO BE CARRIED OUT AND TRIALS TO BE UNDERTAKEN IN PRESENCE OF NAVAL REP. MAT-CU/NI. LENGTH - 30 RMT. DIA - 32 MM. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
INSTRUMENTATION CHECKS AND REPAIRS OF MARINE AC FAULT INDICATIONS TO BE UNDERTAKEN BY OEM INSITU. CALIBRATION CERTIFICATE TO BE PROVIDED BY OEM. QTY - 08 MARINE AC. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIAL.
(A) CARRY OUT FUNCTIONAL/HOT/COLD TEST OF SAFETY DEVICES AND WARNINGS FOR CORRECT OPERATION.
(B) QUOTE FOR RENEWAL OF 10 SENSORS, 04 SAFETY DEVICES AND 06 GAUGES
05 IIN NOS SEA WATRER SYSTEM VALVES NOT HOLDING TO BE OVERHAULED/ RENEWAD. OVERHAULING INCLUDES DISMENTLING OF VALVE AND RENEWEL OF ANTICIPATORY SPARES VALVE SEAT, SPINDLE,VALVE DISC, GLAND PACKING, GLAND BUSHS, STUDS AND GASKETS AND PRESSURE TEST OF VALVE IS TO BE CARRIED OUT. DIA -80 MM
RENEWAL OF FUELING POINT DECK NECK CONNECTION PACKING/ GASKET IN FOXLE
SEA WATER AND FRESH WATER SYSTEM RUBBER AND METALLIC BELLLOWS DETERIORATED TO BE RENEWAD AS PER SAMPLE QTY- 35 RIFITTING YARD TO SUPPLY SPARES
RUBBER BELLOWS IN DAS SEA AND FRESH WATER SYSTEM DETERIORATED TO BE RENEWD QTY- 10 REFITTING YARD TO SUPPLY SPARES
RUBBER AND METALLIOC BELLOWS OF MISCELLANOUS SHIP'S SYSTEM DETERIOATATED TO BE RENEWED AS PER SAMPLE. SPARES TO BE SUPPLIED BY REFITTING YARD.
LOCAL OPERATION STEERING GEAR SOLENOID MALFUNCTIONING SOLENOID TO BE RENEWED. SPARES TO BE SUPPLIED BY OEM/ REFITTING YARD.
EXHAUST LEAKAGE OBSERVED FROM EXHAUST MANIFOLD JOINTS AT VARIOUS PLACES. JOINT TO BE RENEWED. JOB INVOLVES: (A) REMOVAL OF EXHAUST LAGGING. (B) REMOVAL OF EXHAUST MANIFOLD AND COMPENSATOR. (C) RENEWAL OF EHXAUST GASKETS AND FITLMENT OF MANIFOLD AND COMPENSATOR. (D) RENEWAL OF EXHAUST LAGGING.
LOAD TESTING OF FOLLOWING TO CARRIED OUT AND LOAD CERTIFICATE TO BE PROVIDED:- (A) CHAIN PULLY 02 NOS. (B) MAIN ENGINE CYLINDER HOIST FIXTURE 02 NOS.
INTERMITTENT OVER FLOW OF LUB OIL OBSERVED FROM L/O COLLECTING FUNNELS OF BOTH MAIN ENGINES. RA FOR MANUFACTURING OF NEW FUNNELS WITH INCREASE IN DIA (DART:2220017)
RA FOR MANUFACTURING OF COMPENSATOR FOR PORT MAIN ENGINE
LUB OIL TEMPERATURE,EXHAUST TEMPERATURE, CHARGE AIR TEMPERATURE, COOLANT TEMPERATURE SHOWING ERRATIC READING ON E1 DA. RA FOR DR
BILGE PUMP NOT DEVELOPING PRESSURE RA FOR OVERHAULING OF BILGE PUMP , AER QTY -01 (DART:2220209)
SME TURBOCHARGER RPM INDICATOR NOT FUNCTIONING. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIALS. (222015)
CALIBRTATION OF FOLLOWING TO CARRIED OUT AND CALIBRATION CERTIFICATE TO BE PROVIDED:- (A) TORQUE WRENCH. 03 NOS (B) PH METER. 02 NOS (C)NAGMAN CALIBRATORS:- (i) TEMPAERATURE CALIBRATORS. (ii) HP CALIBRATORS. (iii) LP CALIBRATORS. (D) T-30. (E) KITTIWAKE LUB OIL TEST KIT. (F) mA-mV CALIBRATOR. 01 (G) ME PEAK PRESSURE GAUGE 02 NOS.
CHEST VALVES OF FUEL SYSTEM NOT HOLDING. RA FOR OVERHAULING OF FUEL SYSTEM CHEST VALVES. SIZE- 100 MM, QTY 03.
QUOTE FOR RENEWAL OF 02 FUEL SYSTEM CHEST VALVES
QUOTE FOR REPLACEMENT OF 4 DCVS ALONGWITH VALVE BLOCK ASSEMBLY 4/3 WAY VALVE - QTY 03, 4/2 WAY VALVE - QTY 01.
STERN THRUSTER LOCKING MECHANISM BORKEN. RA FOR MANUFACTURING OF LOCKING MECHANISM AS PER SAMPLE. QTY 01, MAT - MS
CALIBRATION OF FOLLOWING RELIEF VALVES TO BE UNDERTAKEN AND NECESSARY CALIBRATION CERTIFICATES MAY BE PROVIDED (A) FUEL RELIEF VALVES - QTY 02 (SET PR. 3.0 BAR) (B) L/O RELIEF VALVES - QTY 02 (SET PR. 2.0 BAR), QTY 02 (SET PR. 4.5 BAR)
CYLINDER HEAD COVERS OF SME DETORIATED. CYLINDER HEAD COVERS TO BE REPLACED ALONG WITH SECURING CAPS. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIALS.
SIGHT GLASS OF VARIOUS RU TANKS NOT VISIBLE. RA FOR REPLACEMENT OF SIGHT GLASS TUBE. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIALS.
COUPLING PADS OF STERN THRUSTER DAMAGED. RA FOR MANUFACTURING AND FITMENT OF COUPLING PADS.
EXHAUST TEMP DISPLAY OF SME SHOWING ERRATIC READINGS IN MCR. RA FOR REPLACEMENT OF TEMP DISPLAY UNIT. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIALS.
RA FOR SERVICIBILITY CHECKS OF G1 AND G2 DA SV MOUNTS
CONTROL AIR LEAKAGE OBSERVED FROM REDUCERS OF BOTH MCR THROTTLE. RA FOR DEFECT RECTIFICATION.
CONTINUOUS FALSE ALARMS OBSERVED ON RO PLANT MONITORING PANEL IN MCR. RA FOR DEFECT RECTIFICATION AND
HIGH EXHAUST TEMPERATURE OBSERVED IN G1 AND G2 DA AT FULL LOAD. FREQUENT FAILURE OF GASKET AND COMPENSATOR OBSERVED.EXHAUST OUTLET ALIGNMENT WITH COMPENSATOR ALONGWITH NECESSARY STRENGTHENING TO BE UNDERTAKEN. RENEWAL OF 03 COMPENSATORS TO BE CATERED
SOLENOID VALVES OF BOTH STEERING GEAR MALFUNCTIONING. RA FOR SERVECEABILITY CHECKS OF BOTH STEERING GEAR SOLENOID VALVES. REPLACE IF SOLENOIDS DEFECTIVE. REFITTING YARD TO PROVIDE SPARES/ CONSUMABLES/ MATERIALS. QTY -04
CATCH MEMORY OF G1, G2 DA CONTROL PANEL IN MCR AND AER FILLED UP. DUE TO THE ABOVE DEFECT FRESH DATA IS NOT BEING RECORDED. RA FOR CLEARING OF CATCH MEMORY OF G1 AND G2 DA CONTROL PANELS. QTY- 04
ONE IN NO STUD IN STBD MAIN ENGINE AIR INTAKE AIR MANIFOLD OF CYLINDER NO 4 BROKEN INSIDE. STUD TO BE REPLACED. JOB INVOLVES REMOVAL OF AIR INTAKE MANIFOLD, REPLACEMENT OF STUD AND FITMENT OF AIR INTAKE MANIFOLD
ENGINEERING - PART III
REMOVAL OF OLD 500 KW MTU DA AND ALTERNATOR ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW 500 KW CUMMINS DA AND ALTERNATOR ALONG STW AS ABER CAT-II REPLACEMENT. (ABER PART-I FORWARDED TO HQSNC VIDE INS SAGARDHWANI LETTER 300/38/1a DATED 22 JUN 22). MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
MODIFICATION FOR PROVISION OF POKER GAUGE READING ON SHAFTING AND MANUFACTURING OF POKER GAUGE AS PER REQUIRED DIMENSIONS. POKER GAUGE READING TO BE TAKEN. (ARTICLE 0802 OF INBR 3000 AND IHQ MoD(N)/DME LETTER EG/5602/TRN DATED 17 JUN 20). MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REPLACEMENT OF FLANGES WITH PRESS FIT/FLANGELESS COUPLINGS WITH CU-NI PIPE ALONGWITH ALL ACCESSORIES FOR BILGE WATER SYSTEM
REPLACEMENT OF FLANGES WITH PRESS FIT/FLANGELESS COUPLINGS WITH CU PIPE ALONGWITH ALL ACCESSORIES FOR FRESH WATER AND CHILLED WATED SYSTEM
ELECTRICAL - PART I
SR1- CARRYOUT PERFORMANCE TEST AS PER GCS DOCUMENT 1100-3234 TP (TBD) AND COMPARE WITH TEST RESULT SHEET AS PER GCS DOCUMENTS 1100-3234 RK (TBD) CHAPTER 5.1 VOL-1.
SR2- CARRYOUT CLEANING OF AERIAL AND PAINT THE AERIAL WITH RF PAINT. OBTAIN DOCKYARD ASSISTANCE IF REQUIRED.
SR3- LAND ALL THE BUILT IN METER TO SHOP FOR CALIBRATION TEST/ REPAIR.
SR4- MEASURE CHARACTERISTICS IMPEDANCE OF THE ANTENNA FEEDER.
SR5- APPLY NECOL LACQUARE TO ALL SOCK VIBRATION MOUNTING.
NR1- CARRY OUT PERFORMANCE TEST AND FUNCTIONAL TEST AT SHOP FLOOR FOR HATS.
NR2- TEST ALL MODULE AND PCBs AS PER CHAPTER 8 Vol III OF TECHNICAL REPAIR AND MAINTENANCE MANUAL.
NR3- CARRY OUT CLEANING OF ANTENNA AND PAINT WITH RF PAINT.
SR1- CARRY OUT VISUAL INSPECTION OF THE MOUNTINGS . IF CORRODED REPLACE/ REPAIR AS NECESSARY.
SR2- CARRY OUT INTERNAL INSPECTION FOR ANY SIGN OF DAMAGE/ DETERIORATION OF COMPONENTS AND WIRING ,REPLACE/ REPAIR AS NECESSARY.
SR3- CLEAN AND APPLY RF PAINT TO THE ANTENNA . OBTAIN DOCKYARD ASSISTANCE IF REQUIRED.
SR4- MEASURE TRANSMITTER POWER OUTPUT AT THE INPUT OF THE ANTENNA USING 'THROUGH LINE WATTMETER'.IF MEASURED POWER IS LESS THEN 12 WATT, EACH CONNECTOR ENROUT IS TO BE OPENED, CLEAN AND RE-MADE. IF THE POWER IN THE ANTENNA IS STILL LESS THEN 12 WATT, THEN THE CABLES RUN ARE TO BE CHECKED FOR DAMAGES AND REPAIR/ REPLACE IF REQUIRED.
SR5- MEASURE ANTENNA VSWR, WHENEVER ANTENNA ARE REMOVED FOR PAINTING BY DOCKYARD. IF VSWR IS MORE THEN 2, THEN ANTENNA IS TO BE REPLACED/ REPAIRED BY YARD/ OEM.
SR6- CHECK CABLE HEALTH USING TIME DOMAIN REFLACTOMETER (TDR) OR USING SPECIAL TEST SETUP WITH NETWORK ANALYSER AS PER PROCEDURE IN JIC PAE M7-2
NR1- CARRY OUT COMPLETE OVERHAULING OF THE EQUIPMENT &TEST FOR OPTIMUM PERFORMANCE.
SR1- INSPECT THE SHOCK MOUNTS FOR DAMAGE / DETEROIRATION , RENEW IF NECESSARY.APPLY NECOL LACQUER ON SHOCK MOUNTS .
SR2- CARRY OUT CALIBRATION AND PERFORM SELF CHECKS
NR1- LAND THE EQUIPMENT TO SHOP FLOOR FOR OVERHAULING AND SERVICEABILITY CHECKS.
SR1- CARRYOUT CLEANING OF ANTENNA .OBTAIN DOCKYARD ASSISTANCE IF REQUIRED.
NR1- LAND RECIEVER UNIT TO THE SHOP FLOOR FOR OVERHAUL AND PARAMETER CHECKS.
SR1- INSPECT SHOCK/VIBRATION MOUNTING FOR DAMAGE OR DETERIOTION. RENEW IF NECESSARY.
SR2- CARRY OUT FOLLOWING CHECKS:- (A) INSPECT WIRING AND COMPONENTS FOR SIGNS OF DAMAGE/ DETERIOTION. (B) CARRY OUT INTERNAL CLEANING OF THE DEVICES.
NR1- LAND THE EQUIPMENT TO SHOP. CARRY OUT OVERHAULING AND PERFORMANCE CHECKS.
SR1- INSPECT SHOCK/VIBRATION MOUNTING FOR DAMAGE OR DETERIOTION. RENEW IF NECESSARY.
SR2- CARRY OUT FOLLOWING CHECKS:- (A) INSPECT WIRING AND COMPONENTS FOR SIGNS OF DAMAGE/ DETERIOTION. (B) CARRY OUT INTERNAL CLEANING OF THE DEVICES.
NR1- LAND THE AMPLIFIERS TO SHOP. CARRY OUT OVERHAULING AND PERFORMANCE CHECKS.
SR1- CARRYOUT SERVICIABLITY CHECK OF ALL RF MODEM CARDS, SERIAL CARDS, POWER SUPPLY CARD AND RAID CARD IN SERVER AND SADL.
SR2- CARRY OUT FUNCTIONAL CHECKS OF COMPLETE SYSTEM
SR3- INSPECT THE SHOCK MOUNTS FOR DAMAGE/DETERIOTION, RENEW IF REQUIRED.
NR1- LAND EQUIPMENT TO THE SHOP FLOOR FOR OVERHAULING AND SERVICIABILITY CHECKS.
SR1- CHECK THE CABLE VISUALLY FOR PROPER SHIELDING AND EARTHING ASPECTS TO AVOID CAPACITIVE INTERFERENCE SIGNAL AND MAGNETIC FIELDS.
SR2- INSPECT THE SHOCK MOUNTING VISUALLY FOR INTACTNESS OF NECOL LACQUER AND DETERIORATION OF RUBBERS.
NR1- LAND ALL DEFECTIVE PCB'S/MODULES TO SHOP FLOOR/RRC FOR REPAIR.
SR1- CARRYOUT PERFORMANCE AND PARAMETERS CHECKS AS PER SECTION 4.2 AND 4.3 OF MAINTENANCE MANUAL.
SR1- INSPECT THE SHOCK MOUNTS FOR DEMAGE / DETEROIRATION , RENEW IF NECESSARY.APPLY NECOL LACQUER ON SHOCK MOUNTS REPLACE IF REQUIRED
SR2- CARRY OUT CALIBRATION AND PERFORM SELF CHECKS
NR1- LAND EQUIPMENT TO THE SHOP FLOOR FOR OVERHAULING AND SERVICIABILITY CHECKS.
SR1- CLEAN AND APPLY RF PAINT ON THE ANTENNA. TAKE DOCKYARS ASSISTANCE IF REQUIRED.
SR2- CHECK PROPER FUNCTIONING OF THE EQUIPMENT AND POWER SUPPLY UNIT.
SR3- CHECK ALL PERIPHERALS AND COMPONENTS FOR DEMAGE /DEFECT. REPLACE THE COMPONENT IF REQUIRED.
NR1- CARRY OUT VISUALINSPECTION OF THE CABLE FOR SIGNS OF DAMAGE. REPLACE THE CABLE IF REQUIRED.
SR1- INSPECT THE SHOCK MOUNTS FOR DEMAGE / DETEROIRATION , RENEW IF NECESSARY
SR2- CARRY OUT CALIBRATION OF RECORDER UNIT AND PERFORM SELF CHECKS.
NR1- LAND EQUIPMENT TO THE SHOP FLOOR FOR OVERHAULING AND SERVICIABILITY CHECKS.
NR1- CARRYOUT COMPLETE OVERHAUL AND CHECK FOR OPTIMUM PERFORMANCE.
NR1- CARRY OUT COMPLETE OVERHAULAND CHECK FOR OPTIMUM PERFORMANCE.
SR1 - CARRY OUT THE NO LOAD TEST IN ACCORDANCE WITH THE MAINTENANCE MANUAL 2650(2), CHAPTER 5, PARA 5.1.1.
SR2 - CARRY OUT SPEED AND DISTANCE RUN FOR THE MASTER UNIT.
NR1 - CARRY OUT THE FOLLOWING TESTS IN ACCORDANCE WITH THE MAINTENANCE MANUAL 2650(2), CHAPTER 6:- (I) ANTI CONDENSATION HEATER TEST. (II) TEST FOR MICRO PROCESSOR CARD (PB 3). (III) TEST FOR I/O CARD (PB 4). (IV) TEST FOR VFC CARD (PB 5). (V) TEST FOR OSCILLATOR CARD (PB 8). (VI) TEST FOR OSCILLATOR AMPLIFIER CARD (PB 10). (VII) TEST FOR DETECTOR CARD (PB 7). (VIII) TEST FOR CALIBRATION CARD (PB 9). (IX) TEST FOR FD CARD (PB 16). (X) TEST FOR DISPLAY CONTROLLER CARD (PB 13). (XI) TEST FOR NUMERIC DISPLAY CARD (PB 12). (XII) TEST FOR ALPHA NUMERIC DISPLAY CARD (PB 11). * PERFORMANCE CERTIFICATE TO BE PROVIDED AFTER WORK COMPLETION.
NR2 - CARRY OUT THE TEST FOR REPEATER DISTRIBUTION CARD IN ACCORDANCE WITH THE MAINTENANCE MANUAL 2650(2), CHAPTER 7.
NR3 - CARRY OUT THE TEST FOR SIMULATION CARD IN ACCORDANCE WITH MAINTENANCE MANUAL 2650(2), CHAPTER 8.
NR4 - CARRY OUT THE OVER ALL SYSTEM TEST IN ACCORDANCE WITH MAINTENANCE MANUAL 2650(2), CHAPTER 9.
NR5 - EXAMINE AND REFIT THE PICK UP HEAD AND REPEATERS UNITS.
SR1 - CARRY OUT THE PRINTER AND SPEED CONTROL CHECKS AS PER INBR 2651(2), PART II, PARA 2.3.10.
SR3 - CARRY OUT VISUAL EXAMINATION OF PCBS VIZ. PC1 TO PC11 / MODULES IN ACCORDANCE WITH ANNUAL MAINTENANCE SCHEDULE OF INBR 2651(2), PART II, PARA 2.4.1. (INBR 4826(X) PART II CHAPTER 2, PARA 2.4 REFERS FOR VER 3.1)
SR4 - SERVICE THE ECHO SOUNDER PCBS IN ACCORDANCE WITH THE INBR 2651(2), PART II, PARA 3.2.
NR1 - REMOVE MAIN RECORDER, REPEATER AND THE TRANSDUCER TO THE SHOP FOR OVERHAUL AND CALIBRATION.
NR2 - EXAMINE THE TRANSDUCER AND CASINGS. PRESERVE THE TRANSDUCER SURFACE DURING DRY-DOCKING. CARRY OUT VISUAL EXAMINATION OF THE TRANSDUCER CABLES, CHECK CONTINUITY AND INSULATION.
SR1 - CHECK SENSOR FOR CONTAMINATION DUE TO EXHAUST GASES, WASH IT WITH FRESH WATER AND MILD SOAP SOLUTION AS NECESSARY.
SR2 - CHECK THE SHOCK VIBRATION MOUNTS, RENEW IF NECESSARY.
NR1 - OVERHAUL ALL UNITS INCLUDING ANTENNA. SET TO WORK AS NEW PERFORMANCE. PERFORMANCE CERTIFICATE TO BE PROVIDED AFTER WORK COMPLETION.
SR1 - INSPECT THE EARTHING STRIPS OF ALL UNITS FOR PROPER GROUNDING. RENEW STRIPS IF REQUIRED.
SR2 - CARRY OUT SPM CHECKS OF THE ANTENNA MOTOR.
SR3 - CARRY OUT PARAMETER CHECKS OF THE RADAR. PARAMETER SAT CERTIFICATE TO BE PROVIDED.
SR4 - CLEAN & APPLY RF PAINT ON THE ANTENNA.
SR5 - INSPECT THE SHOCK MOUNTS AND CHECK THAT THE FASTENING UNITS ARE PROPERLY TIGHTENED. RE-COAT WITH NECOL LACQUER.
SR6 - CHANGE THE OIL IN COMBINED ANTENNA PEDESTAL. CHECK THE SYSTEM FOR PROPER OPERATION.
SR7 - CARRY OUT VSWR, SENSITIVITY AND POWER OUTPUT CHECKS. TEST CERTIFICATE TO BE PROVIDED.
SR8 - CARRY OUT PERFORMANCE TEST AS PER MANUAL/ DOCUMENTATION.
SR9 - CARRY OUT CLEANING OF AERIAL AND PAINT THE AREAL WITH RF PAINT.
SR10 - MEASURE CHARACTERISTIC IMPEDANCE OF THE ANTENNA FEEDER.
SR11 - CARRY OUT COMPLETE OVERHAULING OF THE EQUIPMENT AND TEST FOR OPTIMUM PERFORMANCE.
NR1 - OVERHAUL ALL UNITS. SET TO WORK AS NEW PERFORMANCE.
NR2 - CARRY OUT OVERHAULING OF ANTENNA & ANTENNA DRIVE UNIT. PAINT THE ANTENNA WITH RF PAINT.
NR3 - CARRY OUT STW & PRESENT SYSTEM FOR HATS & SATS.
NR4 - REPLACE THE PRIMARY BATTERY ON NON-RECHARGEABLE MEMORY CARDS.CHANGE BATTERY WHILE CARD IS PLUGGED INTO A POWERED-UP DISPLAY TOPREVENT LOSS OF DATA.(IF APPLICABLE).
NR5 - OVERHAUL ALL UNITS AT SHOP FLOOR. CARRY OUT SETTING TO WORK AND CHECK THE PERFORMANCE.
NR6 - TEST ALL MODULE AND PCBS AS PER TECHNICAL REPAIR AND MAINTENANCE MANUAL.
SR1 - CARRY OUT COMPLETE TESTING TUNING OF THE SYSTEM AS PER MAINTENANCE MANUAL.
(A) UNDERTAKE OVERHAULING (WITH BALANCING AND BERING REPLACMENT) INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) LOAD TRIALS FOR ONE HOUR TO BE PROVED TO NAVAL TRIALS AGENCIES
SR 1-CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR
SR2- CALIBRATE THE OVER LOAD MRECHANISM OF THE STARTER
NR1- CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR SUBJECT TO QC CHECKS. CARRY OUT LOAD TRIAL FOR 4 HOURS (SOW :- REMOVE THE MOTOR AND CARRY OUT OVERHAULING , BEARING TO BE RENEWED. REWINDING OF STATOR AND ROTOR. PAINTING, COUPLING AND ALIGNMENT WITH GEAR. CARRY OUT LOAD TRIAL AS PER ETMA GUIDELINES ON COMPLETION OF OVERHAULING . CATER FOR DE-GUTTING, RE-GUTTING, LAGGING, CUTTING AND WELDING OF DECK/BULKHEADS, REMOVAL AND REFITMENT OF PIPES, REMOVAL AND LAYING OF CABLES. SYSTEM TO BE PROVED)
(A) CARRY OUT COMPLETE OVERHAULING OF CONTROL PANEL AT BOW THRUSTER COMPARTMENT, BRIDGE , PORT WING AND STBD WING. SERVICEABILITY CHECKS OF ALL RELAYS, MODULES, CONTACTORS,TRANSFORMERS, INDICATION LAMPS TO BE CARRIED OUT AND REPLACE IF DEFECTIVE NOTE:- POST REPAIR/ROUTINES TRIALS TO BE OFFERED TO THE NAVAL TRIAL AGENCIES. OBSERVATIONS / DEFECTS OBSERVED TO BE LIQUIDATED AND TRIALS TO BE REOFFERED TO NAVAL TRIAL AGENCIES. POST COMPLETION OF THE ROUTINES /OVERHAUL, THE MACHINERY SHOULD BE PROVED TO RATED/ DESIGNED POWER / CAPACITY WITHOUT LIMITATIONS /OBSERVATIONS AND VIBRATION LEVELS AT ALL POINTS SHOULD BE LESS THAN 5 MM/SEC. (B) UNDERTAKE LOAD TRIAL FOR 04 HOURS. (POWER SUPPLY MODULE PLC M340-01, PROCESSOR MODULE M340- 01, R/I CONVERTOR-04 , CONTACTOR- 5, RELAY (24VDC)- 30, HEAVY DUTY TRANSFORMERS -02 MAIN CONTACTORS-06 AUXILIARY CONTACTORS -10, MAIN FUSES WITH BASE-10, CONTROL FUSES WITH BASE -20 INDICATORS-20, JOYSTICK-01)(MT-NOT AVAILABLE)
SR 1-CARRY OUT COMPLETE OVERHAULING OF MOTOR STARTER
SR2- CALIBRATE THE OVER LOAD MRECHANISM OF THE STARTER
NR1- CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR SUBJECT TO QC CHECKS. CARRY OUT LOAD TRIAL FOR 4 HOURS. (SOW :- REMOVE THE MOTOR AND CARRY OUT OVERHAULING , BEARING TO BE RENEWED. REWINDING OF STATOR AND ROTOR. PAINTING, COUPLING AND ALIGNMENT WITH GEAR. CARRY OUT LOAD TRIAL AS PER ETMA GUIDELINES ON COMPLETION OF OVERHAULING . CATER FOR DE-GUTTING, RE-GUTTING, LAGGING, CUTTING AND WELDING OF DECK/ BULKHEADS, REMOVAL AND REFITMENT OF PIPES, REMOVAL AND LAYING OF CABLES. SYSTEM TO BE PROVED
(A) CARRY OUT COMPLETE OVERHAULING OF CONTROL PANEL AT BOW THRUSTER COMPARTMENT, BRIDGE , PORT WING AND STBD WING. SERVICEABILITY CHECKS OF ALL RELAYS, MODULES, CONTACTORS,TRANSFORMERS, INDICATION LAMPS TO BE CARRIED OUT AND REPLACE IF DEFECTIVE NOTE:- POST REPAIR/ROUTINES TRIALS TO BE OFFERED TO THE NAVAL TRIAL AGENCIES. OBSERVATIONS / DEFECTS OBSERVED TO BE LIQUIDATED AND TRIALS TO BE REOFFERED TO NAVAL TRIAL AGENCIES. POST COMPLETION OF THE ROUTINES /OVERHAUL, THE MACHINERY SHOULD BE PROVED TO RATED/DESIGNED POWER / CAPACITY WITHOUT LIMITATIONS /OBSERVATIONS AND VIBRATION LEVELS AT ALL POINTS SHOULD BE LESS THAN 5 MM/SEC. (B) UNDERTAKE LOAD TRIAL FOR 04 HOURS. (THE EQUIPMENT PERFORMANCE WILL BE CONSIDERED SATISFACTORY ONLY IF IT THE PERFORMANCE TRIALS ARE CLEARED BY NAVAL INSPECTION AGENCY). (POWER SUPPLY MODULE PLC M340-01, PROCESSOR MODULE M340- 01, R/I CONVERTOR-04 , CONTACTOR- 5, RELAY - 30 , HEAVY DUTY TRANSFORMERS -02 MAIN CONTACTORS-06 AUXILIARY CONTACTORS -10, MAIN FUSES WITH BASE-10, CONTROL FUSES WITH BASE -20 INDICATORS-20 JOYSTICK-01)(MT-NOT AVAILABLE)
(A)- CARRY OUT OVERHAULING OF THE CONTROL SYSTEM
(B)CARRY OUT OVERHAUL OF 01 MOTOR
(C)CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER(DOL) (D) CALIBRATION OF ALL MEASURING INSTRUMENTS
(A) CARRY OUT OVERHAULING OF THE CONTROL SYSTEM
(B) CARRY OUT OVERHAUL OF 03 MOTORS
(C) CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER
(D) CALIBRATION OF ALL MEASURING INSTRUMENTS
(A)- CARRY OUT OVERHAULING OF THE CONTROL SYSTEM
(B)CARRY OUT OVERHAUL OF 01 MOTOR
(C)CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER (D) CALIBRATION OF ALL MEASURING INSTRUMENTS
(A) OVERHAULING OF ALL 07 DECK HANDLING MOTORS ,415V, 3 PHASE, 50Hz . (B) OVERHAULING OF 03 CONTROL PANEL (QTR DECK, BALOON DECK, DEEP SEA WINH). . REPLACE ALL RELAYS, TIMER, PCBS, ELECTRONIC CARDS, TRANSFORMES, FUSES, SWITCHES, INDICATION LAMPS, SOLENOIDS, JOYSTICKS, PUSH BUTTONS, PAY OUT/PAYIN PCBS. (C) OVERHAULING OF ALL O6 STARTER PANEL OF DECK HANDLING GEARS. REPALCE ALL CONTACTORS, TIMERS, RELAYS, OLR, TRANSFORMERS, SWITCHES, FUSES, INDICATION LAMPS. (PUSH BUTTONS, INDICATION LAMPS, ELMAX CONNECTORS, 06 NOs. BCH MAKE 70 AMPS CONTACTOR & 03 No. 40 AMPS BCH MAKE CONTACTORS, BCH MAKE TIME DELAY RELAY, 415 - 230 V CONTROL TRANSFORMER, CT MOUNTED BCH MAKE OVERLOAD RELAY , 27 NOs. COPPER LUGS OF REQUIRED SIZES, 01 CORE, 1 SQ MM COPPER CONDUCTOR, INSULATED) (MT-NOT AVAILBLE)
(B) OVERHAULING OF 03 CONTROL PANEL (QTR DECK, BALOON DECK, DEEP SEA WINH). . REPLACE ALL RELAYS, TIMER, PCBS, ELECTRONIC CARDS, TRANSFORMES, FUSES, SWITCHES, INDICATION LAMPS, SOLENOIDS, JOYSTICKS, PUSH BUTTONS, PAY OUT/PAYIN PCBS. (PUSH BUTTONS, INDICATION LAMPS, ELMAX CONNECTORS, 06 NOs. BCH MAKE 70 AMPS CONTACTOR & 03 No. 40 AMPS BCH MAKE CONTACTORS, BCH MAKE TIME DELAY RELAY, 415 - 230 V CONTROL TRANSFORMER, CT MOUNTED BCH MAKE OVERLOAD RELAY , 27 NOs. COPPER LUGS OF REQUIRED SIZES, 01 CORE, 1 SQ MM COPPER CONDUCTOR, INSULATED) (MT-NOT AVAILBLE)
(C) OVERHAULING OF ALL O6 STARTER PANEL OF DECK HANDLING GEARS. REPALCE DEFECTIVE ALL COMPONENTS POST CHECKS. (PUSH BUTTONS, INDICATION LAMPS, ELMAX CONNECTORS, 06 NOs. BCH MAKE 70 AMPS CONTACTOR & 03 No. 40 AMPS BCH MAKE CONTACTORS, BCH MAKE TIME DELAY RELAY, 415 - 230 V CONTROL TRANSFORMER, CT MOUNTED BCH MAKE OVERLOAD RELAY , 27 NOs. COPPER LUGS OF REQUIRED SIZES, 01 CORE, 1 SQ MM COPPER CONDUCTOR, INSULATED) (MT-NOT AVAILBLE)
SR1- CARRY OUT CALIBRATION OF ALL INDICATING INSTRUMENT & SAFETY DEVICES
SR2-CHECK THE CONDITION OF SHOCK/VIBRATION MOUNTS, RENEW IF NECESSARY.
SR3- REPLACE MICRO SWITCHES MOUNTED TO THE NFU STEERING LEVERS, OUTPUT RELAY AND POTENTIOMETER , IF REQUIRED
SR4- EXMINE RUBBER SEALS ON COVERS OF VARIOUS UNITS AND REPLACE WHERE NECESSARY.
SR5- CARR OUT SPM CHECKS. LUBRICATE /REPLACE BEARING OF THE MOTOR AS NECESSARY(SS TO FORWARD SPM CHECKS REPORT TO QC)
NR1-OVERHAUL MOTOR AND STARTER SUBJECT TO QC CHECKS. CARRY OUT TRIALS ON COMPLETION OF REPAIRS(SS TO CARRY OUT SPM CHECK/CONDITION MONITORING AND FORWARD REPORT TO DOCKYARD)
SR1- RENEW SUPPORTING LIQUID, DISTILLED WATER AND CARRY OUT FOLLOWING CHECKS:- (I) SWITCH ON GYRO COMPASS AND CHECK ITS PERFORMANCE (II) CHECK FOLLOW UP SYSTEM WITH GYRO COMPASS (III) CHECK SENSITIVITY OF FOLLOW UP SYSTEM, IT SHOULD NOT BE LESS THAN 70 DEGREES/SECOND
NR1- REMOVE THE MASTER UNIT TO SHOP FLOOR, CARRY OUT OVERHAUL AND SHOP TRIALS
NR2-CARRY OUT OVERHAULING OF REPEATER (QTY -10) , CONTROL UNIT (QTY -02) SIGNAL UNIT (QTY -03) , OPERATOR UNIT (QTY-02), POWER SUPPLY UNIT (QTY -02) ,OPERATING CHANGE OVER UNIT(QTY-01) , CHANGE OVER BOX (QTY-01), NMEA DISTRIBUTION BOX (QTY-02)
SR1- EXAMINE THE CONNECTION BETWEEN THE MAIN NEGATIVE TERMINAL AND THE MAIN EARTH CONNECTION OF THE HULL.CHECK THE MEGGER RESISTANCE OF THE MAIN NEGATIVE TERMINAL .IT SHOULD BE ZERO.
SR2- REMOVE FUSE FROM EACH OF THE ANODE FUSE TERMINAL AND MEASURE RESISTANCE .RESISTANCE SHOULD BE 0.5 TO 1 Ohm.
SR3- TEST EACH ANODE FOR NO OPEN CIRCUIT OR PARTIAL SHORT CIRCUIT AS PER PARA 20SI(a) OF NO 06/2011.
SR4- CHECK REFERENCE CELL POTENTIAL AS PER PARA 19(a) OF NO 06/2011.
SR5- CHECK ALL ANODES AND REFERENCE ELECTRODES FOR SATISFACTORY INSULATION TO HULL USING 500V MEGGER TO ENSURE THAT THERE IS NO PHYSICAL SHORTING OF THE ANODE TO HULL.THE ANODE TO HULL INSULATION SHOULD BE AT LEAST IN ORDER OF FEW MEGA Ohm. RAISE SPECIFIC DEFECTS TO DOCKYARD AS NECESSARY.
SR6- CHECK BONDING CONNECTIONS BETWEEN PROPELLER SHAFT & HULL AND RUDDER & HULL FOR MECHANICAL SOUNDNESS AND ZERO RESISTANCE. (REFER PARA 3.11 OF INBR 372/83)
SR7- CHECK ICCP CABLE GLANDS FOR FIRM MECHANICAL TIGHTNESS OF CONNECTION AND ENSURE CONTINUITY OF CIRCUITS .CHECK FOLLOWING (A) CABLE ENTRY INTO COFFERDAMS. (B) CABLE CONNECTION IN CONTROLLER. (C) CABLE CONNECTION IN JUNCTION BOX. (D) CABLE RUNS IN CONDUITS.
SR8- CHECK SHAFT EARTHING ASSEMBLY (SLIP RING ) AND BRUSHES ARE FREE AND NOT WORN OUT.
SR9- CARRY OUT SERVICEABILITY CHECKS OF ACU BY REFITTING AUTHORITY AS PER PARA 19 SI (c) OF NO 06/2011.
SR11- CARRY OUT OPEN LOOP FULL LOAD TEST AS PER INBR-372/83 CHAPTER 4 PARA 4.10 AND 4.13 AND CONFIRM SATISFACTORY WORKING OF AUTO CONTROL UNIT.
SR12- CARYY OUT DUMMY LOAD TEST OF CONTROL PANEL AS PER INSTRUCTIONS IN CHAPTER 4 OF INBR 372/83.
SR1- CARRY OUT OVERHAULING OF MAGNETIC COMPASS AND RENEW SUPPORTING LIQUID.
SR2- CARRY OUT SWING CHECK AND CALIBRATE THE COMPASS
NR1-CARRY OUT VISUAL INSPECTION OF SHOCK MOUNTS. REPLACE IF NECESSARY. (WHEREVER APPLICABLE)
NR2-REMOVE THE MOTORS AND SELSYN M5, M6, M7 CHECK THE CONTACT RINGS, BRUSHES CLEAN THE RELAY CONTACTS OF PM 4 WITH SPIRIT. (FOR EKM SUBMARINES).
NR3-CHECK THE CABLE GLAND FOR PROPER FITNESS. IF REQUIRED CHANGE THE GLAND PACKING
SR1- CLEAN 24 V RECTIFIERS AND TIGHTEN TERMINAL CONNECTION
SR2- CHECK UP SPARES PCB ON SYSTEM AND PRESERVE
NR1- LAND THE CPONTROL UNIT AND SPINDLE VALVE TO SHOP FOR OVERHAU;ING SOW :- REMOVE AND REFIT THE CONTROL UNIT AND SOLENOD VALVE. CHECK RELAY, TIMER, SWITCHES, PUSH BUTTON AND TIMER PCB AND REPLACE ALL DEFECTIVE COMPONENETS. SYSTEM TO BE PROVED TO SS.
NR1- OVERHAUL TRANSMITTER AND RECEIVER PANELS AND ESTABLISH PERFORMANCE CHECKS OONBOARD. SOW :- CHECK ALL COMPONENT OF TRANSMITTER & RECEIVER, PCBs OF JUNCTION BOX. REPLACE ALL DEFECTIVE COMPONENT & PCBs. PROVE COMPLETE SYSTEM TO SS
(A) OVERHAULING AND FUNCTIONAL CHECKS OF TRANSMITTER AND RECEIVER PANELS AND ESTABLISH PERFORMANCE CHECKS THROUGH OEM. (B) OVERHAULING OF JUNCTION BOX (QTY -02) SOW :- CHECK ALL COMPONENT OF TRANSMITTER & RECEIVER, PCBs OF JUNCTION BOX. REPLACE ALL DEFECTIVE COMPONENT & PCBs. PROVE COMPLETE SYSTEM TO SS NOTE:- POST REPAIR/ROUTINES TRIALS TO BE OFFERED TO THE NAVAL TRIAL AGENCIES. OBSERVATIONS / DEFECTS OBSERVED TO BE LIQUIDATED AND REOFFERED TO NAVAL TRIAL AGENCIES. POST COMPLETION OF THE ROUTINES/OVERHAUL, THE MACHINERY SHOULD BE PROVED TO RATED/DESIGNED POWER / CAPACITY WITHOUT LIMITATIONS /OBSERVATIONS AND VIBRATION LEVELS AT ALL POINTS SHOULD BE LESS THAN 5 MM/SEC. THE EQUIPMENT PERFORMANCE WILL BE CONSIDERED SATISFACTORY ONLY IF IT THE PERFORMANCE TRIALS ARE CLEARED BY NAVAL INSPECTION AGENCY.
SR1- CARRY OUT SERVICIABILITY CHECKS OF ALL UNITS AND OVERALL CHECK OF SYSTEM INCLUDING ACOS, PCBs, MANUAL CALL POINTS, DETECTORS & HOOTERS (WHERE APPLICABLE). PROJECT SPECIFIC DEFECT TO DOCKYARD AND UNDERTAKE REPAIR/ REPLACEMENT OF DEFFECTIVE PART.
NR1- CARRY OUT ALL SR ROUTINES.
NR2- RENEW AND RE-INSTALL UNSERVICABLE UNITS OF THE SYSTEM AND CARRY OUT FUNCTIONAL TEST.(WHEREVER APPLICABLE).REFITTING YARD TO QUOTE FOR QTY 04 OF SENSORS.
NR3-REPAIR/ REPLACE DEFECTIVE CABLE AS NECESSARY. (SS TO CARRY OUT CABLE SURVEY AND FORWARD REPORT TO DOCKYARD)
NR4- CARRY OUT VISUAL INSPECTION OF SHOCK MOUTS. REPLACE IF NECESSARY
NR1- REMOVE FLOOD ALARM UNIT TO SHOP FLOOR FOR RAPAIR, OVERHAUL/RECONDITIONING/ CALIBRATION AS NECESSARY. .REFITTING YARD TO PROVIDE 02 NO SPARES/ CONSUMABLES/ MATERIAL
NR2- REMOVE FLOOD SENSOR TO SHOP FOR CALIBRATIION
SR1- REMOVE AND EXAMINE SEA WATER SIDE OF ALTERNATOR AIR COOLER (WHERE FITTED) FOR CORROSION, EROSION AND FOULING. CLEAN TUBE PLATE AND TUBES WITH WATER JET (BR3000 ART. 1801 REFERS) CARRY OUT CHEMICAL CLEANING IF NECESSARY. PRESSURE TEST ON COMPLITION.
SR2- MAKE SURE THE CONTACT BOLTS OF THE GENERATOR OUTPUT TERMINAL AND THE BINDING POSTS OF THE EXCITATION SYSTEM ON THE CONTACT STUDS AND BOLTS ARE TIGHT AND FREE FROM CORROSION. CHECK ALL EARTH CONNECTION ARE TIGHT AND PROPERLY EARTHED, REPLACE IF REQUIRED.
SR3- CHECK SECURING ARRANGEMENT OF POWER, CONTROL CABLES TO BUS BAR/ AVR AND FAN COVER SCREW. ALL LOOSE SCREWS TO BE TIGHTENED. DEFECTIVE SCREWS TO BE REPLACED.
SR4- CHECK INSULATION OF THE PUTPUT TERMINAL AND REVERSING SWITCH CONTACT OF GOVERNOR MOTOR FOR SIGN OF BURNS/ CRACK. REPLACE IF NECESSARY.
SR5- CARRY OUT OVERHAUL OF GOVERNOR MOTOR SUBJECT TO SPM CHECKS.
SR6- CHECK AVR FOR SERVICEABILITY. CARRY OUT CALIBRATION AS NECESSARY. IN CASE OF ANY TUNNING/ CALIBRATION UNDER TAKEN ON AVR, THE VOLTAGE CONTROL TEST AND PARALLELING TRIALS TO BE UNDERTAKEN.
SR7- CARRY OUT THE PREPARATORY OPERATION FOR THE 'FIRST START' AS PER MAINTENANCE DOCUMENTATION WITH A LOAD OF NOT LESS THAN THAT SPECIFIED IN THE DOCUMENTATION.
SR8- CHECK THE INSULATION RESISTANCE OF THE THERMO-COUPLE COMPENSATING LEADS (WHERE FITTED)
SR9- CHECK SECURING ARRANGEMENT OF POWER AND CONTROL CABLES TO BUS BAR/ AVR. ALL LOOSE SCREWS TO BE TIGHTENED. DEFECTIVE SCREWS TO BE REPLACED.
SR10- REPLACE THE FOLLOWING (WHERE APPLICABLE) :- (i) THERMO-COUPLE (ii) ELECTRICAL TEMPERATURE INDICATOR (iii) TACHO-METER TRANSMITTOR (iv) BALL AND ROLLER BEARING OF PUMP MOTOR (v) ROTATING RECTIFIER ASSEMBLY
SR11- CARRY OUT SPM CHECKS, PHASE BALANCING, INSULATION MEASUREMENT.OVERHAUL GENERATOR REPLACE BEARING IF REQUIRED AND CARRY OUT LOAD TRAILS AND RECORD RESULT IN LOG BOOK NOTE;- BEFORE CHANGING THE LUBRICANTS OF BEARINGS, WASH OUT BEARING ASSEMBLY, WASHING THE BEARING ASSEMBLY IS TO BE CARRIED AS PER TECHNICAL INSTRUCTIONS OF THE ALTERNATORS.
SR12- CARRY OUT CALIBRATION OF OVER VOLTAGE PROTECTION UNIT (OVPU), REVERSE POWER RELAY AND OVER SPEED TRIP.
NR1- CARRY OUT INSPECTION OF SHOCK/ VIBRATION MOUNTING. REPLACE AFTER 4000 HRS OF ALTERNATOR OPERTIONAL.
NR2- CARRY OUT OVERHAULING OF ALTERNATOR AND ENSURE ALL CABLE GLANDS, JOINTS OF SHEETS METAL ON THE ALTERNATOR ARE AIR TIGHT AND ALL SEALING STRIPS OF TERMINAL BOX COVER ARE RENEWED. UNDERTAKE TRIAL ON COMPLITION OF OVERHAULL VIZ. FULL LOAD TRIAL, VOLTAGE CONTROL TEST, SPEED CONTROL TEST AND PARALLELING TRIALS. RECORD RESULTS IN LOG BOOK. NOTE:- POST REPAIR/ROUTINES TRIALS TO BE OFFERED TO THE NAVAL TRIAL AGENCIES. OBSERVATIONS / DEFECTS OBSERVED TO BE LIQUIDATED AND REOFFERED TO NAVAL TRIAL AGENCIES. POST COMPLETION OF THE ROUTINES/OVERHAUL, THE MACHINERY SHOULD BE PROVED TO RATED/DESIGNED POWER / CAPACITY WITHOUT LIMITATIONS /OBSERVATIONS AND VIBRATION LEVELS AT ALL POINTS SHOULD BE LESS THAN 5 MM/SEC. PROVE PARALLELING OPERATION BETWEEN AL THE 04 DIESEL ALTERNATORS IN ALL THE CONFIGURATIONS. THE EQUIPMENT PERFORMANCE WILL BE CONSIDERED SATISFACTORY ONLY IF IT THE PERFORMANCE TRIALS ARE CLEARED BY NAVAL INSPECTION AGENCY
NR3- CARRY OUT SERVICEABILITY CHECKS OF ALL INSTUMENTATION. CHECK AVR FOR SERVICEABILITY. CARRY OUT CALIBRATION AS NECESSARY. IN CASE OF ANY TUNNING/CALIBRATION UNDER TAKEN ON AVR, THE VOLTAGE CONTROL TEST AND PARALLELING TRIALS TO BE UNDERTAKEN.
SR1- CALIBRATE 50% OF PANEL INSTRUMENTS/METERS.
SR2- APPLY NECOL LACQUER TO SHOCK AND VIBRATION MOUNT. REPLACEMENT IF DETERIORATED.
SR3- CARRY OUT IN-SITU SERVICEABILITY CHECKS OF BREAKERS AND RAISE SPECIFIC DEFECT TO DOCKYARDS FOR REPAIR. CARRY OUT SERVICEABILITY CHECKS OF PROTECTION CIRCUIT; RAISE SPECIFIC DEFECTS TO DOCKYARD, (WHERE APPLICABLE)
SR4- CARRY OUT FOLLOWING ROUTINES ON SWITCHBOARD AND BUSBARS :- (A) INSPECT LUGS/ CONNECTORS/ CT/ PT AND OTHER COMPONENETS AND UNDERTAKE REPAIR DETERIORATION/ DAMAGE OF MSB CABLES/ WIRING AS NECESSARY. (B) REPAIR/ REPLACE BUSBARS INSULATORS IF NECESSARY (C) CLEAN AND DECARBONIZE THE BUSBARS. (D) CARRY OUT FUNCTIONAL CHECKS OF MSB AND PARALLELING TRIALS WITH ALL COMBINATIONS OF GENERATOR SUPPLY. UNDERTAKE CALIBRATION & FUNCTIONAL CHECKS OF FOLLOWING:- (i) OVER VOLTAGE (ii) UNDER VOLTAGE (iii) OVER FREQUENCY (iv) UNDER FREQUENCY (v) REVERSE POWER (vi) OVER SPEED (vii) ALL BREAKER SAFTIES (viii) ALL GENERATOR GUARDS (ix) PROTECTION RELAYS (x) RENEW OF COLOURED BREAKER TALLIES 78 NOs.
NR1- CARRY OUT FUNCTIONAL CHECKS OF ALL SWITCHBOARD BREAKERS FOR PROPER OPERATION. BREAKERS TO BE CALIBRATED AS PER DUE DATE AND CERTIFICATE TO BE PROVIDED TO SS.
NR2- CARRY OUT CALIBRATION OF PROTECTION CIRCUIT RELAYS/ GSKs AND SUBSEQUENTLY CARRYOUT PROTECTION CIRCUIT CHECKS ONBOARD ( OVER VOLTAGE, UNDER VOLTAGE, REVERSE POWER AND OVER SPEED) DURING LOAD TRIALS OF DAs.
NR3- UNDER TAKE PARALLELING TRIALS WITH ONBOARD DAs IN ALL CONFIGURATIONS. NOTE:- POST REPAIR/ROUTINES TRIALS TO BE OFFERED TO THE NAVAL TRIAL AGENCIES. OBSERVATIONS / DEFECTS OBSERVED TO BE LIQUIDATED AND REOFFERED TO NAVAL TRIAL AGENCIES. POST COMPLETION OF THE ROUTINES/OVERHAUL, THE MACHINERY SHOULD BE PROVED TO RATED/DESIGNED POWER / CAPACITY WITHOUT LIMITATIONS /OBSERVATIONS AND VIBRATION LEVELS AT ALL POINTS SHOULD BE LESS THAN 5 MM/SEC. PROVE PARALLELING OPERATION BETWEEN AL THE 04 DIESEL ALTERNATORS IN ALL THE CONFIGURATIONS. THE EQUIPMENT PERFORMANCE WILL BE CONSIDERED SATISFACTORY ONLY IF IT THE PERFORMANCE TRIALS ARE CLEARED BY NAVAL INSPECTION AGENCY.
NR4- MEASURE AND RECORD THE INSULATION RESITANCE OF SWITCHBOARD. IT SHOULD BE MORE THEN 2 MEGA OHMS.
SR1- CHECK THE BREAKER FOR ITS OPTIMUM PERFORMANCE AND LAND THE BREAKER TO DOCKYARD FOR REPAIRS IF PERFORMANCE IS UNSATISFACTORY. NR1- CARRY OUT CALIBRATION OF RELAYS AND PCBs. REPLACE COMPONENTS IF REQUIRED. NR2- ON SPRING SECURING NUTS/ LOCKNUTS APPLY (LOCTITE) OR EQUIVALENT COMPOUND TO PREVENT LOOSENING UNDER VIBRATION.
SR1- CHECK THE BREAKER FOR ITS OPTIMUM PERFORMANCE AND LAND THE BREAKER TO DOCKYARD FOR REPAIRS IF PERFORMANCE IS UNSATISFACTORY. NR1- CARRY OUT CALIBRATION OF RELAYS AND PCBs. REPLACE COMPONENTS IF REQUIRED. NR2- ON SPRING SECURING NUTS/ LOCKNUTS APPLY (LOCTITE) OR EQUIVALENT COMPOUND TO PREVENT LOOSENING UNDER VIBRATION.
SR1- CARRY OUT ROUTINE ON FILTER BAKC IF APPLICABLE:- (A) TURN "OFF" THE FILTER FROM THE POWER SUPPLY. (B) CLEAN THE FILTER WITH COMPRESSED AIR 1.5 X 105 PA AFTER EVERY 3000 HRS. (C) CHECK THE RELIABILITY OF CONTACT CONNECTIONS AND FIXING OF CAPACITORS. (D) CHECK THE FILTER INSULATION RESISTANCE. IT SHOULD NOT LESS THAN 50 M OHMS. (D) CLEAN WITH ALCOHOL / AIR (E) VARNISH & BAKE THE TRANSFORMERS (F) CARRY OUT INSULATION CHECKS (MIN 2 MEGA OHMS) AND PROVE THE SYSTEM SS.
SR2- EXAMINE INCOMING AND OUTGOING LEADS FOR SIGNS OF OVERHEATING AND DETIORIATION &. REPLACED AS REQUIRED. TIGHTEN ALL ELECTRICAL CONNECTIONS AND FASTERNERS.
SR3- CARRY OUT CALIBRATION OF 04NOs. VOLTMETERS (0-30 V DC), 04 NO. AMMETER (0-100 AMPS). PROVIDE CALIBRATION CERTIFIICATE .
SR4- OVERHAUL THE RECTIFIER AS NECESSARY.
NR1- CARRY OUT LOAD -TRIALS AT SPECIFIED VALUE.
NR1- (A) INSPECT ALL SHOCK/ VIBRATION MOUNTS AND RAISE SPECIFIC DEFECT TO DOCKYARD FOR RENEWAL OF MOUNTS. (B) CARRY OUT THE INSULATION RESISTANCE CHECK ON THE PRIMARY AND SECONDARY WINDING. MINIMUM SECONDARY INSULATION SHOULD BE 10 M OHM(INCLUDING LOAD CIRCUIT). (C) CARRY OUT CHECKS FOR OPTIMUM PERFORMANCE 415/230V, 3 PH, 50 HZ, 15 KVA TRANSFORMER
NR1- (A) INSPECT ALL SHOCK/ VIBRATION MOUNTS AND RAISE SPECIFIC DEFECT TO DOCKYARD FOR RENEWAL OF MOUNTS. (B) CARRY OUT THE INSULATION RESISTANCE CHECK ON THE PRIMARY AND SECONDARY WINDING. MINIMUM SECONDARY INSULATION SHOULD BE 10 M OHM(INCLUDING LOAD CIRCUIT). (C) CARRY OUT CHECKS FOR OPTIMUM PERFORMANCE 415/230V, 3 PH, 50 HZ, 10 KVA TRANSFORMER
NR1- (A) INSPECT ALL SHOCK/ VIBRATION MOUNTS AND RAISE SPECIFIC DEFECT TO DOCKYARD FOR RENEWAL OF MOUNTS. (B) CARRY OUT THE INSULATION RESISTANCE CHECK ON THE PRIMARY AND SECONDARY WINDING. MINIMUM SECONDARY INSULATION SHOULD BE 10 M OHM(INCLUDING LOAD CIRCUIT). (C) CARRY OUT CHECKS FOR OPTIMUM PERFORMANCE 415/230V, 3 PH, 50 HZ, 5 KVA TRANSFORMER
NR1- CARRY OUT FOLLOWING ROUTINES ON STARTER/MOTOR:- (A) OVERHAUL MOTOR INCLUDING REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN, (B) CHECK FOR ALIGNMENT AND CARRY OUT TRIALS FOR FOUR HOURS. (C) CHECK THE PERFORMANCE OF THE MOTOR AS PER DESIGNED PARAMETERS, RENEW/ REPAIR DEFECTIVE COMPONENTS (D REPLACE BEARINGS. (E) OFFER TRIALS TO NAVY TRIALS TEAM (F) CARRY OUT SPM CHECKS, STARTING AND RUNNING CURRENT. VALUES TO BE WITHIN DESIGNED LIMITS. (G) PROVE SYSTEM POST OVERHAULING/REPAIRS
SR1- CARRY OUT FOLLOWING ROUTINES ON STARTER/MOTOR:- (A) OVERHAULINF OF CONTROL PANEL INCLUDING CLEANING OF BUS BAR AND REWIRING. RENEWAL OF 40 AMPS CONTACTORS, 415 TO 230 V 1000 VA 01 NO. CONTROL TRANSFORMER,04 Nos. OVER LOAD RELAY, 30 Nos. ELMAX CONECTORS, 04 Nos. NO/NC, 08 Nos. LED BASED INDICATION LAMPS, 04 Nos. 32 AMPS ROTARY SWITCHES, 06 NOs. FUSE BASE & FUSE CARRIERS. RENEWAL OF MCBS THREE POLE 63 AMPS 05 IN NOS . CHECK FOR RUSTING/ CORROSION OF THE PANEL BODY RUSTED/ CORRODED , REPLACE/ RENEW PANEL , FOUNDATION TO BE RENEWED BY WELDING . CLEANING OF BUS BAR AND REWIRING (01 CORE 1 SQ MM/ 6 SQ MM/ 2 SQ MM COPPER CONDUCTOR, INSULATED WIRE APPROX 01 METERS EACH, (B) CONNECTORISATION DIAGRAM TO BE PROVIDED TO THE SHIP POST COMPLETION OF THE JOB). (C) SYSTEM TO BE PROVED POST OVERHAULING. NR1- CARRY OUT COMPLETE OVERHAULING OF PUMP STARTER SUBJECT TO QC CHECKS. CARRY OUT TEST LOAD TRIALS FOR 4 HOURS.
NR1- CARRY OUT FOLLOWING ROUTINES ON STARTER/MOTOR :- (A) OVERHAUL MOTOR INCLUDING REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN, (B) CHECK FOR ALIGNMENT AND CARRY OUT TRIALS FOR FOUR HOURS. (C) CHECK THE PERFORMANCE OF THE MOTOR AS PER DESIGNED PARAMETERS, RENEW/ REPAIR DEFECTIVE COMPONENTS (D REPLACE BEARINGS. (E) OFFER TRIALS TO NAVY TRIALS TEAM (F) CARRY OUT SPM CHECKS, STARTING AND RUNNING CURRENT. VALUES TO BE WITHIN DESIGNED LIMITS. (G) PROVE SYSTEM POST OVERHAULING/REPAIRS
NR1- CARRY OUT FOLLOWING ROUTINES ON STARTER/MOTOR :- (A) OVERHAUL MOTOR INCLUDING REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN, (B) CHECK FOR ALIGNMENT AND CARRY OUT TRIALS FOR FOUR HOURS. (C) CHECK THE PERFORMANCE OF THE MOTOR AS PER DESIGNED PARAMETERS, RENEW/ REPAIR DEFECTIVE COMPONENTS (D REPLACE BEARINGS. (E) OFFER TRIALS TO NAVY TRIALS TEAM (F) CARRY OUT SPM CHECKS, STARTING AND RUNNING CURRENT. VALUES TO BE WITHIN DESIGNED LIMITS. (G) PROVE SYSTEM POST OVERHAULING/REPAIRS
NR1- CARRY OUT FOLLOWING ROUTINES ON STARTER/MOTOR:- (A) OVERHAUL MOTOR INCLUDING REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN, (B) CHECK FOR ALIGNMENT AND CARRY OUT TRIALS FOR FOUR HOURS. (C) CHECK THE PERFORMANCE OF THE MOTOR AS PER DESIGNED PARAMETERS, RENEW/ REPAIR DEFECTIVE COMPONENTS (D REPLACE BEARINGS. (E) OFFER TRIALS TO NAVY TRIALS TEAM (F) CARRY OUT SPM CHECKS, STARTING AND RUNNING CURRENT. VALUES TO BE WITHIN DESIGNED LIMITS. (G) PROVE SYSTEM POST OVERHAULING/REPAIRS
SR1- CARRY OUT FOLLOWING ROUTINES ON STARTER/MOTOR:- (A) OVERHAUL INCLUDING CLEANING BUS BAR AND REWIRING OF CONTRO PANEL. (B) RENEWAL 40 AMPS CONTACTORS, 415 TO 230 V, 1000 VA 01 NO. CONTROL TRANSFORMER,04 Nos. OVER LOAD RELASY, 30 Nos. ELMAX CONECTORS, 04 Nos. NO/NC. 08 Nos. LED BASED INDICATION LAMPS, 04 Nos. 32 AMPS ROTARY SWITCHES, 01 NOs. 06 NOs. FUSE BASE & FUSE CARRIERS. RENEWAL OF MCBS THREE POLE 63 AMPS 05 IN NOS (C) CHECK FOR RUSTING/ CORROSION OF THE PANEL BODY RUSTED/ CORRODED , REPLACE/ RENEW PANEL. FOUNDATION TO BE RENEWED BY WELDING . (D) CLEANING OF BUS BAR AND REWIRING (01 CORE 1 SQ MM/ 6 SQ MM/ 2 SQ MM COPPER CONDUCTOR, INSULATED WIRE APPROX 01 METERS EACH, (E) CONNECTORISATION DIAGRAM TO BE PROVIDED TO THE SHIP POST COMPLETION OF THE JOB). (F) SYSTEM TO BE PROVED POST OVERHAULING. NR1- CARRY OUT COMPLETE OVERHAULING OF STARTER SUBJECT TO QC CHECKS. CARRY OUT TEST LOAD TRIALS FOR 4 HOURS. NR2- CARRY OUT CALIBRATION OF THR OVER-LOAD RELAY.
NR1- CARRY OUT FOLLOWING ROUTINES ON STARTER/MOTOR:-(A) OVERHAUL MOTOR (INCLUDING REWINDING, VARNISHING, PAINTING, RENEWING TERMINAL PLATES ), 415V, 50 HZ, 3 PH, 80 KW MOTOR FOR AC COMPRESSOR (B)CHECK FOR ALIGNMENT, FREE ROTATION AND CARRY OUT TRIALS. (C) CARRY OUT SPM CHECKS, STARTING AND RUNNING CURRENT VALUES TO BE WITHIN DESIGNED LIMITS. (D) REPLACE BEARINGS. (E) PROVE THE SYSTEM TO SS IN OPERATIONAL STATE.
SR1- CARRY OUT FOLLOWING ROUTINES ON STARTER/MOTOR:- (A) COMPLETE OVERHAULING OF AC COMPRESSOR (1, 2 &3) 415V, 50 HZ, 3 PH, 80 KW MOTOR STARTERS. (B) OVERHAULING OF SOFT STARTERS. (C) CARRY OUT LOAD TRIALS FOR FOUR HOURS, OEM/ TRADE TO OFFER TRIALS TO NAVY TRIALS TEAM , LIQUIDATE ALL OBSERVATIONS . (D) PROVIDE CALIBRATION CERTIFIICATE. (E) CHECK THE SPM READINGS, STARTING & RUNNING CURRENTS. THE VALUES TO BE WITHIN DESIGNED PARAMETERS. (E) PROVE COMPLETE SYSTEM POST OVERHAULING. NR1- CARRY OUT COMPLETE OVERHAULING OF STARTER SUBJECT TO QC CHECKS. CARRY OUT TEST LOAD TRIALS FOR 4 HOURS.
NR1- CARRY OUT FOLLOWING ROUTINES ON STARTER/MOTOR:- (A) OVERHAULING OF QUANTITY 03 FIRE MAIN MOTOR 415V, 50 HZ, 3 PH, 50 HP MOTOR (B) CHECK FOR ALIGNMENT AND CARRY OUT TRIALS FOR FOUR HOURS. (C) CHECK THE PERFORMANCE OF THE MOTOR AS PER DESIGNED PARAMETERS, RENEW/ REPAIR ALL DEFECTIVE COMPONENTS (D) REPLACE BEARINGS. (E)OFFER TRIALS TO NAVY TRIALS TEAM (F) CARRY OUT PAINTING, SPM CHECKS, STARTING AND RUNNING CURRENT. VALUES TO BE WITHIN DESIGNED LIMITS. (G) PROVE SYSTEM TO SS POST OVERHAULING.
SR1- CARRY OUT FOLLOWING ROUTINES ON STARTER/MOTOR:- (A) OVERHAUL STARTER, INCLUDING RENEWING PUSH BUTTONS, INDICATION LAMPS, ELMAX CONNECTORS, 02 NOs. BCH MAKE 70 AMPS CONTACTOR & 01 No. 40 AMPS BCH MAKE CONTACTORS, BCH MAKE TIME DELAY RELAY, 415 - 230 V CONTROL TRANSFORMER, CT MOUNTED BCH MAKE OVERLOAD RELAY , 09 NOs. LUGS (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY, INTERNAL CONTROL WIRING 01 CORE, 1 SQ MM COPPER CONDUCTOR, INSULATED). (C) OFFER TRIALS TO NAVY TRIALS TEAM. (D) CALIBRATION CERTIFICATE TO BE PROVIDED FROM NABL ACCREDITED LABORATORY. (E) CONTROL PANEL TO BE PAINTED, ALL SCREWS FOR SECURING TO BE RENEWED. (F) SYSTEM TO BE PROVED TO SS POST OVERHAULING NR1- CARRY OUT COMPLETE OVERHAULING OF STARTER SUBJECT TO QC CHECKS. CARRY OUT TEST LOAD TRIALS FOR 4 HOURS.
SR1- CARRY OUT FOLLOWING ROUTINES ON STARTER/MOTOR:- (A)OVERHAUL MOTOR INCLUDING REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN, (B) CHECK FOR ALIGNMENT AND CARRY OUT TRIALS FOR FOUR HOURS. (C) CHECK THE PERFORMANCE OF THE MOTOR AS PER DESIGNED PARAMETERS, RENEW/ REPAIR ALL DEFECTIVE COMPONENTS (E)OFFER TRIALS TO NAVY TRIALS TEAM (D) REPLACE BEARINGS. (F) CARRY OUT PAINTING, SPM CHECKS, STARTING AND RUNNING CURRENT. VALUES TO BE WITHIN DESIGNED LIMITS. (G) PROVE SYSTEM TO SS POST OVERHAULING. (H) QUOTE FOR QUANTITY 01 MOTOR 415V, 50 HZ, 3 PH, 20 HP MOTOR
SR1- CARRY OUT FOLLOWING ROUTINES ON STARTER/MOTOR:- (A) OVERHAUL STARTER, INCLUDING RENEWING PUSH BUTTONS, INDICATION LAMPS, ELMAX CONNECTORS, 02 NOs. BCH MAKE 70 AMPS CONTACTOR & 01 No. 40 AMPS BCH MAKE CONTACTORS, BCH MAKE TIME DELAY RELAY, 415 - 230 V CONTROL TRANSFORMER, CT MOUNTED BCH MAKE OVERLOAD RELAY , 09 NOs. LUGS (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY, INTERNAL CONTROL WIRING 01 CORE, 1 SQ MM COPPER CONDUCTOR, INSULATED). (C) OFFER TRIALS TO NAVY TRIALS TEAM. (D) CALIBRATION CERTIFICATE TO BE PROVIDED FROM NABL ACCREDITED LABORATORY. (E) CONTROL PANEL TO BE PAINTED, ALL SCREWS FOR SECURING TO BE RENEWED. (F) SYSTEM TO BE PROVED TO SS POST OVERHAULING. NR1- CARRY OUT COMPLETE OVERHAULING OF STARTER SUBJECT TO QC CHECKS. CARRY OUT TEST LOAD TRIALS FOR 4 HOURS.
SR1- CARRY OUT FOLLOWING ROUTINES ON STARTER/MOTOR:- (A) OVERHAUL MAIN AND PRIMING MOTOR (INCLUDING REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN), CARRY OUT DYNAMIC BALANCING OF FAN .( REPLACE BEARINGS.) (D) CHECK FOR ALIGNMENT, FREE ROTATION AND CARRY OUT TRIALS. (E) REPLACE BEARINGS. (F) CARRY OUT ALLIGNMENT AND SPM CHECKS, STARTING AND RUNNING CURRENT. VALUES TO BE WITHIN DESIGNED LIMITS. (G) PROVE THE MOTOR FOR CORRECT FUNCTIONING
SR1- CARRY OUT FOLLOWING ROUTINES ON STARTER/MOTOR:- (A) OVERHAUL STARTER INCLUDING RENEWING PUSH BUTTONS, INDICATION LAMPS, ELMAX CONNECTORS (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY. (C) REPLACE TIME DELAY RELAY AND AUXILARY CONNECTORS PROVIDE CALIBRATION CERTIFIICATE. (D) REPLACE SINGLE PHASE PROTECTION RELAY. (E) PROVE SYSTEM POST OVERHAUL. NR1- CARRY OUT COMPLETE OVERHAULING OF STARTER SUBJECT TO QC CHECKS. CARRY OUT TEST LOAD TRIALS FOR 4 HOURS.
NR1- COMPLETE OVERHAULING OF DAVIT CONTROL PANEL AND REMOTE PANEL . REPLACE 10 IN NO. ROTARY SWITCHES . SERVICEABILITY CHECKS OF VFD DRIVE. REPLACE 10 IN NO. CONTACTORS, 05 IN NO. MCB. (B) RENEWAL OF CABLE FROM STARTER PANEL TO REMOTE PANEL (25 MTRS) . NR2- CARRY OUT OVERHAULING OF ALL DAVIT PARTS. (A) RENEW 03 Nos. NAVIGATION LAMPS WITH CABLING AND SECURING ARRANGEMENT. (B) REPLACE ALL LIMIT SWITCHES. NR3- (A) DISMOUNT THE HOOK FROM WIRE ROPE CONNECTION AND OVERHAUL. REASSEMBLE THE HOOK TO THE WIRE ROPE CONNECTION. (B) CARRY OUT PERFORMANCE TRIALS. (C) SYSTEM TO BE COMPLETELY PROVED POST OVERHAULING. (D) CONNECTORISATION DIAGRAM TO BE PROVIDED TO THE SHIP POST COMPLETION OF THE JOB).
NR1- (A) OVERHAUL MOTOR INCLUDING REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN, (B) CHECK FOR ALIGNMENT AND CARRY OUT TRIALS FOR FOUR HOURS. (C) CHECK THE PERFORMANCE OF THE MOTOR AS PER DESIGNED PARAMETERS, RENEW/ REPAIR DEFECTIVE COMPONENTS (D REPLACE BEARINGS. (E) CARRY OUT SPM CHECKS, STARTING AND RUNNING CURRENT. VALUES TO BE WITHIN DESIGNED LIMITS. (F) PROVE SYSTEM POST OVERHAULING/REPAIRS. (G) CARRY OUT LOAD TRIALS.
NR - CARRY OUT COMPLETE OVERHAULING OF MOTOR . CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF MOTOR STATERS. CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR . CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR STATERS. CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR . CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR STATERS. CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR AND STATERS. CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR AND STATERS. CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR AND STATERS. CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR AND STATERS. CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTORS . CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR STATERS. CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR STATERS. CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR. CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR AND STATERS. CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR AND STATERS. CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR AND STATERS. CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR STATERS. CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR . CARRY OUT TEST BED TRIAL FOR 4 HOURS
NR - CARRY OUT COMPLETE OVERHAULING OF PUMP MOTOR STATERS. CARRY OUT TEST BED TRIAL FOR 4 HOURS
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND BEARING. (E) CARRY OUT DYNAMIC BALANCING OF FAN AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH STARTER WITH COMPRESSED AIR. (A) COMPLETE OVERHAULING OF THE STARTER. (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY MECHANISM (C) UNDERTAKE PAINTING OF STARTER (D) ALL THE STARTER CALIBRATIONS ARE TO BE CARRIED OUT AND CERTIFICATES TO BE PROVIDED FOR THE SAME.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND BEARING. (E) CARRY OUT DYNAMIC BALANCING OF FAN AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH STARTER WITH COMPRESSED AIR. (A) COMPLETE OVERHAULING OF THE STARTER. (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY MECHANISM (C) UNDERTAKE PAINTING OF STARTER (D) ALL THE STARTER CALIBRATIONS ARE TO BE CARRIED OUT AND CERTIFICATES TO BE PROVIDED FOR THE SAME.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND BEARING. (E) CARRY OUT DYNAMIC BALANCING OF FAN AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH STARTER WITH COMPRESSED AIR. (A) COMPLETE OVERHAULING OF THE STARTER. (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY MECHANISM (C) UNDERTAKE PAINTING OF STARTER (D) ALL THE STARTER CALIBRATIONS ARE TO BE CARRIED OUT AND CERTIFICATES TO BE PROVIDED FOR THE SAME.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND BEARING. (E) CARRY OUT DYNAMIC BALANCING OF FAN AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH STARTER WITH COMPRESSED AIR. (A) COMPLETE OVERHAULING OF THE STARTER. (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY MECHANISM (C) UNDERTAKE PAINTING OF STARTER (D) ALL THE STARTER CALIBRATIONS ARE TO BE CARRIED OUT AND CERTIFICATES TO BE PROVIDED FOR THE SAME.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND BEARING. (E) CARRY OUT DYNAMIC BALANCING OF FAN AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH STARTER WITH COMPRESSED AIR. (A) COMPLETE OVERHAULING OF THE STARTER. (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY MECHANISM (C) UNDERTAKE PAINTING OF STARTER (D) ALL THE STARTER CALIBRATIONS ARE TO BE CARRIED OUT AND CERTIFICATES TO BE PROVIDED FOR THE SAME.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND BEARING. (E) CARRY OUT DYNAMIC BALANCING OF FAN AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH STARTER WITH COMPRESSED AIR. (A) COMPLETE OVERHAULING OF THE STARTER. (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY MECHANISM (C) UNDERTAKE PAINTING OF STARTER (D) ALL THE STARTER CALIBRATIONS ARE TO BE CARRIED OUT AND CERTIFICATES TO BE PROVIDED FOR THE SAME.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND BEARING. (E) CARRY OUT DYNAMIC BALANCING OF FAN AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH STARTER WITH COMPRESSED AIR. (A) COMPLETE OVERHAULING OF THE STARTER. (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY MECHANISM (C) UNDERTAKE PAINTING OF STARTER (D) ALL THE STARTER CALIBRATIONS ARE TO BE CARRIED OUT AND CERTIFICATES TO BE PROVIDED FOR THE SAME.
SR1- BLOW THROUGH STARTER WITH COMPRESSED AIR. (A) COMPLETE OVERHAUL STARTER, INCLUDING RENEWING PUSH BUTTONS, INDICATION LAMPS, ELMAX CONNECTORS, BCH MAKE 63 AMPS CONTACTOR & 63 AMPS BCH MAKE CONTACTORS, BCH MAKE TIME DELAY RELAY, 415 - 230 V CONTROL TRANSFORMER, CT MOUNTED BCH MAKE OVERLOAD RELAY , 09 NOs. LUGS, 70 AMPS MCB- 02 IN NOS (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY, INTERNAL CONTROL WIRING, and 1 SQ MM COPPER CONDUCTOR, INSULATED). (C) CALIBRATION CERTIFICATE TO BE PROVIDED (E) CONTROL PANEL TO BE PAINTED, ALL SCREWS FOR SECURING TO BE RENEWED. (F) SYSTEM TO BE PROVED POST OVERHAULING / RENEWALS.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND BEARING. (E) CARRY OUT DYNAMIC BALANCING OF FAN AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH STARTER WITH COMPRESSED AIR. (A) COMPLETE OVERHAUL STARTER, INCLUDING RENEWING PUSH BUTTONS, INDICATION LAMPS, ELMAX CONNECTORS, BCH MAKE 63 AMPS CONTACTOR & 63 AMPS BCH MAKE CONTACTORS, BCH MAKE TIME DELAY RELAY, 415 - 230 V CONTROL TRANSFORMER, CT MOUNTED BCH MAKE OVERLOAD RELAY , 09 NOs. LUGS, 70 AMPS MCB- 02 IN NOS (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY, INTERNAL CONTROL WIRING, and 1 SQ MM COPPER CONDUCTOR, INSULATED). (C) CALIBRATION CERTIFICATE TO BE PROVIDED (E) CONTROL PANEL TO BE PAINTED, ALL SCREWS FOR SECURING TO BE RENEWED. (F) SYSTEM TO BE PROVED POST OVERHAULING / RENEWALS.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND BEARING. (E) CARRY OUT DYNAMIC BALANCING OF FAN AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH STARTER WITH COMPRESSED AIR. (A) COMPLETE OVERHAULING OF THE STARTER. (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY MECHANISM (C) UNDERTAKE PAINTING OF STARTER (D) ALL THE STARTER CALIBRATIONS ARE TO BE CARRIED OUT AND CERTIFICATES TO BE PROVIDED FOR THE SAME.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND BEARING. (E) CARRY OUT DYNAMIC BALANCING OF FAN AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH STARTER WITH COMPRESSED AIR. (A) COMPLETE OVERHAULING OF THE STARTER. (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY MECHANISM (C) UNDERTAKE PAINTING OF STARTER (D) ALL THE STARTER CALIBRATIONS ARE TO BE CARRIED OUT AND CERTIFICATES TO BE PROVIDED FOR THE SAME.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND BEARING. (E) CARRY OUT DYNAMIC BALANCING OF FAN AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH STARTER WITH COMPRESSED AIR. (A) COMPLETE OVERHAULING OF THE STARTER. (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY MECHANISM (C) UNDERTAKE PAINTING OF STARTER (D) ALL THE STARTER CALIBRATIONS ARE TO BE CARRIED OUT AND CERTIFICATES TO BE PROVIDED FOR THE SAME.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND BEARING. (E) CARRY OUT DYNAMIC BALANCING OF FAN AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH STARTER WITH COMPRESSED AIR. (A) COMPLETE OVERHAULING OF THE STARTER. (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY MECHANISM (C) UNDERTAKE PAINTING OF STARTER (D) ALL THE STARTER CALIBRATIONS ARE TO BE CARRIED OUT AND CERTIFICATES TO BE PROVIDED FOR THE SAME.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND BEARING. (E) CARRY OUT DYNAMIC BALANCING OF FAN AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH STARTER WITH COMPRESSED AIR. (A) COMPLETE OVERHAULING OF THE STARTER. (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY MECHANISM (C) UNDERTAKE PAINTING OF STARTER (D) ALL THE STARTER CALIBRATIONS ARE TO BE CARRIED OUT AND CERTIFICATES TO BE PROVIDED FOR THE SAME.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND BEARING. (E) CARRY OUT DYNAMIC BALANCING OF FAN AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND BEARING. (E) CARRY OUT DYNAMIC BALANCING OF FAN AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- CARRY OUT INSPECTION AND CLEANING OF COTACTOR PANEL
SR2- CLEAN AND INSPECT ACCESSIBLE COMPONENTS OF NECOL LACQUER. CHECK FOR DETERIORATION OF RUBBER AND INTACTNESS OF THE RUBBER/ METAL BOND. RENEW RUBBER COMPONENTS AT EARLIEST OPPORTUNITY IF DETERIORATED. APPLY NECOL LACQUER TO RUBBER PARTS.
SR3- CLEAN UNSEALED RALAYS USING A CLEAN LINT FREE CLOTH MOISTENED IN SPIRIT. ABRASIVES ARE NOT BE USED.
NR1- CARRY OUT FUNCTIONAL CHECKS, ACOS TO BE PROVED FOR AUTOMATIC CHANGEOVER FROM NORMAL TO ALTERNATE AND VIS-A-VIS IN 0.25 SECONDS. CHECK FOR PROPER FUNCTIONING OF ACOS IN VARIOUS CONFIGURATIONS. THE CHANGE OVER SHOULD BE EFFECTED WITHIN THE DESIGN SPECIFIED TIME LIMITS. TEST THE CHANGE OVER SWITCH BY REDUCING THE NORMAL SUPPLY VOLTAGE BETWEEN 75-80% AND SWITCH SHOULD CHANGE TO ALTERNATE SUPPLY, INCREASE THE SUPPLY BETWEEN 90-95%, THE SWITCH SHOULD REVERT TO NORMAL POSITION
SR1- CARRY OUT INSPECTION AND CLEANING OF COTACTOR PANEL
SR2- CLEAN AND INSPECT ACCESSIBLE COMPONENTS OF NECOL LACQUER. CHECK FOR DETERIORATION OF RUBBER AND INTACTNESS OF THE RUBBER/ METAL BOND. RENEW RUBBER COMPONENTS AT EARLIEST OPPORTUNITY IF DETERIORATED. APPLY NECOL LACQUER TO RUBBER PARTS.
SR3- CLEAN UNSEALED RALAYS USING A CLEAN LINT FREE CLOTH MOISTENED IN SPIRIT. ABRASIVES ARE NOT BE USED.
NR1- CHECK FOR PROPER FUNCTIONING OF HCOS IN VARIOUS CONFIGURATIONS. THE CHANGE OVER SHOULD BE EFFECTED WITHIN THE DESIGN SPECIFIED TIME LIMITS.
SR1- TIGHTEN ALL ELECTRICAL CONNECTION AND FASTENERS.
SR2- EXAMINE LIGHT FITTINGS TO ENSURE COMPLETENESS AND REPLACE MISSING PARTS AND DEFECTIVE LIGHTS.
SR3- CARRY OUT FUNCTIONAL TRIALS.
NR1- LAND SUSPECTED BATTERY FOR CAPACITY TEST.
SR1- CARRY OUT FOLLOWINF:- (A) OVERHAUL OF ALDIS LIGHT. (B) INSPECT SWITCH SOCKET FOR CORROSION AND INGRESS OF WATER. (C) EXAMINE CONTACTS FOR BURNING AND PITTING. (D) CHECK CORRECT OPERATION OF SWITCH MECHANISM.
SR2- EXAMINE FRONT COVER SEALING AND RENEW IF NECESSARY.
NR1- CARRY OUT FOLLOWINF:- (A) CLEAN THE REFLECTOR, FRONT GLASS AND LAMP ENVELOPE WITH A CLEAN SOFT CLOTH. (B) INSPECT THE ALDIS LIGHT INTERNALLY FOR SIGN OF BURNING/ OVER -HEATING OF COMPONENTS.
NR1- (A) CARRY OUT COMPLETE OVERHAULING OF UPS, ISOLATION TRANSFORMERS AND CAPACITY TEST OF BATTERIES (B) PROVE SYSTEM POST OVERHAULING WITH BACK UP CHECK AS PER DESIGN SPECIFICATION.
NR1- (A) DEFECT RECTIFICATION OF THE FOLLOWING OBSERVATIONS AND PROVING OF THE SYSTEM TO INDIAN NAVAL TRIAL TEAM & SHIPS STAFF IN THE PRESENCE OF YARD AS PER DESIGN SPECIFICATIONS AND EED-Q-267: (I) TRANSISENT VOLTAGE DROP AT CABLE END ON APPLICATION OF 800A LOAD. (II) TRANSIENT VOLTAGE DROP AT CABLE END ON APPLICATION OF 1000A LOAD. (III) RECOVERY TIME AT CABLE END ON APPLICATION OF 1000A. (IV) RIPPLE PEAK TO PEAK VOLTAGE. (B) HSR CABLE ASSEMBLY TO BE REPLACED AS PER SPECIFICATIONS (C) UNDERTAKE PROTECTIVE DEVICE CHECKS OF UNDER VOLTAGE AND OVER LOAD (D) CONTROL PANEL INCLUDING REPLACEMENT OF DETERIOTED/ CORRODED BUSBAR, CABLES, LUGS. (E) SERVICEABILITY CHECKS OF PCBs, CAPACITORS, RELAYS, INSTRUMENTION METER REPLACE DEFECTIVE METERS INCLUDING REMOTE CONNECTION BOX.
(F) PAINTING OF MAIN CONTROL AND REMOTE PANEL
(G) REMOVE DUST AND THROUGH CLEANINESS OF ALL BUSBAR AND CONDUCTORS
(H) REPLACE DEFECTIVE PUSH BUTTONS, INDICATION LAMPS, OUT PUT 28VOLT DC CABLE
(J) SECURING OF PANELS WITH HINGES, SCREW AND NUTS TO BE RENEWED. CARRY OUT TRIAL WITH AND WITHOUT LOAD WITH THE SHIP STAFF. CARRYOUT LOAD TESTING. PROVIDE CALIBIRATION AND OVERHAULING CERTIFICATE.
(K) PROVE SYSTEM TO FULL OPERATIONAL CONDITION POST OVERHAULING.
COOKING RANGE/ HOT PLATE/ MAKE - SUSHMA AND SUSHMA CO. NR1- CARRY OUT COMPLETE INSPECTION OF ELECTRICALLY OPERATED RANGES, BOILERS, OVENS, FRYERS, GRILLS FOR PROPER OPERATION.
NR2- OVERHAUL THE EQUIPMENT COMPLETELY,TEST AND RESET ALL SAFETY MECHANISM DO AS MENTIONED BELOW:- (A) 01 IN OFFICER'S GALLEY,10 KW WITH OVEN (i) HOT PLATE-02 NOS (ii) CONTROL PANEL-02 NOS
(B) SAILOR'S GALLEY, 20 KW WITH OVEN (i) HOT PLATE-04 NOS (ii) CONTROL PANEL-04 NOS
(C) CHANGE THE ELEMENT.
(D) RENEW THE INTERNAL WIRING.
(E) CHECK THE ROTARY SWITCHES, CHANGE WITH NEW ONE.
(F) CALIBRATE TEMPERATURE SENSORS AND TEMPERATURE GAUGES IF FITTED.
(G) REPLACE TEMERATURE CUT-OUT OF WATER HEATERS FOR SATISFACTORY OPERATION AND ADJUST AS REQUIRED.
(H) OVERHAULING OF POTATO PEELER, RICE BOILER, WATER BOILER AND WATER BOILER/RICE BOILER CONTROL PANEL IN SHIP'S GALLEY.
(J) OVERHAULING OF FOOD WARMER IN SHIPS GALLEY. (I)REPLACE ALL DEFECTIVE COMPONENTS (ii) REPLACE HEATING ELEMENT AND THERMOSTATE
SR1- OVERHAUL THE PATATO PEELER. CARRY PUT SPM CHECKS AND RECORD READING. LUBRICATE/ REPLACE BEARING AS NECESSARY.
SR1- CHECK OVERLOAD SETTING OF STARTERS. CALIBRATE WITH CURRENT INJECTOR IF REQUIRED.. NR1- CARRY OUT OVERHAULING OF COMPRESSOR.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND IMPELLER BEARING IF REQUIRED. (E) CARRY OUT DYNAMIC BALANCING OF IMPELLER AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND IMPELLER BEARING IF REQUIRED. (E) CARRY OUT DYNAMIC BALANCING OF IMPELLER AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND IMPELLER BEARING IF REQUIRED. (E) CARRY OUT DYNAMIC BALANCING OF IMPELLER AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND IMPELLER BEARING IF REQUIRED. (E) CARRY OUT DYNAMIC BALANCING OF IMPELLER AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND IMPELLER BEARING IF REQUIRED. (E) CARRY OUT DYNAMIC BALANCING OF IMPELLER AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND IMPELLER BEARING IF REQUIRED. (E) CARRY OUT DYNAMIC BALANCING OF IMPELLER AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH MOTOR WITH COMPRESSED AIR. SR2- CARRY OUT SPM CHECKS. NR1- OVERHAUL MOTOR AND CARRY OUT REWINDING, VARNISHING, RENEWING TERMINAL PLATES & COOLING FAN. (A) UNDERTAKE TRIALS INCLUDING SPM CHECKS, RUNNING CURRENT, STARTING CURRENT, ALIGNMENT AND CHECK FOR FOR OPTIMUM PERFORMANCE. PROVE THE MOTOR WITH SPM IN GREEN ZONE (B) CHECK FOR CORROSION/ MATERIAL STATE OF THE MOTOR BODY INCLUDING FOUNDATION, REPAIR IF NECESSARY. (C)REPLACE ALL DEFECTIVE COMPONENTS. (D) REPLACE METALLIC (IRON) IMPELLERS AND IMPELLER BEARING IF REQUIRED. (E) CARRY OUT DYNAMIC BALANCING OF IMPELLER AND PAINTING. NR2- AFTER REPAIR/ OVERHAUL OF MOTORS CHECK THE FOLLOWINGS:- (A) THE IMPELLER IS CORRECTLY FITTED. (B) MOTOR IS CORRECTLY CONNECTED TO MAIN SUPPLY AND FAN IS ROTATING CORRECT DIRECTION.
SR1- BLOW THROUGH STARTER WITH COMPRESSED AIR. (A) COMPLETE OVERHAULING OF THE STARTER. (B) CARRY OUT TRIALS AND CALIBRATE OVERLOAD RELAY MECHANISM (C) UNDERTAKE PAINTING OF STARTER (D) ALL THE STARTER CALIBRATIONS ARE TO BE CARRIED OUT AND CERTIFICATES TO BE PROVIDED FOR THE SAME.
ELECTRICAL - PART II
SPM OF G2 DA AT 'DRIVEN END' IN YELLOW ZONE.BEARING REPLACEMENT MAY BE REQUIRED AS FEASIBILITY FOR GREASING NA.
STARTER PANEL CONTACTOR AND SAFETY CUT OUT DAMAGED AND SAME TO BE REPLACED. (A) COMPLETE OVERHAULING OF STARTER PANEL. (B) REPLACEMENT OF LIMIT SWITCH. (C) CARRY OUT PERFORMANCE CHECKS IN THE PRESENCE OF SHIP STAFF AND PROVE SYSTEM (D) PROVIDE CALIBRATION CERTIFIICATE
DEFECTIVE HELO DECK TO BE LIGHT REPLACED IN VIEW PERISHED. (A) COMPLETE RENEWAL OF DECK ANGLE LIGHT INCLUDING (QTY-06), DECK BAR LIGHT (QTY-12) ,STOP BOW LIGHT (QTY-02) AND COMPLETE WIRING, INVOLVES FITMENT OF NEW BASE OF DECK ANGLE LIGHT. (B) COMPLETE RENEWAL OF HORIZONTAL LIGHT INCLUDING COMPLETE WIRING, FITMENT OF NEW BASE WITH CHANNEL TRAY. (C) PROVE SYSTEM POST RENEWAL
(A) MOVING ROLLER AND WIPER OF WINDOW WIPER DAMAGE NEED TO BE REPLACE THE WIPER AND ROLLER OF ALL WINDOW WIPER.
(A) OVERHAULING OF DB INCLUDING CLEANING OF BUS BAR. (B) SAFETY PLATE TO BE PLACED INSIDE DBs FOR SAFETY. (C) RENEW OF INDICATION LAMP WITH RED, YELLOW AND BLUE COLOURS.
A) DEFECTIVE MAGAZINE LIGHT, PAINT STORE, BOSUN STORE F ITTINGS TO BE RENEWED WITH SHOCK MOUNT. (B) RENEW OF COMPLETE WIRING.
50 IN NO DEFECTIVE BUNK LIGHTS TO BE REPLACED.
LED LIGHTS FITTING SHOCK MOUNT DAMAGE AT VARIOUS PLACES NEED TO BE RENEWED ALL SHOCK MOUNT.
30 IN NOS ALUMINIUM BASE WEATHER DECK LIGHT DEFECTIVE AND SAME TO BE REPLACED WITH TRANSPARENT GLASS COVER
(A) 15 REFLECTORS NOT WORKING PROPERLY. (B) REPLACE OF ALL EXISTING REFLECTORS WITH LED 100W LED BASED REFLECTORS. (C) FITMENT OF BASE PLATES INVOLVES WELDING AND CUTTING.
ALDIS LIGHT 24 V DC SWITCH SOCKE AND CABLE PERISHET AT BRIDGE TOP, PORT BRIDGE WING AND STBD BRIDGE WING. RENEW OF 03 24V DC SWITCH SOCKET AND CABLING 100 MTRS 2 CORE DC CABLE.
CABLE SECURING AT VARIOUS PLACES DAMAGED. SECURING OF CABLES INCLUDING PROPER COMBING, SECURING USING SS TIE ROPE FOR 300 MTRS CABLE SECURING TO BE DONE AT VARIOUS PLACES.
70 NO CABLE GLAND TO BE SEALED WITH SILICON GEL FOR WATER TIGHT.
GALLEY INDICATION LAMP SYSTEM NOT WORKING OUTSIDE SHIPS GALLEY, OFFICERS GALLEY AND DCHQ. ALL THREE INDICATION BOARDS TO BE REPLACED WITH MODULAR INDICATION SYSTEM AS PER SOTR (IHQ MOD(N) LETTER EE/03/8926 DATED 03 MAY 11).
LAUNDRY INDICATION LAMP SYSTEM NOT WORKING OUTSIDE SHIPS LAUNDRY AND DCHQ. ALL TWO INDICATION BOARDS TO BE REPLACED WITH MODULAR INDICATION SYSTEM AS PER FOST LAUNDRY SAFETY ACQUAINT SAQ/L-01/14 DATED 05 MAY 14
BOTH GALLEY INDICATION PANEL CABLE SHOWING LOW INSULATION NEED TO REWIRING OF GALLEY INDICATION PANEL FROM DCHQ TO OFFICER'S GALLEY AND DCHQ TO SAILOR'S GALLEY.
BILGE LIGHT DETERIORATED AT MACHINERY PLACES . 20 BILGE LIGHT TO BE RENEWED. WORK INVOLVE WELDING, CUTTING AND FITEMENT.
LAUNDARY INDICATION PANEL CABLE SHOWING LOW INSULATION NEED TO REWRING OF LAUNDARY INDICATION PANEL FROM DCHQ TO LAUNDARY
(A) OVERHAULING OF HEVY DUTY WASHING MACHINE. (B) OVERAUL THE MOTOR INCLUDING REWINDING, VARNISHING, PAINTING, FITMENT & ALIGNMENT AND CONTROL PANEL. CARRY OUT TRIALS FOR FOUR HOURS AND CHECK FOR OPTIMUM PERFORMANCE. CARRY OUT EARTHING. CHECK INSULATION RESISTANCE, IT SHOULD NOT BE LESS THAN 5 MEGA OHMS. (C) AIR HEATER TUBES & THERMOSTATS TO BE RENEWED. (E) PROVE SYSTEM POST OVERHAUL.
(A) COMPLETE OVERHAULING OF CONTROL PANEL AND REMOTE PANEL INCLUDING PAINTING. (B) REPLACE 10 DEFECTIVE FUSES, 05 CONTACTORS, AND CONNECTORS (C) REPLACEMENT OF 02 EACH LIMIT SWITCH IN BOTH THE MER AND AER REMOTE PANEL. (D) REPLACEMENT OF 02 AUDIO AND VISUAL ALARM IN BOTH THE MER AND AER. (E) CARRY OUT PERFORMANCE CHECKS IN THE PRESENCE OF SHIP STAFF AND PROVE SYSTEM.
(A) SERVICEABILITY CHECKS AND OVERHAULING OF MARINE AC COMPRESSOR AND FAN MOTOR. (B) SERVICEABILITY CHECKS OF MARINE AC STARTER PANEL.
ACCOMODATION LADDER STARTER CABLE SHOWING LOW INSULATION NEED TO REWIRING FROM WORDROOM LOBBY TO PORT & STBD CATWALK
FWD AND AFT ANCHOR LIGHT CABLE SHOWING LOW INSULATION NEED TO REWRING FROM NAVIGATIONAL LIGHT PANEL TO FOXEL AND Q.DECK.
REPLACEMENT OF MAST OBSTRUCTION LIGHT IN VIEW OF PERISHED
TR-2400 CABLE CONNECTORS BROKEN, TO BE REPLACED.
PAE M7 POWER INDICATION BULB NOT GLOWING, TO BE REPLACED.
DMR 16A CABLE CONNECTORS BROKEN, CONNECTORISATION AND IDENTIFICATION TALLIES TO BE MADE.
LRAD AUX CABLE CONNECTOR DEFECTIVE, TO BE REPAIRED.
UPS NOT HOLDING BACKUP SUPPLY, SERVICIABILITY CHECKS OF UPS AND BATTERIES ( QTY 20).
BOX COVER FOR TELEPHONE AT VARIOUS LOCATIONS ON UPPER DECK BROKEN,TO BE REPLACED.
(A)DISPLAY CONTROL BOARD MALFUNCTIONING. REPAIR/REPLACEMENT OF DISPLAY CONTROL BOARD. (B) SWITCHING “ON” KNOB NOT WORKING. REPAIR/ REPLACEMENT OF THE SAME. (C) BACK UP OF UPS TO REDUCE TO 20 MIN. RA REPAIR/ REPLACEMENT OF THE SAME.
OVERHAULING ,SERVICIABILITY AND FUNCTIONALITY CHECKS OF ALL 42 CCTV CAMERAS, 06 PTZ CAMERAS AND 03 FIXED CAMERAS DEFECTIVE. REPLACE ALL DEFECTIVE COMPONENTS.
BRIGHTNESS CONTROL AND SWITCHING "ON" PUSH BUTTON NOT WORKING REPLACE/REPAIR PUSH BUTTONS AND OVERHAULING, SERVICEABILITY CHECKS OF SOG/COG REPEATERS THROUGH OEM AND REPLACE THE DEFECTIVE MODULES AND CHECK FOR OPTIMUM PERFORMANCE.
OVERHAULING, SERVICEABILITY CHECKS OF NMEA BUFFER THROUGH OEM AND REPLACE THE DEFECTIVE MODULES AND CHECK FOR OPTIMUM PERFORMANCE.
(A) MAGAZINE /ARMOURY ALARM PANEL IN DCHQ NOT WORJKING. (B) CONTROL PCB AMD MAGAZINE HATCH DEFECTIVE SENSOR TO BE REPLACED.
POOR RECEPTION OBSERVED IN THE SYSTEM. R/A FOR OVERHAULING, SERVICEABILITY CHECKS OF RECEIVER AND ANTENNA ASSEMBLY THROUGH OEM AND REPLACE THE DEFECTIVE MODULES AND CHECK FOR OPTIMUM PERFORMANCE.
POOR RECEPTION OBSERVED IN THE SYSTEM. R/A FOR OVERHAULING, SERVICEABILITY CHECKS OF RECEIVER AND ANTENNA ASSEMBLY THROUGH OEM AND REPLACE THE DEFECTIVE MODULES AND CHECK FOR OPTIMUM PERFORMANCE.
(A) SERVICEABILITY CHECKS OF OF 5 RPM METER, 5AMPS METER, 5 VOLT METERS, 02 DRIVE INDICATOR. (B) REPLACE IF DEFECTIVE.
(A) SERVICEABILITY CHECKS OF OF 5 RPM METER, 5AMPS METER, 5 VOLT METERS, 02 DRIVE INDICATOR. (B) REPLACE IF DEFECTIVE.
WSDS SYSTEM SHOWING ERRATIC READING INTERMITTENTLY. SUSPECTED SENSOR IS MALFUNCTIONING. OVERHAULING / CALIBRATION OF SENSOR TO BE CARRIED OUT THROUGH OEM.CALIBRATION CERTIFICATE TO BE PROVIDED FROM OEM.
ELECTRICAL - PART III
REMOVAL OF OLD AIR CIRCUIT BREAKER 1000A ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW AIR CIRCUIT BREAKER 1000A AS ABER CAT-II REPLACEMENT. (BPs APPROVED VIDE HQSNC/ CLO LETTER EE/3090/93(I) DATED 26 NOV 21.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD SWITCH BOARD BREAKER & MCCBS ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW SWITCH BOARD BREAKER & MCCBS AS ABER CAT-II REPLACEMENT. (BPs FORWARDED TO HQSNC/CLO FOR APPROVAL VIDE INS SAGARDHWANI LETTER 309/1 DATED 30 OCT 21.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD TRANSRECTIFIER ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW TRANSRECTIFIER AS ABER CAT-II REPLACEMENT. (BPs APPROVED VIDE HQSNC/ CLO LETTER EE/3090/93 DATED 05 JAN 22.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD GALLEY AND MACHINERY VENTILATION ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW GALLEY AND MACHINERY VENTILATION AS ABER CAT-I REPLACEMENT. (ABER APPROVED VIDE HQSNC CLOEE/1320/05/ ABER DT. 25 JUN 18.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD AUTO CHANGE OVER SWITCH (ACOS) ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW AUTO CHANGE OVER SWITCH AS ABER CAT-I REPLACEMENT. (BPs APPROVED VIDE HQSNC/ CLO LETTER EE/3090/93(i) DATED 17 JUN 22.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD BATTERY CHARGING RECTIFIER ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW BATTERY CHARGING RECTIFIER AS ABER CAT-II REPLACEMENT. (BPs APPROVED VIDE HQSNC/ CLO LETTER EE/3090/93 DATED 04 JAN 22.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD UPS 30 KVA ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW UPS 30 KVA AS ABER CAT-II REPLACEMENT. (BPs APPROVED VIDE HQSNC/ CLO LETTER EE/3090/93 DATED 05 JAN 22.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD DA RECTIFIER ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW DA RECTIFIER AS ABER CAT-I REPLACEMENT. (BPs APPROVED VIDE HQSNC/ CLO LETTER EE/3090/93 DATED 17 JUN 22.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD GALLEY EQUIPMENTS ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW GALLEY EQUIPMENTS AS ABER CAT-II REPLACEMENT. (ABER APPROVED VIDE HQSNC CLOEE/1320/05/ ABER DT. 25 JUN 18.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD AFDS ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW AFDS AS ABER CAT-II REPLACEMENT. (BPs APPROVED VIDE HQSNC/ CLO LETTER EE/3090/93 DATED 30 JAN 19.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD FLOOD ALARM SYSTEM ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW FLOOD ALARM SYSTEM AS ABER CAT-II REPLACEMENT. (BPs APPROVED VIDE HQSNC/CLO LETTER EE/3090/93 DATED 03 DEC 20.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD INMARSAT 'C' ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW INMARSAT 'C',AS ABER CAT-II REPLACEMENT. (BPs APPROVED VIDE HQSNC/CLO LETTER EE/3090 DATED 16 FEB 21.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD MAIN BROADCAST ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW MAIN BROADCAST AS ABER CAT-II REPLACEMENT. (BPs APPROVED VIDE HQSNC/CLO LETTER EE/3090 DATED 16 FEB 21.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD SURVEY AND MACHINERY INTERCOM ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW SURVEY AND MACHINERY INTERCOM AS ABER CAT-II REPLACEMENT. (BPS APPROVED VIDE HQSNC/ CLO LETTER EE/3090/93 DATED 28 JAN 22.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD CONNING INTERCOM AND LOUDHAILER ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW CONNING INTERCOM AND LOUDHAILER AS ABER CAT-II REPLACEMENT. (BPs APPROVED VIDE HQSNC/ CLO LETTER EE/3090/93 DATED 28 JAN 22.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD TELEPHONE EXCHANGE ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW TELEPHONE EXCHANGE AS ABER CAT-II REPLACEMENT. (BPs APPROVED VIDE HQSNC/ CLO LETTER EE/3090/93 (II) DATED 05 JAN 22.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF OLD ECHO SOUNDER ALONG WITH ITS ASSOCIATED SYSTEMS. INSTALLATION AND COMMISSIONING OF NEW ECHO SOUNDER V3 AS ABER CAT-II REPLACEMENT. (BPs APPROVED VIDE HQSNC/CLO LETTER EE/3090/93 DATED 05 JAN 22.) MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
REMOVAL OF PAE M7 INCLUDING ANTENNA AND RCU, INSTALLATION AND COMMISIONING OF SDR TAC 1A & 1C SYSTEM AS PER APPROVED BPS (ABER APPROVED VIDE HQSNC LETTER EE/3090/93 DATED 04 JUL 18. MAIN EQUIPMENT BOM TO BE SUPPLIED BY IN AND INSTALLATION MATERIAL TO BE SUPPLIED BY SHIPYARD. INSTALLATION, STW, COMMISSIONING AND TRIALS UNDER OEM SUPERVISION TO BE CATERED BY THE SHIPYARD
NPOL PACKAGE
THE WORK INVOLVES REMOVAL OF BARNACLE/SEA GROWTH PARTICLES WITH SUITABLE WOODEN MATERIAL FROM ALL UNDER WATER SENSORS/ACOUSTIC WINDOWS (MULTIBEAM ECHO SOUNDER, SUB BOTTOM PROFILER, ADCP, DUAL FREQUENCY ECHO SOUNDER, SBES, UCS). AFTER CLEANING SENSOR HEADS SHOULD BE COVERED WITH WOODEN BRACKETS TO PROTECT.
REMOVAL & REFITMENT OF POLY CARBONATE WINDOW OF SBP,CLEANING OF UNDERWATER CHAMBER, REPLACEMENT WITH NEW GASKETS (03 GASKET OF SIZE 900 X 535MM). REMOVAL OF EXISTING ANODE.
PROVISIONING AND FITMENT OF 06 NO OF ANTENNA (GA830) OF DGPS MODEL NO TRIMBLE MPS865.
OVERHAULING/REPAIR OF MARINE AC UNITS (2 TON) IN NPOL SCIENTIFIC LABS (GEOPHYSICAL LAB, PHYSICAL LAB & MET LAB. THE WORK INVOLVES REPLACEMENT OF LEAKY AND CORRODED SEA WATER PIPE LINES WITH SUITABLE HEAT RESISTANT METAL PIPE, REPLACEMENT OF DAMAGED WATER INLET/OUTLET PIPES ON EQUIPMENT SIDE, REPLACEMENT OF GASKETS AND AIR/ WATER FILTERS & PAINT TOUCH UP ON RUSTED AREAS. (PIPE MAT CU-NI OF DIA1 INCH, LENGTH 30 MTR & 10 IN NOS WATER INTERCONNECTION PIPE)
REMOVAL OF EXISTING SEWAGE PIPE WHICH IS ROUTED THROUGH GEO PHYSICAL LAB RE-FITMENT WITH 6INCH DIAMETER GI PIPE OF LENGTH 10 MTR FOR SEWAGE LINE THAT CONNECTING GALLEY AND DOUBLE OFFICER CABIN TO SEWAGE TREATMENT PLANT. THIS INVOLVE MODIFICATION OF FLANGES ON ENTIRE LINE, REPLACEMENT OF GASKETS, NUT BOLTS PAINTING ON THE NEW ARRANGEMENT WITH MARINE GRADE PAINT WITH SHIPS COLOUR SCHEME.
REMOVAL OF EXISTING SIDE SCAN SONAR WINCH FROM QUARTER DECK. THE WORK INVOLVES REMOVAL OF EXISTING SIDE SCAN SONAR WINCH, CUTTING OF UNWANTED METAL STRUCTURES, CLOSING OF DECK PLATE WITH STEEL IF REQUIRED, PAINTING WITH MARINE GRADE PAINT ON THE DECK PLATE AFTER REMOVAL OF THE WINCH, CLOSING THE AREA WITH TEAK WOOD BLOCKS MATCHING THE SAME QUARTER DECK HEIGHT. SHIFTING AND UNLOADING OF SSS WINCH TO NPOL,THRIKKAKARA CAMPUS.
PROVISION OF A NEW METAL CUPBOARD AT QUARTER DECK FOR KEEPING NPOL MOORING ACCESSORIES. THE WORK INVOLVES FABRICATION OF NEW 3 X 2 X 4FT (LWH) HEAVY CUPBOARD WITH METAL PARTITION AND LOCKING MECHANISM, WELDING OF BRACKETS AT QUARTER DECK & PAINTING OF CUPBOARD WITH MARINE GRADE PAINT INCLUDING NAME PLATE
INSTALLATION OF 38 KHZ TRANSDUCER AND 200 KHZ TRANSDUCER FOR EXISTING EA 440 ECHO SOUNDER. REMOVAL OF EXISTING 38/200 KHZ EA440 DUAL FREQUENCY SINGLE BEAM ECHO SOUNDER TRANSDUCER FROM HULL AND REPLACEMENT WITH NEW ONE. THE WORK INVOLVES REMOVAL OF OLD 38 KHZ AND 200 KHZ TRANSDUCERS WITH CABLES SEPARATELY, FITMENT OF NEW TRANSDUCERS ALONG WITH CABLE TILL TRANS RECEIVER END & CONNECTIVITY UPTO GEO LAB. CABLE TERMINATION JOBS ON BOTH TRANSDUCERS 38 KHZ AND 200 KHZ AND MINOR FABRICATION WORKS' ON TRANS-RECEIVER BOX. (2X2 CORE - 50MTR CABLE) CONDUCTING SATS OF THE ECHO SOUNDER. OEM SUPPORT WILL BE ARRANGED BY NPOL. (TRANSDUCERS WILL BE SUPPLIED BY NPOL)
REMOVAL OF MBES INSPECTION WINDOWS AND CLEANING OF THE TRANSDUCER CHAMBER. THE WORK INVOLVES REMOVAL OF SOUND VELOCITY PROFILER MOUNTING PLATE AND INSPECTION WINDOW, CLEANING OF THE SVP SENSOR FOR ANY SEA GROWTH, CLEANING OF THE CHAMBER AND PAINTING ON THE SVP PLATE WITH ANTI-FOULING PAINT.
ONE TO ONE REPLACEMENT OF FAULTY WATER SAMPLER STORAGE UNIT (DEEP FREEZER) IN CHEMICAL LAB. THE WORK INVOLVES PROVISIONING AND FITMENT OF NEW DEEP FREEZER MATCHING WITH THE EXACT SIZE OF EXISTING MOUNTING BRACKETS.
UPGRADATION OF 03 NOS OF PTZ CCTV CAMERAS WITH 5 MEGA PIXEL IP67 RATED PTZ CAMERAS FIXED AT FOXEL,BALLOON DECK & QUARTER DECK. THE WORK INVOLVES INSTALLATION OF 03NOS OF CCTV CAMERAS, REROUTING OF ITS DATA & POWER CABLES,INSTALLATION OF SOFTWARE ONBOARD COMPUTER, REPLACEMENT OF FAULTY 05 NOS OF 32 INCH FULL HD MONITOR FIXED IN VARIOUS SCIENTIFIC LAB, OPERATIONAL CHECK AND REPLACEMENT OFDVR UNIT (IN CS CABIN) WITH 3 MONTH DATA STORAGE.
FABRICATION OF A METALLIC/FRP COVERS FOR THE CTD TENSION DISPLAY UNIT TO PROTECT IT FROM RAIN.{250(L) X 250 (W) X 250(H) 2 SIDE OPENABLE. ALL DIMENTIONS ARE IN MM.}HE WORK INVOLVES FABRICATION AND FITMENT OF THE ABOVE STRUCTURE ON THE EXISTING CTD TENSION DISPLAY STAND WITH TRANSPARENT WINDOW.
PERMANENT ROUTING OF DATA CABLE'S FROM TENSION DISPLAY UNIT TO A-FRAME PULLEY.
PROVISION OF 2 NOS IP 67 RATED 230V /5A POWER SOCKETS NEAR TO TENSION DISPLAY UNIT.(15 MTR DATA CABLE)
REPAIR AND OVERHAUL OF CTD WINCH SYSTEM INCLUDING ELECTRICAL AND HYDRAULIC MOTORS. THE WORK INVOLVES:
PROVISIONING AND ONE TO ONE REPLACEMENT OF 4000M ELECTROMECHANICAL CABLE.(CABLE SPECIFICATION CONDUCTOR 14AWG. ARMOR GALV HS STEEL. ARMOR INNER. THICKNESS >5MM. ARMOR ORDER. THICKNESS >8MM. OVER ALL DIMENSTION 8MM, BREAKING STRENGTH 55.2N BEND DIAMETER 43 CM ELONGATION. 29 MM/KN VOLTAGR RATING 1800V INSULATION RESISTENCE @500V DC 15000MS. DC RESISTENCE CABLE 9.2 OHM/KM ARMOUR RESISTANCE 7.2 OHM/ KM CAPACITANCE 154PF/M VELOCITY OF PROPAGATION @ 1MHZ 67%) UNWINDING AND GREASING OF EXISTING ELECTROMECHANICAL WIRE ROPE AND WINDING OF THE REMOVED WIRE ON A SEPARATE DRUM
PROVISIONING AND FITMENT OF 03 NOS OF CTD CONNECTOR CABLE WITH ELECTRO MECHANICAL WINCH ROPE. THE SPLICING SHOULD ABLE TO WITHSTAND 4000M WATER DEPTH PRESSURE.
PROVISIONING OF SLIP RING UNIT OF THE WINCH . CHECKING THE INSULATION RESISTANCE OF HYDRAULIC MOTOR, CHANGING OF HYDRAULIC OIL AND CHANGING OF OIL FILTERS, GREASING OF THE MOVING PARTS.(RING - 5AA CONTINUOUS, EACH RING VOLTAGE 600V, ELECTRICAL NOISE <5UV, COIN SILVER RINGS- SILVER GRAPHITE CONDTACTS - BALL BEARINGS STAINLESS STEEL ENCASEMENT PARTS CONDENSATION SHIELDS SHAFT-FACE SEAL)
INSPECTION AND GREASING OF PULLEY FOR ANY DEFECT AND APPLICATION OF GREASE FOR LUBRICATION.
REPLACEMENT OF BREAKING PADS
PROVISION OF RAIN PROTECTIVE COVER FOR THE TOTAL WINCH SYSTEM.3800(L) X 3500(W)X 3000 (H) FOR RAIN PROTECTIVE COVER ALL DIMENTIONS' ARE IN MM
PROVISIONING AND FITMENT OF EVERGRIP WITH A LOAD CAPACITY OF 2T WITH CONNECTOR AND ELECTROTECHNICAL CABLE AND CTD CONNECTOR.
CONDUCTING LOAD TEST ON THE ELECROMECHANICAL CABLE ALONG WITH EVERGRIP.
CALIBRATION OF TENSION DISPLAY FOR LOAD AND PAYOUT.
PROVISIONING AND FITMENT OF A FRESH WATER PUMPING MECHANISM ON THE BASEMENT OF ONLINE CTD WINCH SYSTEM TO CLEAN THE WIRE ROPE WHILE RETRIEVAL OF WINCH.THE PUMPING MECHANISM WORK INVOLVES ROUTING OF FRESH WATER LINE TOWARDS WINCH AREA, FABRICATION AND FITMENT OF PUMP MOTOR AND ITS FRAME, ROUTING OF FRESHWATER LINES FOR THE MOTOR, ROUTING OF METAL TUBES AND 2 ADJUSTABLE NOZZLE ON BOTH SIDE OF ELECTROTECHNICAL CABLE NEAR THE CABLE SPOOLING SYSTEM.
REPLACEMENT OF ALL LIMIT SWITCHES(SPECIFICATION IP-67, 02 NOS BC 9 "T" LIMIT SWITCH, 1 NO -1 NC, 415 V 50 HZ - 1.5 A. IP-67, 2 NOS OMRON D4C-1632, 2A-250 VOLT)
RECTIFICATION OF SPOOLING MECHANISM.
PROVISIONING AND FITMENT OF 4 INPUT 12 OUTPUT SERIAL DATA BUFFER UNITS IN SCIENTIFIC LABS.
PROVISIONING AND ROUTING OF 2 SETS OF SHIELDED CAT6 CABLES FOR NEW SCIENTIFIC EQUIPMENT FROM GEO PHYSICAL LAB TO OTHER SCIENTIFIC LABS (MET, COMPUTER, CHEMICAL, PHYSICAL,WET LAB PORT & STBD) INCLUDING CHIEF SCIENTIST CABIN. THE WORK INVOLVES PROVISIONING AND ROUTING OF NEW SHIELDED CAT 6 CABLES, CONFIGURATION OF EXISTING 05 NOS OF CISCO SWITCHES IN LABS TO A COMMON IP ADDRESS PROVIDED BY NPOL, SUPPLY OF 3 MTR & 5 MTR CAT 6 STRAIGHT AND CROSS CABLE ASSEMBLY (10 EACH).
PAINT TOUCH UP ON EXISTING SBES RACK ASSEMBLY, PLACED AT GEOPHYSICAL LAB, WITH PRESENT COLOUR SCHEME. 600 (L) X 630 (W) X 1750 (H) ALL DIMENSIONS ARE IN MM
PROVISIONING OF D SHACKLES, CAVELR ROPES, CABLE TIES (CV-50 TO CV-300), BUBBLE WRAPS,WD-40, GREASE PUMP, SILICON SEALANT, INSULATION TAPES, COTTON WASTE ETC. ARE REQUIRED DURING NR TO SECURE THE ONBOARD SCIENTIFIC EQUIPMENT'S. 15*15 METER 05 NOS TARPAULINS (I) 10 MM SS D SHACKLE-10
(II) 8 MM SS D SHACKLE-20
(III) 6 MM SS D SHACKLE-10
(IV) 19MM BOW SHACKLE-04
(V) 25.4 MM BOW SHACKLE-04
(VI) CV -50 TO CV -300 (200 NOS EACH)
(VII)WD-40 - 300ML X 24 NOS
(VIII) SILICON SEALANT - 05 NOS
(IX) INSULATION TAPE - 3 DOZEN
(X) COTTEN WASTE - 20 KG
(XI) 05 TARPAULIN 15X15 FEET, 200 GSM
(XII) CAVLER ROPES
(XIII) BUBBLE WRAP
(XIV) GREASE PUMP)
PROVISIONING AND FIXING OF A HEAVY-DUTY TEAK WOOD WORK TABLE ( 4 FT X 2 FT) IN PORT WET LAB.
PROVISIONING AND FIXING OF CUSHIONED CHAIRS (METALLIC FRAME WITH ARMREST) IN WET LABS. (35"H X 26" WX 23"L). STEEL BASE WITH OUT WHEEL
FLOOR RENEWAL, FLOOR PAINTING, POLISHING OF UNDERLAY, CABLE TRAY PAINTING, IN GEOPHYSICAL, PHYSICAL OCEANOGRAPHY, CHEMICAL OCEANOGRAPHY, MET LAB AND COMPUTER LAB.
DRAIN WATER RETURN OBSERVED IN LADY SCIENTIST CABIN. CHECK AND REPLACE THE NON-RETURN VALVE IF DAMAGED.
PAINTING OF CABIN BUNKS AND CUPBOARD. THE WORK INVOLVES REMOVAL OF 12 BUNKS AND 09 CUPBOARDS FROM SCIENTIFIC CABINS/LABS AND SPRAY PAINTING ON THE SAID ITEMS WITH EXISTING COLOUR SCHEME. . PRIOR TO FLOOR PAINTING, ENTIRE CABIN WALL SHOULD BE PAINTED WITH WHITE COLOUR PAINT SCHEME.IN SCIENTIST CABINS. PRIOR TO FLOOR PAINTING, ENTIRE CABIN WALL SHOULD BE PAINTED WITH WHITE COLOUR PAINT SCHEME.WALL & CEILING PAINTING IN ALL LAB & CABINS WITH EXISTING PAINT SCHEME. (WALL PAINTING AREA: SCIENTIST CABIN -1: 32 SQ MTR, SC-2 : 32 SQ MTR, LS CABIN : 37 SQ MTR , JR SC -2: 37 SQ MTR, JR SC -4 : 28 SQMTR , PO :46 SQMTR, GEO: 60 SQ MTR , CO45 SQ MTR, MET LAB : 39 SQ MTR, COMPUTER : 50 SQ MTR , STBD WET LAB : 70 SQ MM)
SUPPLY AND FITMENT OF 12 NOS OF BED CURTAINS IN SCIENTIST CABINS
PAINTING OF WORK TABLE AND ITS DRAWERS. THE WORK INVOLVES REMOVAL OF DAMAGED MICA AND BEADINGS FROM WORK TABLE, PUTTING OF NEW MICA AND BEADING WITH SAME COLOUR SCHEME, REMOVAL OF TABLE LOCKERS FOR SPRAY PAINTING, FITMENT AFTER SAID WORK AND CHANGING OF DAMAGED LOCK AND KEYS. QTY+ 06 NOS X 13 MTR (L) *1MTR (H)*1.3 MTR (W)
REPAIRS / REPLACEMENT OF FAULTY INSTRUMENTS TABLES / DRAWERS IN THE 05 SCIENTIFIC LABS. SUPPLY OF 02 NOS OF SOFA SETS WITH CENTRE TABLE IN THE COMPUTER LAB FOR THE USE DURING MISSION PRESENTATIONS. (DRAWERS -10 NOS, LOCKER KEY SETS- 20 NOS )
LEAKAGE RECTIFICATION OF WASH BASIN OF VARIOUS SCIENTIFIC CABINS. BOTTLE TRAP TO BE CHECKED AND REPLACED.
RENEWAL AND FITMENT OF 03 NOS OF FULL HD 32 INCH CCTV DATA DISPLAY UNITS IN SCIENTIFIC CABIN 1, 2 AND LADY SCIENTIST CABIN
WORK TO BE UNDERTAKEN IN 05 CABINS:- ROUTING OF TELEPHONE LINE IN SCIENTIST CABINS AND FITMENT OF TELEPHONE THEREAFTER. THE WORK INVOLVES ROUTING OF CABLES,FITMENT OF TELEPHONE FRAME AND FITMENT OF NEW 02 NOS OF PLUG POINTS IN CABIN.TELEPHONE LINE LENGTH 50 MTR
REPLACEMENT OF EXISTING 230V POWER SOCKETS WITH NEW ONE
PROVISION & FITMENT OF 10 NOS OF CALLER ID TELEPHONES.
PROVISION AND FITMENT OF BUNK CLIMBING SUPPORT BRACKET (STAINLESS STEEL LADDER) FO NPOL CABINS. THE WORK INVOLVES FABRICATION OF NEW LADDER, PAINTING, & REMOVAL OF UNWANTED METAL PROJECTIONS ON THE TOP OF THE BUNK.
PROVISIONING OF METAL HANDLE SUPPORT ON THE WALL TOP FOR CLIMBING
REPLACEMENT OF MIRRORS IN ALL CABINS
FLOOR PAINTING IN THE 05 SCIENTIST CABINS WITH EXISTING PAINT SCHEME. THE WORK INVOLVES REMOVAL OF EXISTING VINYL FLOORING IN 05 CABINS, PAINTING OF FLOOR AREA, PROVISIONING AND PUTTING OF VINYL FLOORING IN CABINS, REPLACEMENT OF WALL PAPER IN JUNIOR SCIENTIST CABINS, CORRIDOR PAINTING OF SCIENTIFIC CABINS AND POLISHING OF 11 FRONT DOORS.
WORK TO BE UNDERTAKEN IN 05 CABINS:- REPAIR OF DOOR/ALMIRAH LOCKS AND HINGES, DB COVERS AND MINOR REPAIRS IN THE TABLES IN SCIENTIFIC LABS AND CABINS. THE WORK INVOLVES REPLACEMENT OF BROKEN DOOR HOOKS AND LOCKS, FITMENT OF DOOR STOPPERS AND REPLACEMENT OF FAULTY LOCKS IN THE CUPBOARDS, REPAIRING WORK ON DOOR STOPPERS, PROVISION OF NEW DOOR STOPPER IN JR SCIENTIST CABIN ETC. MAIN DOOR LOCK -05NOS, DOOR HOOK - 04 NOS. DOOR STOPPER HYDRAULIC -03
REPLACEMENT OF 55-INCH CCTV MONITORING DISPLAY
RENEWAL AND FITMENT OF OF 5.1 SOUND BAR SYSTEM
FLOOR UNDULATION REPAIR, PUTTING OF VINYL FLOORING AND DISPLAY PANEL MODIFICATION ACCORDING TO NEW DISPLAY UNIT.
PROVISION OF SAFETY GUARD IN CABIN BED
MICA CHANGES IN CABIN FURNISHING
REPLACEMENT OF WALL PANELLING
REPLACEMENT OF MATTRESS OF SIZE 180CMX 64CM X 100XM
CLOSURE OF GAP BETWEEN BOTH JR SCIENTIST CABIN LOCATED ABOVE THE PARTITION WALL.(APPROXIMATE SIZE 10X2 FEET) THE WORK INVOLVES THE FIXING OF METALLIC PLATE AND APPLICATION OF PAINT
PROVISION PRINTED BRONZE NAME PLATES FOR ALL SCIENTIFIC EQUIPMENT'S(NAME WILL BE PROVIDED BY NPOL) DIMENSION 300MM (L) X 50MM(H) X 4(THICKNESS)
PROVISION OF 02 NO, 230 V, SOCKET FOR WALL MOUNTED FANS
INSTALLATION OF REPEATER UNIT FOR ECHO SOUNDER ALONG WITH IP RATED EXTENDED DISPLAY ON QUARTER DECK. THE JOB INVOLVES LAYING OF POWER AND 80M HDMI CABLE FROM GEO LAB TO QUARTER DECK. REPEATER UNIT WILL BE SUPPLIED BY NPOL. POWER AND DATA CABLE TO BE PROVISIONED BY SHIPYARD (SPECIFICATION 1.5 SQM X 3 CORE 80M)
PROVISION AND INSTALLATION OF IP BASED PUBLIC ADDRESSING SYSTEM FOR 75METER. THE TRANSRECEIVER UNIT NEEDS BE INSTALLED IN WEATHER PROOF ENCLOSER FOR PROTECTION. THE SYSTEM HAS TO BE INSTALLED BETWEEN PO LAB AND WINCH OPERATING STATION. PROVISION OF 75METER CAT 5/6 CABLE
PROVISION AND INSTALLATION TCP IP BASED DISPLAY EXTENDER BETWEEN GEO AND PO LAB
PROVISION AND INSTALLATION OF 30KVA INDUSTRIAL GRADE 3PHASE INPUT SINGLE PHASE OUTPUT(230/50HZ) ONLINE UPS WITH 45 MIN BACKUP ALONG WITH ISOLATION TRANSFORMER INSTALLED ON BOTH INPUT AND OUTPUT. WORK INVOLVES THE FOLLOWING:- PROVISION AND INSTALLATION OF 30KVA UPS. REMOVAL OF EXISTING 30KVA UPS AND ITS SUBSYSTEMS FROM STARBOARD WET LAB. MANUFACTURING AND FITMENT OF FRAME WORK FOR THE MOUNTING OF UPS AND BATTERY COMPARTMENT. THE WORK INVOLVES THE ROUTING OF INPUT AND OUTPUT POWER CABLE TO JB PROVIDED BY SHIP/NPOL. SMF BATTERY HAS TO BE INSTALLED AND SECURED ON BATTERY COMPARTMENT TO AVOID VIBRATION. MOUNTING OF BOTH ISOLATION TRANSFORMERS. PROVISION OFMCB,ELCBJUNCTION BOX, INTERCONNECTION CABLES, CABLE TERMINATORS,CONNECTION BETWEEN BATTERY AND UPS, LOAD TESTING OF UPS PROVISION OF 3 YEAR WARRANTY FOR THE SYSTEM. THE SYSTEM HAS TO BE INSTALLED ON STARBOARD WET LAB. EXISTING DIMENTION NUMERIC DIGITAL HP E 30, UPS- 400 (W) X800 (L) X1100 (H) MM, BATTERY UNIT- 570 (W) X 770 (L) X 1400 (H)MM, BATTERY- 12 V, 75 AH, SMF VLRA X 36 NOS
FITMENT OF BASE PEDESTAL FOR RADIOMETER ON THE BRIDGE MAST. BASE PEDESTAL WILL BE SUPPLIED BY NPOL.
Description of Work / Item(s)
Amount
LIST OF SPARES TO BE QUOTED BY THE SHIPYARDS
MK-V (0.9 KG)
MK-III
MK -V (01 KG
AS PER NCD 1481 ISSUE 3, 1491, 1493 ISSUE 1 and 1494 ISSUE 1
SWR 6 MM DIA, LENGTH 200M.
PULLEY FOR 6MM SWR
ROPE SAFETY NETS AS PER SAMPLE
GI PIPE 2" DIA
(A) WOODEN PLANKS WITH TEAK/ SAL WOOD. SIZE OF EACH WOOD PLANK 150X90MM.
(B) RUBBER SEALANT
BRASS STRAINERS AS PER SAMPLE
REDUCING VALVE
PNEUMERSTAT (CPL)
PNEUMERSTAT FILTER
PNEUMERSTAT OIL 100 cc
PNEUMERSTAT DIAPHRAGM
PNEUMERSTAT MAIN SPRING
SAFETY VALVE
3-WAY VALVE
PILOT VALVE
POLYFLO HOSE BLUE
POLYFLO HOSE YELLOW
POLYFLO COUPLING STRAIGHT 2X1/4''
POLIFLO COUPLING T 3X1/4''
POLIFLO COUPLING NUT 1/4''
POLIFLO HOSE GREEN
MOUNTING SCREW SLIDER ROLLER
DIAPHRAGM
BALL BEARING 3X8X3
BALL BEARING 3X10X4
Packing
Motor oil seal
Breathing Plug
Oil level indicator
Drain plug
packing
Packing
Oil seal
Grease nipples
Packing
Oil seal
Rivets
Oil seal
Rivets
Packing
Packing
Packing
Packing
Packing
Oil seal
Packing
Oil level indicator
Packing
Packing
Packing
Packing
Oil seal
Packing
Bearing
Oil seal
Breather
Oil level indicator
Drain plug
Packing
Grease nipples
Packing
Packing
Oil seal
Packing
Oil seal
Packing
Oil seal
Grease nipples
Grease nipples
Grease nipples
Magnetic coil
Springs
Brake lining bearer with brake lining and rivets
Packing shims
Drain plug
Coil housing
Spring
Brake lining bearer assembly
Packing shims
EFSWR 8 MM DIA, LENGTH 30M.
BEARING
BEARING
BEARING
BEARING
OIL SEAL
GEAR OIL
GREASE
WORM SHAFT BEARING
WHEEL SHAFT BEARING
WHEEL SHAFT BEARING OUTPUT END
SLIPING CLUTCH CUM COUPLING BEARING
WORM SHAFT OIL SEAL
WHEEL SHAFT OIL SEAL
BAND BRAKE LINING UPPER PART
BAND BRAKE LINING LOWER PART
GREASE NIPPLE
GREASE NIPPLE
GREASE NIPPLE
GREASE NIPPLE
GEAR OIL INDIAN OIL
GREASE
OIL SEAL FOR WORM SHAFT
OIL CATCHER WORM SHAFT
SEAM FOR WORM SHAFT OIL CATCHER
BEARING FOR WORM SHAFT
BEARING FOR WHEEL SHAFT
OIL CATCHER WHEEL SHAFT
OIL SEAL FOR WHEEL SHAFT
SWR 12MM
GEAR OIL SERVO SYSTEM 553 OR EQVT
MORTISE LOCKS WITH HANDLE
HYDRAULIC DOOR CLOSER
HINGES
DOOR FRAMES
WOODEN DOOR
EMERGENCY ESCAPE FLAPS
DOOR STOPPER
RUBBER GASKET
NWT DOORS
KICK OUT PANELS
RUBBER BEADING
DOOR CLIPS (MATERIAL - SS)
DOOR CLIPS (MATERIAL - SS)
TOROIDAL SEALING
WORN OUT WEDGES.
HATCH RETAINING CLIPS
MWMB(THICKNESS 25MM/900X600)
MOTORS/IMMPELLERS/BLOWERS
ATU FILTERS
WIRE MESS FRAMES AS PER SAMPLE
MUSHROOM HEADS RUBBER BREEDING
RUBBER BREEDING
VENTILATION FLAPS
BRASS BUTTERFLY NUTS AND TUMBLER BOLTS
WIRE MESSES AS PER SAMPLE
DIFFUSERS
BATHROOM FITTINGS AS PER DL
UNDERLAY
O' RINGS
DOWTY SEALS
COPPER WASHERS
PIPE CLAMPS
HIGH PRESSURE FILTER ELEMENT
RETURN LINE FILTER ELEMENT
SUCTION STRANNERS(MAIN)
SUCTION STRAINERS(AUX)
THERMOSTAT
OIL RESISTANT GASKETS (SS) FLANGES, WATER PUMP & OIL COOLER
RELIEF VALVE SEAL KITS (20 NOS VALVES)
FLOW DIVIDER (06 NOS) SEALS KITS
FLOW CONTROL VALVE (08 NOS) SEALS KITS
LOAD HOLDING VALVE (15 NOS) SEALS KITS
COUNTER BALANCE VALVE (18 NOS) SEALS KITS
PROPORTIONAL CONTROL VALVE (TOP DECK)
PROPORTIONAL CONTROL VALVE SEALS KITS
SHUT OFF VALVES (HIGH PRESSURE)
DIRECTION CONTROL VALVE SEAL KITS
SOLENOID COILS FOR ABOVE DC VALVES
ISOLATING COCKS
BALL VALVES(HYD RESERVOIR)
MULTI SPOOL DC VALVES OIL SEALS
HYDRAULIC CYLENDERS/ACTUATORS SEAL KITS
PRESSURE GUAGES,HYD HIGH PRESSURE
PRESSURE GUAGES, LOW PRESSURE FOR WATER
ANATI VIBRATION MOUNTS FOR CPU PUMP SETS
ANTI VIBRATION MOUNTS FOR CONTROL PANNELS
FLEXIBLE DRIVE COUPLINGS (SPIDERS) FOR MOTOR-PUMP
SS SEAMLESS PIPES 12 MM OD (FOR CRANES)
SUATABLE FERRULE FITTINGS SS FOR ABOVE (FOR CRANES)
MS SEAMLESS PIPE, 25 MM OD, 280 BAR WP(CPU) AREA
MS SEAMLESS PIPE, 30 MM OD, 280 BAR WP(CPU) AREA
FERRUEL TYPE FITTINGS FOR ABOVE, 25 AND 30 MM PIPE
BEARINGS SKF N217
BEARING ROLLERS DIA 20X 16 L
5/8 '' ROLLER CHAIN LINK
BREAK BAND 10X100
RIVETS COPPER
ANTI VIBRATION MOUNTS FOR CONTROL PANNELS
ANTI VIBRATION MOUNTS FOR MAIN PUMP/ MOTORS
ANTI VIBRATION MOUNTS FOR TRACTION WINCH
COUPLING, INSERT
COUPLING, INSERT
VERTICAL ROLLER
HORIZONTAL ROLLER
SPOOLING BLADE
ROLLER CHAIN
CONNECTING LINK
BREATHER, FILLER
GUAGE, LEVEL 10"
LY RELAY
LY RELAY
BULBS
RED LENSE
CONTROL FUSE
CONTROL FUSE
FILTER
WASHER BUSHING
WASHER BUSHING
ELECTRIC MOTOR (30 HP (22KW 38 AMPS 415,50 HZ 3 PHASE)
HYDRAULIC OIL (SHELL TELLUS 46)
ELECTRIC MOTOR
HYDRAULIC OIL (SHELL TELLUS 32)
8MM ELECTRO-MECHANICAL SWR
PLANETARY GEAR REDUCER
HYDRAULIC PUMP
HYDRAULIC MOTOR
FILTER ELEMENT
PRESSURE GAUGE
MAIN CONTROLLER
REMOTE CONTROLLER
SHUTTLE VALVE
BRAKE SOLENOID VALVE
POWER OPERATOR WHICHT
POWER CONTACTOR
OVERLOAD RELAY
STEP-DOWN TRANSFORMER
POWER SUPPLY
PILLOW BLOCK BEARING
L/W HYDRAULIC MOTOR
L/W PUMP
L/W SOLENOID VALVE
L/W SCREW
L/W SUPPORT BEARING
L/W OVERRIDE SWITCH
L/W LIMIT SWITCH
L/W END LIMIT SWITCH
Emergency Switches
Push button switches for motor ON
Push button switches for motor OFF
Motor ON indication lamps
Motor available indication lamps
Emegency Push button switch station
Thermostat
18 dia Proximity Switches
12 Dia proximity switches
30 Dia proximity switches
Joy Stick with Single Potentiometer
Joy Stick with 2 Potentiometers
Digital indicator for tension
Digital indicator for Payout
Digital Indicator for Speed
Digital Indicator for Remote boxes
Indicator Lamp for Power on
Indication lamp for fault
Push Button Switches for spooling controls
Power contactors for Hydraulic motors
Fuses for Hydraulic Motors
Power Contactors for spooling Motors
Fuses for Spooling Motors
Fuses for Control circuit
Transformer for Hydraulic Motor Starter
24 V DC Power supply
Contact Terminals
Control Relays with Bases
NO/NC Conatct Blocks
Proportional Controller Card
Proportional Valves
Load Cell
Weight Transmitter
Encoder
Hydraulic Distributer
Regulation Card for Solenoid Valve
Electric Motor
Pulley for Rope
Oil Seal
Bearing
Encoder
Regulation Card for Solenoid Valve
Gasket Kit for Hydraulic Cylinder
Gasket Kit for Hydraulic Cylinder
Grease Nipple
Main Hydraulic Pump Gaskets Kit
Filter Cartridge
Relief Valve
Cut Off Valve
Manometer
Hydraulic Distributer Gaskets Kit
Lights Kit
Fuses Kit
Aux Relay Kit
Push Button Kit
LOCKS
HINGES
MIRROR
SS ROD
CLOTH HOOK
INNER LOCK
HANDLE
REPAIR OF DOOR FRAMES
FULL CUPBOARD RENEWAL
SHOE RACK TELESCOPIC CHANNEL
SHOE RACK LOCKS
BREATHER CAPS SECURING CHAIN (MATERIAL- SS)
FOOT STEPS
SHOES RACK LOCKS
CANVAS MATERIAL
RUBBER BEADING
ENGINEERING
Sealing strips
Gasket
Seal ring
Round buna ring
Gasket
Round seal ring
Seal ring
Bearing shell
Cotter pin
Washer
Locking washer
Cotter pin
Set of brg. Halves
Piston ring with RH gap
Piston ring with LH gap
Piston ring with RH gap
Oil scraper ring
Seal ring
Round buna ring
Cotter pin
Valve seat insert
Sealing strips
Hexagonal head screw with collar
Gasket
Gasket
Seal ring
Seal ring
Gasket ovel
Seal ring
Seal ring
Worm screw
Taper pin
Worm screw
Slide ring
Worm screw
Shearing pin
Cylindrical screw
Lock washer
Lock washer
Threaded pin
Worm screw
Hex.head screw
Dowel pin
Taper pin
Threaded pin
Hex.head screw
Spherical seat
Roller
Locking ring
Seals
Hose clip
Bellows
Hose sleeve
Hose sleeve
Inlet valve cone
Valve guide
Spring plate
Feather key
Clamping piece comp
Cylindrical screw
Spring ring
Hexagon bolt
Lock washer
Thrust piece
Snap ring
Outer spring
Inner spring
Outlet valve cone
Valve guide
Spring plate
Feather key
Clamping piece comp
Cylindrical screw
Spring ring
Hexagon bolt
Lock washer
Thrust piece
Snap ring
Outer spring
Inner spring
Pendulum Ball bearing
Seal ring
Gasket
Fitting Key
Deep Groove Ball bearing
Cy.l Roller Bearing
Round Gasket
Taper Pin
Gasket
Gasket
Adjusting shim
Gasket
Screw plug
Seal ring
Round buna ring
Gasket
Vent screw
Vent screw
Gasket
Gasket
Locking ring
Strap
Cotter pin
Cotter pin
Thrust spring
Lock washer
Cylindrical pin
Zero spring
Cotter pin
Coller bush
Coller bush
Taper pin
Coupling sleeve
Centering ring
Coupling sleeve
Sealing ring
Hex.nut
Coller bush
Taper pin
Taper pin
Radial shaft seal
Locking ring
Hex.nut
Needle guide with needle
Round seal ring
Spring
Adjusting screw
Tab wassher
Hexagonal bolt
Washer
Feeler pin
Snap ring
Washer
Spring
Distance pipe
Nozzle with orifices
Seal ring
Filter element
Gasket
Gasket
Coller bolt
Gasket
Hexagon screw
Expansion piece
Expansion piece
Gasket
Hexagon screw
Hexagon nut
Gasket
Gasket
Coller screw
Lock nut
Taper pin
Castellated nut
Taper pin
Seal ring
Disc filter element
Gasket
Gasket
Round buna ring
Feather key
Gasket
Round buna ring
Lock ring
Washer
Deep groove ball brg.
Gasket
Butting ring
Butting ring
Hex .head screw
Slide ring seal
Simmer ring
Simmer ring
Slide ring seal
Deep groove ball brg.
Penduium ball bearing
Fitting key air wheel
Fitting key rotery wheel
Cord seal
Butting ring air stage
Cord seal
Ball bearing bush
Hex .head screw
Segger ring
Simmer ring
Deep groove ball brg.
Fitting key
Sealing ring
Locking washer
Locking washer
Slide ring seal
Notched taper pin
Threaded pin with point
Locking washer
Butting ring ceramics
Slide ring seal coal
Cord seal
Simmer ring
Taper pin
Hook type circlip
Cylindrical pin
Worm screw
Hook type circlip
Taperpin
Cotter pin
Gasket
Gasket
Gasket
Seal ring
Seal ring
sealing ring
coller screw
sealing ring
indicator valve
CONTAMINATION INDICATOR
PRESSURE SWITCH
PRESSURE SWITCH
PRESSURE SWITCH
PRESSURE SWITCH
PRESSURE GAUGE
PRESSURE GAUGE
PRESSURE SWITCH
SET OF SEALS
SET OF SEALS
OPEN END COVER
END COVER
ANODE
PRESSURE GAUGE
FILTER ELEMENT
THERMOMETER
THERMOMETER
THERMOMETER
PRESSURE SWITCH
PRESSURE SWITCH
PRESSURE GAUGE
VENTING FILTER
SHAFT SEALING RING
HEXAGON SCREW
ANTI-FRICTION BEARING
ANTI-FRICTION BEARING
ANTI-FRICTION BEARING
HEXAGON SCREW
ANTI-FRICTION BEARING
ANTI-FRICTION BEARING
OIL PUMP
OIL PUMP
SHAFT SEALING RING
OIL DISTRIBUTER
HEXAGON SCREW
ANTI-FRICTION BEARING
ANTI-FRICTION BEARING
ANTI-FRICTION BEARING
SET OF SEALS
ANTI-FRICTION BEARING
LOCKING PLATE
SHAFT SEALING RING
SPRING
NON - RETURN VALVE
ALLEN SCREW
SPRING WASHER
RECTANGULAR RING
RETAINING
INNER DISC
OUTER DISC
CARRIER PIN
CARRIER
ALLEN SCREW
SPRING WASHER
CLAMPING SLEEVE
PLUG SCREW
ALLEN SCREW
SPRING WASHER
ALLEN SCREW
SPRING
RECTANGULAR RING
HEXAGON SCREW
HEXAGON NUT
ANTI-FRICTION BEARING
ANTI-FRICTION BEARING
ANTI-FRICTION BEARING
RETAINING RING
ANTI-FRICTION BEARING
ANTI-FRICTION BEARING
ANTI-FRICTION BEARING
RETAINING RING
CLAMPING SLEEVE
CLAMPING SLEEVE
CLAMPING SLEEVE
ALLEN SCREW
SET OF SEALS
LOCKING PLATE
RETAINING RING
WIRE SOCKET
LOCKING WIRE
GLUE BEST
STANDBY LO PUMPS
IMPELLER
AIR IMPELLER
SHAFT
BALL BEARING (NBC 330 & 325 OR EQUAL)
SPLIT INNER RACE
INNER RACE CLAMPING RING
CLAMPING RING SCREW
SPLIT CAGE CONTAINING ROLLER
CASE JOINING CLIP
SPLIT OUTER RACE
OUTER RACE RETAINGING SCREW
HOLDING RING
HUTH SEALING RING
BULB SEALING RING
RUBBER RING
LINER
BULB SEALING RING
RUBBER RING
LINER
BUSH BEARING
LANTERN RING
TALLOW PACKING 25*25
NEOPRENE RUBBER X 25
NEOPRENE RUBBER X 25
RUBBER PACKING 785 OD X 685 ID X 3 THICK
RUBBER PACKING 721 OD X 621 ID X 3 THICK
COMPRESSOR RING (RUBBER)
RUBBER SEGMENTS
O' RING
BOWL DISC
TOP DISC WITH NECK
SPRING FOR BEARING
BALL BEARING SKF 2201
PAD FOR FRICTION BLOCK
GRAVITY DISC
SIGHT GLASS
BUSHING
RUBBER RING FOR FRAME HOOD PACKING
SPLASH GUARD
BUSHING FOR BOWL LOCK SCREW
SHAFT
GEAR WHEEL (PINNION COMPLETE)
PIN FOR GEAR WHEEL
COLLAR ( THROW OFF)
SCREW
BALL BERAING SKF 6203
SLEEVE ( BALL BEARING)
BOWL SPINDLE ( FIXED SUS)
SPRING
GUAGE GLAS (LEVEL)
GLASS FIXING WASHER & FRAME PLATE
PACKIING
PIN SLOTTED FOR HINGE BELT
SPRING FOR BRAKE
SPINDLE FOR BRAKE
BUSHING FOR BRAKE
SPRING FOR LOCK PIN
LOCK RING
SPRING FOR LATCH PIN
O RING FOR INLET TUBE
GLASS TUBE
SHEAR COUPLING
O RING
BUSHING
PUMP WHEEL LONG SHAFT
SLEEVE ( BUSHING), INNER
PUMP WHEEL ( SHERT SHAFT)02
BUSHING
RUBBER RING
PUMP WHEEL
PUMP WHEEL
WORM WHEEL SHAFT
OIL SEAL
BALL BEARING SKF 6202
SPRING FOR RELIEF VALVE
VALVE CONE FOR RELIEF VALVE
WORM WHEEL WITH PIN
O RING
SV ASSY 1" BSP A/C SP 10/12/15
SEAL OIL B45X60
SOL/V ASSY 2
BUSH DIST SP 10112/15120
WASHER CU I/L & DV HV20/25/30
COPPER WASHER
O RING SS15 TS12/15
PISTON & GP DIA70 SS02/03/05
PISTON & GP DIA 127 SP 10/12/15
O RING
PISTON & GP DIA50 SP
OBS NRV ASSY 1/2"BSP
OBS DELIVERY VALVE 3/4" BSP
OBS INLET VALVE ASSY
OBS DISCHARGE VALVE ASSY
OBS DEL UL VALVE 3/4" BSP
OBS PISTON RINGS DIA 70
OBS GASKET SP 10/12/15/20
OBS RING PACKING HP20
OBS PISTON RINGS - 50 DIA
OBS GASKET CONT SYSTEM SP
OBS PISTON RING DIA 127 SP
SV ASSY 3/4" BSP 11 TO 12KSC
SV ASSY 3/4"BSP18KSC
VALVE ASSY B
INLET VALVE ASSY
VALVE ASSY DIS HV SP
VALVE ASSY DRAIN 1/4" BSP
AUTO DRAIN VALVE
TEMP SWITCH KP81
GM20302B2K3 SIL PSW
1 1/4" SPDT O/L SWITCH
OBS 2500H RACPKGE SP12
VALVE FINGER TYPE DIA50 CYL
VALVE FINGER TYPE DIA 70 CYL
V-BELT C98
O RING
SV ASSY 1" BSP A/C SP 10/12/15
CYL NO1 DIA70 M/CTS02 SS02/03
HEAD DIA 70 CYL SP COMPRESSOR
CYL DIA 127 M/C SP1 0/12/15/20
CYLINDER HEAD DIA 127
HEAD DIA50 CYL-SP M/C SP 10/12
FLAT VALVE DIA70 CYL SS02/03
INLET VALVE PLUG
PLUG DEL VALVE M/C HV SP RLY
FLAT VALVE DIA50 CYL HP03/05
SEAL OIL B45X60
SOL/V ASSY 2
BUSH DIST SP 10112/15120
WASHER CU I/L & DV HV20/25/30
COPPER WASHER
O RING SS15 TS12/15
PISTON & GP DIA70 SS02/03/05
PISTON & GP DIA 127 SP 10/12/15
O RING
CYL DIA50, SP-M/C SP SERIES
PISTON & GP DIA50 SP
OBS NRV ASSY 1/2"BSP
OBS DELIVERY VALVE 3/4" BSP
OBS INLET VALVE ASSY
OBS DISCHARGE VALVE ASSY
OBS DEL UL VALVE 3/4" BSP
OBS PISTON RINGS DIA 70
OBS GASKET SP 10/12/15/20
OBS RING PACKING HP20
OBS PISTON RINGS - 50 DIA
OBS GASKET CONT SYSTEM SP
OBS PISTON RING DIA 127 SP
SV ASSY 3/4" BSP 11 TO 12KSC
SV ASSY 3/4"BSP18KSC
VALVE ASSY B
INLET VALVE ASSY
VALVE ASSY DIS HV SP
VALVE ASSY DRAIN 1/4" BSP
AUTO DRAIN VALVE
TEMP SWITCH KP81
GM20302B2K3 SIL PSW
1 1/4" SPDT O/L SWITCH
OBS 2500H RACPKGE SP12
VALVE FINGER TYPE DIA50 CYL
VALVE FINGER TYPE DIA 70 CYL
V-BELT C98
IMPELLER
SHAFT
SHAFT SLEEVE
DEEP GROOVE BALL BEARING
LANTERN RING
O RING
O RING
VALVE SET
BACK UP RING FOR HP PUMP VALVE PLUG
SEAL KIT
HP PUMP ANODE PLUG
HP PUMP DRIVING BELT SET
CIRCLIP B90 (INTERNAL)
O RING 30X1.6
O RING 49.5X3
MECHANICAL SEAL LOWER 1"
MECHANICAL SEAL UPPER 1"
OIL DIAPHRAGM
IMPELLER
MECHANICAL SEAL
O RING SET
CONTACTOR
UPPER BEARING
IMPELLER
MECHANICAL SEAL
O RING SET
CABLE GROMATE
CABLE LEAD GROMATE
UPPER BEARING
LOWER BEARING
LIP SEAL
IMPELLER
O RING
GASKET COPPER WASHER
GASKET FRAME END COVER
SEAL OIL
GASKET SHAFT END COVER
BEARING BALL
BEARING BALL W/SNAP RING
RING BEARING RETAINER
BUSHIN CRANK PIN
VALVE SAFETY
GASKET AIR HEAD
VALVE FINGER
SPACER
GASKET SPACER
GASKET COPPER
GASKET FLANGE
SET RING
RING LOCK
GASKET AIR HEAD
ASSEMBLY SPACER/VALVE LOW PRESSURE
VALVE FINGER
SPACER
GASKET SPACER
SET RING
VALVE SAFETY
GASKET
GASKET
O-RING
VALVE STEM SEAL
O-RING
CYLINDER HEAD GASKET
O-RING
O-RING
SEALING RING
O-RING
O-RING
GASKET
O-RING
GASKET
O-RING
O-RING
O-RING
O-RING
COPPER SEALING RING
DAMPER STRIP
O-RING
WASHER A COP
ROTARY SEAL
SHAFT SEAL
O-RING
O-RING
GASKET
O-RING
O-RING
GASKET
O-RING
SHAFT SEAL
GAITER
COUNTERRING
ROTARY SEAL
SPACER RING
O-RING
GASKET
O-RING
GASKET
GASKET
O-RING
O-RING
O-RING
O-RING
GASKET
O-RING
O-RING
O-RING
GASKET
O-RING
O-RING
COPPER SEALING RING
O-RING
COPPER SEALING RING
O-RING
O-RING
WASHER A COP
GAITER
O-RING
SEALING RING
BEARING CYLINDRICAL ROLLER
GROOVED BALL BEARING
SEALING RING
HOLE-TYPE NOZZLE
SPARE PARTS KIT
EXHAUST VALVE
GASKET
GASKET
GASKET
GASKET
SNAP RING
O-RING
O-RING
GASKET
DAMPER STRIP
FUEL FILTER ELEMENT
O-RING
O-RING
GASKET
COPPER SEALING RING
O-RING
O-RING
GASKET
GASKET
O-RING
O-RING
O-RING starter motor
O-RING starter motor
ADJUSTING WASHER
RING SNAP HV ZNPH R5F
COUNTERRING
ADJUSTING WASHER
SNAP RING
DRIVE SHAFT
O-RING
SET OF SHIMS
SET OF SHIMS
PROTECTIVE SLEEVE
BOLT HEX SOC HD
IMPELLER
GASKET
COPPER SEALING RING
O-RING
O-RING
SHAFT SEAL
PRESSURE SLEEVE
COLLAR SCREW
THRUST RING
VALVE ROTATOR
INLET VALVE
VALVE COLLET
DOOMED NUT
COOLANT PUMP SHAFT
WASHER SPRING B8
HEX SCREW
WASHER
HEX SCREW M10 x 50
SCREW
WASHER
O-RING
O-RING
O-RING
O-RING
O-RING
O-RING
O-RING
O-RING
O-RING
SEALING RING
WASHER A COP
SEALING RING
SEALING RING
SEALING RING
HEX SCREW
BOLT HEX SOC HD
SCREW
BOLT HEX SOC HD
SPACER SLEEVE
WASHER
Support Ring
Gasket
Gasket
Gasket
Lock Plate
Washer
Screw
Gasket
Gasket
Spacer
Spacer
Gasket
Gasket
Sealing Ring
Screw
Spring
Spring
Thermal Element
Gasket
O-ring
Gasket
Gasket
Gasket
Gasket
Gasket
Gasket
Lub Oil Filter Set
Groot Ball Bearing
Tab Washer (Lock Plate)
Air Fiter
Outer Valve Spring
Inlet Valve Spring
Screw
Cyl.Head Bolt
Cyl.Head Bolt
Hex Screw
Guard Plate
Guard Plate
Rubber Mount
Screw
Screw
Thrust Bolt
Thrust Bolt
Gasket
Spacer Ring
Oil Pressure Relief Valve
Oil Pressure Relief Valve
Pressure Relief Valve
Thrust Bolt
Impeller (S/W pump)
CLAMP,HOSE
HOSE,PLAIN
HOSE,PLAIN
PLUG,ZINC ELECTRODE
HOSE,PLAIN
CLAMP,T BOLT
SEAL,O RING
CLAMP,T BOLT
SCREEN,FILTER
SEAL,O RING
GASKET,INTAKE MANIFOLD
SEAL,GROMMET
GASKET,AIR COMPRESSOR
SEAL,INJECTOR
CLAMP,HOSE
CLAMP,HOSE
CAP,FILLER
VALVOLINE PREMIUM BLUE 7800 PLUS 1/55 LTR
GASKET,CONNECTION
GASKET,WTR TRF CONNECTION
SEAL,O RING
SEAL,RECTANGULAR RING
HOSE,PLAIN
SEAL,O RING
HOSE,ELBOW
HOSE,ELBOW
GASKET,CONNECTION
SPIDER,JAW COUPLING
CLAMP,T BOLT
CLAMP,T BOLT
HOSE,PLAIN
SEAL,O RING
HOSE,PLAIN
"SEPARATOR,FUEL WATER"
GASKET,AFT HOUSING
HOSE,FLEXIBLE
KIT,SEAL
HOSE,PLAIN
ELEMENT,LUB OIL FILTER
"ELEMENT,OIL BYPASS FILTER"
GASKET,HEAT EXCHANGER
GASKET,HEAT EXCHANGER
GASKET,FUEL PUMP
"CLEANER,AIR"
GASKET,ROCKER LEVER COVER
STRIP TEST
GASKET,RKR LEVER HOUSING
CLAMP,HOSE
CLAMP,HOSE
COOLANT,EG 50:50 PREMIXED 50 LT DRUM
GASKET GOVERNOR SET
ELBOW,PLAIN STREET PIPE
IMPELLER
PUMP O RING/ GAKET SET
MECHANICAL SEAL
WEARING RING
ENGINE GASKET SET
LUB OIL STAINER
FUEL FILTER
PRESSURE GAUGE
TEMPERATURE GAUGE GAUGE
IMPELLER
AIR IMPELLER
SHAFT
BALL BEARING SKF 6306
BALL BEARING SKF 6305
BALL BEARING
BUSH BEARING FOR PRIMING PUMP
WEARING FOR CASING
SEAWATERRESISTANT PACKING
NEEDLE BEARING
BEARING
BEARING
BEARING
BEARING
BEARING
BEARING
O' RING C/S 12
O' RING
OIL SEAL
CIRCLIP
O RING
O RING
O RING
O RING
O RING
CIRCLIP
O RING
O RING
MONEBAR SEAL
O RING
O RING
O RING
O RING
IMPELLER
AIR IMPELLER
SHAFT
BALL BEARING SKF 6306
BALL BEARING SKF 6305
IMPELLER
SHAFT
BUSH BEARING
BALL BEARING NBC 317 OR EQUAL
IMPELLER
WEARING RING
WEARING RING
SHAFT SLEEVE
BEARING 7308B
IMPELLER LOCK NUT
PACKING
GASKET
BUSH BEARING
TAB WASHER
O RING
DISC COUPLING
WASHER
DIGITAL CONTACT TYPE PORTABLE HANO TECHOMETER
OIL PRESSURE REGULATING VALVE
CRANK CASE HEATER ASSEMBLY
SHAFT SEAL ASSEMBLY
OIL PUMP ASSEMBLY
GASKET SET FOR COMPRESSOR
SET OF NEOPRENE O RINGS
SET OF SEALING RINGS
SPLIT PIN
SUCTION STRAINER
SOLENOID COIL
OIL STRAINER
V-BELTS
CONNECTING ROD ASSEMBLY
DISCHARGE VALVE ASSY FOR R-22
BUSHING STD
PISTON PIN
SCRAPPER RING
SUCTION VALVE RING PLATE
SUCTION VALVE RETAINING PLATE
DISCHARGE VALVE RING PLATE
HALF SECTION BEARING FOR CRANK SHAFT
CASTLE NUT
PISTON RINGS
VALVE SPRING
DRIER CORE
PISTON PIN (GUIDE PIN)
BUSHING
NEEDLE BEARING INA HK 0912
SEEGAR RING WR 18
SEEGAR RING A 22
CIRCLIP
BEARING
OIL SEAL
O RING
O RING
OIL SEAL
PISTON SEAL
SOCKET HEAD SCREW
BONDED SEAL
O RING
O RING
O RING
O RING
O RING
ABRASION SEAL
BONDED SEAL
OIL SEAL
BONDED SEAL
O RING
O RING
O RING
O RING
BONDED SEAL
O RING
O RING
O RING
O RING
O RING
SEEGAR RING
O RING
VALVE BALL
BONDED SEAL
OIL SEAL
CORK SEAL
SPARK PLUG
ENGINE GASKET
CRAB REPAIR KIT
FUEL FILTER
PISTON RING ASSLY
NEEDLE BEARING
ROLLER BEARING ASSLY
ROLLER BEARING ASSLY
ROLLER BEARING ASSLY (UPPER)
BALL BEARING(LOWER)
ANODE ASSLY
ANODE
WATER PUMP REPAIR KIT
STARTER SOLENOID
THERMOSTAT
RELAY
TACHOMETER-6000
TACHOMETER HARNESS
TEMP. GAUGE
TRIM GAUGE SENDER
WATER PRESSURE GAUGE
THROTTLE AND SHIFT CABLE
FLUSH PUMP
INTERNAL OIL FILTER ELEMENT
INTEGRAL OIL SEPARATOR HEATER KIT
CAPACITY CONTROL SOLENOID VALVE
MOTOR TERMINAL PLASTIC INSULATORS
OIL FILTER REPLACEMENT GASKET & O-RING SET
GASKET SET FOR CONDENSOR
TEFLON SEAT WASHER 4-1/8''
TEFLON SEAT WASHER 5/8''
PRESSURE GAUGE 65 DIAL -1 TO 15 Kg/CM2 FOR R134a
SEAWATER DIFFERENTIAL PRESSURE GAUGE
CATCH ALL FILTER DRIER FILTER DRIER C-032F
TEFLON SEAT WASHER 2-1/8''
COIL FOR PILOT OPERATED SOLENOID VALVE SPORLAN TYPE 180S
SW PRESSURE GAUGES
PRESSURE GAUGE 65 DIAL 0 TO 25 Kg/CM2 FOR R134a
TEFLON SEAT WASHER 1-5/8''
CATHODIC BOLT
FILTER DRIER CORE
SYNTHETIC REF OIL SAVSYN2068
INTERNAL OIL FILTER ELEMENT
REFRIGERANT SUCTION FILTER
INTEGRAL OIL SEPARATOR HEATER KIT
CAPACITY CONTROL SOLENOID VALVE
MOTOR TERMINAL PLASTIC INSULATORS
OIL FILTER REPLACEMENT GASKET & O-RING SET
GASKET SET FOR CONDENSOR
CHARGING VALVE
TEFLON SEAT WASHER 4-1/8''
TEFLON SEAT WASHER 5/8''
KIT FOR POWER CONTACTOR
PRESSURE TRANSDUCER
PRESSURE GAUGE 65 DIAL -1 TO 15 Kg/CM2 FOR R134a
SEAWATER DIFFERENTIAL PRESSURE GAUGE
CURRENT TRANSFORMER MCS CT-250
CATCH ALL FILTER DRIER FILTER DRIER C-032F
TEFLON SEAT WASHER 2-1/8''
COIL FOR PILOT OPERATED SOLENOID VALVE
COIL FOR PILOT OPERATED SOLENOID VALVE SPORLAN TYPE 180S
SW PRESSURE GAUGES
PRESSURE GAUGE 65 DIAL 0 TO 25 Kg/CM2 FOR R134a
TEFLON SEAT WASHER 1-5/8''
CATHODIC BOLT
3 WAY ISOLATION VALVE FOR PRESSURE GAUGES
FILTER DRIER CORE
TEMPERATURE TRANSDUCER
SYNTHETIC REF OIL SAVSYN2068
M/E L/O STANDBY PUMP
FUEL OIL TRANSFER PUMP
SEPARATOR/ CENTRIFUGE MAB 103
SEPARATOR/ CENTRIFUGE MAB 103
GEAR PUMP MVZ2/35 BODE 4 G/B STAND BY L/O PUMP
1531 DT04 20S RO PLANT
EXHAUST COMPENSATOR
DZUS FASTENERS
THERMOCOUPLE
GASKET
THERMOMETER
ZINC PLUGS OF VARIOUS SIZES
BRASS ADAPTORS
PRESSURE REDUCER 8 BAR TO 2 BAR
FLEXIBLE HOSE WITH ADAPTORS
STRAINERS
NON RETURN VALVE 1 1/2" BSP
SAFTY VV 3RD STAGE
RELIEF VALVES
PRESSURE GAUGES 0 TO 100 BAR
CONNECTOR
ANODE
FUEL FILTER
DIAPHARAGM KIT
CARB REPAIR KIT
CARB GASKET KIT
TUBING
FITTING TEE
NRV FLANGE GASKET
GASKET INTERCOOLER FLANGE
VALVE SEAT DRAIN VALVE
AIR FILTER COOLER ASSY
GASKET CYLINDER HEAD DIA127
VALVE PLATE DIA70
VALVE PLATE DIA50
BALL BEARING SKF 6310
V' BELT
GASKET DIA 127 CYLINDER HEAD TO FLANGE, INLET
GASKET, CRANKCASE TO DIA 70 CYLINDER
RUBBER BELLOWS
FLEXIBLE RUBBER BELLOWS, DIA - 50 MM
RUBBER BELLOWS WITH Cu-Ni END FLANGE, DIA - 100 MM
SENSOR/ SWITCH
PRESSURE GAUGES
TEMP GAUGES 0-50 DEG C
TEMP GAUGES 0-120 DEG C
TEMP GAUGES 0-80 DEG C
PRESSURE GAUGE 0-10 BAR
PRESSURE GAUGE 0-15 BAR
PRESSURE GAUGE 0-25 BAR
PRESSURE GAUGES
PRESSURE SWITCH
PRESSURE SWITCH
PRESSURE SWITCH
PRESSURE SWITCH
PRESSURE GAUGE
PRESSURE GAUGE
PRESSURE SWITCH
PRESSURE SWITCH
PRESSURE SWITCH
BILGE LIGHT
FILTER CANDLES
PR. GUAGE
TEST COCKS
MAGNET COIL
SPLIT INNER RACE
EDUCTOR NOZLE
EDUCTOR NOZLE
MECHANICAL SEAL
MOUNTS
RUBBER JOINTS
STEEL WIRE
PULLIY
ALUMINIUM TALLIES
MECHANICAL SEAL
REPAIR KIT
SET OF JOINTS
PISTON RING SET
EXTERNAL FUEL FILTER
FLOW METER
FLEXIBLE HOSE WITH ADAPTORS
MECHANICAL SEAL
RO FILTER
TEFLON GASKETS
40 MM SDNR VALVE
SPRINKLER NOZZLE
DRAIN COCKS 1/2 INCH
GASKET
SENSOR, TEMPERATURE
GAUGE, TEMPERATURE
SWITCH, PRESSURE
SWITCH, TEMPERATURE
SWITCH, TEMPERATURE
SENSOR, PRESSURE
SENSOR, PRESSURE
SWITCH, COOLANT LEVEL
SENSOR, TEMPERATURE
SWITCH, MAGNETIC
METALLIC BELLOW
RUBBER BELLOW
RUBBER BELLOW
SUCTION AND DISCHARGE BELLOW WITH END FLANGES
SOLENIOID VALVE
EXPANSION JOINT
EXPANSION JOINT
FLANGE GASKET
BUSH BEARING
MECHANICAL SEAL
GASKET
SHAFT END NUT
RPM INDICATOR
CHEST VALVE 80 MM
4/3 WAY DCV WITH VALVE BLOCK
4/2 WAY DCV WITH VALVE BLOCK
CYLINDER COVER
GLASS TUBE OD-13 MM, ID-10 MM
COUPLING PADS
TEMPERATURE INDICATOR
SV MOUNTS
COMPENSATOR
GASKET
SOLENOID VALVE
CuNi 90/10 PIPE FOR VIEGA DOUBLE PRESSFIT COUPLING 28 X 1.2 MM
CuNi 90/10 PIPE FOR VIEGA DOUBLE PRESSFIT COUPLING 35 MM X 1.5 MM
CuNi 90/10 PIPE FOR VIEGA DOUBLE PRESSFIT COUPLING 42 MM X 1.5 MM
CuNi 90/10 PIPE FOR VIEGA DOUBLE PRESSFIT COUPLING 54 MM X 1.5 MM
CuNi 90/10 PIPE FOR VIEGA DOUBLE PRESSFIT COUPLING 76.1 MM X 2 MM
CuNi 90/10 PIPE FOR VIEGA DOUBLE PRESSFIT COUPLING 108 MM X 2.5 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 ELBOW (90 DEG) 28 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 ELBOW (90 DEG) 35 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 ELBOW (90 DEG) 42 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 ELBOW (90 DEG) 54 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 ELBOW (90 DEG) 76.1 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 ELBOW (90 DEG) 108 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 ELBOW (45 DEG) 35 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 ELBOW (45 DEG) 42 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 ELBOW (45 DEG) 54 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 ELBOW (45 DEG) 76.1 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 REDUCER 28 X 35 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 REDUCER 35 X 42 MM
VIEGA DOUBLE PRESSFIT CuNi "T" PIECE 35 MM
VIEGA DOUBLE PRESSFIT CuNi "T" PIECE 42 MM
VIEGA DOUBLE PRESSFIT CuNi "T" PIECE 54 MM
VIEGA DOUBLE PRESSFIT CuNi "T" PIECE 108 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 UNEQUEL "T" PIECE 28 X 22 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 UNEQUEL "T" PIECE 35 X 22 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 UNEQUEL "T" PIECE 35 X 28 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 UNEQUEL "T" PIECE 54 X 35 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 UNEQUEL "T" PIECE 108 X 54 MM
VIEGA DOUBLE PRESSFIT CuNi 90/10 UNIONS
VIEGA PRESSFIT GM FLANGE 28 MM
VIEGA PRESSFIT GM FLANGE 35 MM
VIEGA PRESSFIT GM FLANGE 42 MM
VIEGA PRESSFIT GM FLANGE 54 MM
VIEGA PRESSFIT GM FLANGE 76.1 MM
VIEGA PRESSFIT GM FLANGE 108 MM
PIPE CLAMP 28 MM
PIPE CLAMP 35 MM
PIPE CLAMP 42 MM
PIPE CLAMP 54 MM
PIPE CLAMP 76.1 MM
PIPE CLAMP 108 MM
Globe Valve up to 2 1/2"
Strainers up to 2 1/2"
COPPER PIPE FOR VIEGA PRESSFIT COUPLING 22MM X 1.2 MM
COPPER PIPE FOR VIEGA PRESSFIT COUPLING 28 MM X 1.2 MM
COPPER PIPE FOR VIEGA PRESSFIT COUPLING 35MM X 1.5 MM
VIEGA DOUBLE PRESSFIT COPPER ELBOW (90 DEG) 22MM
VIEGA DOUBLE PRESSFIT COPPER ELBOW (90 DEG) 28 MM
VIEGA DOUBLE PRESSFIT COPPER ELBOW (90 DEG) 35 MM
VIEGA DOUBLE PRESSFIT COPPER ELBOW (45 DEG) 22MM
VIEGA DOUBLE PRESSFIT COPPER ELBOW (45 DEG) 28 MM
VIEGA DOUBLE PRESSFIT COPPER ELBOW (45 DEG) 35 MM
VIEGA DOUBLE PRESSFIT COPPER REDUCER 28 X 22 MM
VIEGA DOUBLE PRESSFIT COPPER REDUCER 35 X 22 MM
VIEGA DOUBLE PRESSFIT COPPER REDUCER 35 X 28 MM
VIEGA DOUBLE PRESSFIT COPPER "T" PIECE 22MM
VIEGA DOUBLE PRESSFIT COPPER "T" PIECE 28 MM
VIEGA DOUBLE PRESSFIT COPPER "T" PIECE 35 MM
VIEGA DOUBLE PRESSFIT COPPER UNEQUEL "T" PIECE 28 X 22 MM
VIEGA DOUBLE PRESSFIT COPPER UNEQUEL "T" PIECE 35 X 22 MM
VIEGA DOUBLE PRESSFIT COPPER UNEQUEL "T" PIECE 35 X 28 MM
VIEGA DOUBLE PRESSFIT UNIONS ADAPTOR GM 22 MM
VIEGA DOUBLE PRESSFIT UNIONS ADAPTOR GM 28 MM
VIEGA DOUBLE PRESSFIT UNIONS ADAPTOR GM 35 MM
VIEGA DOUBLE PRESSFIT FLANGE GM 22 MM
VIEGA DOUBLE PRESSFIT FLANGE GM 28 MM
VIEGA DOUBLE PRESSFIT FLANGE GM 35 MM
GM HEXNIPPLE 22 X 15 MM
GM HEXNIPPLE 22 X 28 MM
GM HEXNIPPLE 28 X 35 MM
PIPE CLAMP 22 MM
PIPE CLAMP 28 MM
PIPE CLAMP 35 MM
Ball valve Up to 2"
ELECTRICAL
BEARING 6202 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
OVER LOAD RELAY(2A)
COPPER LUGS
BEARING 6202 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6204 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6308 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6004 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6308 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6208 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6308 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6308 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6004 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6004 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6308 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6205 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6004 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6206 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6206 ZZ
TERMINAL PLATE
COOLING FAN
REPLACE METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6308 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6004 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6205 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6306 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6004 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6303 ZZ
TERMINAL PLATE
COOLING FAN
REPLACE METALLIC (IRON) IMPELLER
COPPER LUGS
BEARINGS 6202 ZZ
TERMINAL PLATE
COOLING FAN
METALLIC (IRON) IMPELLER
COPPER LUGS
BEARING 6308 ZZ
TERMINAL PLATES
BEARING 6308 ZZ
TERMINAL PLATES
BEARING 6205 ZZ
TERMINAL PLATES
BEARING 6210ZZ
MER EXHAUST FAN MOTOR 30HP,415V,3PH,50HZ
CABLE(2 CORE,16 SQ MM)
MOTOR TERMINAL PLATES
TERMINALS CABLE COPPER LUGS 16 SQ MM
20 SQ MM THREE CORE
BEARING 6210ZZ
MER SUPPLY FAN MOTOR 30HP,415V,3PH,50HZ
CABLE(3 CORE,16 SQ MM)
MOTOR TERMINAL PLATES
TERMINALS CABLE COPPER LUGS 16 SQ MM
20 SQ MM THREE CORE
BEARING 6210 ZZ
AER SUPPLY AND EXHAUST FAN MOTOR 25HP,415V,3PH,50HZ
POWER CABLE (2 CORE, 16 SQ MM)
MOTOR TERMINAL PLATES
TERMINALS CABLE COPPER LUGS 16 SQ MM
PUSH BUTTONS
BEARING 6313, 6317
TEMINAL PLATES
HEATER, BREAK LINING.
BEARINGS 6313
TERMINAL CONNECTION BOX & PLATES
RUBBER SEALING OF CONNCETION BOX.
BEARINGS DE 6312 & NDE 6310
TERMINAL CONNECTION BOX & PLATES
RUBBER SEALING OF CONNCETION BOX.
BEARING (6302 ZZ)
TERMINAL PLATES
BEARINGS 6309 ZZ
IMPELLER
TERMINAL PLATES
CABLE (03 CORE, 03 SQ MM)
BEARINGS 6308 ZZ
IMPELLER
TERMINAL PLATES
CABLE (03 CORE, 03 SQ MM)
BEARINGS 6306 ZZ
IMPELLER
TERMINAL PLATES
CABLE (03 CORE, 03 SQ MM)
BEARINGS 6309 ZZ
IMPELLER
TERMINAL PLATES
CABLE (03 CORE, 03 SQ MM)
BEARINGS 6306 ZZ
IMPELLER
TERMINAL PLATES
CABLE (03 CORE, 03 SQ MM)
BEARINGS 6004 ZZ
IMPELLER
TERMINAL PLATES
CABLE (03 CORE, 03 SQ MM)
BEARINGS 6004ZZ
ATU NO. 7 MOTOR 3HP 415V, 50HZ, 3PH
IMPELLER
TERMINAL PLATES
TERMINAL BOX
BEARING NOS 6212
BEARING 6309 ZZ
TERMINAL CONNECTION BOX
BEARING 6309 ZZ
TERMINAL CONNECTION BOX
BEARING 6206 ZZ
TERMINAL CONNECTION BOX
BEARING 6004 ZZ
TERMINAL CONNECTION BOX
BEARING 6309 ZZ
TERMINAL CONNECTION BOX
TERMINAL CONNECTION BOX
BEARING 6206 ZZ
TERMINAL PLATES
COOLING FAN
HEATER
THERMISTOR
BEARING 6308,6305
BEARINGS
BEARINGS
CONTACTORS 16 AMPS
ELMAX CONNECTORS
INDICATION LAMP
PUSH BUTTON SWITCH
OVER LOAD RELAY 0.75 A
POWER CABLE 1.5 SQ MM COPPER WIRE PVC INSULATION
CONTACTORS 16 AMPS
ELMAX CONNECTORS
INDICATION LAMP
PUSH BUTTON SWITCH
OVER LOAD RELAY 2AMPS
POWER CABLE 1.5 SQ MM COPPER WIRE PVC INSULATION
CONTACTORS 16 AMPS
ELMAX CONNECTORS
INDICATION LAMP
PUSH BUTTON SWITCH
OVER LOAD RELAY 03AMPS
POWER CABLE 1.5 SQ MM COPPER WIRE PVC INSULATION
CONTACTORS 16 AMPS
ELMAX CONNECTORS
CONTROL TRANSFORMER (415/230)V
INDICATION LAMPS
PUSH BUTTON SWITCH
OVER LOAD RELAY(10A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 16 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
OVER LOAD RELAY(2.5A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 16 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(10A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 16 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(6A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 16 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(1A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 32 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(1A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 32 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(2.5A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 20 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(2.5A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 20 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(6A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
HRC FUSES WITH BASE
20 A BCH CONTACTORS
OVER LOAD RELAY (2A)
SINGLE COIR CABLE 2.5 SQ MM
CONTACTORS 32 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(4A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 20 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(3A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 20 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(2A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 20 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(2.5A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 20 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(3A) AND (14A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 40 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(6A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 40 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(4A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 20 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(10A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 32 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(10A)
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
CONTACTORS 20 AMPS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY
CABLE (1 CORE, 1.5 SQ MM, COPPER CONDUCTOR, PVC INSULATED)
PUSH BUTTONS
INDICATION LAMPS RED AND GREEN
ELMAX CONNECTORS
BCHMAKE 63 AMPS CONTACTOR
BCH MAKE TIME DELAY RELAY
415 - 230 V CONTROL TRANSFORMER
OVERLOAD RELAY(30A)
COPPER LUGS OF REQUIRED SIZES
01 CORE, 16 SQ MM COPPER LUGS(CONDUCTOR, INSULATED)
PUSH BUTTONS
INDICATION LAMPS RED AND GREEN
ELMAX CONNECTORS
BCHMAKE 63 AMPS CONTACTOR
BCH MAKE TIME DELAY RELAY
415 - 230 V CONTROL TRANSFORMER
OVERLOAD RELAY(30A)
COPPER LUGS OF REQUIRED SIZES
01 CORE, 16 SQ MM COPPER LUGS(CONDUCTOR, INSULATED)
PUSH BUTTONS
INDICATION LAMPS RED AND GREEN
ELMAX CONNECTORS
BCHMAKE 63 AMPS CONTACTOR
BCH MAKE TIME DELAY RELAY
415 - 230 V CONTROL TRANSFORMER
OVERLOAD RELAY(30A)
COPPER LUGS OF REQUIRED SIZES
01 CORE, 16 SQ MM COPPER LUGS(CONDUCTOR, INSULATED)
PUSH BUTTONS
INDICATION LAMPS RED AND GREEN
ELMAX CONNECTORS
BCHMAKE 63 AMPS CONTACTOR
BCH MAKE TIME DELAY RELAY
415 - 230 V CONTROL TRANSFORMER
OVERLOAD RELAY(40A)
COPPER LUGS OF REQUIRED SIZES
01 CORE, 16 SQ MM COPPER LUGS(CONDUCTOR, INSULATED)
HRC FUSES WITH BASE
20 A BCH CONTACTORS
OVER LOAD RELAY (2A)
SINGLE COIR CABLE 2.5 SQ MM
BCH MAKE CONTACTORS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(25A)
BCH MAKE CONTACTORS
ELMAX CONNECTORS
OVER LOAD RELAY (20A)
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY
BCH MAKE CONTACTORS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(15A)
BCH MAKE CONTACTORS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(20A)
BCH MAKE CONTACTORS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(6A)
BCH MAKE CONTACTORS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(10A)
BCH MAKE CONTACTORS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(40A)
CONTACTORS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(30A)
CONTACTORS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(30A)
CONTACTORS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(6A)
CONTACTORS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(1.5A)
CONTACTORS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY(20A)
SOFT STARTER
BCH MAKE CONTACTORS
ELMAX CONNECTORS
INDICATION LAMPS
PUSH BUTTON SWITCH
CONTROL TRANSFORMER
OVER LOAD RELAY
ELMAX CONNECTORS
MCCB 63 AMPS
5 DP MCCB
EARTH FAULT RELAY
CURRENT TRANSFORMERS 415/230V
OVER LOAD RELAY 0.75 A
415 - 230 V CONTROL TRANSFORMER
BCH MAKE 20 AMPS CONTACTORS 415 TO 230 V, 1000 VA
CONTROL TRANSFORMER
OVER LOAD RELAYS (20A) AND (2.5A)
MCB 32 AMPS
MCB MAIN 63 AMPS
ELMAX CONECTORS
LED BASED INDICATION LAMPSRED AND GREEN
32 AMPS ROTARY SWITCHES
FUSE BASE & FUSE CARRIERS
MCCB 4 POLE 63 A
MCCB 2 POLE 25 A
SIEMENS OVER LOAD RELAY 20 A
VFD (ATV71HD11N4)
CONTACTORS 50AMPS
COOLING FAN 220V 1PH
ROTARY SWITCHES 100 AMPS
TWO WAY SWICTHES
AIR FILTERS
D CONNECTORS
CONTACTORS 30AMPS
PHASE SEQUENCE CHANGER
DYNAMO
TIME DELAY RELAY
STARTER
NAVIGATION LIGHT (RED, GREEN AND WHITE)
CONTACTORS,
FUSES 6A
LIMIT SWITCHES
HRC FUSES (32A,25A, 10A,06A,04A, 02A)
220 V & 415 V AUXILLARY CONTACTORS
VOLTMETER (0-500V) AC
AMMMETER (0-1200A) & (0-800A)
FREQUENCY METER (45-55) HZ
KILOWATTMETER (0-450 KW) & (0- 690 KW)
POWER FACTOR METER(0.5-1)
DOUBLE VOLTMETER (0-500V)
DOUBLE FREQUENCY METER (45-55)
PUSH BUTTON SWITCHES
CURRENT TRANSFORMERS 415V/230V
POTENTIAL TRANSFORMERS
MCCB 150 AMPS
MCCB 250 AMPS
MCCB 100A
EARTHING STRIPES
MCCB 800A
ANTI CONDESATION HEATER
GENERATOR GUARD
COPPER LUGS
NUT BOLTS
ACB SIEMENS 630 A
ACB GE SPECTRONICS 1000A
INDICATION LAMP
ROTARY SWITCH
DIODES
VOLTMETER (0-30 V DC)
AMMETER (0-100A)
INDICATION LAMP
ROTARY SWITCH
VOLTMETER (0-30 V DC)
AMMETER (0-100A)
DIODES
CABLE (3 CORE, 16 SQ MM, COPPER CONDUCTOR)
NUT BOLTS
COPPER LUGS
EBONITE INSULATOR PLATE
SHOCK MOUNTS
CABLE (3 CORE, 16 SQ MM, COPPER CONDUCTOR)
NUT BOLTS
COPPER LUGS
EBONITE INSULATOR PLATE
SHOCK MOUNTS
CABLE (3 CORE, 16 SQ MM, COPPER CONDUCTOR)
NUT BOLTS
COPPER LUGS
EBONITE INSULATOR PLATE
SHOCK MOUNTS
THERMOSTAT
HEATING ELEMENT
HEAT PROOF CABLE ( 03 CORE, 6 SQ MM)
HEAT PROOF SINGLE CORE 6 SQ MM,
ASBESTOS SHEET
SINGLE CORE 2 SQ MM POWER CABLE
SIEMENS MAKE CONTACTORS
TIMERS
NDICATION LAMPS
CONNECTORS
415V,3PH, 50 HZ 630 A BREAKER
SHORE SUPPLY CABLE 300M 250 SQ MM COPPER MULTI STRANDED
PHASE SEQUENCE METER
HAND CHANGE OVER SWITCH 200 A
HAND CHANGE OVER SWITCH 100 A
COPPER BUSBARS
HSR CABLE 240SQMM
100 A BCH CONTACTORS
INDICATION LAMPS
PUSH BUTTONS
AUXILARY CONTACTS
DECK ANGLES LIGHT FITTINGS
HORIZONTAL LIGHTS
CABLE 5 SQ MM SINGLE CORE
ROTARY RECTIFIER ASSEMBLY
BEARINGS 6319, 6322, 6319 C3 & 6322 C3
MICROPROCESSOR CARD
VFC CARDS
OSCILLATOR CARD
CABLE CHANNEL TRAY WITH COVER(10CM WIDE)
CABLE CHANNEL TRAY WITH COVER(20CM WIDE)
CONTROL UNIT FOR GALLEY FIRE FIGHTING SYSTEM
EXTINGUISING AGENT CYLINDER
POWER CABLE 03 CORE 01 SQMM
SENSORS
HOOTERS
EMERGENCY STOP SWITCH
AUTO CHANGE OVER SWITCH (ACOS) , 100 AMPS, 415 V, 3PH, 50 HZ
CABLE 3 CORE, 95 SQMM
SHROUDED PUSH BUTTON YELLOW COLOUR
ADD ON BLOCK 1NC CONTECT
TRIPLE POLE 3 WAY WITH OFF ROTARY SWITCH RATED 6A
CONTACTOR 70A, 380-415V, 50 HZ COIL 2NO+2NC
MAX POWER CONTACTOR
CONTACTOR COIL
HRC FUSE LINK RATED 2A
HRC FUSE LINK RATED 20A
CONTACTOR X-MER PRY 415V, SEC 24V,50 HZ, 10VA
EAPL 2C/O DELAYED, 0.3SEC-30 MIN, A1D1
VOLTAGE SENSING RELAY
Waterproof LED light fitting
230 V LED Lamp
BEARING DE-6318 NDE -6314
POWER SUPPLY MODULE PLC M340
PROCESSOR MODULE M340
R/I CONVERTOR
RELAY(24V DC)
HEAVY DUTY TRANSFORMERS
MAIN CONTACTORS
AUXILIARY CONTACTORS
MAIN FUSES WITH BASE
CONTROL FUSES WITH BASE
INDICATORS
JOYSTICK
BEARING DE-6318 NDE -6314
POWER SUPPLY MODULE PLC M340
PROCESSOR MODULE M340
R/I CONVERTOR
RELAY
HEAVY DUTY TRANSFORMERS
MAIN CONTACTORS
AUXILIARY CONTACTORS
MAIN FUSES WITH BASE
CONTROL FUSES WITH BASE
INDICATORS
JOYSTICK
RPM Meter (0-1800)
Amps Meter (0-1000A DC)
Volt meter (0-600V DC)
PUSH BUTTONS
INDICATION LAMPS
ELMAX CONNECTORS
BCH MAKE 70 AMPS CONTACTOR
40 AMPS BCH MAKE CONTACTORS
BCH MAKE TIME DELAY RELAY
415 - 230 V CONTROL TRANSFORMER
CT MOUNTED BCH MAKE OVERLOAD RELAY
COPPER LUGS OF REQUIRED SIZES
01 CORE, 1 SQ MM COPPER CONDUCTOR, INSULATED
FOLLOW UP AMPLIFIER PCB
CAN BUS PCB
FEED BACK POTENTIOMETER
SIGNAL CALIBRATION BOX
RUDDER ANGLE INDICATOR
LIMIT SWITCH
CPU PCB
GYRO SUPPORTING LIQUID
DISTILLED WATER
SENSOR PCB
POWER SUPPLY PCB
CONNECTION PCB
OUTER SPHERE PCB
INTERFACE PCB
NMEA COURSE BUS CONVERTER CARD
GYRO PUMP.
PUMP ROTER WITH AXIS
CONTROL LOGIC CARD
ANNOUNCIATION CARD
INDICATION LAMPS (STD)
MCB DP (20A)
MAINS TRANSFORMER(TR1-1800VA)
AUXILIARY TRANSFORMER (20VA)
DC-MCCB(100A)
STD MAGNETIC COMPASS
TRANSMITTING MAGNETIV COMPASS
AC-DC CONVERTER (115/230V AC, 24V DC, 240W)
DIMMER 230V AC
DIMMER 24 V DC
JUNCTION BOX FOR REPEATER COMPASS
4 CORE 1.5 SQMM
LFH CABLE(3 CORE 1.5 SQMM)
SET ON BOARD SPARE
TIMER PCB
SOLENOID VALVE
DIAPHRAM
RELAY
PUSH BUTTON
TRANSMITTER
RECEIVER
JUNCTION BOX
TRANSMITTER
RECEIVER
JUNCTION BOX
SMF BATTERY (12 V 7.2 AH)
SMOKE SENSOR
HEAT SENSOR
ZONE/LOOP MODULE
INTRINSICALLY SAFE IDOLATOR
SHORT CIRCUIT ISOLATOR
DUAL PICK UP SENSORS
SMF BATTERY(65 AH,12V)
CPU PCB
INDICATION LAMPS (AS PER SAMPLE)
FUSES 02 AMPS
04 WAY ROTARY SWITCHES
SCREENED RF CABLE
CONTROL CABLE
SHORE LINE PORT CARD
SHORE LINE CONNECTION BOX
SHORE TELEPHONE 8 LINE INCOMING POINT
BATTERY 12V 7 AH
SPEAKERS 8W HORN TYPE&4W (WP)
SPLASH PROOF MIC
20W AMPLIFIER
100W AMPLIFIER
MIC CONNECTION BOX
HEADSET CONNECTION BOX
MIC STOWAGE BOX
HEADSET WITH BOOM MIC
12 V 4 Ah BATTERY
MCU MODULE
CP MODULE
SYNTHESISER MODULE
AM MODULE
PANEL MB
RF MODEM CARDS
SERIAL CARDS
16 CORE CABLE
LINK II CONNECTOR
PAE CONNECTOR
TR 2400 CONNECTOR
POWER SUPPLY CARDS AND RAID CARD IN SERVERUPS BATTERIES - 12 V 17 AH
WIRE AERIAL
INSULATOR
HF UNIT
SYNTHESISER
IF/AF PROCESSOR
08W HORN TYPE (WP) SPEAKERS
04W (NWT) SPEAKERS
PAS 8450 SRE MIC SOCKET
PAS 8480 SRE AND MUSIC PRE AMPLIFIER
PAS 8450 LIC
LBD 8486 ALARM1
LBD 8486 ALARM3
PAS 8464 MB/SRE LINK
PAS 8488 MB PRIORITYA>B
PAS 8481 LINE AMPLIFIER SRE
PAS 8481 LINE AMPLIFIER TRANSMIT
PAS 8483 I/P MON. SEL
PAS 8473 I/P O/P MON SEL+ MON SPEAKER
LBD 8468 O/P MON. SEL & VC
PAS 1268 PSU 24V DC
PAS 8450 PSU 5V
FAN PANEL
200W AMPLIFIER
RELAYS
TIMER UNIT
LBD 8484 CHIME
LAN CABLE
TELEPHONE CABLE
IP BASED TELEPHONE SET
CAMERA
AUDIO AMPLIFIER 200W
SPEAKERS 100W
BOOM MIC
CORDLESS MIC
16 Channel Digital Multichannel recorder (DMR-16 audio channels )
Shock Mounts
Power supply cable (3X4 Sq mm)
BNC connectors
Ethernet connector(RJ45)
USB connector (Type A)
Mono jack External speaker
02 core cable(STP cable)
1 KVA online UPS
Spike Guard 16 Amps
Hard disk(1 TB)
MCB(16 Amps)
M7 V/UHF TX/RX SET
ECCM MODULE WITH TALON WAVEFORM
GPS RECIEVER AND ANTENNA
GUARD RECIEVER
SURGE SUPPRESOR
REMOTE CONTROL UNIT
HEADSET WITH MIC
VHF FILTER
UHF FILTER
DIPLEXER
ANTENNA
RADAR SUPRESSION FILTER
SPEECH SECRECY EQUIPMENT(MA 4470)
SPEECH SECRECY EQUIPMENT ACCESSORIES
RG213 CABLE
RG218 CABLE
CONNECTOR FOR RG213 CABLE
CONNECTOR FOR RG218 CABLE
N-N ADOPTER CONNECTOR
34 U TWO SYSTEM RACK
CABLE FOR RCU
TOOL KIT
PSU MODULE
PROCESSOR MODULE
RF CONTROL MODULE
CONTROL HEAD MODULE
INTERFACE MODULE
RF PA MODULE
RC INTERFACE MODULE
GUARD RECIEVER
COMPONENTS SPARE KIT
CABLE 3 CORE 1.5 SQMM
SCREEN CABLE 10 CORE
CABLE RG 6
EM LOG MASTER UNIT (V2)
DISTRIBUTION UNIT
REPEATER UNIT( VCS)
REPEATER UNIT( BH)
CAL/TEST BOX
JUNCTION BOX
TRANSDUCER ASSEMBLY
CABLE ASSY-2 (100 MTRS)
EXTRACTOR TOOL (C SPANNER)
RETRANSMISSION UNIT
JUNCTION BOX
MICRO CONTROLLER CARD ASSEMBLY
FD CARD ASSEMBLY
CALIBRATION CARD ASSEMBLY
FUSE- 1A
FUSE- 2A
FUSE- 6A
FAN 115V AC, 25W
POWER SUPPLY 5V,6A
EXTENDER PCB ASSEMBLY
POWER MODULE
MOXA CARD
RIB CARD
CABLE FOR MOXA CARD
DATA INTERFACE UNIT,
KETBOARD
SHOCK MOUNTINGS
Display Control BOARD
RTM CONTROL BOARD
TRANSFORMER PCB,
TORQUE PCB
3-PH RELAY
MAGNETRON
AZIMUTH SENSOR
HL PROXMITY SWITCH
ANTENNA BUFFER PCB
SIRIUS PCB
23 INCH DISPLAY
ALPHA ASSEMBLY
VMFT PROCESSOR
SCAN CONVERTOR
PC I/O UNIT STANDARD COMPASS
24 SHOCK AND VIBRATION MOUNTING
MAIN PCB
DISPLAYUNIT
KEY PAD
ANTENNA
Receiver Assembly
TRANSRECIVER MODULE
33KHZ & 210 KHZ SIGNAL PROCESSING UNIT
POWER SUPPLY UNIT
COMMUNICATION UNIT
CCTV CAMERA
CAT 6 LAN CABLE
POWER CABLE 3x1.5 SQMM
MANAGED LAN SWITCH 24 PORT WITH CABINET
CCTV DISPLAY(32 inches)
UPS 2KVA
CCTV CAMERA CONTROL UNIT
Camera Lens
Power Supply Module
Infrared System
DA Bearing - NUP218
Safety Switch
415 V/ 25A Contactor with 01 OLR
Rotary Switch 415 V/ 25 A
Control Transformer (415 V, 3 Ph, 50 Hz To 220 V, 3 Ph, 50)
Deck Angle light
Deck Bar Light
Stop Bow Light
Cable (2 Core X 2.5 Sqmm)
Wiper Blade
Moving Roller
Safety Plates
30 Nos Each Of Lamp Red, Yellow And Blue
Flash proof Light
Cable (2 core x 2.5 sqmm)
Bunk Light
Shock Mount
Weather Deck Light With Transparent Glass
100W Led Reflector
Base Plate
24 V Dc Switch Socket
DC Cable. (2.5 Sqmm x 2 Core)
Cable Tray
Stain Steel Tie Rope
Gland packing material
Indication Panel
05 Yellow, 10 Red And 10 Green Light Indication Of 230v
230V with 2 NO/NC Contactor
Three phase 230V coil contactor
Indication Panel -
05 Yellow 05 Red And 05 Green Indication Of 230V
230V with 2 NO/NC Contactor and 02 Nos 3 pole moving 230V Contactor
Power Supply Cable (0.5 Sqmm 6 Core)
Bilge Light 20
power supply cable. (0.5 Sqmm x 6 Core)
Air Heater Tube
Thermostat
Nos 24V DC Relay
Contactor with 2 NO/NC Of 220V
Limit Switch/ Safety Switch
Fan Assembly With Motor
Cable (2.5 Sqmm x 3 Core)
Cable (2.5 Sqmm x 2 Core)
Mast head Light
RCU Connectors
Indication Yellow Lamp
BNC Connectors
SS metallic Talley
Aux Cable Connector
Battery, (12 V 75AH)
SS Box
Control PCB
NMEA Buffer (RS 232/ RS 422)
Control Panel with Hooter and Visual Alarm Panel
NO/NC Switch
Cable (0.5 sqmm x 04 Core)
Receiver Assembly
RPM Meter (0-1800)
Ammemeter (0-1000A DC)
Voltmeter (0-600V DC)
Larsen and Toubro Limited
Hindustan Shipyard Limited
COCHIN SHIPYARD LIMITED
COCHIN SHIPYARD LIMITED
Larsen and Toubro Limited
Hindustan Shipyard Limited
Larsen and Toubro Limited
COCHIN SHIPYARD LIMITED
Garden Reach Shipbuilders and Engineers Limited
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid