Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Ref. No.
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
10 Dec 2020, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
KAMAL BALA
CF-17, AA-1C, New Town, Kolkata
REQUEST FOR EMPANELMENT OF AGENCIES FOR DIVERSION WORK OF TRANSMISSION LINE UNDER ER-II
ER-II/KOL/CS/I-2463/RFx: 5001000480
Empanelment
Other Services
Multi-stage
West Bengal & Sikkim
10 Dec 2020
25 Aug 2020
10 Dec 2020
25 Aug 2020
10 Dec 2020
25 Aug 2020
Survey
Excavation of Various types of Soil.
Concreting( including all associated work related to foundation work
Erection of various types of Towers, Tower parts and its body/ extensions (complete) including Bolts & Nuts, Step bolts, Hangers, D-Schacles etc including tack welding & application of zink rich primer and two coats of enamel paints.
Installation of Earthing of Towers
Installation of Tower Accessories
Installation of Insulator Strings complete with Arching horns, necessary Hardwares & Stringing of conductor including fixing of conductor accessories, Installing & Stringing of Earthwire / OPGW including fixing of eaartwire/OPGW accssories.
De-Stringing of Insulator Strings, Conductor, Earthwire with all conductor & earhwire Hardwares, providing necessary back stays and transporting back to POWERGRID store
Installation of following atems for Aviation Requirement
Dismantling of various types of Towers, Tower parts and its body/ extensions (complete) including Bolts & Nuts, Step bolts, Hangers, D-Schacles, Danger plate, Number Plate, Phase Plate, ACD etc including de- welding of Bolts & Nuts and transporting back to POWERGRID Store (within 100 Km).
Loading, Unloading & Transportation of new Tower parts, conductor,H/W etc.from POWERGRID store to site . Also loading, Unloading & Transportation of old Tower parts, conductor,H/W etc.from site to POWERGRID store (within 100 Km)
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge.
1:3:6 or richer mix
Demolishing R.C.C work manually/by mechanical means including stacking steel bars and disposal of un-servicable material within 50 meters lead as per direction of Engineer-in charge.
Tower Foundation protection work
Name of the Company
Figures in INR
Sales
Other Income(Except non-incurring income)
Total Income
Net Profit After Tax (PAT)
Share Capital
Reserves & Surplus
Miscellaneous Exp not written off
Net worth
Net Fixed Assets
Non current Assets
Net Current Assets
Capital Employed(7+8)
Current Assets
Inventories
Sundry Debtors
Liquid Assets
Current Liabilities & Provisions
Long Term Loan Funds
Repayment of Loans
Depreciation
Interest Paid
PAT + Depreciation + Interest
Profitability Ratios (%)
Net Profit to Total Income (4/3)
Net Profit to Capital Employed (4/9)
Net Profit to Net Worth (4/6)
Liquidity Ratios (Times)
Current Ratio (10/12)
Debt to Equity Ratio (13/6)
Other Ratios (%)
Debtor to Sales Ratio
Inventory to Sales Ratio
Other Ratios (Times)
Debt Service Coverage Ratio [17/(14+16)]
Interest Coverage Ratio [17/16]
Debtor Turnover Ratio (Sales/Av Receivables)
Other Ratios (Days)
Debtor Velocity (365/Debtor Turnover Ratio)
Debtor Turnover Ratio
Debtor Velocity
Figures in INR Millions
Sales
Other Income(Except non-incurring income)
Total Income
Net Profit After Tax (PAT)
Share Capital
Reserves & Surplus
Miscellaneous Exp not written off
Net worth
Net Fixed Assets
Net Current Assets
Capital Employed(7+8)
Current Assets
Inventories
Sundry Debtors
Liquid Assets
Current Liabilities & Provisions
Long Term Loan Funds
Repayment of Loans
Depreciation
Interest Paid
PAT + Depreciation + Interest
Profitability Ratios (%)
Net Profit to Total Income
Net Profit to Capital Employed
Net Profit to Net Worth
Liquidity Ratios (Times)
Current Ratio (10/12)
Debt to Equity Ratio (13/6)
Other Ratios (%)
Debtor to Sales Ratio
Inventory to Sales Ratio
Other Ratios (Times)
Debt Service Coverage Ratio [17/(14+16)]
Interest Coverage Ratio [17/16]
Debtor Turnover Ratio (Sales/Av Receivables)
Other Ratios (Days)
Debtor Velocity (365/Debtor Turnover Ratio)
Figures in INR Crores
Sales
Other Income(Except non-incurring income)
Total Income
Net Profit After Tax (PAT)
Share Capital
Reserves & Surplus
Miscellaneous Exp not written off
Net worth
Net Fixed Assets
Net Current Assets
Capital Employed(7+8)
Current Assets
Inventories
Sundry Debtors
Liquid Assets
Current Liabilities & Provisions
Long Term Loan Funds
Repayment of Loans
Depreciation
Interest Paid
PAT + Depreciation + Interest
Profitability Ratios (%)
Net Profit to Total Income
Net Profit to Capital Employed
Net Profit to Net Worth
Liquidity Ratios (Times)
Current Ratio (10/12)
Debt to Equity Ratio (13/6)
Other Ratios (%)
Debtor to Sales Ratio
Inventory to Sales Ratio
Other Ratios (Times)
Debt Service Coverage Ratio [17/(14+16)]
Interest Coverage Ratio [17/16]
Debtor Turnover Ratio
(Sales/Av Receivables)
Other Ratios (Days)
Debtor Velocity
(365/Debtor Turnover Ratio)
Name of the Company
Figures in INR
PARTICULARS
Net Cash flow from Operating Activities (A)
(As per the Cash Flow Statement forming part of the
Audited Accounts)
Lon Term Loans - banks repaid (B)
Dividend and Dividend Tax paid (C)
Cash Flow from Operations net of Repayment of loans &
Dividend (A)-(B)-(C)
Cash Flow from Operations net of Repayment of loans &
Dividend (In Crores)
Name of the Company
Figures in INR Crores
PARTICULARS
Net Cash flow from Operating Activities (A)
(As per the Cash Flow Statement forming part of the
Audited Accounts)
Lon Term Loans - banks repaid (B)
Dividend and Dividend Tax paid (C)
Cash Flow from Operations
net of Repayment of loans & Dividend (A)-(B)-(C)
REQUEST FOR EMPANELMENT [RfE (2463)] OF AGENCIES FOR DIVERSION WORK OF TRANSMISSION LINE UNDER ER-II
REF.: ER-II/KOL/CS/I-2463/RFx: 5001000480
This Price_schedule sheet is enclosed as per the requirements of SRM Portal attachment bidding and not for the purpose of agencies submitting their applications for empanelments for the aforesaid subject.
Survey
Excavation of Various types of Soil.
Concreting( including all associated work related to foundation work
Erection of various types of Towers, Tower parts and its body/ extensions (complete) including Bolts & Nuts, Step bolts, Hangers, D-Schacles etc including tack welding & application of zink rich primer and two coats of enamel paints.
Installation of Earthing of Towers
Installation of Tower Accessories
Installation of Insulator Strings complete with Arching horns, necessary Hardwares & Stringing of conductor including fixing of conductor accessories, Installing & Stringing of Earthwire / OPGW including fixing of eaartwire/OPGW accssories.
De-Stringing of Insulator Strings, Conductor, Earthwire with all conductor & earhwire Hardwares, providing necessary back stays and transporting back to POWERGRID store
Installation of following atems for Aviation Requirement
Dismantling of various types of Towers, Tower parts and its body/ extensions (complete) including Bolts & Nuts, Step bolts, Hangers, D-Schacles, Danger plate, Number Plate, Phase Plate, ACD etc including de- welding of Bolts & Nuts and transporting back to POWERGRID Store (within 100 Km).
Loading, Unloading & Transportation of new Tower parts, conductor,H/W etc.from POWERGRID store to site . Also loading, Unloading & Transportation of old Tower parts, conductor,H/W etc.from site to POWERGRID store (within 100 Km)
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge.
1:3:6 or richer mix
Demolishing R.C.C work manually/by mechanical means including stacking steel bars and disposal of un-servicable material within 50 meters lead as per direction of Engineer-in charge.
Tower Foundation protection work
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
Price_schedule.xlsx
xlsx • 0.01 MB
10_1_2_Appendix B-C-D OPGW Inst..pdf
pdf • 1.75 MB
04_2_APP-I_Precommissioning final.pdf
pdf • 1.25 MB
04_3_APP-II_SFQP Transmission Line, Revision 06.pdf
pdf • 2.80 MB
04_5_Annex-I_ SAT.pdf
pdf • 0.33 MB
04_6_AM formats.pdf
pdf • 0.56 MB
00-Cover Page_Vol-II.doc
doc • 0.12 MB
04_1-Section 4-Rev-6 March-2018 withMod june 19.pdf
pdf • 0.82 MB
01-SECTION-1 Empanelment of Erection Agencies R1.pdf
pdf • 0.85 MB
02-Section-II -Rev-6 March-2018.pdf
pdf • 0.74 MB
03_1-SECTION - 3 - Rev-6 March-2018 with Mod upto Oct-2018 .pdf
pdf • 0.99 MB
03_3_ TS_VOL-II_,Sec-III _2nd Part_ Annex B -C-D-E.pdf
pdf • 0.48 MB
01 Instruction to Bidders Sec-1 to 5.doc
doc • 0.47 MB
02_Annex-I (Sec-2_Clause-1 2).doc
doc • 0.19 MB
03_KMP Decla_(Sec-2_Clause-6 9).docx
docx • 0.05 MB
04_RfE (2020)_Sec-6_Appli Form.doc
doc • 0.20 MB
05_Attach-1_Integrity Pact.doc
doc • 3.83 MB
06_Attach-2_Power of Attorney.doc
doc • 0.14 MB
07_Attach-3_QR.doc
doc • 0.20 MB
08_Attach-4_Cover Page.doc
doc • 0.16 MB
09_Attach-4_Sec-I (Comp Profile).doc
doc • 0.19 MB
10_Attach-4_Sec-II (Fin Details).doc
doc • 0.17 MB
11_Attach-4_Sec-II-(Bank Certi).docx
docx • 0.05 MB
12_Attach-4_Sec-II-Fin Details.xlsx
xlsx • 0.04 MB
13_Check List.docx
docx • 0.05 MB
Exhaustic BOQ.xlsx
xlsx • 0.01 MB
Scope of work.docx
docx • 0.06 MB
Thumbs.db
db • 0.01 MB
Corrigendum_-_III.doc
doc • 1.19 MB
Corrigendum_-_II.doc
doc • 1.19 MB
Corrigendum_-_I.doc
doc • 1.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .