Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 38 22 39 PLOT NO C11 SRI TOWER ROAD NO 10 INDUSTRIAL ESTATE INDUSTRIAL ESTATE KANCHARAPALEM VISAKHAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance NO 5 1ST FLOOR CITY PLAZA DABA GARDEN DABA GARDEN VISAKHAPATNAM ANDHRA PRADESH 530020 | VISAKHAPATANAM | ANDHRA PRADESH | 530020 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
30 Dec 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM
NORMAL REFIT OF IN ASSET
2021_NAVY_493492_1
COM/0361/IN ASSET/NR O/L-22/A
Open Tender
Marine Services
Turn-key
150 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
COY CONFERENCE HALL
11 Feb 2022
9 Dec 2021
31 Dec 2021
9 Dec 2021
30 Dec 2021
16 Dec 2021
10 Dec 2021 - 30 Dec 2021
14 Dec 2021
240 days
HULL SOW - IN-ASSET (NR22) Equipment/Defect Description HULL SOW 001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e ND(V) slipway).
002 Hull Cleaning Under Water and Boot Top Area (a) jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and present for survey.
002 Hull Cleaning Shipside above water including bulwark and Superstrcture (b) HP jet clean entire Shipside (with a pressure not exceeding 3000 PSI) to remove the salts and contaminants from the surface and present for survey and present for survey.
002 Hull Cleaning Weather Deck (c) HP jet clean entire Weather Deck including fittings (with a pressure not exceeding 3000 PSI) remove salts and contaminants from the surface and present for survey.
002 Hull Cleaning Tanks (d) Manually clean following tanks and present for survey.The tanks should be washed out with fresh water and soap water to remoeve any sediment or dirt present in the tank :- WB Tanks (08 Nos)-2340 Sqm. , Fore peak tank- 680 Sqm, Fuel oil tank including avcat -1515 Sqm., domestic FW tank - 60 Sqm, fuel oil tank (02)- 200 Sqm Bilge tank-20 Sqm., lube oil tank - 30 Sqm, dirty oil tank - 33 Sqm, sullage tank, overflow tank - 45 Sqm, Slop tank p& s 02 - 150 Sqm,FW-155 Sqm. ,Void spaces and cofferdam-401 Sqm., cable locker-60 Sqm., Sqm., Various stores( provision, bosun, deck, cargo, paint and eng. Electrical stores)- 430 Sqm.and engine room including bilges-1100 Sqm. Steerin comp - 200 Sqm Pump and emg pump room- 500Sqm
003 Hull survey External and Internal Hull survey. Carry out visual and hammer survey (in the presence of QC representatives) in accordance with NO 01/15 of under water hull, boot top area, above water hull, super structure, weather decks and all internal compartments(i.e. FW tanks, ballast tanks, fore peak tank, engine room, steering compartment, FO tanks, cofferdams, all stiffeners and deck fittings etc.. Approx. area:7724 Sqm Firm to submit 07 copies of Hull survey report .
004 UTG Survey Carry out UTG survey in the presence of QC representatives of U/W hull, sea tubes, sea chest and wherever recquired ie.superstructure,above water hull,weather deck,tank top etc.as per survey team. Firm to submit 07 copies of Hull survey report. All deck fittings to be surveyed, repaired and load tested where considered necessary.All manholes to be inspected and repaired to ensure watertightness including conduct of Chalk impression test.
005 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, degutting/regutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc. Note 2:- Firms to indicate cost of new panelling(2mm thick) and Lagging (2" MFMB) material in the budgetary cost for 50 sqm each.
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (a) 25 x 25 mm - 150Nos
006 Build ups (b) Carry out build ups as indicated by the Hull survey team/ Surveyor (b) 50 x50 mm - 75 Nos
007 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor
008 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.
009 Sea tubes and underwater grating (a) Surface prepartion of of the sea tubes to be carried out for survey and pressure testing of sea tube including sea chest . Dia - 300mm
009 Sea tubes and underwater grating (b) Open underwater gratings, present for survey, carry out necessary repairs and refit back.
010 Draught Marks Draught marks, both Roman and Numeric, corroded/eaten away. To be renewed and painted.
011 Sacrificial Anodes (a) Renew MK - IV sacrificial anodes which are perished over 50%. Note:- Anodes will be supplied by Firm.
011 Sacrificial Anodes (b) Renew MK - VI sacrificial anodes which are perished over 50%. Note:- Note:- Anodes will be supplied by Firm.
012 Surface preparation Under Water area including Boot top area with Grit Blasting Spot blasting to SA 2.5 on complete UW area including boot top.last paint scheme done in 2012 while induction and due for renewal as per NO-53/16 :-
012 Surface preparation Under Water area including Boot top area with Grit Blasting Spot blasting to SA 1 on complete UW area including boot top as per NO-53/16 :-
013 Painting - Jotun Scheme Under Water area including Boot top area Complete UW Paint scheme renewal view last paint scheme done in 2012 while induction and due for renewal as per NO-53/16 :- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red) - 150 microns DFT
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Sea Quantum Pro U and Spectrum 150 microns (Light Red/Dark Red) - 150 microns DFT
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Black)-2x150 microns DFT Note: 7th Coat is only for boot top area.
14 Surface Preparation Above Water Area and Bulwark (a) Spot blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application.
014 Surface Preparation Above Water Area and Bulwark (b) Carry out surface preparation with sweep blasting on above area to ST1 standard for paint application as recommended by paint OEM.
015 Painting - JOTUN Scheme. Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
015 Painting - JOTUN Scheme. Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
015 Painting - JOTUN Scheme Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic(Grey) - 125 microns DFT
015 Painting - JOTUN Scheme. Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP RAL 9011(black) - 60 microns DFT
016 Surface Preparation Super Structure (a) Carry out mechanical cleaning to ST3 standard as per survey report of Paint OEM for paint application.
016 Surface Preparation Super Structure (b) Carry out surface preparation with sweep blasting on above area to ST1 standard for paint application as recommended by paint OEM.
017 Painting - JOTUN Scheme Super Structure Paint super structure area area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - penguard primer -50 microns DFT
017 Painting - JOTUN Scheme Super Structure Paint super structure area area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 80 red brown - 125 microns DFT
017 Painting - JOTUN Scheme Super Structure Paint super structure area area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic 80 grey- 125 microns DFT
017 Painting - JOTUN Scheme Super Structure Paint super structure area area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP IS 5/ 358 (Buff Colour)- 150 microns DFT
018 Surface Preparation Weather Decks Bridge Deck Bridge Top and Fittings (a) Carry out Hydrojet ballasting to ST3 standard as per survey report of Paint OEM for paint application for entire weather deck, wheel house deck, flag deck and life raft deck.
019 Painting - JOTUN Scheme Weather Decks Bridge Deck Bridge Top and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
019 Painting - JOTUN Scheme Weather Decks Bridge Deck Bridge Top and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 of 200 microns
019 Painting - JOTUN Scheme Weather Decks Bridge Deck Bridge Top and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota Armour Dark grey of 800 microns
020 Surface Preparation Internal Compartments Fresh Water Tanks (02 Nos) (a) Carry out mechanical cleaning to ST3 standard as per survey report of Paint OEM for paint application.
020 Surface Preparation Internal Compartments Fresh Water Tanks (02 Nos) (b) Carry out mechanical cleaning to ST1 standard as per survey report of Paint OEM for paint application.
021 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) Paint two in no. fresh water tanks and one fire fighting foam tank with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard HB (white) -100 microns DFT
021 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) Paint two in no. fresh water tanks and one fire fighting foam tank with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Penguard HB(Grey) -100 microns DFT
021 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) Paint two in no. fresh water tanks and one fire fighting foam tank with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Penguard HB (white) -100 microns DFT
022 Surface Preparation Fore Peak & Aft Peak Tanks , Void Space, Cofferdam and cable locker (a) Carry out mechanical cleaning to ST3 standard as survey report of Paint OEM for paint application.
022 Surface Preparation Fore Peak & Aft Peak Tanks , Void Space, Cofferdam and cable locker (b) Carry out mechanical cleaning to ST 1 standard as per survey report of Paint OEM for paint application.
23 Painting - JOTUN Scheme Fore Peak & Aft Peak Tanks , Void Space, Cofferdam and cable locker Paint Fore Peak & Aft Peak Tanks , Void Space, Cofferdam and cable locker with following paint scheme. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
23 Painting - JOTUN Scheme Fore Peak & Aft Peak Tanks , Void Space, Cofferdam and cable locker Paint Fore Peak & Aft Peak Tanks , Void Space, Cofferdam and cable locker with following paint scheme. (b) 2st Coat: primer - Anticorrosive - Jotacote Universal (Aluminium) -150 microns DFT
23 Painting - JOTUN Scheme Fore Peak & Aft Peak Tanks , Void Space, Cofferdam and cable locker Paint Fore Peak & Aft Peak Tanks , Void Space, Cofferdam and cable locker with following paint scheme. (c) 3rd Coat: Anticorrosive - Jotacote Universal (Grey) - 150 microns DFT
23 Painting - JOTUN Scheme Fore Peak & Aft Peak Tanks , Void Space, Cofferdam and cable locker Paint Fore Peak & Aft Peak Tanks , Void Space, Cofferdam and cable locker with following paint scheme. (d) 4st Coat: Top coat : Penguard Top coat -50 microns DFT
024 Surface Preparation Ballast Tank (08 Nos) (a) Carry out mechanical cleaning to ST3 standard as survey report of Paint OEM for paint application.
024 Surface Preparation Ballast Tank (08 Nos) (b) Carry out mechanical cleaning to ST 1 standard as per survey report of Paint OEM for paint application.
025 Painting - JOTUN Scheme Ballast Tanks(08 No) Paint ballast tanks (08 in no.) with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
025 Painting - JOTUN Scheme Ballast Tanks(08 No) Paint ballast tanks (08 in no.) with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
025 Painting - JOTUN Scheme Ballast Tanks(08 No) Paint ballast tanks (08 in no.) with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
026 Surface Preparation Machinery Compartments- Engine room and ASP (a) Carry out mechanical cleaning to ST 3 standard as per survey report of Paint OEM for paint application ( Bilges).
026 Surface Preparation Machinery Compartments -Engine room and ASP (b) Carry out mechanical cleaning to ST 1 standard as per survey report of Paint OEM for paint application (Bulkheads).
027 Painting - JOTUN Scheme. Machinery Bilges Paint bilges of Engine room and ASP compartment with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
027 Painting - JOTUN Scheme. Machinery Bilges Paint bilges of Engine room and ASP compartment with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Anticorrosive - Jotacote Universal grey (Aluminium) - 150 microns
027 Painting - JOTUN Scheme. Machinery Bilges Paint bilges of Engine room and ASP compartment with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive - Jotacote Universal (Grey) - 150 microns
027 Painting - JOTUN Scheme. Machinery Bilges Paint bilges of Engine room and ASP compartment with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Penguard Top Coat GREY - 60 microns.
028 Surface Preparation Machinery Compartments- Bulkheads of Engine Room And ASP (a) Carry out mechanical cleaning to ST 3 standard as per survey report of Paint OEM for paint application ( Bilges).
028 Surface Preparation Machinery Compartments- Bulkheads Of Engine Room And ASP (b) Carry out mechanical cleaning to ST 1 standard as per survey report of Paint OEM for paint application ( Bilges).
029 Painting- Jotun Scheme. Machinery Compartments- Bulkheads Of Engine Room And ASP Paint bulkheads of Engine room and SRP compartments with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer - 50 microns DFT
029 Painting- Jotun Scheme. Machinery Compartments- Bulkheads Of Engine Room And ASP Paint bulkheads of Engine room and SRP compartments with following paint scheme:- (b) 2nd Coat: White interior fire retardant paint 100 microns DFT
029 Painting - Jotun Scheme. Machinery Compartments- Bulkheads Of Engine Room And ASP Paint bulkheads of Engine room and SRP compartments with following paint scheme:- (c) 3rd Coat: White interior fire retardant paint 100 microns DFT
030 Cleaning and Application of Oil (a) Fuel Tanks Manually scrap and clean Fuel Tank (10 nos) to bare metal and apply two coats of OM 750 oil. Note:- Quoted repair cost shall be inclusive of cost of oil also
030 Cleaning and Application of Oil (b) RU (FODS) Tank Manually scrap and clean RU Tank (02nos) to bare metal and apply two coats of OM 750 oil Note:- Quoted repair cost shall be inclusive of cost of oil also
030 Cleaning and Application of Oil (c) LO tanks & dirty oil tanks Manually scrap and clean LO Tank and dirty oil tank to bare metal and apply two coats of OM 750 oil Note:- Quoted repair cost shall be inclusive of cost of oil also
031 Surface Preparation Tank AVCAT Tank Carry out mechanical cleaning to ST3 standard as survey report of Paint OEM for paint application.
032 Painting - JOTUN Scheme AVCAT Tank Paint AVCAT Tank with following paint scheme. (a) 1st Coat: Anti corrosive - Tankguard HB-150 microns DFT Note:- Quoted repair cost shall be inclusive of cost of paints also.
032 Painting - JOTUN Scheme AVCAT Tank Paint AVCAT Tank with following paint scheme. (a) 1st Coat: Anti corrosive - Tankguard HB-150 microns DFT Note:- Quoted repair cost shall be inclusive of cost of paints also.
033 Chairs Chairs in bridge and master/crew cabin damaged/ broken/ including cushion & roller wheels, Chairs is to be replaced as per sample.
034 Fixed H2S Sensor Provision of Fixed H2S sensors in the vicinity of STP compartment. (OEM - Hi-Point Services Pvt. Ltd.) Including installation of sensors and control pannel. Trial of H2S sensor to be undertaken as per NCD 3930 issue 3. Note:- Trial report along with H2S sensors calibration certificate by OEM to be submitted.
035 Water purifier Provision Of Drinking Water Purifier of 9 Ltr Capacity For Domestic Use In Galley And Crew Dinning Hall. Work Also Involves Fitment, Piping Arrangement And Commissioning Of The System. –With 02 Set Of Spares Including Filter And Membrane. Work Includes Provisioning Of Following Spares Also :- (a) RO Membrane Welded -01 , (b) RO Membrane High Flow-01 (c) Inline Carbon filter-01 , (d) Inline Sediment Filter- 01 , (e) Activated Carbon Filter (Excel Elite) , (f) Post Carbon Filter-01
036 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and refitment a) Anchor
036 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and refitment (b)Length of chain cable-275 Mtrs each, dia-24 mm
036 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and refitment. (c) Swivel piece
036 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and refitment. (d) Lug less joining shackles
036 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and refitment. (e) Cable stopper
036 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and refitment. (f) D Shackles
039 Bollards Single bollards (a)Bollards including foundation corroded, thinned to be repaired as per Hull survey report.
040 Bollards Twin bollards (a) Twin Bollards including foundation corroded, thinned to be repaired as per Hull survey report.
040 Bollards Twin bollards (b) twin Bollards including foundation corroded, thinned to be renewed as per Hull survey report.
041 Tyre Fender Tyre fender damaged on P&S side , to be renwed with used aircraft tyre fenders moulded with 8 mm white natural rubber. Mat- Rubber, colour-white . No painting or coating of any other form will be permitted. (a) OD 800 mm; ID 400mm width of tyre- 360 mm
041 Tyre Fender securing arrangement Tyre fender to be secured with 16 mm dia chain on head, stern and ship side (b) Securing chains: 16 mm dia
041 Tyre Fender securing arrangement Tyre fender to be secured with D shackles on ship side (c) Shackles 16 mm dia
041 Tyre Fender securing arrangement Securing chain is to be passed through metallic sleeves inserted into the tyre fenders (d) Securing Brackets (3 per tyre) of Tyre Fenders damaged / detoriartyed to be renewed
041 Tyre Fender securing arrangement Tyre fenders securing eye plates to be welded along ships side for connecting of securing chains (e) Eye plate thickness 8 mm. (Mat - MS)
042 Bulwark (a)Bulwark at various places dented/damaged. To be included in hull in survey and renew as per survey report. Thickness-6 mm
043 Bulwark coaming (b) Bulwark coaming pipes corroded and thinned. To be included in hull in survey and renewed as per survey report. Dia 3 " Mat : MS
043 Bulwark farme (c) Bulwark frame corroded and thinned at various locations on weather deck. To be included in hull in survey and renewed as per survey report.
044 Sky light/port holes Sky light at various places damaged including glass. Skylight/port holes is to be repaired as per sample.
045 D SHAPED FENDERS (a) 'Removal of all D shaped fenders for survey of C channels and necessary repairs is to be attended on securing channels including nut and bolts). Post repair of C channels damaged fenders is to be renewed Details of D shaped rubber fender and associated fittings are as follows:- D' shaped fenders of 1000 X100X250 mm
045 D Shaped Fenders Securing Arrangement C Channel (b) Fender Securing Arrangement Corroded/Thinned/Holed , To Be Repaired As Per Hull Survey Reports
045 D shaped fenders securing arrangement nut and bolts (c) Fender securing arrangement i.e nut and bolts corroded/thinned/holed , to be renewed for securing of D fenders around ship side
046 Rubber beading. Rubber beading of doors at various places perished/cracked to be renewed and chalk test to be proved. As per sample (a) WT door
046 Rubber beading. Rubber beading of hatches at various places perished/crackedto be renewed and chalk test to be proved. As per sample b) WT hatch
046 Rubber beading. Rubber beading of hatches at various places perished/crackedto be renewed and chalk test to be proved. As per sample b) Circular hatch
046 Rubber beading. Rubber beading of skylight perished/crackedto be renewed and chalk test to be proved. As per sample (c) Ventilator/Sky light
047 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and PROVE TO 150 mm for 10 minutes. Note:- APT and proving of those tanks wherein steel renewel/buildup undertaken as part of steel renewal DL.005 above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (a) Fresh Water Tank
047 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and PROVE TO 150 mm for 10 minutes. Note:- APT and proving of those tanks wherein steel renewel/buildup undertaken as part of steel renewal DL. 005 above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (b) Ballast Tank
047 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and PROVE TO150 mm for 10 minutes. Note:- APT and proving of those tanks wherein steel renewel/buildup undertaken as part of steel renewal DL. 005 above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial.. (c) Forepeak Tank ,cofferdam and void spaces
047 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and PROVE TO 150 mm for 10 minutes. Note:- APT and proving of those tanks wherein steel renewel/buildup undertaken as part of steel renewal DL. 005above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (d) Fuel Tank ,do tanks , bilge holding tank
048 BIilge Platform (a) Renew bilge platform plate. Material- chequered aluminium, thickness- 05 mm
048 BIilge Platform (b) Bilge platform supporting brackets to be renewed where ever required. Mat - MS
049 Cleats MS cleats perished/thinned to be repaired. As per survey report. Mat : MS
050 Mushroom type Ventilators (a) Mushroom type ventilators to be removed, cleaned/ overhauled and fitted back. All greasing nipples to renew. Operation of Mushroom heads to prove for satisfatory ops. Details- Mush room head dia-600 - 1000 mm, Height-800 mm
050 Mushroom type Ventilators (b) Wire mesh of all the mushrooms head corroded/thinned/holed , to be renewed. As per sample.
051 Tank/Vent Pipe Vent pipes of various tanks on upper deck corroded and thinned, to be repaired. (Mat. GI pipe) (a) Pipe dia 2 1/2 inch
051 Tank/Vent Pipe Vent pipes of various tanks on upper deck corroded and thinned, to be repaired. (Mat. GI pipe) (b) Distance piece and flanges: Dia 150mm (including rubber joints)
052 WT Hatch butterfy nut & bolt (a) Butterfy Nut & and Bolt of WT Hatch at various places jammed , to be lubricated including washer and fitted back
053 WT Doors (a) Clips of WT. Doors Jammed to be removed lubricated including washer, nut and fitted back
053 WT Hatch metal coaming (b) Metallic coaming of WT Hatches on weather deck and various locations corroded and thinned. To be renewed as per survey report.
054 Circular hatches Oprating lever of circular hatches jammed, to be overhauled and Prove for satisfactory Operation
055 NWT doors NWT wooden doors including frames of wheel house/crew cabin, master cabin perished /damaged. To be repaired
056 Ventilation trunking Ventilation trunking perished to be repaired/ renewed. Location: - crew rest room , masters cabin, ED rest room galley/dinning hall, engine room and fitted back .
057 Breather pipe Breather pipe on weather deck perished/damage.To be repaired.
058 Liferaft Securing stand of Life rafts perished and damaged. To be renewed alongwith rubber lining and supporting frame, including fitment of HRG Mat-MS .Thickness- 06mm.
059 Nav Light Nav light foundation (Port & Stbd) corroded, to be repaired/renewed. Size: 620mmx620mmx300mm and thickness 6mm, Mat MS
060 Drainage System MS Scupper lips with rubber packing corroded/thinned/holed, to be renewed at ship side.
061 Drainage System (a)Deck Drain pipes corroded/ holed, to be renewed/repaired. Dia 2 1/2 inch. Mat: GI note : Pipes / fittings should be secured with rubber packing’s and clamps uniformly
061 Drainage System (b) Deck Drain of wheel deck (P&S) chocked. Drain water flows to all connected accomodation areas, including Master cabin,alleyways and Galley. Chemical cleaning of Drain pipes to be undertaken. Post chemical cleaning of pipe to be refit. Deck Drain lines to prove for satisfactory operation. Note : Job involves degutting and regutting of panelling.
062 Drainage System Scupper with coaming of drain pipe corroded/ thinned, to be repaired. Size: 250mmx200mm
063 Drainage System Deck drain pieces on upper deck corroded, to be repaired. Dia 2 1/2 inch, each of length 01Mtr. note-The job involves removal/repair and fitment of pipes/ panelling/ lagging/ trunking in the way.
064 Drainage System. Soil pipes of Crew, ED's and Master's bathroom to be removed chemically cleaned and fit back.
065 Pipelines Carry out pressure testing & repairs of soil pipe/drainage pipe/fresh water lines fitted at various locations
066 Domestic Water Supply (a) Serviceability checks of water cooler in crew dining hall is to be carried out. Water Cooler to prove for Satisfactory Operation. Renew Water Cooler if found BER. (Firm to quote for service & material cost as mentioned in scope of work)
066 Domestic Water Supply (b) Domestic water Purifier all Filter catridges to renew. Pipes & connections to water purifier repair/renew.
067 Lifebuoy (a) Lifebuoys to be painted as per sample including lettering and symbols.
067 Lifebuoy (b) Lifebuoys stand damaged/corroded to be repaired.
068 Furniture (a) Wooden table damaged/broken at crew dinnig hall and crew cabin to be renewed.
068 Furniture (b) CRCA/Wooden kit locker at various places broken/damaged. To be repaired.
066 Furniture (c) CRCA standing lockers perished, to be renewed. (183x40x45 cm)
069 Guard Rails and stanchions (a)Fixed guardrail stanchions/ flat bar on weather deck deformed/bent from deck to be repaired/renewed. (mat-MS angle bar)
069 Guard Rails and stanchions (b) Fixed guardrails pipe on weather deck deformed/bent to be repaired/renewed. (mat-MS)
069 Guard Rails and stanchions (c) Securing chain between stanchions on upper deck damaged. To be renewed.
070 Name board Fuel barge name board perished/damaged, to be renewed/repaired. (a) Repair/renewal of vessel name board including electroplating to be carried.
070 Name board Fuel Barge name board perished/damaged, to be repaired. (b) Illuminated name board with Perspex sheet - 01
071 Door locks Mortise lock of non WT door defective at various locations, New mortise locks to be fitted. including 03 set of keys
072. Sanitary system Wash basin & WC to be renew in accomodation
072 Sanitary system SS tap damaged in crew batroom repaired as indicated (b) SS tap: 1/2 inch
072 Sanitary system supply pipes damaged-corroded/thinned/holed in crew batroom and wc to be repaired as indicated c) Supply pipe: Mat : Cu-Ni, dia: ½’’
072 Sanitary system Flush valves damaged-corroded/thinned/holed in crew batroom and wc to be repaired as indicated d) Flush valves - Mat - Brass, Dia - 2"
072 Sanitary system PVC Wash basin Drain Pipe Line Damaged To Be Renewed As Indicated (e) PVC drain pipe Note:- Quoted repair cost shall include cost all items.
072 Sanitary system WC/Commode (f) WC commode flush system not working. Flush system to repair and prove for satisfactory operation
072 Sanitary system WC/Commode (g) WC commode and base plate in crew wash room perished/corroded, to be renewed.
073 Bathroom fittings Bathroom fittings damged/broken in crew bathrooms and master bathroom , to be renewed as per sample (a)cu -ni supply pipes
073 Bathroom fittings Bathroom fittings damged/broken in crew bathrooms and master bathroom , to be renewed as per sample (b) Shower head
074 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments. (a) Degutting of tiles in crew bathroom, ED and Master Bathroom to be undertaken. Post degutting of tiles application of underlay to be undertaken as per NCD 3717.
074 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments. (b) Surface preparation and application of EROP. As per NCD 3717
074 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments NOTE;-Dry Compt area-110 SQM, Wet Compt Area-30 SQM, Dadoes area- 15 SQM (c) Application of Underlay as per NCD 3717
074 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments NOTE;- Dry Compt area-110 SQM, Wet Compt Area-30 SQM, Dadoes area- 15 SQM (d) Application of sealer coat and top coat on entire area As Per NCD 3717.
074 Deck underlay (e) Dadoe casting of wet compartment to be undertaken as per NCD 3717.
075 Foundation Foundation of deck machinery / deck fittings corroded/thinned/perished , to be repaired as per survey report
076 Lagging MFMB Lagging at indicated places to be removed to facilitate structural repairs and to be renewed with new lagging post completion of repairs.
077 Manhole (a) Manhole covers corroded/ thinned To be renewed as per survey report Mat - IS 2062 Grade 'B' steel. Size - 2' X 1.5'
077 Manhole (b) Rubber joints deterioted, to be renewed
077 Manhole (c) studs of manholes corroded, to be renewed. Only defective studs which are found defective on survey to be renewed. MS Studs with nut, size 20 mm
078 Extinguishers Provision of following extinguishers to be undertaken (a) 9 Ltr AFFF extinguisher
078 Extinguishers Provision of following extinguishers to be undertaken (b) 2 Kg CO2 Extinguisher
078 Extinguishers Provision of following extinguishers to be undertaken (c) 10 Kg DCP extinguisher
078 FF items/Extinguishers Provision of following fire hoses to be undertaken (d) Fire hoses with coupling
079 GRP Shed Repair of damaged GRP shed frame at Foxle of Gi pipes and fitment of the same on fwd. (a) Size: 8m x 4m Approx. Mat: GRP
080 Wet compartment Dadoe area Dadoe areas of wet compartments corroded, thinned and holed to be renewed. (Mat- MS)
081 Bunks (a) Bunks at crew rest room corroded/thinned/holed , to be repaired, mat-ms and wood
081 Bunks (b) Bunks matress at crew rest room perished/torned , to be renewed. As per sample.
082 Towing Hook Towing hook to be overhauled and load tested to 25 Tons . Note 1 -The job involves overhaul of operating handle, renewel of steel wire rope and in way pullies. Note 2 - Firm to project for load testing to CoY. Load testing will be undertaken by ND(VZG). Any defects occurred during load testing will be rectified by the firm.
083 Single Arm Boat Davit MAKE/MODEL : M/S Aquarius Fibreglass Pvt. Ltd. Hoisting Speed 18mtr/min, Lowering Speed (By Gravity)- 36-60 Mtr/min, Slewing (By Hand) Through Slewinh Handle. Firm to quote for services and material cost to undertake scope of work.
083 Single Arm Boat Davit (a)The Centrifugal Brake assembly (Two Brake Shoes lined with Friction lining & Restrained by Spring on Each shoe) to Overhaul . Renew Brake Shoes,Friction lining. Prove for satisfactory Operation. All greasing fittings/nipples to renew
083 Single Arm Boat Davit (b) Single Arm Boat Davit Motor overhauling to carry out. Renew wear down parts. Prove for satisfactory Operation
083 Single Arm Boat Davit (c) Gear Box to inspect, Flush Through Oil. Fresh Oil to be filled. (Oil Grade SAE-90) (Qty- 40 L)
083 Single Arm Boat Davit (d) Dead Man Brake Assembly to overhaul. Renew the brake shoes. Check brake drum , Clean drum surfaces. Prove Dead man brake assembly for satisfactory Operation.
083 Single Arm Boat Davit (e) Wire Ropes- Remove old grease & lubricate with fresh grease. Grease all points.
083 Single Arm Boat Davit (f) Check the functioning of all limit switches. Renew Defective limit switches Prove them for satisfactory Operation.
083 Single Arm Boat Davit (g) Load Test of Single Arm Boat Davit fitted at Quarter Deck to be undertaken as per INBR 1552. MAKE/MODEL : M/S Aquarius Fibreglass Pvt. Ltd.???
084 Serviciability checks/ Load Test (a) Serviceability checks and Load test of EFSWR fall to be undertaken and load test certificate provided. Load- 1.5 times of SWL.as per INBR 1552 (SWL- 1250 kgs), Submit a copy of load test to this office.
084 Serviciability checks/ Load Test (b) Serviceability checks of ARH of boat davit to be undertaken and test certificate to be submit to this office.
085 Pneumatic Fender. (a) Provision of Pneumatic Fender on (P & S) side at FWD (fr st 40-45) and AFT ( fr st 15-20) Specification of fenders:- Size - 660x1160 mm , Mat-Neoprene Blended Rubber having 65 % min Neoprene Content , Colour-White, Tensile strength- 180 Kgf/CM2, Elongation at break- 400 % min, Hardness- 700 max, Tear Strength- Min 40 Kgf/CM2, Compression set- 30 % Max, Abrasion resistance- 0.5 CC Max.
086 Pneumatic Fender Securing Arrangement (a) Fabrication of MS eye with 08 MM Thickness on shipside.
086 Pneumatic Fender Securing Arrangement (b) Provision of D Shackles, Dia 16 MM
086 Pneumatic Fender Securing Arrangement (c) Provision of Securing Chain 16 MM Dia length RMT 4 Mtr Each
087 SEAWAGE TREATMENT PLANT,MAKE:- HAMWORTHY,CAPACITY- 27 PERSONS, MODEL-STA-2C Qty-01 Firm to quote for Service & spares/ material Required to undertake scope of work.
087 SEAWAGE TREATMENT PLANT,MAKE:- HAMWORTHY (a) Surge tanks to be chemically cleaned.
087 SEAWAGE TREATMENT PLANT,MAKE:- HAMWORTHY (b) Portable compressor to be overhauled.
087 SEAWAGE TREATMENT PLANT,MAKE:- HAMWORTHY (c) Overboard discharge pump to be overhauled.
087 SEAWAGE TREATMENT PLANT,MAKE:- HAMWORTHY (d) Ventury to be dismantled cleaned internally and boxed back
087 SEAWAGE TREATMENT PLANT,MAKE:- HAMWORTHY (e) Inline strainer to be dismantled and stainer element to be renewed.
087 SEAWAGE TREATMENT PLANT,MAKE:- HAMWORTHY (f) Chlorinator not working. Repair/overhauling of Chlorinator to be carried out. Renew flexible pipes and conncetion . Prove chlorinator for satisfactory operation. (Firm to Quote for Service & material cost )
087 SEAWAGE TREATMENT PLANT,MAKE:- HAMWORTHY (g) Air regualtor to be dismantled cleaned and boxed up and set pressure to be at range 0-150psi.
087 SEAWAGE TREATMENT PLANT,MAKE:- HAMWORTHY (h) Electro catalytic cell to be dismantled and acid cleaned using 6% to 10% soultion of water and muriatic acid.
087 SEAWAGE TREATMENT PLANT,MAKE:- HAMWORTHY (j) Flexible hoses/ Wire breaded hoses to be renewed.Air filter element to be renewed
087 SEAWAGE TREATMENT PLANT,MAKE:- HAMWORTHY (k) Complete assembly and system pipe to be painted post work completion as per code.
087 SEAWAGE TREATMENT PLANT,MAKE:- HAMWORTHY (m) V-DTN compressor to overhaul. Air Filtering cartridge & blades to renew. Compressor to prove for satisfactory operation.
088 Electrically Operated Windlass Manufacturer:- M/s Hemant Engineering Works,Thane; Stud Link Chain Dia: 24 mm, Electric Motor(415V, 50 Hz) Output: 10 HP, Motor Speed : 1500 RPM.
088 Electrically Operated Windlass (a) Anchor Windlass. Completely strip & overhaul anchor windlass (including lub oil renewals), renew brake linings, refit and to be proved for satisfactory operation.
088 Electrically Operated Windlass (b) Mechanical Unit Gear Box- Clean Gear Box throughly and renew Oil.
088 Electrically Operated Windlass (c) Oil Reserve tank:- Clean tank properly & Fill with fresh oil. (Qty-200 Ltrs)
088 Electrically Operated Windlass (d) Arrest leakage in the Pipes & fittings. Renew damaged/ leaking pipe joints. All Grease nipples to be renewed.
088 Electrically Operated Windlass (e) Bearings- Renew All Anti Friction Bearings.
088 Electrically Operated Windlass (f) Windlass Operation control lever sluggish operation observed. Control lever box to overhaul. Sight glass (for Ampere meter) and control lever handle to renew. Gaskets and sealing of cover to be renewed.
089 Electrically Operated Mooring Capstan Manufacturer:- M/s Hemant Engineering Works, Pull- 5Ton Oil Quantity in Reduction Gear Box- 40 Ltrs,Waping Force- 5000kg at 15M/Min, Slack at 30M/min, Warping Head 400MM* 400 Long
089 Electrically Operated Mooring Capstan (a) Drain Gear unit oil & flush thoroughly and refill with fresh oil. (Qty- 100 Ltrs)
089 Electrically Operated Mooring Capstan (b) Clean all surfaces and adjacent to end covers. Remove old grease and Lubricate all greasing points. All Grease nipples to be renewed.
089 Electrically Operated Mooring Capstan (c) Overhauling of Mooring Capston to be carried out. Renew brake linings, refit and to be proved for satisfactory operation.
090 Miscellaneous
090 Miscellaneous (a) New name tally for tank vents head to be fitted
090 Miscellaneous (b) WT Door Handle In accomodation areas to be renewed
090 Miscellaneous (c) New Handrails to be fitted in wheel house.
090 Miscellaneous (d) Sounding table plates to be fitted for cargo tank (As per sample)
090 Miscellaneous (e) Name Stenciling/marking on all tank manhole covers to be done. ( Manhole cover Qty-30)
ENGINEERING WORK PACKAGE Note:- Firm to quote for Service & Material for undertaking scope of work. Firm to supply spares/material if not specified supply by ND(V)/Navy. All reports of callibration/Test to be submitted along with Job complition
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 MARINE PROPULSION ENGINE,POWER-522KW @ 2100 RPM,ENG.SL NO-STBD(25392400),PORT(25393244), Qty - 02, STBD M/E R/H -399hrs(Jul 21) , PORT M/E R/H-332hrs (Jul 21) Routines mentioned below to be carried out on both engines. Post completion of routines trials to be undertaken for proving correct operation. Spares required for undertaking each routine as recieved from OEM is placed under mandatory list of spares. Spares not covered in mandatory list for undertaking below mentioned routines to be quoted in BoQ of spares.
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (a) Fuel system: Clean and calibrate injectors and record test pressures. Change injector inlet screen.
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (b) Replace fuel pump filter (screeen and magnet).
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (c) Air system: Overhauling of Turbo charger, compressor wheel and diffuser to be carried out.
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (d) Charge air cooler & Fresh water cooler: Clean internal passages of Charge Air Cooler and Fresh water cooler coolant side using Restore Plus as laid down in operating manual. Renew Zinc anodes
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (e) Drain Lub oil, Flush Through using restore plus. Refill with new oil OMD113. Oil to be supplied by firm
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (f) Clean Charge Air Cooler air inside core and clean using hot water and pressure test up to 2 kg/cm2.6000H4.KTA19.
1000 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (g) Remove dirt ,deposits & Clean Engine body with solvent .Clean and apply primer and paint with heat resistant paint???????????????????????????????????????????????????????????????????????
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (h) Carryout flushing through of coolant system. Renew coolant in the system.Coolant to be supplied by firm.
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (j) Check thickness of vibration damper at 0,90,180 and 270 degree positions.Replace damper if variation of the 4 readings exceeds 0.0010inch (0.25mm) or exceeds max allowable thickness.Checks to be undertaken in coupled condition.Cost of vibration damper to be included in material quote.
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (k) Carry out safety device checks of all cut-outs/safety alarm fitted on engine .Checks to be carried out by OEM and report/certificate for the same to be rendered.
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (m) Check crank end clearances with a dial indicator,attaching against damper.Min-0.13mm,Max-0.51mm.OEM report for the same to be rendered.
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (n) Renew engine oil filter, fuel oil filters and by pass filters. Each Qty- 10 No’s
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (p) Carry out valve clearance checks. Adjust tappet setting. Post routines head cover gaskets to be renewed.
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (q) Chemical Clean coolant expansion float tank from inside.
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (r) Overhaul starting air motors using repair kit supplied by OEM. Starting motors to be repaired through OEM and proved for operation.All spares for the same to be included in cost of spares
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (s) New Starting Air Motors to be supplied.
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (t) All rubber durets, hoses and wire braided hoses fitted on engine to be replaced as per sample.
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (u) All instrumentation gauges are with needle valve to be renewed.????????????????????????????????????????
1001 MAIN ENGINE,MAKE-CUMMINS,MODEL-KTA-19-M4 (v) Remove & chemical Clean lub oil cooler & fresh water cooler & carry out pressure testing. Job to include for both main engine lub oil coolers & fresh water coolers. Renewal of all gaskets/ O-rings, repair of end covers, plugging of tubes to be carried out. Pressure testing certificates to be rendered.
1002. GEAR BOX (Qty-02) , MAKE: TWIN DISK, MODEL: MGX5222DC, OIL CAPACITY 3.14LTS, SL NOS (2122155,2122154); Heat Exchanger (Qty-02) :- Model:- HB 702-81983 HE Operating Pressure:-Shell-325ps; Tubes: 150ps. Routine to be carried out by OEM . Spares required for undertaking each routine as recieved from OEM is placed under mandatory list of spares. Spares not covered in mandatory list for undertaking below mentioned routines to be quoted in BoQ of spares.
1002. GEAR BOX, MAKE: TWIN DISK (a) Drain Oil Completely & flush through system throughly. Remove,Clean,Inspect & install suction screen.
1002. GEAR BOX, MAKE: TWIN DISK (b) Charge System with fresh oil. (Type of Oil- SAE- 40) OIL to be supplied by firm
1002. GEAR BOX, MAKE: TWIN DISK (c) Renew Oil Filters. (Filters to be supplied by firm)
1002. GEAR BOX, MAKE: TWIN DISK (d) Cleaning & Pressure testing of Heat Exchangers to be carried out. Prove Heat Exchanger for Optimum performance.
1002. GEAR BOX, MAKE: TWIN DISK (e) If Heat Exchanger found BER, Heat Exchanger to be renewed. Heat Exchanger :- Make:- Thermal Transfer Products Ltd. Model:- HB 702-81983 Operating Pressure:-Shell-325ps; Tubes: 150ps
1002. GEAR BOX, MAKE: TWIN DISK (f) Transimission Sump Oil Temeperature Gauge to be renewed (0-120 degree) Item to be supplied by firm
1002. GEAR BOX, MAKE: TWIN DISK (g) Main Clutch Oil Pressure Gauge (0-40 Bar) to be renewed .Item to be supplied by firm
1002. GEAR BOX, MAKE: TWIN DISK (h) Oil Pressure & Temperature Switches to be callibrated.
1002. GEAR BOX, MAKE: TWIN DISK (j) Overhaul Regulating Valve. Check Valve Operation before reinstallation.
1002. GEAR BOX, MAKE: TWIN DISK (j) Overhaul Control Valve. Check Valve Operation before reinstallation.
1002. GEAR BOX, MAKE: TWIN DISK (k) Check the alingnment of engine & Transmission output flange to propeller shaft.
1002. GEAR BOX, MAKE: TWIN DISK (m) Open inspection door and carry out Inspection of Gear box. Check for any worn & damage gears.
1002. GEAR BOX, MAKE: TWIN DISK (n) Lub Oil Relief Valve- Remove, Overhaul & pressure test to be carried out before reinstallation.
1002. GEAR BOX, MAKE: TWIN DISK (p) Wire Breaded Oil hoses to be renewed (Size- 25mm)
1002. GEAR BOX, MAKE: TWIN DISK (q) Oil Pump to be overhauled & prove for satisfatory operation. ( Model: 5080 U10, SL No. 1001349A/B)
1003 STERN GEAR SYSTEM (Set - 02 ) MAKE: MODEST INFRASTRUCTIRE LTD. MAIN ENGINE POWER: 700 HP ; SPEED 2100 RPM ; REDUCTION GEAR RATIO 6.55:1 ; PROPELLER DIAMETER : 1740MM NUMBER OF BLADES: 4; PROPELLER , MAKE : WARTSILA, SL NOS:- MMI/WIL/005,MMI/WIL/006, Propeller shaft length: 5100mm, Propeller shaft diameter : 145 mm; Intermediate shaft length : 2159.5 mm, Intermediate Shaft Diameter : 135 mm; Propeller shaft Material : SS 316,TS 515 N/MM2 ; Intermediate Shaft Material:- Forged Steel TS- 515 N/MM2
1003 STERN GEAR SYSTEM (a) 'A- Bracket' - Inspection of 'A-Bracket' to be carried out. Rope gaurds to be removed and 'A- Bracket' bush wear down to be measured. (Note:- The wear down limits are 5 mm.) On completion of inspection. Rope gaurds to be fitted back.
1003 STERN GEAR SYSTEM (b)'A- Bracket'- 'A' bracket bushes to be renewed if wear down found beyond limit. Bush to be supplied by firm.
1003 STERN GEAR SYSTEM (c ) Shaft inspection to be carried out. Shaft to be checked for chain pitting, grooving, circumferrential wastage due to wear,corrosion due to sea water and errosion due to rubbing of any loose component. Shaft key way to be inspected for any crack/damage.report of inspection to be rendered.
1003 STERN GEAR SYSTEM (d ) Propeller shaft bearing clearances to be measured. ( Maximum wear down limit is 5 mm.)
1003 STERN GEAR SYSTEM (e) Propeller shaft bearing to be replaced if found beyond limit.( Maximum wear down limit is 5 mm.)
1003 STERN GEAR SYSTEM (f) Propellers to be cleaned during docking and examination to carried out for checking any defect on smooth surfaces of the blade due to corrosion,cavitation.Roughness around the propeller blade tips to be ground out & polished to return the blade in original condition.
1003 STERN GEAR SYSTEM (g) Repairs of Propeller blades to be undertaken for any damage caused by severe pitting,crack/fracture/tears and local edge deformation observed on blades. (Propeller Details:-Propeller RPM 320; Propeller Dia 1740 mm; PropellerWeight:- 544kg, Propeller Material:- Mn Bronze,Grade Cu1,UTS 440N/mm2, P/D Ratio:- 0.88)
1003 STERN GEAR SYSTEM (h) Dynamic balancing of propellers to be carried out post repairs. Report of balancing to be rendered.
1004 ELECTRO HYDRAULIC STEERING GEAR SYSTEM, (Qty-02) MAKE: GEETA ENGINEERING WORKS PVT.LTD, Set No;- 6203-Y322-S MODEL: TR2C-2 X 2.1.35'. Routines to be undertaken by OEM.Spares not covered in mandatory list for undertaking below mentioned routines. SAME TO QUOTED IN BOQ OF MATERIAL.
1004 ELECTRO HYDRAULIC STEERING GEAR SYSTEM (a) Carry out alignment checks and record the readings for the hydraulic actuator assemblies, tiller crossheads and rudder stocks as per OEM technical specification.
1004 ELECTRO HYDRAULIC STEERING GEAR SYSTEM (b) Synchronizing of rudder angle indicator and Mechnical Indicator to be carried out.
1004 ELECTRO HYDRAULIC STEERING GEAR SYSTEM (c) Steering Gear System oil tanks to be cleaned. Complete hydraulic system to be flushed through. Oil for flush through to be supplied by firm (qty-400 Ltrs, Price of oil to be considered in cost of material) (Oil Grade- Servo-68)
1004 ELECTRO HYDRAULIC STEERING GEAR SYSTEM (d) Hydraulic oil to be charged into system post flushing. Oil to be supplied by firm. (Oil Grade :- Servo-68)
1004 ELECTRO HYDRAULIC STEERING GEAR SYSTEM (e) Hydraulic oil hoses for steering gear to be renewed. (Hose Size: 3/4 inch,19.1 mm, Hose No. 301SN-12, Max Operating Press- 215 Bar)
1004 ELECTRO HYDRAULIC STEERING GEAR SYSTEM (f) Steering control hydraulic gear pump to be overhauled and prove for satisfactory operation. ???????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????
1004 ELECTRO HYDRAULIC STEERING GEAR SYSTEM (g) Manual Operation Hand Wheel system - Hydraulic tank to be cleaned and flushed through .(Oil Tank Capacity-3.5 Ltrs) .Oil to be supplied by firm.
1004 ELECTRO HYDRAULIC STEERING GEAR SYSTEM (h) Manual Operation Hand Wheel system- Ball valve (1/4") and Oil Pipe (Length-01 Mtr) to be renewed.
1004 ELECTRO HYDRAULIC STEERING GEAR SYSTEM (j) Manual Operation Hand Wheel System- Wire breaded hose to be renewed (1/4") to be renew. Size- 10mm
1004 ELECTRO HYDRAULIC STEERING GEAR SYSTEM (k) Manual operation Hand wheel system - Gear Pump to be overhauled and proven for satisfactory condition. ???????????????????????????????????????????????????????????????????????????????????
1004 ELECTRO HYDRAULIC STEERING GEAR SYSTEM (m) Steering control hydraulic gear pump suction filters to be renewed with new filters ???????????????????????????????????????????????????????????????????????????????????
1004 ELECTRO HYDRAULIC STEERING GEAR SYSTEM (n) Steering gear room bilge pump (Hand Operated pump) to be overhauled, prove for satisfactory operation. ???????????????????????????????????????????????????????????????????????????????????
1005 RUDDER ASSEMBLY, MAKE: M/S NIBHA INDUSTRIES, SR NO:- i)BOM13C005, (ii)BOM13C005
1005 RUDDER ASSEMBLY, MAKE: M/S NIBHA INDUSTRIES (a) Check the rudder pintle and jumping clearance. Check the rudder drop. Report of inspection to be rendered.
1005 RUDDER ASSEMBLY, MAKE: M/S NIBHA INDUSTRIES (b) Open Top & Bottom Plug and check for any water inside rudder. Check the cement on the coupling bolts. Renew the cement and check the condition of the palm nut. Post inspection of rudder assembly, prepare rudder for opeational readiness.
1005 RUDDER ASSEMBLY, MAKE: M/S NIBHA INDUSTRIES (c) Check the condition of sacrificial anodes on rudder. Renew the anodes.
1005 RUDDER ASSEMBLY, MAKE: M/S NIBHA INDUSTRIES (d) Check the actual position of the rudder,compared to the rudder angle indicator. Deviation observed to be corrected.
1005 RUDDER ASSEMBLY, MAKE: M/S NIBHA INDUSTRIES (e) Gauge rudder bearing top and bottom clearances.Record parameters and inspection report to be rendered.
1005 RUDDER ASSEMBLY, MAKE: M/S NIBHA INDUSTRIES (f) Renew lower rudder bushes and sealing rings.
1005 RUDDER ASSEMBLY, MAKE: M/S NIBHA INDUSTRIES (g) Renew Gland packings
1006 DIESEL GENERATOR,MAKE-Cummins India LTD.MODEL-6CTA8.3-D(M),OUTPUT-179 BHP@1500RPM,SL NO:-25774677(PORT) , 25774678(STBD), Qty - 02 (PORT D/G R/H-903 hrs, STBD D/G R/H - 781hrs). Routine to be undertaken by OEM. Post completion of routines DA to be proven for satisfactory operation. Spares required for undertaking each routine as recieved from OEM is placed under mandatory list of spares. Spares not covered in mandatory list for undertaking below mentioned routines to be quoted in BoQ of material.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (a) Remove intake Manifold.Clean & Pressure test.Renew all gaskets and O rings
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (b) Remove Exhaust Manifold.Clean & Pressure test.
1006 DIESEL GENERATOR, MAKE-Cummins India LTD (c) Remove turbo charger. Clean, inspect & Overhauling to be carried out. New turbocharger repair kit to be used for overhauling.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (d) Remove Fuel injection pump. Clean,inspect,calibrate & repair with new spare parts.(Spares required for overhauling to be supplied by firm)
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (e) Remove Injectors, Clean,inspect,Repair & Calibrate with new spares.Report of calibration to be rendered.(spares for overhauling injectors to be considered in boq of material).Nozzle of the injectors to be renewed.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (f) Renew Fuel connections (High Pressure pipe lines).
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (g) Overhauling of coolant/water pump to be carried out.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (h) Renew Belt tensioner.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (j) Overhauling of Sea water pump to be carried out and performance trials to be undertaken
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (k) Remove starter motor. Clean,inspect & Overhaul with new spare parts.(all spares required for overhauling to be supplied by the firm)
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (m) Replace all flexible hoses/wire breaded hoses of cooling system, air system, lub oil and fuel systems.(All hoses to be considered within the cost of material)
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (n) Replace zinc plugs of Heat Exchangers. Firm to quote for material cost of Zn plugs.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (p) Check / Tighten all foundation bolts.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (q) Carry out Tappet settings. For 6CT/CTA 8.3 D(M)- Valve setting intake valve cleanrance is 0.0012" & Exhaust valve clearance is 0.024" .Renew cylinder head cover gaskets during fitt back.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (r) Post completion of routines,start the engine and check all parameters . Undertake load trials.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (s) Undertake inspection and cleaning of charge air cooler followed by pressure testing.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (t) Renew the Injectors.Injectors to be supplied by firm
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (u) Lub oil filters & by pass filters to be replaced with new filters.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (ae) Replace air intake filter with new filters.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (w) Check thottle linkage,lubricate ball joints of the throttle linkage of hyd. Governor.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (x) Renew fuel filters, Filters to be supplied by the firm
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (y) Overhaul of fresh water pumps to be carried out, Prove for satisfactory Operation
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (z) Remove & chemical Clean lub oil cooler & fresh water cooler & carry out pressure testing.Renew gasket & 'o' rings.Repairs of end covers to be undertaken(02 each)
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (aa) Drain Coolant, Flush Through using restore plus. Renew coolant.Coolant to be supplied by firm
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (ab) Sea water pump foundation to be renewed.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (ac) All rubber duretts,clamps,jubilee clips to be renewed. These consumbales to be supplied by firm
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (ad) Renew crankcase breather.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (ae) Change air intake filter.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (af) Renew drive belts .Adjust tension of belts as per OEM manual.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (ag) Magnetic switch of Both DGs are defective , to be renewed.Item to be supplied by firm
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (ah) All instrumentation gauges with needle valve to be renewed.
1006 DIESEL GENERATOR,MAKE-Cummins India LTD (aj) Hand operated pump (Connected to DA Sump ) to be overhauled and prove for satisfactory operation. Pump Handle , Pump suction and discharge hose (Flexible/wire breaded hose) to be renewed.
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI,TYPE-ELECTRIC DRIVEN,HIGH PRESSURE ,MODEL-LG 02 100,WORKING PB99:D112RESSURE-10 Kg/CM2 ,SL NO-EMFL080002(MOTOR DRIVEN), QTY-01. Note- Routine to be undertaken by OEM.All spares required for undertaking routines to be included in cost of material.
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (a) Delivery Unloader valve to be overhauled & proven for satisfatory operation.
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (b) Cylinder head to be overhauled with repair kit. All consumable for the overhauling to be supplied by the firm.
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (c) Air Breather to be renewed
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (d) Dischrage air pressure gauge to be renewed.range-0-7 bar
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (e) Renew air inlet filter element.
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (f) Instumentation gauges pipes with suitable end fittings to be renewed mat:CuNi dia:1/4"
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (g) Pressure gauges to be renewed.range 0-30 bar
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (h) Pressure switches to be renewed & caliberated.cut off-10bar
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (j) Oil/Water separator compressors to be Overhauled.
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (k) Chemical Cleaning & pressure testing of air bottles to be carried out. Capacity-100ltrs,Pressure testing of air bottle to be undertaken at firm's workshop. Test report for the same to be rendered.
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (m) Renew air system cocks.mat-ss,dia-20mm
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (n) Lub oil pump of compessor to be overhauled.
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (p) Lub oil sump to be drained,Cleaned & new oil to be charged.Oil to be supplied by the firm.
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (q) Sump stainers/ filter to be Cleaned.
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (r) Air Bottle drain valve to renewed
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (s) Cooling fan to be Cleaned Inspected & fitted back.
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (t) Drive belts of compressor to be renewed
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (u) Compressor to be proved for satisfactory performance.
1007 HP AIR COMPRESSOR,MAKE-ELGI VRI (v) Overhaul NRV & prove for satisfactory operation.
1008 SEPARATOR MAKE:-WESTFALIA SEPERATOR, MODEL :- DTC2-02-137, FUEL OIL PURIFIER SL NO:-9064-343, Qty-01 LUBE OIL PURIFIER,SL NO:-9064-341, Qty- 01.Spares required for undertaking each routine as recieved from OEM is placed under mandatory list of spares. Spares not covered in mandatory list for undertaking below mentioned routines to be quoted in BoQ of material.
1008 SEPARATOR MAKE:-WESTFALIA SEPERATOR (a) Dismantle Bowl Assembly, Clean it completely, Renew all Gaskets,O-Rings/Sealing Rings. Throughly clean the Drive Chamber , Renew Oil Assemble Bowl Assembly.
1008 SEPARATOR MAKE:-WESTFALIA SEPERATOR (b) Clean drive belt contacts surfaces of spindle & flat belt pulley. Renew Drive Belt.
1008 SEPARATOR MAKE:-WESTFALIA SEPERATOR (c) Renew Ball bearings
1008 SEPARATOR MAKE:-WESTFALIA SEPERATOR (d) Renew wire breaded hoses.
1008 SEPARATOR MAKE:-WESTFALIA SEPERATOR (e) Renew Pressure & temperature gauges.
1009 OILY WATER SEPERATOR,MAKE:-VICTOR MARINE,CAPACITY-0.5CU.M/[email protected],MODEL-CS500,SL NO:-00666, Qty-01.spares required for undertaking each routine as recieved from OEM is placed under mandatory list of spares. Spares not covered in mandatory list for undertaking below mentioned routines to be quoted in BoQ of material.
1009 OILY WATER SEPERATOR,MAKE:-VICTOR MARINE, (a) Drain both seperator stages & Remove top Covers & valves. Throughly clean the seperator & clean all valves. Reassemble, Using new First stage & Second stage Coalescer cartridges & joints. Reset pressure relief valve for operation. Prove system for Satisfactory operation.
1009 OILY WATER SEPERATOR,MAKE:-VICTOR MARINE, (b) Seperator Feed pump to be overhauled, Renew Seal, Bearings Pump Rotor & stator. Prove for satisfactory operation.
1009 OILY WATER SEPERATOR,MAKE:-VICTOR MARINE, (c) Oil dump Valve to be overhauled & prove for satisfactory Operation
1009 OILY WATER SEPERATOR,MAKE:-VICTOR MARINE, (d) Water valve to be overhauled. Valve piston,O-rings, Seals, Spring to be renewed. Prove for satisfactory Operation.
1009 OILY WATER SEPERATOR,MAKE:-VICTOR MARINE, (e) Capacitance Oil Detection Probe to be renewed. ( CP4-R2)
1009 OILY WATER SEPERATOR,MAKE:-VICTOR MARINE, (f) Oi/ Water Seperator Automatic Control- Functional Checks of Smart Cell Bilge Monitor to be carried out.
1009 OILY WATER SEPERATOR,MAKE:-VICTOR MARINE, (g) Oi/ Water Seperator Divertor valve Operational Checks to be carried out. Overhauling of valve to be carried out and prove for satisfactory operation.
1009 OILY WATER SEPERATOR,MAKE:-VICTOR MARINE, (h) Oil/ Water Seperator Divertor valve Operational Checks to be carried out. Overhauling of valve to be carried out and prove for satisfactory operation.
1011 HYDROPHORE ,MAKE:-DENKI ENGINEERING CO. LTD,DESIGN PRESSURE:- 6.0 BAR,Qty-01
1011 HYDROPHORE ,MAKE:-DENKI ENGINEERING CO. LTD (a) Chemical Cleaning and pressure testing of hydrophore tank to be carried out.
1011 HYDROPHORE ,MAKE:-DENKI ENGINEERING CO. LTD (b) Water level gauge glass to be renewed. Gauge glass to be supplied by the firm
1011 HYDROPHORE ,MAKE:-DENKI ENGINEERING CO. LTD c) Carry out overhauling of Fresh water pump. Pump to prove for satisfactory operation. (B.E pump,Model:-Ao.3120K)
1012 FUEL OIL PUMP-1 & 2,MAKE:TUSHACO PUMPS PVT. LTD,CAPACITY-6.0Cu.m,MODEL-T3ST-45,SL NO:-1395137-2806(NO.1),1395137-2807(NO.2), Qty-02
1012 FUEL OIL PUMP-1 & 2,MAKE:TUSHACO PUMPS PVT. LTD (a) Carry out overhauling of Pump and Prove for Satisfactory Operation. Renew shaft, mechanical seal, bearing, bearing bracket, bearing bushes, shaft sleeve, keys, gaskets,coupling and guard.
1012 FUEL OIL PUMP-1 & 2,MAKE:TUSHACO PUMPS PVT. LTD (b) Pump & motor foundation frame to repair
1012 FUEL OIL PUMP-1 & 2,MAKE:TUSHACO PUMPS PVT. LTD (c) Suction & discharge presure gauges to be renewed.range suction -1 to 2bar, discharge- 0 to 6 bar.
1012 FUEL OIL PUMP-1 & 2,MAKE:TUSHACO PUMPS PVT. LTD (d) Renew three jaw coupling & rubber spider coupling between pump & motor.
1012 FUEL OIL PUMP-1 & 2,MAKE:TUSHACO PUMPS PVT. LTD (e) Overhaul of relief valve to be carried out. Relief valve to be set for prescribed pressure .(set pr.-5Kg/cm2)
1012 FUEL OIL PUMP-1 & 2,MAKE:TUSHACO PUMPS PVT. LTD (f) Instrumentation gauges pipes with suitable end fittings to be renewed. mat: CuNi dia:1/4”
1012 FUEL OIL PUMP-1 & 2,MAKE:TUSHACO PUMPS PVT. LTD (g) Renew needle valve gauges.Mat-ss 1/4"
1012 FUEL OIL PUMP-1 & 2,MAKE:TUSHACO PUMPS PVT. LTD (h) Carry out alignment of pump with motor & prove for satisfactory performance.
1013 DIRTY OIL PUMP,MAKE:-TUSHACO PUMPS PVT. LTD,MODEL:-T1S50.1,PRESSURE 4.6 KG/CM2 ,SL NO:-139513772768,Qty-01
1013 DIRTY OIL PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (a) Carry out overhauling of Pump and Prove for Satisfactory Operation. Renew shaft, mechanical seal, bearing, bearing bracket, bearing bushes, shaft sleeve, keys, gaskets,coupling and guard..
1013 DIRTY OIL PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (b) Suction & discharge pressure gauges to be renewed. Range - suction -1 to 2 bar & discharge 0-6 bar
1013 DIRTY OIL PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (c) Renew needle valve.Mat:ss dia 1/4"
1013 DIRTY OIL PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (d) Renew three jaw coupling & rubber spider coupling between pump & motor.
1013 DIRTY OIL PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (e) Overhaul of relief valve to be carried out. Relief valve to be set for prescribed pressure.(set pr. 5Kg/cm2)
1013 DIRTY OIL PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (f) Instumentation gauges pipes with suitable end fittings to be renewed .CuNi dia:1/4"
1013 DIRTY OIL PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (g) Carry out alignment of pump with motor & prove for satisfactory performance.
1014 BILGE PUMP ,MAKE:-BE PUMPS ,MODEL:-A02110K-DGS2,CAPACITY:-15Cu.M/Hr ,SL NO:-361745,Qty-01
1014 BILGE PUMP ,MAKE:-BE PUMPS (a) Carry out overhauling of Pump and Prove for Satisfactory Operation.
1015 LUB OIL TRANSFER PUMP,MAKE:-TUSHACO PUMPS PVT. LTD , MODEL:-T3SFP20/46,CAPACITY:-1 Cu.M/Hr@5KG/CM2.SL. NO-1395137-2784,Qty-01
1015 LUB OIL TRANSFER PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (a) Carry out overhauling of Pump and Prove for Satisfactory Operation. Renew shaft, mechanical seal, bearing, bearing bracket, bearing bushes, shaft sleeve, keys, gaskets,coupling and guard..
1015 LUB OIL TRANSFER PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (b) Suction & discharge presure gauges to be renewed range:suction -1 to 2 bar, discharge- 0 to 6 bar
1015 LUB OIL TRANSFER PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (c)Renew three jaw coupling & rubber spider coupling between pump & motor.
1015 LUB OIL TRANSFER PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (d) Overhaul of relief valve to be carried out. Relief valve to be set for prescribed pressure .(set pr. 5Kg/cm2)
1015 LUB OIL TRANSFER PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (e) Coupling/Belt Guard to be renewed / Manufactured
1015 LUB OIL TRANSFER PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (f) Instrumentation gauges pipes with suitable end fittings to be renewed. mat: CuNi dia:1/4”
1015 LUB OIL TRANSFER PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (g) Renew needle valve.Mat-ss 1/4"
1015 LUB OIL TRANSFER PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (h) Carry out alignment of pump with motor &prove for satisfactory performance.
1016 BALLAST PUMP 1 & 2,MAKE:-JHONSON PUMP (SPX) ,MODEL:- CV 65-16033M2TL,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-60Cu.M/Hr MAXIMUM(120Cu.M/Hr) ,SL NO:-(I) Y901049006 (II) Y901049005,Qty-02
1016 BALLAST PUMP 1 & 2,MAKE:-JHONSON PUMP (SPX) (a) Carry out overhauling of Pump and Prove for Satisfactory Operation.
1017 FIRE PUMP ,MAKE:-JOHNSON PUMP (SPX) ,MODEL:- CV 40-25033M2TL,TYPE:-SELF PRIMING,CENTRIFUGAL,CAPACITY:-30Cu.M/Hr MAXIMUM(42Cu.M/Hr) ,SL NO:-Y901049004,Qty-01
1017 FIRE PUMP ,MAKE:-JHONSON PUMP (SPX) (a) Carry out overhauling of Pump and Prove for Satisfactory Operation. Renew shaft, mechanical seal, bearing, bearing bracket, bearing bushes, shaft sleeve, keys, gaskets,coupling and guard..
1017 FIRE PUMP ,MAKE:-JHONSON PUMP (SPX) (b) Suction &discharge presure gauges to be renewed.range suction -1 to 2.1 kg/cm2, discharge - 0 to 6 bar.
1017 FIRE PUMP ,MAKE:-JHONSON PUMP (SPX) (c)Renew three jaw coupling & rubber spider coupling between pump & motor.
1017 FIRE PUMP ,MAKE:-JHONSON PUMP (SPX) (d) Overhaul of relief valve to be carried out. Relief valve to be set for prescribed pressure .(set pr. 5Kg/cm2)
1017 FIRE PUMP ,MAKE:-JHONSON PUMP (SPX) e) Coupling/Belt Guard to be renewed / Manufactured
1017 FIRE PUMP ,MAKE:-JHONSON PUMP (SPX) (f) Instrumentation gauges pipes with suitable end fittings to be renewed. mat: CuNi dia:1/4”
1017 FIRE PUMP ,MAKE:-JHONSON PUMP (SPX) (g) Renew needle valve.Mat-ss
1017 FIRE PUMP ,MAKE:-JHONSON PUMP (SPX) (h) Carry out alignment of pump with motor &prove for satisfactory performance.
1017 FIRE PUMP ,MAKE:-JHONSON PUMP (SPX) (j) Clean and flush service liquid tank if found any leakages on body renew tank
1017 FIRE PUMP ,MAKE:-JHONSON PUMP (SPX) (k) Renew service liquid tank connecting hoses,pipe nipple, NRV,T piece and air inlet valve
1018 CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS PVT. LTD.MODEL:-TDSH-118/064, CAPACITY:-60 Cu.M/Hr,SL NO:-(I)1395184/2453,(II)1326350/0036,Qty-02
1018 CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS PVT. LTD (a) Carry out overhauling of Pump and Prove for Satisfactory Operation. Renew shaft, mechanical seal, bearing, bearing bracket, bearing bushes, shaft sleeve, keys, gaskets,coupling and guard..
1018 CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS PVT. LTD (b) Suction &discharge presure gauges to be renewed.range suction -1 to 4.2bar, discharge- 0 to 10bar.
1018 CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS PVT. LTD (c)Renew three jaw coupling , rubber spider coupling,bearings & seals between pump & motor.
1018 CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS PVT. LTD (d) Overhaul of relief valve to be carried out. Relief valve to be set for prescribed pressure (set pr.-5Kg/cm2)
1018 CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS PVT. LTD (e) Coupling/Belt Guard to be renewed / Manufactured
1018 CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS PVT. LTD (f) Instrumentation gauges pipes with suitable end fittings to be renewed. mat: CuNi dia:1/4”.
1018 CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS PVT. LTD (g) Renew needle valve.Mat-ss 1/4"
1018 CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS PVT. LTD (h) Carry out alignment of pump with motor & prove for satisfactory performance.
1019 FUEL OIL/AVCAT STRIPPING PUMP,MAKE:-TUSHACO PUMPS PVT. LTD,MODEL:-T3ST-45/6,CAPACITY:-6Cu.M/Hr,SL NO:-(I)1395137/2804, (II) 1398137/2805,Qty-02
1019 FUEL OIL/AVCAT STRIPPING PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (a) Carry out overhauling of Pump and Prove for Satisfactory Operation. Renew shaft, mechanical seal, bearing, bearing bracket, bearing bushes, shaft sleeve, keys, gaskets,coupling and guard..
1019 FUEL OIL/AVCAT STRIPPING PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (b) Suction & discharge pressure gauges to be renewed.range-(-1 to 4.2Kg/Sq.Cm) & 0-10Kg/Sqcm
1019 FUEL OIL/AVCAT STRIPPING PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (c) Renew needle valve.Mat:ss dia 1/4"
1019 FUEL OIL/AVCAT STRIPPING PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (d) Overhaul of relief valve to be carried out. Relief valve to be set for prescribed pressure (set pr. 5Kg/cm2)
1019 FUEL OIL/AVCAT STRIPPING PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (e) Coupling/Belt Guard to be renewed / Manufactured
1019 FUEL OIL/AVCAT STRIPPING PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (f) Instumentation gauges pipes with suitable end fittings to be renewed .CuNi dia:1/4"
1019 FUEL OIL/AVCAT STRIPPING PUMP,MAKE:-TUSHACO PUMPS PVT. LTD (g) Carry out alignment of pump with motor & prove for satisfactory performance.
1020 FRESH WATER CARGO PUMP,MAKE:-JOHNSON PUMP(SPX), MODEL:-6V40-200B3M2TI,TYPE:-SELF PRIMING, CENTRIFUGAL, CAPACITY:-10Cu.M/Hr@30Kg/Sq.Cm,SL NO:-(i)Y-901049002.(ii)Y-901049003,Qty-02
1020 FRESH WATER CARGO PUMP,MAKE:-JHONSON PUMP(SPX) (a) Carry out overhauling of Pump and Prove for Satisfactory Operation. Renew shaft, mechanical seal, bearing, bearing bracket, bearing bushes, shaft sleeve, keys, gaskets,coupling and guard..
1020 FRESH WATER CARGO PUMP,MAKE:-JHONSON PUMP(SPX) (b) Instumentation gauges pipes with suitable end fittings to be renewed .CuNi dia:1/4"
1020 FRESH WATER CARGO PUMP,MAKE:-JHONSON PUMP(SPX) (c)Renew three jaw coupling , rubber spider coupling,bearings & seals between pump & motor.
1020 FRESH WATER CARGO PUMP,MAKE:-JHONSON PUMP(SPX) (d) Overhaul of relief valve to be carried out. Relief valve to be set for prescribed pressure (set pr. 5Kg/cm2)
1020 FRESH WATER CARGO PUMP,MAKE:-JHONSON PUMP(SPX) (e) Coupling/Belt Guard to be renewed / Manufactured
1020 FRESH WATER CARGO PUMP,MAKE:-JHONSON PUMP(SPX) (f) Renew needle valve. Mat-1/4"
1020 FRESH WATER CARGO PUMP,MAKE:-JHONSON PUMP(SPX) (g) Suction &discharge presure gauges to be renewed.range suction -1 to 2.1 kg/cm2, discharge - 0 to 6 bar.
1020 FRESH WATER CARGO PUMP,MAKE:-JHONSON PUMP(SPX) (h) Carry out alignment of pump with motor &prove for satisfactory performance.
1020 FRESH WATER CARGO PUMP,MAKE:-JHONSON PUMP(SPX) (j) Renew self priming unit connecting hoses
1020 FRESH WATER CARGO PUMP,MAKE:-JHONSON PUMP(SPX) (k) Renew service liquid tank if found defective renew tank
1021 AVCAT CARGO PUMP,MAKE-TUSHACO PUMPS PVT. LTD,MODEL:-TDSH-105/058,CAPACITY-70Cu.m,SL.NO-(i)1326333/5514 (ii)1326333/5515
1021 AVCAT CARGO PUMP,MAKE-TUSHACO PUMPS PVT. LTD (a) Carry out overhauling of Pump. Pump Bearings,Mechanical Seals & Oil Seals to renew. Pump suction & discharge presure gauges to be renewed.range suction gauge -1 to 4 bar, discharge gauge 0-10 bar. Prove Pumps for Satisfactory Operation
1021 AVCAT CARGO PUMP,MAKE-TUSHACO PUMPS PVT. LTD (b) Renew shaft, Drive and idler Gears.
1021 AVCAT CARGO PUMP,MAKE-TUSHACO PUMPS PVT. LTD (c) Renew coupling , rubber spider coupling between pump & motor.
1021 AVCAT CARGO PUMP,MAKE-TUSHACO PUMPS PVT. LTD (d) Overhaul of relief valve to be carried out. Relief valve to be set for prescribed pressure (set pr. 5Kg/cm2)
1021 AVCAT CARGO PUMP,MAKE-TUSHACO PUMPS PVT. LTD (e) Coupling/Belt Guard to be renewed / Manufactured
1021 AVCAT CARGO PUMP,MAKE-TUSHACO PUMPS PVT. LTD (f) Instumentation gauges pipes with suitable end fittings to be renewed .CuNi dia:1/4"
1021 AVCAT CARGO PUMP,MAKE-TUSHACO PUMPS PVT. LTD (g) Renew needle valve.Mat-SS 1/4"
1021 AVCAT CARGO PUMP,MAKE-TUSHACO PUMPS PVT. LTD (h) Drain lube oil and refill with Fresh Oil (Qty- 2 ltr) Oil Grade - Servo 68 (Oil to Supply by Firm)
1021 AVCAT CARGO PUMP (j) Carry out alignment of coupling halves, prove for satisfactory performance.
1022 FRESH WATER PUMP, MAKE: BE PUMPS, MODEL: A0320K, SL NO:- 668888
1022 FRESH WATER PUMP (a) Carry out overhauling of Pump.Dismantle pump completely. Examine all parts for wear. Renew shaft, mechanical seal, bearing,bearing bushes, shaft sleeve, keys, gaskets,
1022 FRESH WATER PUMP (b) Instumentation gauges pipes with suitable end fittings to be renewed .CuNi dia:1/4"
1022 FRESH WATER PUMP (c) Suction & discharge presure gauges to be renewed Gauge range- suction -1 to 2.1 kg/cm2, discharge - 0 to 6 bar.
1023 EMERGENCY BILGE PUMP,MAKE:-B.E PUMPS,CAPACITY-15CU.M/HR,MODEL-A 5110KK-DGS2-316-MS3,SL NO:-361747,Qty-01
1023 EMERGENCY BILGE PUMP,MAKE:-B.E PUMPS (a) Carry out overhauling of Pump and Prove for Satisfactory Operation. Renew shaft, mechanical seal, bearing, bearing bracket, bearing bushes, shaft sleeve, keys, gaskets,coupling and guard.
1023 EMERGENCY BILGE PUMP,MAKE:-B.E PUMPS (b) Suction &discharge presure gauges to be renewed.range suction -1 to 2.1 kg/cm2, discharge - 0 to 6 bar.
1023 EMERGENCY BILGE PUMP,MAKE:-B.E PUMPS (c)Renew coupling & rubber spider coupling between pump & motor.
1023 EMERGENCY BILGE PUMP,MAKE:-B.E PUMPS (d) Overhaul of relief valve to be carried out. Relief valve to be set for prescribed pressure (set pr. 5Kg/cm2)
1023 EMERGENCY BILGE PUMP,MAKE:-B.E PUMPS (e) Coupling/Belt Guard to be renewed / Manufactured.
1023 EMERGENCY BILGE PUMP,MAKE:-B.E PUMPS (f) Instrumentation gauges pipes with suitable end fittings to be renewed. mat: CuNi dia:1/4”
1023 EMERGENCY BILGE PUMP,MAKE:-B.E PUMPS (g) Renew needle valve.Mat-ss
1023 EMERGENCY BILGE PUMP,MAKE:-B.E PUMPS (h) Carry out alignment of pump with motor & prove for satisfactory performance.
1024 EMERGENCY FIRE PUMP,MAKE:-JHONSON PUMPS,CAPACITY-30CU.M/HR@80BAR,MODEL-OH80-400,SL NO:-Y901049001,Qty-01
1024 EMERGENCY FIRE PUMP,MAKE:-JHONSON PUMPS (a) Carry out overhauling of Pump and Prove for Satisfactory Operation. Renew shaft, mechanical seal, bearing, bearing bracket, bearing bushes, shaft sleeve, keys, gaskets,coupling and guard..
1024 EMERGENCY FIRE PUMP,MAKE:-JHONSON PUMPS (b) Instumentation gauges pipes with suitable end fittings to be renewed .CuNi dia:1/4"
1024 EMERGENCY FIRE PUMP,MAKE:-JHONSON PUMPS (c) Overhaul of relief valve to be carried out. Relief valve to be set for prescribed pressure (set pr. 5Kg/cm2)
1024 EMERGENCY FIRE PUMP,MAKE:-JHONSON PUMPS (d) Coupling/Belt Guard to be renewed / Manufactured.
1024 EMERGENCY FIRE PUMP,MAKE:-JHONSON PUMPS (e) Renew needle valve. Mat-1/4"
1024 EMERGENCY FIRE PUMP,MAKE:-JHONSON PUMPS (f) Suction & discharge presure gauges to be renewed.range 30"-0" &0-100psi
1024 EMERGENCY FIRE PUMP,MAKE:-JHONSON PUMPS (g) Carry out alignment of pump with engine & prove for satisfactory performance.
1025 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKAR, Type- HA 394, Rating 28/30 kw. Engine No:- 03.1021.16/1300001, Engine RPM 1800 (Qty-01). Spares for below mentioned routines to be supplied by the firm and included in cost of materials
1025 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKAR (a) Carry out tappet setting of valves
1025 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKAR (b) Remove injector & Carry out overhauling of injectors. spares for overhauling of injector to be supplied by the firm.
1025 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKAR (c) Drain Lub oil sump,Clean Sump and charge new oil.
1025 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKAR (d) Renew air filter element, fuel filter element, and lub oil filter element.
1025 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKAR (e) Renew all rubber hoses,durrets.
1025 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKAR (f) Renew insulation/lagging of the exhaust pipe .
1025 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKAR (g) Renew the fuel oil wire breaded hoses.
1025 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKAR (h) Check for any leakages,if found same to be rectify.
1025 EMERGENCY FIRE PUMP ENGINE,MAKE:-KIRLOSKAR (k) Engine to be proved for satisfactory performance post work completion.
1026 CO2 Fire Fighting sytem(ENGINE ROOM,PAINT STORE &GALLEY EXHAUST DUCT) Maker:-ZEEL MARKETING PVT.LTD (All procedures to be carried as mentioned below and replace defective parts if required).Work to be undertaken by IRS approved firm for undertaking job.
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (a) Carry out pressure testing of CO 2 cylinders and recharge with CO 2. Head valve assembly in each cylinders to be overhauled and to include renewal of diaphragm, gaskets .Weigh the cylinders post pressure testing.
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (b) Admit LP air into ring main Checking the system for leaks. Ensure that all the discharge pipes and nozzles are clear.
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (c) calibrate pressure gauges fitted in the system.
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (d) Non return valves on cylinder heads to be overhauled.Head valve assembly in each cylinders to be overhauled and to include renewal of diaphragm, gaskets .Weigh the cylinders post pressure testing.
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (e) CO2 discharge nozzles to be opened, Checked for chockages, Cleaned and fitted back
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (f) Overhaul shuttle valve
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (g) Overhaul of relief valve assembly, Prove for satisfactory Operation.
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (h) Overhaul of pressure operated switch. Prove for satisfactory Operation
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (j) Complete system piping to be blown through using HP air to prove system free of blockages
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (k) CO2 cylinders (45 kg capacty) and system pipes to be painted as per coding post work completion.
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (m) All system pipes (dia-20 mm) to be painted as per coding post work completion.
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (n) Disconnect operating cables from cylinders. Remove old grease and renew grease on all external fittings i.e. pulleys,pull handles,actuators,micro-switches and cables and cables (as applicable). Ensure freedom of movement of gang release piston , and all cables, pulleys, cocks and valves. Examine all nozzles and piping for any obstruction and Clean, if required. Reconnect cables on completion.
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (p) Renew flexible hoses. (Pr 275bar)
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (q) Actuator to be overhauled( operated by N2) Prove for satisfactory Operation
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (r) Carry out functional Checks of the sensors,alarms,soienoid and safety system. Ensure that they are operational. Replace/repair componets as required.
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (s) Check the pressure in pilot bottles.if the weight falls below 10% of initial weight, recharge the cylinders.
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (t) Lamp Checks of various ' Indication' in the Control Panel. Replace if defective
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (u) Check Klaxon Horn
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (v) Check Hooter and Fire detector
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (w) Clean all contacts of relays and push buttons of the control panel.
1026 CO2 Fire Fighting sytem,Maker:-ZEEL MARKETING PVT.LTD (x) Carry out insulation and continuity Check of wiring and control panel. Note: The entire CO2 system to be proved for functional Checks without CO2
1027 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL Cleaning, Repair, Renewal and Pressure Testing:- 5 bar
1027.1.Sea water lines
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (a) Main sea chest line, dia 125mm
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (b) Main sea chest line to stbd M/E, dia 65mm
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (c) Main sea chest line to port D/G, dia 32mm
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (d) Main sea chest line to port M/E, dia 65mm
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (e) Main sea chest line to stbd D/G, dia 32mm
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (f) Main sea chest line to Fire pump, dia 80mm
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (g) Stbd M/E OBD line, dia 80mm
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (h) Port M/E OBD line, dia 80mm
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (j) Stbd D/G to OBD pipe line, dia 65mm
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (k) Port D/G to OBD pipe line, dia 65mm
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (m)Main sea chest line to ballast and fire pump line,dia 125mm
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (n) Main sea chest line to Ballast pump line, dia 100mm
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (p) Fire Main line, dia 40mm
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (q) Forward sea chest to emg fire pump suction line, dia 100mm
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (r) Emergency bilge pump suction line, dia 50mm
1027.1 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (s) Emergency bilge pump discharge line, dia 50mm
1027.2. Fuel line
1027.2 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (a) Storage tank to fuel pump suction line,dia 40mm
1027.2 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (b) Fuel pump discharge to RU tank line, dia 40mm
1027.2 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (c) Storage tank to Fuel purifier line, dia 25mm
1027.2 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (d) Fuel purifier to RU tank line, dia 15mm
1027.2 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (e) RU tank to M/Es and D/Gs fule supply line, dia 32mm
1027.2 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (f) RU tank to M/Es and D/Gs fule supply line, dia 15mm
1027.2 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (g) RU tank to fuel pump priming line, dia 40mm
1027.2 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (h) M/Es and D/Gs return line, dia 15mm
1027.2 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (j) Fuel cargo tank to cargo pump suction line, dia 150mm
1027.2 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (k) Fuel cargo pump dischage line, dia 150mm
1027.2 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (m)Fuel cargo tank to stripping pump suction line, dia 40mm
1027.2 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (n) Fuel stripping pump discharge line, dia 40mm
1027.2 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (p) Emergency fire pump engine fuel lines, dia 15mm
1027.3. Fresh water lines
1027.3 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (a) Fresh water cargo pump to Hydrophore line, dia 25mm
1027.3 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (b) Hydrophore pump discharge line, dia 25mm
1027.4.Air line
1027.4 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (a) Discharge line from Air bottle to service connections, dia 15mm
1027.4 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (b) Discharge line from Air bottle to service connections, dia 40mm
1027.4 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (c) Discharge line from Air bottle to service connections, dia 25mm
1027.5. AVCAT/LSHSD OIL Lines EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (b) Deck fuel Pipe lines/Manifold discharge line, dia 100mm
1027.6. Hydraulic lines
1027.6 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (a) Hydraulic line, dia 15mm
1027.6 EQPT/SYSTEM: SYSTEM PIPES FOR CHEMICAL CLEANING (b) Hydraulic line, dia 20mm
1028 Following valves are to be overhauled & pressure tested upto 1.5 times of working pressure. Name tally to be placed for valves.
1028.1 Sea water system valves
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves. (a) Gate valves, dia 125mm (main sea chest line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (b) Butterfly valves, dia 125mm (main sea chest line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (c) Butterfly valve, dia 65mm (main sea chest to stbd M/E line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (d) Butterfly valve, dia 32mm (main sea chest to Port D/G)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (e) Butterfly valve, dia 65mm (main sea chest to Port M/E)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (f) Butterfly valve, dia 32mm (main sea chest to stbd D/G)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (g) SDNR angle valve,dia 80mm (stbd M/E to OBD line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (h) SDNR angle valve,dia 80mm (port M/E to OBD line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (j) SDNR angle valve,dia 65mm (stbd D/G to OBD line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (k) SDNR angle valve,dia 65mm (port D/G to OBD line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (m)Gate valve ,dia 125mm (main sea chest line to ballast & fire pump)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (n)Butterfly valve ,dia 125mm (main sea chest line to ballast & fire pump)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (p) Butterfly valves,dia 100mm (main sea chest to ballast pump line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (q) Butterfly valve, dia 100mm (Ballast pump to OBD discharge lines)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (r) Butterfly valves, dia 65mm (Fire pump discharge line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (s) Pressure releif valves, dia 65mm (Fire pump discharge line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (t) Butterfly valves, dia 40mm (Fire pump discharge line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (u) Butterfly valves, dia 25mm (Fire pump discharge line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (v) Fire hydrant valves, dia 65mm (Fire pump discharge line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (w)Gate valve, dia 100mm (Forward sea chest to fire pump line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (x)Butterfly valve, dia 100mm (Forward sea chest to fire pump line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (y)Butterfly valve, dia 100mm (Emergency fire pump discharge to OBD)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (z)SDNR valve, dia 100mm (Emergency fire pump discharge to OBD)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (aa)SDNR valve, dia 80mm (Emergency fire pump discharge line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (ab)Ball valve, dia 25mm( Hydrohore suction line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (ac)Ball valve, dia 25mm( Hydrohore discharge line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (ad)SD valve, dia 25mm( Hydrohore discharge line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (ae)SDNR valve, dia 40mm( Hydrohore discharge line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (af)Ball valve, dia 40mm( Hydrohore discharge line)
1028.1 EQPT/SYSTEM: Overhauling and pressure testing of Valves (ag)Ball valve, dia 40mm( Hydrohore discharge line)
1028.2.Cargo fuel system valves
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (a) SDNR valve, dia 40mm (storage tank to fuel pump line valve)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (b) SDNR valves, dia 40mm (Fuel pump discharge to RU tank)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (c) Ball valve, dia 25mm (storage tank to purifier suction line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (d) SDNR valve,dia 15mm (storage tank to purifier suction line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (e) SDNR valve, dia 15mm (purifier to RU tank line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (f) SDNR valve, dia 25mm (purifier to RU tank line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (g) Quick shut-off valve, dia 40mm (FODS to fule pump priming line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (h) Drain valve, dia 25mm (FODS drain valves)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (j) SD valves, dia 15mm (M/Es and D/Gs return line to FODS)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (k)SDNR valves, dia 150mm (Cargo fuel pump suction line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (m)Butterfly valves, dia 150mm (Cargo fuel pump suction line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (n)Gate valves, dia 40mm(Fuel cargo to stripping pump line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (p)Butterfly valves, dia 40mm(Fuel cargo to stripping pump line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (q)Gate valves, dia 40mm(Fuel stripping discharge line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (r)Butterfly valves, dia 40mm((Fuel stripping discharge line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (s)Butterfly valve, dia 150mm (Cargo fuel pump discharge line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (t)SDNR valve, dia 150mm (Cargo fuel pump discharge line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (u)Gate valve, dia 150mm (Cargo fuel pump discharge line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (v)Quick shutoff valve,dia 32mm (FODS to M/Es & D/Gs fuel supply line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (w) SDNR valve, dia 25mm (FODS to M/Es & D/Gs fuel supply line)
1028.2 EQPT/SYSTEM: Overhauling and pressure testing of Valves (x) SDNR valve, dia 15mm (FODS to M/Es & D/Gs fuel supply line)
1028.3 Fresh water System valves EQPT/SYSTEM: Overhauling and pressure testing of Valves (a) Ball valves, dia 25mm (fresh water line)
1028.4. Air Line valves EQPT/SYSTEM: Overhauling and pressure testing of Valves (a) SDNR valves, dia 40mm
1028.4 EQPT/SYSTEM: Overhauling and pressure testing of Valves (b) Ball valves, dia 40mm
1028.4 EQPT/SYSTEM: Overhauling and pressure testing of Valves (c) SDNR valves,dia 25mm
1028.4 EQPT/SYSTEM: Overhauling and pressure testing of Valves (d) Ball valves, dia 25mm
1028.4 EQPT/SYSTEM: Overhauling and pressure testing of Valves (e) Pressure Relief valves, dia 25mm
1028.4 EQPT/SYSTEM: Overhauling and pressure testing of Valves (f) Reducer
1028.5 Avcat line EQPT/SYSTEM: Overhauling and pressure testing of Valves (a) Butterfly valves, dia 100mm (Avcat cargo pump suction line)
1028.5 EQPT/SYSTEM: Overhauling and pressure testing of Valves (b)SD valves, dia 100mm (Avcat cargo pump suction line)
1028.5 EQPT/SYSTEM: Overhauling and pressure testing of Valves (c)Releif valves, dia 100mm (Avcat cargo pump suction line)
1028.5 EQPT/SYSTEM: Overhauling and pressure testing of Valves (d) SDNR valve, dia 100mm (Avcat cargo discharge line)
1028.5 EQPT/SYSTEM: Overhauling and pressure testing of Valves (e) Ball valve, dia 15mm (Avcat filter seperator)
1028.5 EQPT/SYSTEM: Overhauling and pressure testing of Valves (f) Drain valve, dia 15mm (Avcat filter seperator)
1028.5 EQPT/SYSTEM: Overhauling and pressure testing of Valves (g) Needle valve, dia 15mm (Avcat filter seperator)
1028.6. Steering system valves EQPT/SYSTEM: Overhauling and pressure testing of Valves (a) Gate valves, dia 20mm
1028.6 EQPT/SYSTEM: Overhauling and pressure testing of Valves (b) Ball valves, dia 20mm
1029 EQPT/SYSTEM: Cleaning/Renewal of strainers 1029 EQPT/SYSTEM: Renewal of strainers (a)Dia 125mm (main sea chest)
1029 EQPT/SYSTEM: Renewal of strainers (b)Dia 65mm (Bilge suction line)
1029 EQPT/SYSTEM: Renewal of strainers (c)Dia 40mm (Fuel suction line)
1029 EQPT/SYSTEM: Renewal of strainers (d) Dia 100mm (avcat suction line)
1029 EQPT/SYSTEM: Cleanin of strainers (e)Dia 100mm (avcat discharge line)
1030.Equip/ System: MISCELLANEOUS: 1030 Equip/ System: MISCELLANEOUS (a) Exhaust laging of DG exhaust system to be renewed,Dia-100mm
1030 Equip/ System: MISCELLANEOUS (b) Remove & Caliberate flow meter of fuel & AVCAT system.After caliberation flow meter to be refitt and prove for satis factory performance.(Make:- Scientific Devices(B) pvt.Ltd, Model:- TFM-100/150 ck.v-5.8502, Range:- 12-120 Cu. M/Hr)
1030 Equip/ System: MISCELLANEOUS (c)Flow meter to be renewed. (Make:- Scientific Devices(B) pvt.Ltd, Model:- TFM-100/150 ck.v-5.8502, Range:- 12-120 Cu. M/Hr) Manufacture of various adapters as per sample
1030 Equip/ System: MISCELLANEOUS (d) Fuel transfer hose to be renewed.(length-120mtr,Dia:80mm)
1030 Equip/ System: MISCELLANEOUS (e) Manufacture of iron racks as per given specification:- Length- 8 feet, base length- 4 feet, breadth- 2.6 feet,thickness:- 1.5mm,sheelve:- 5 ( three side plate covered)
1030 Equip/ System: MISCELLANEOUS (f) 1HP pump portable pump to be repair. If Found BER Pump to Renew.
1030 Equip/ System: MISCELLANEOUS (g) Exhaust laging of both M/E exhaust system to be renewed,Dia-150mm
1030 Equip/ System: MISCELLANEOUS (h) Chemical Cleaning of exhaust system of both M/E(Dia-150mm)
1030 Equip/ System: MISCELLANEOUS (j) New Fuel Transfer Hoses to supply (20 Mtr,4")
1030 Equip/ System: MISCELLANEOUS (m) Supply Cargo Manifold Reducer (6" to 4") (Material SS)
1030 Equip/ System: MISCELLANEOUS (n) Manufacture of various adapters as per sample (Size 1/2 inch to 2 inch)
1030 Equip/ System: MISCELLANEOUS (p) Chemical Cleaning of exhaust system of both DG(Dia-100mm)
ELECTRICAL WORK PACKAGE 2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) starting control pannel (including Local along with back supply(Located in E/R) & Remote Panels(located in W/H) Make: Power control engineering Carryout calibration of following gauges and sensors. Firm to submit all callibration report . Firm to quote for Service & Material for undertaking scope of work)
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (a) Functional checks for Engine wiring harness to carry out. Job includes continuity, Insulation checks of Harness. Rectify the fault/defect.
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (b) Carryout calibration of Lube oil pressure sensors. (Sensors for alarm & trip)
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (c) Renew Lube oil pressure sensors.
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (d) Carryout calibration of water temperature sensors
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (e) Renew water temperature pressure sensors
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (f) Carryout calibration of Lube oil temperature sensors
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (g) Renew Lube oil temperature sensors
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (h) Carryout calibration of Coolant level sensor
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (j) Renew Coolant level sensor
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (k) Carryout calibration of Gear box oil pressure sensor
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (m) Renew Gear box oil pressure sensor
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (n) Carryout calibration of Gear box oil Temperature Sensor
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (p) Carryout calibration of Engine Speed Sensor
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (q) Renew Engine Speed Sensor
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (r) Carryout of calibration of Engine speed meter cum Hour Meter
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (s) Renew Engine speed meter cum Hour Meter ( Wheel House & Engine Room Qty-02 Each)
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (t) Carry out calibration of Lube oil Pressure Gauge
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (u) Callibration of Lube oil temperature Gauge to be carried out
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (v) Carry out Callibration of DC center zero Ammeter for battery charging/discharging rang -50 to +50
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (w) Callibration of Both Main engines exhaust temp sensors
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (x) Overhauling of self starters 24V. Clutch plates, carbon bushes, bearings and pinion to renewed. (Firm to quote for Service & Material for undertaking scope of work)
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (y) Renew the self starters 24V DC for cumins engine,model-KTA19M4
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4) (z) Safety device checks for M/Es to be undertaken using simulators.
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4), (aa) Repair M/E control back up power supply transformer . Rating : 430V/230V,350VA
2001 Eqpt/System:Main Engine (Make:Cummins Engines,Model-KTA19M4), (ab) Renew M/E control back up power supply transformer . Rating : 430V/230V,350VA
2002 Eqpt/System:Reduction Gear box Make:TwinDisc incorporated,Model:MGX5222 DC; S.no:2122154,2122155
2002 Eqpt/System:Reduction Gear box (a) Clutching and disengaging control from wheel house found not operating intermittently. Defect to be rectified.
2002 Eqpt/System:Reduction Gear box (b) Electronic solenoid valves ( For Reverse, Neutral and forward Operation) to renew .
2002 Eqpt/System:Reduction Gear box (c) Primary and Secondary Clutch Valve Coil to renew
2002 Eqpt/System:Reduction Gear box (d) Carryout calibration of Gear Box Lube oil pressure sensor
2002 Eqpt/System:Reduction Gear box (e) Carryout calibration of Gear Box Lube oil Temperature sensor
2002 Eqpt/System:Reduction Gear box (f) Renew Lube oil Temperature sensor
2002 Eqpt/System:Reduction Gear box (g) Renew Lube oil pressure sensor
2003 Eqpt/System:Steering system.Make:Geeta Eng.works pvt ltd,Model:TR2C-2x2.1.35,Capacity:1.6tons,35ᵒ RTSN
2003 Eqpt/System:Steering system controls (a) Steering gear all safety alarms to prove for satisfactory operation.
2003 Eqpt/System:Steering system controls (b) Steering Gear Power failure and Phase failure alarm malfunctioning. To be rectified.
2003 Eqpt/System:Steering system controls (c) Steering Gear low oil level alarm showing erratic reading. To be rectified.
2003 Eqpt/System:Steering system controls (d) Steering Gear Control joy stick in bridge not responding intermittently. Defect to be rectified
2003 Eqpt/System:Steering system controls (e) Calibrate Rudder angle indicator with steering wheel position and rudder position. Carry out required repair/renewal of cables and foundation/support of indicators.
2003 Eqpt/System:Steering system controls (f) Intermittent fault observed in changing over between follow up and non-follow up mode. Defect to be rectified.
2003 Eqpt/System:Steering system controls (g) Rectify defect for Follow Up and Non Follow Up Mode. Prove System for Satisfactory Operation.
2003 Eqpt/System:Steering system controls (h) Steeering Panel Board to Mechanically cleaned, apply primer & paint.
2003 Eqpt/System:Steering system.Make:Geeta Eng.works pvt ltd, (j) Steering Gear motors to Overhaul, Prove for Satisfactory Operation
2003 Eqpt/System:Steering system.Make:Geeta Eng.works pvt ltd, (k) Overhauling of Steering Gear motor Control Panel (Job Includes Cleaning of Callibration of OLR's, Functional Checks of Contactors, Timers).
2004 Eqpt/System:Ship Cruising Control System.Make:Quick Shift,Model:EC300, Twin Disc (located at W/H & E/R)
2004 Eqpt/System:Ship Cruising Control System (b) Check continuity of Control wiring (From Wheel house to Engine room). Rectify all defects.
2005 Eqpt/System:Shaft RPM indication System.
2005 Eqpt/System:Shaft RPM indication System (a) Shaft RPM sensor showing erratic reading. Sensor to be callibrated.
2005 Eqpt/System:Shaft RPM indication System (b) Cleaning of all connections,internal components with cleaning agents.
2005 Eqpt/System:Shaft RPM indication System (c) Check the functions/output for techo generator
2005 Eqpt/System:Shaft RPM indication System (d) Check the alingnment of tech genarator with M/E shaft, Carry out necessary alingment.
2005 Eqpt/System:Shaft RPM indication System (e) Check and tighten all connections at techo generator,junction boxes, & at meters (in W/H)
2005 Eqpt/System:Shaft RPM indication System (f) Continuity checks of control wiring to be carried out. Necessary repairs to be undertaken.
2005 Eqpt/System:Shaft RPM indication System (g) Renew sensor for RPM indication
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) starting control pannel. Make:Power control Engineer Qty-02.Spares not covered inmandatory list .Firm to quote for Service & Material for undertaking scope of work.
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (a) Calibration of Lube oil pressure sensor to be carried out
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (b) Renew Lube oil pressure sensor
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (c) Renew Fresh water/coolant temperature sensors
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (d) Calibration of Fresh water/coolant temperature sensors to be carried out
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (e) Calibration of Lube oil temperature sensors to be carried out
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (f) Renew Lube oil temperature sensors
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (g) Calibration of Coolant level sensor to be carried out
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (h) Renew Coolant level sensor
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (j) Renew Engine Speed / RPM Sensor
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (k) Calibration of Engine Speed / RPM Sensor to be carried out
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (m) Calibration of Sea water pressure sensor to be carried out
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (n) Calibration of Exaust gas temperature sensor
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (p) Calibration of Engine Speed/RPM meter 0-2000RPM to be carried out
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (q) Calibration of Lube oil Pressure Meter 0-10 bar to be carried out
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (r) Calibration of Lube oil temperature Meter 0ᵒ-150ᵒC to be carried out
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (s) Calibration of Fresh water/ coolent temperature Meter 0ᵒ-150ᵒc to be carried out
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (t) Calibration of Exaust gas tempetarue Meter 0ᵒ-500ᵒC to be carried out
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (u) Calibration of Sea water pressure Meter 0-2.5bar to be carried out
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (v) Safety device checks for M/Es to be undertaken using simulators to be carried out
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (w) Calibration of DC Ammeter 0-30A for battery charging.
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (x) Calibration of DC 0-30V volt meter for control panel voltage
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (y) Renew the magnetic switches 24V DC for self starter circuit
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (z) Repair self starters 24V DC
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (aa) Renew the self starters 24V DC
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (ab)Renew the dynamos 24V DC
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (ac) Repair the dynamos 24V DC
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (ad) Check the continuty of harness & insulation between each cable in wiring harness. Rectify the defective wiring
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (ae)Tighten the all the connections at sensors plug tops,gauges terminals,connector bars & etc.
2006 Eqpt/System:DG Engine (Make:KOEL;MODEL:6CTA8.3DM) (af) Renewal indication bulbs 24V for DG starting control panel for indications
2007 Eqpt/System:Alternators 415V,3Ph,140KVA,195A at 0.8PF,Excitation voltage:48V,Speed:1500RPM,Make:kirloskar,Type:Brushless forced air cooled Ac generator(s.nos:X1231212QS-03,X1231212QS-04),qty-2nos.Spares not covered inmandatory list .Firm to quote for Service & Material for undertaking scope of work.
The definition of overhaul of Alternators includes the following:- (a) Dismantle The Alternators has to be dismantled and landed by Yard for overhauling. (b) Undertake trueness checks of rotor on the lathe. (c) Check for ovality in bearing housing. (d) Clean the rotor and stator thoroughly with alcohol, air, varnish and bake. (e) Measure the insulation of windings, rotor,and stator. In case insulation is below one mega ohm rewind the field / stator (f) Replace heater and thermistor units. (g) Assemble the Alternators with new bearings (h) In case of repairs to shaft trueness /renewal of winding,undertake dynamic balancing of the rotor part. (j) Check and rectify phase imbalance in insulation of windings (k) Undertake test bed Trials and confirm no load/ load trails, starting and running currents, speed, SPM readings apart from other standard checks. SPM reading are to be in green zone post overhaul. (l) All Alternators and machinery body/ cabinets to be painted as per the original colur. (m) Alternators name plate along with motor / Alternators details to be renew. (n) Wiring/ cabling which are removed during gutting/ degutting to be re wired wherever applicable.
2007 Eqpt/System:Alternators 415V,3Ph,140KVA,195A (a)Overhaul the alternators .Ensure all cable glands, joint of sheet metal on alternator are air tight. All sealings strips of terminal box cover are renewed.. Post overhauling of alternator, prove for trials viz full load trials, voltage control test,speed control test and paralleling trails.
2007 Eqpt/System:Alternators 415V,3Ph,140KVA,195A (b) Carry out operational checks of AVR
2007 Eqpt/System:Alternators 415V,3Ph,140KVA,195A (c) Renew Shock/vibration mountings.
2007 Eqpt/System:Alternators 415V,3Ph,140KVA,195A (d) Controls synchronization to prove for satisfactory operation
2007 Eqpt/System:Alternators 415V,3Ph,140KVA,195A (e) Carry out callibration of over voltage protection unit, reverse power relay and Over speed trip.
2007 Eqpt/System:Alternators 415V,3Ph,140KVA,195A (f) Carry out serviceability checks of all intrumentation.
2008 MAIN SWITCH BOARD Make L&T. Qty - 01
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (a) Main Switchboard and busbar routines to be carried out. Inspect lugs, connectors and repair deterioration/damage of MSB cables/wiring.Repair busbars insulators. Clean and decarbonize the busbars. Checking the tightness of fastenings on the switchboard. Internal cleaning to clear our the accumulation of dust/dirt. Renewal of gaskets on doors and the condition of weather seals. All bolted panels to secure.
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (b) Check Earth fault resistance of switchboard with the panel instrument/meter and record the readings. The insulation should not be less than 2 Mega ohm. If insulation is less,isolate and rectify the defect.
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (c) Carry out visual inspection of MSB,Breakers, feeder breakers for cleanliness and remove dust,dirt deposits.
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (d) The servicebility checks to carry out for "Set point and Delay of Under-Voltage". Renew Undervoltage coil.
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (e) The servicebility checks to carry out for "Set point And Delay of Over-Current" . Over Current coil to be renewed
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (f) The servicebility checks to carry out for "Set point And Delay of "Reverse Power". Reverse power coil to renew.
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (g) Renew Rubber insulation mat placed surrounding of MSB. ( Thickness 6mm, Size- 1 Mtr x 2 Mtr)
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (h) Carry out functional checks of all switchboard breakers for proper operation. All Breakers to be callibrated
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (i) Defective Breakers to be renwed
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (j) Calibration of duoble scale volt meter to be carried out
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (k) calibration of Ammeter to be carried out
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (m) Calibration of freqency meters to be carried out
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (n) Calibration of double scale frequency meter to be carried out
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (p) Calibration of kilo watt meterto be carried out
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (q) Calibration of cosØ meter,(power factor meter) to be carried out
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (r) calibration of Synchroscope meter to be carried out
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (s) calibration of Earth Fault indicator to be carried out
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (t) Renew KW Meters 0 to 150KW (New) Make: AE,Type:3ph/3wire
2008 MAIN SWITCH BOARD , OEM: Marine Electrical , Mumbai (u) Replace with new one LED bulbs 230V,20W pin type (BC Type) inside the MSB
2009 Eqpt/System: Shore Supply Make: Marine Electrical, 100amps, 415V, 3ph, qty -02 nos
2009 Eqpt/System: Shore Supply Make: Marine Electrical (a) Serviceability checks of Shore supply connection box. Shore supply Connection box includes Circuit breaker/isolation switch, Terminals to accept shore supply cable, earthing terminals.
2009 Eqpt/System: Shore Supply Make: Marine Electrical (b) Renew Fuses for shore supply connection box.
2009 Eqpt/System: Shore Supply Make: Marine Electrical (c) Calibration to be carried out for volt meters 0 to 500V AC
2009 Eqpt/System: Shore Supply Make: Marine Electrical (d) Calibration to be carried out for frequency meters Range 45 to 55
2009 Eqpt/System: Shore Supply Make: Marine Electrical (e) Calibration to carry out for Energy meter 3ph AC
2009 Eqpt/System: Shore Supply Make: Marine Electrical (f) Functional check to be carried out for phase sequence Meter 3PH AC
2009 Eqpt/System: Shore Supply Make: Marine Electrical (g) Isolation switch to be renewed.
2009 Eqpt/System: Shore Supply Make: Marine Electrical (j) Renewal of shore suppply cable 3x50 sqmm, rubber insulated, Copper multi stranded wire marine cable Make: Finolex
2009 Eqpt/System: Shore Supply Make: Marine Electrical (k) Shore supply panel box (body) detoriated . Shore supply box to be renewed. Necessary arrangement to be provided to secure cable.
2009 Eqpt/System: Shore Supply Make: Marine Electrical (m) Renew Energy meter 3ph 3wire 150A
2009 Eqpt/System: Shore Supply Make: Marine Electrical (n) Renewal of the phase sequence meter to be carried out
2009 Eqpt/System: Shore Supply Make: Marine Electrical (p) Renewal of the cable lugs (copper) 95sq.mm to be carried out
2010 Eqpt/System:Batteries 200AH ,12V,exide SMF type. Items to be supplied by firm
2010 Eqpt/System:Batteries 200AH ,12V,exide SMF type (a) Renew the batteries 200Ah,12V,exide SMF
2010 Eqpt/System:Batteries 200AH ,12V,exide SMF type (b) Renew the battery connecting lugs
2011 Eqpt/System:Inverter 5KVA,3ph 430V &24V DC Make:S.A power tech.
2011 Eqpt/System:Invertor 5KVA,3ph 430V &24V DC Make:S.A power tech. (a) Invertor is not operational, repair and overhauling of Invertor to be carried out. Invertor to prove for satisfactory operation.
2011 Eqpt/System:Invertor 5KVA,3ph 430V &24V DC Make:S.A power tech. (b) Inverter to be renewed
2011 Eqpt/System:Invertor 5KVA,3ph 430V &24V DC Make:S.A power tech. (c) Dismantle the inverter & clean all the components, PCBs ,relays, capacitors, switches contacts with cleaning agents (CTC)
2011 Eqpt/System:Invertor 5KVA,3ph 430V &24V DC Make:S.A power tech. (d) Renew Inverter battery and battery cables.Renew Input and output wires
2011 Eqpt/System:Invertor 5KVA,3ph 430V &24V DC Make:S.A power tech. (e) Renew defective Power Switch
2011 Eqpt/System:Invertor 5KVA,3ph 430V &24V DC Make:S.A power tech. (f) Renew present inverter with a new inverter. Spec of Inverter- 5KVA,3ph 430V & 24V DC
2011 Eqpt/System:Invertor 5KVA,3ph 430V &24V DC Make:S.A power tech. (g) calibration of volt meter 0-150v DC to be carried out
2011 Eqpt/System:Invertor 5KVA,3ph 430V &24V DC Make:S.A power tech. (h) calibration of Ameter 0-100A DC to be carried out
2011 Eqpt/System:Invertor 5KVA,3ph 430V &24V DC Make:S.A power tech. (j) Assemble the invertor and take load trails & prove for satisfactory performance
2012 Eqpt/System: Transformer rectifier unit 0.8kw,3ph,415V,AC/24V,DC Make;Static transformers Pvt Ltd. S.no-12036/1 & 12036/2 (Located in E/R)
2012 Eqpt/System: Transformer rectifier unit (a) Carryout overhauling of Transformer rectifier unit & prove for satisfactory performance.Renew all defective components. Carry out re-winding of coild if insulation found low/coil found burnt.
2012 Eqpt/System: Transformer rectifier unit (b) Rectifier panel Body to renew
2013 Eqpt/System: rectifier unit .Input AC 230V,O/P DC 24V,30A Make:Sairush (float cum boost charger) (located in E/R) Model type:FCBC 024030
2013 Eqpt/System: Rectifier unit (a) Carryout overhauling of rectifier unit. Renew all defective componentsProve for satisfactory operation
2014 Eqpt/System: Portable battery charger Make:ELAK, Model type:C12/24 (a) Carryout overhauling of portable battery charger. Prove for satisfactory operation
2014 Eqpt/System: Portable battery charger (b) Renew battery charger, Capacity: Input: 230V AC Output: 24V/48V, 10 Amps
2015 Eqpt/System:Control Panels/Starters. The definition of overhaul of Control panels includes the following:- (a) Dismantle the Control panel. (b) Disconnect & Remove all components & wiring. (c) Mechanical cleaning of Control panel board ,weld /repair of any damages to the body/door hinges & painted with one coat of primer & two coat of powder coating(origonal colour) (d) Cleaning of all connections,internal components with cleaning agents. (e) Calibration of OLRs/ Timer relays. & calibration certificates should be submitted with NABL recognition (f) Calibration/functional checks of PCBs, sensors, diode rectifiers & etc. (g) Refixing all components & given the all internal connections. (h) Check the circuitary fucntionality & rectify if any fault.
2015 Eqpt/System:Control Panels/Starters. The definition of overhaul of Control panels includes the following:- (j) Check the insulation between the phases, phase to body & improve it (k) insulation if it is less than 2M ohms. for power circuits & control ciruits. (l) Functional checks of SPP (single phasing preventer) (p) functional checks of contactors. (q) Insulation checks for transformers (r) functional checks of rotary on off switches (s) Fix the circuit diagram on metal plate,name tallies, danger sign plates on control panel body (t) functional checks of push buttons & indication lamps (u)Renewal the fuse links (v) Refixed in onboad &given the all connections . (x) replace the gaskets with neoprene rubber gasket (y) Take load trials after give the power supply
2015 Control Panels/Starters carry out over hauling / servicing routines as per the above defintion for the following control pannels/starters and prove for satisfactory operation. (Total 03 Nos) Starters- star delta-14, DOL starters-10 Nos
2015 Control Panels/Starters (a) Overhauling of control panel for boat davit winch ( including push button station,limit switches) 3Ph,415V,5HP Make: schineeder electric industries,Model: Serie NSYCRN
2015 Control Panels/Starters (b) Overhauling of control panel for capston motor (including remote operational push button stations) Make:Hemant eng.works,single speed,Run & Reverseble with break system
2015 Control Panels/Starters (c) Overhauling of Control Panel for anchor wind loss motor (including master controller) Make:Hemant eng.works,Double speed,Run & Reverseble with break system
2015 Control Panels/Starters (d)Anchor control panel box (body) is rusted & replace with new one.
2015 Control Panels/Starters (e) Overhauling of control panel for oily water separator Make:Victor Marine Ltd.Model;Victor Minisep-CS 0500, s.no 00666,415V,3Ph,50Hz
2015 Control Panels/Starters (f) Overhauling of control panel for fuel oil separator Make:Westfallia, Model no OTC2-02-137,s no 9064-343,capacity 450 Ltrs/hr,415V,50Hz,
2015 Control Panels/Starters (g) Overhauling of control panel for Lub Oil seperator Make:Westfallia Model no OTC2-02-137,s no 9064-338,capacity 300 Ltrs/hr,415V,50Hz,
2015 Control Panels/Starters (h) Overhauling of navigational lighting panel .Make:Waves Electrionics pvt ltd Kochi.india 230V for AC,24V for DC
2015 Control Panels/Starters (j) Star delta starters for Motors to be renewed
2015 Control Panels/Starters (k) DOL starters for Motors to be renewed
2016 Eqpt:Motors / Blowers The definition of overhaul of motor includes the following:- (a) Dismantle the motor. The motor has to be dismantled and landed by Yard for overhauling. (b) Undertake trueness checks of rotor on the lathe. Repair observed Defects (c) Check for ovality in bearing housing. Repair observed Defects. (d) Clean the rotor and stator thoroughly with alcohol, air, varnish and bake. There should be no dust particles or other foreign particles observed after cleaning (e) Measure the insulation of windings of field and stator. In case insulation is below one mega ohm rewind the field / stator. (f) Replace heater and thermistor units. (g) Assemble the motor with new bearings (h) In case of repairs to shaft trueness /renewal of winding,undertake dynamic balancing of the rotor part. (j) Check and rectify phase imbalance in insulation of windings (k) Undertake test bed Trials and confirm no load/ load trails, starting and running currents, speed, SPM readings apart from other standard checks. SPM reading are to be in green zone post overhaul. (m) All motors and machinery body/ cabinets to be painted as per the original colur.
2016 Eqpt:Motors / Blowers Carry out overhauling of the following motors (including blower parts for blowers) and prove for satisfactory operation.
2016 Eqpt:Motors / Blowers (a) Overhauling of Bilge Ballest GS pump motor to be carried out 415V,3Ø,20HP
2016 Eqpt:Motors / Blowers (b) E/R Fire pump motor 415V,3Ø,25HP
2016 Eqpt:Motors / Blowers (c) Bilge pump motor 415V,3Ø,2HP
2016 Eqpt:Motors / Blowers (d) Engine room ventilation Blower motors 415v,3ph,50Hz,7.5HP.
2016 Eqpt:Motors / Blowers (e) LSHSD cargo pump motors 415V,3Ø,20HP
2016 Eqpt:Motors / Blowers (f) Avcat cargo pump motor, 3Ph,415V,50Hz,15HP
2016 Eqpt:Motors / Blowers (g) Air compressor motor 3Ph,415V,50Hz,1HP
2016 Eqpt:Motors / Blowers (h) Pump room ventilation blower 3Ph,415v,50Hz,0.75HP
2016 Eqpt:Motors / Blowers (j) Stripping pump motors 3Ph,415v,50Hz,1.5HP
2016 Eqpt:Motors / Blowers (k) Fresh water cargo pump motor 3Ph,415v,50Hz,6HP
2016 Eqpt:Motors / Blowers (m)forward bilge pump 3Ph,415v,50Hz,10HP
2016 Eqpt:Motors / Blowers (n) Hydrofore pump 3Ph,415v,50Hz,0.75HP
2016 Eqpt:Motors / Blowers (p)Anchor windloss motor (Double Speed motor) 3Ph,415V,50Hz,10HP
2016 Eqpt:Motors / Blowers (q)Capstan motor (single Speed motor) 3Ph,415V,50Hz,25HP
2016 Eqpt:Motors / Blowers (r)Durty oil pump Motor 3Ph,415v,50Hz,0.75HP
2016 Eqpt:Motors / Blowers (s)Lube oil transfor pump Motor 3Ph,415v,50Hz,0.75HP
2016 Eqpt:Motors / Blowers (t)Fuel oil transfor pump Motor 3Ph,415v,50Hz,0.75HP
2017 Eqpt/System: Navigational & Communication Equipments. Firm to quote for operational/Serviceability checks & Continuity checks of control wiring of following navigational equipments fitted in wheel house.
2017 Eqpt/System: Navigational & Communication Equipments Navigational Marine Radar. Make:Koden,Model:MDC-2900P series. (a) Carry out Functional Checks of Equipment. ( Radar system consist of the antena & Scanner unit with a transmit power of 6kW~25kW, a display unit with 19inch color LCD display & Operating Panel Unit)
2017 Eqpt/System: Navigational & Communication Equipments Navigational Marine Radar. Make:Koden,Model:MDC-2900P series. (b) Rectify the Defect observed on marine radar system. Radar system to prove for optimum performance.
2017 Eqpt/System: Navigational & Communication Equipments (Navigational Marine Radar. Make:Koden,Model:MDC-2900P series) (c) Continuity of Connecting Cable to check. (Type 242J159098B) and DC Power Cable (Type:CW-259-2M).
2017 Eqpt/System: Navigational & Communication Equipments (Navigational Marine Radar. Make:Koden,Model:MDC-2900P series) (d) Renew Connecting Cable (Type 242J159098B) (Length-20 Mtr)
2017 Eqpt/System: Navigational & Communication Equipments (Navigational Marine Radar. Make:Koden,Model:MDC-2900P series) (e) Renew DC Power Cable (Type:CW-259-) (Length- 4 Mtr)
2017 Eqpt/System: Navigational & Communication Equipments (Navigational Marine Radar. Make:Koden,Model:MDC-2900P series) (f) Renew all water proof connectors for connecting cable & AC/DC Power Cable
2017 Eqpt/System: Navigational & Communication Equipments (Navigational Marine Radar. Make:Koden,Model:MDC-2900P series) (g) Functional Checks of Rectifier Unit to be carried out (Type:- PS010/VL-PGS001) to carry out. Fuses (5A/20A ) fitted in unit to be renewed.
2017 Eqpt/System: Navigational & Communication Equipments Navigational GPS system. Make:Simrad (Brand name:NAVICO),Model:MX512 (h) Navigational GPS System is not functioning .Serviceability checks to be carried out. GPS system to prove for satisfactory operation.
2017 Eqpt/System: Navigational & Communication Equipments Navigational GPS system. Make:Simrad (Brand name:NAVICO),Model:MX512 (j) Navigational GPS System - Application sofware (Latest) to be updated
2017 Eqpt/System: Navigational & Communication Equipments Make & MODEL: LILLEY & GILLIE MK 20002 COMPASS OUTFIT (k) Magnetic Compass adjustment to be carried out. Prove for optimum performance.
2017 Eqpt/System: Navigational & Communication Equipments Make & MODEL: LILLEY & GILLIE MK 20002 COMPASS OUTFIT (m) Magnetic Compass bowl to inspect. Checks for leaks & bubbles.The Compass gimballing to be checked. The operational test of compass to be carried out . Check that no friction has developed on the pivot & jewel. The upper & lower glass of compass to be renewed.
2017 Eqpt/System: Navigational & Communication Equipments Make & MODEL: LILLEY & GILLIE MK 20002 COMPASS OUTFIT (n) Magnetic Compass bowl to be overhauled . Compass to be proved for optimum performance.
2017 Eqpt/System: Navigational & Communication Equipments Make & MODEL: LILLEY & GILLIE MK 2000s BINNACLE (p) Binnacle lenses & mirror to be renewed.
2017 Eqpt/System: Navigational & Communication Equipments Make & MODEL: LILLEY & GILLIE MK 2000s BINNACLE (q) Binnacle lighting- Lamps to be renewed (Qty- Two nos 24 Volt 15 watt SBC-Pygmy). Cables for lamps to renewed.( Cable length-30 Rmtr)
2017 Eqpt/System: Navigational & Communication Equipments Make & MODEL: LILLEY & GILLIE MK 2000s BINNACLE (r) Binnacle lighting- Defective Control unit to prove for satisfactory operation.
2017 Eqpt/System: Navigational & Communication Equipments Make & MODEL: LILLEY & GILLIE MK 2000s BINNACLE (s) Binnacle lighting- Compass Liquid to be renewed.Rubber O-Rings, Rubber Diaphragm to be renewed.
2017 Eqpt/System: Navigational & Communication Equipments Make & MODEL: LILLEY & GILLIE MK 2000s BINNACLE (t) Binnacle lighting- All Ceiling fittings Neoprene Gaskets, Sealing O-rings on ceiling flangs & Binnacle plateforms to re renewed.
2017 Eqpt/System: Navigational & Communication Equipments (u) Carry out Serviceability checks for Bridge Naviigational Watch Alaram System,Make:Interschalt Maritime systems AG, Model:A006.6-2
2017 Eqpt/System: Navigational & Communication Equipments (v) Carry out Serviceability checks for VHF system. Make:Sailor, Model:6222 VHF DSC,
2017 Eqpt/System: Navigational & Communication Equipments (w) Carry out Serviceability checks for Echo Sounder unit. Make: Raytheon Anschutz, Model:GDS101.
2017 Eqpt/System: Navigational & Communication Equipments (x) Carry out Serviceability checks for Sound power telephones. Make: Cooper/Gitiesse (IMCOS™)
2017 Eqpt/System: Navigational & Communication Equipments Sound power telephones. Make: Cooper/Gitiesse (IMCOS™) (y) Replace Transmitter unit
2017 Eqpt/System: Navigational & Communication Equipments Sound power telephones. Make: Cooper/Gitiesse (IMCOS™) (z) Replace handset cord/ Tinsel Cord
2017 Eqpt/System: Navigational & Communication Equipments (ab) Carry out Serviceability checks for General Alaram system. Make: Cooper/Gitiesse (IMCOS™)
2017 Eqpt/System: Navigational & Communication Equipments (ac) Clean the Eco sounder control unit with dry cloth. Check tightness of interconnecting cables. Check cables & connectors for proper connection.Check grounding wires for damage. Carry out insulation test on supply cable,interconnecting cable and transducer. Check the insulation resistance of the equipment.Check serviceability of fuses. Renew defective fuses.
2017 Eqpt/System: Navigational & Communication Equipments (ad) Eco sounder control unit -
2017 Eqpt/System: Navigational & Communication Equipments (ae) Eco sounder control unit - renew defective grounding wires, Renew defective wiring components.
2017 Eqpt/System: Navigational & Communication Equipments (af) Eco sounder control unit - Carry out serviceability checks of the equipments
2017 Eqpt/System: Navigational & Communication Equipments SAILOR 6222 VHF DSC - (ag) Antenna and connectors are to be cleaned & deposited rust to be removed. Centre Pin of connectors to be renewed.Handset phone extension cord to be renewed.
2017 Eqpt/System: Navigational & Communication Equipments SAILOR 6222 VHF DSC - (ah) Replace enamel/primer coating of surface of the equipment & accessories.Repair defective locks & latches of cover for proper operation
2017 Eqpt/System: Navigational & Communication Equipments SAILOR 6222 VHF DSC - (aj) Renew sailor hand microphone
2017 Eqpt/System: Navigational & Communication Equipments (ak) Gyro unit- Carry out overhauling of repeaters
2017 Eqpt/System: Navigational & Communication Equipments (am) Gyro unit- Carry out overhauling of the master unit. Prove for optimum performance of gyro unit along with the transmission chain & repeaters.
2017 Eqpt/System: Navigational & Communication Equipments (an) Carry out Serviceability checks for Navigational DGPS Sensor. Make:SIMRAD, Model:MX512
2018 Eqpt/System: Light fittings.
2018 Eqpt/System: Light fittings. (a) Carryout overhauling of navigational lights, light fittings, control panels. Check all the switches and replace defective switches.
2018 Eqpt/System: Light fittings. (b) Navigational bulbs to be renewed (AC 230V,60w)
2018 Eqpt/System: Light fittings. (c) DC navigational bulbs to be renewed ( 24V,60w)
2018 Eqpt/System: Light fittings. (d) Repair Watertight swival mounting halogen searchlight fittings. Make:Rayan-2011) 30cm Dia with 1000W lamp lacated at w/h top operated from w/h
2018 Eqpt/System: Light fittings. (e) Renew search light bulbs (1000w)
2018 Eqpt/System: Light fittings. (f) Renew LED Flood Light Fitting (WT) in E/R 120W,230V,AC; Make Sysca/philips (job includes providing the brakets for fixing of light fitting)
2018 Eqpt/System: Light fittings. (g) Renew LED Flood Light Fitting (WT) in steering Compartement 120W,230V,AC; Make Sysca/philips (Job includes repair/renewal/fabrication of the fittings arrangement of light)
2018 Eqpt/System: Light fittings. (h) Provide & laying of cable (multi stand copper cable 2X4sq.mm make finolex) along with from 230V section in MSB
2018 Eqpt/System: Light fittings. (j) provide & installing the 2 in nos switches (metal clad water tight DP ON/OFF rotary type switch) for light fittings in E/R.
2018 Eqpt/System: Light fittings (k)Replace the CFL lights 4 pin type 18w with LED tube lights 230V.20W,2' in existing fittings.
2019 Eqpt/System:Illuminated Name Board-1no (a) Renew the LED tube lights 230V,20W.2' Make;Sysca/philips inside the ship name board.
2020 Eqpt/System: Cooking Range with 2 hot plates with oven;430V 3ph 6kw. Make: Sushuma & co.(Electricals) Type:C1e,S.no:SE/154/1
2020 Eqpt/System: Cooking Range with 2 hot plates with oven (a) Carryout overhauling and prove for satisfactory performance.
2020 Eqpt/System: Cooking Range with 2 hot plates with oven (b) Renew the Heating elements ("W" type) 430V,1500W
2021 Eqpt/System:Electrical Oven Make: Sushuma & co.(Electricals) Type:1-1C,S.no:SE/154/1,AC 230V,50Hz,1200Watts (a) Repair Defective Electrical oven. Renew if found Unserviceable
2022 Eqpt/System:Refrigerator. (D.Door) Make; Samsung,Model/Year:RT28FAJYASA/TL/2013 (a) Servicing of refregirators 275ltrs to be carried out. Prove for satisfactory operation
2022 Eqpt/System:Refrigerator. (D.Door) Make; Samsung,Model/Year:RT28FAJYASA/TL/2013 (b) Renew refregirators ( 275ltrs). if found Unserviceable
2023 Eqpt/System:Deep Freezer (a) Deep freezer has less cooling effect. Carry out Repair/Servicing of Deep Freezer (600 ltr capacity).
2023 Eqpt/System:Deep Freezer (b) Renew Deep Freezer (600 ltr capacity) if found unserviceable
2024 Eqpt/System:split A/Cs Make:Carrier,Capacity 1.5ton
2024 Eqpt/System:split A/Cs Make:Carrier (a) Repair and overhauling of spilt A/Cs to be carried out. .Prove AC unit for satisfactory operation.
2024 Eqpt/System:split A/Cs Make:Carrier (b) Renew AC in found unserviceable.
2024 Eqpt/System:split A/Cs Make:Carrier (c) Pipe connections and insulation between AC indoor/outdoor unit to be renewed
2025 Eqpt/System: Wall mounted Electrical fans (Oscillating) (a) Repair the fans and prove them for satisfactory performance. Renew fans if found unserviceable
2025 Eqpt/System: Wall mounted Electrical fans (Oscillating) (a) Renew fans if found unserviceable
2026 Eqpt/System: Toxic gas monotoring system Make:Marine control systems & services pvt ltd; (a) Functional checks of toxic gas monitoring system to be carried out. Check for Optimum performance. 8- way solenoid bank to be ovehauled and prove for Satisfactory operation.Callibration of all Gas sensors to be carried out. All Line Filters for sampling system to be renewed. Defective Internal Fuses to be renewed.
2026 Eqpt/System: Toxic gas monotoring system Make:Marine control systems & services pvt ltd; (b) Toxic gas sensors to be renewed
2026 Eqpt/System: Toxic gas monotoring system Make:Marine control systems & services pvt ltd; (c) Flammable gas sensors to be renewed
2026 Eqpt/System: Toxic gas monotoring system Make:Marine control systems & services pvt ltd; (d) Sampling system tube (6 mm OD Nylon Tube) to be renewed.
2026 Eqpt/System: Toxic gas monotoring system Make:Marine control systems & services pvt ltd; (e) Pump for sample collection to be renewed.
2027 Eqpt/System:Flow Meters ,Make:Scintific Devices pvt Ltd. Model .no 3FM-100/150 K.V-5.502,Range;12-120 Cubic mtrs./Hr. o/p current 4-20 m Amps(power supply 24V DC) S.No13081559
2027 Eqpt/System:Flow Meters Make:Scintific Devices pvt Ltd. (a) Callibrate the flow meters.
2027 Eqpt/System:Flow Meters Make:Scintific Devices pvt Ltd (b) Renew Flow Meters if found non serviceable
2028 Eqpt/System:Tank content gauge system.Make:Nivo Controls pvt Ltd.Indore,Type:RDA 528,Sr.no:492513,Power supply 230v,AC (it consisting of parts (a) cargo tanks-13in nos,b) Utility tanks-24nos ) &3 in nos indication panels are located at Main deck.E/R & W/H)
2028 Eqpt/System:Tank content gauge system.Make:Nivo Controls pvt Ltd.Indore (a) Calibration of tank level sensors.
2028 Eqpt/System:Tank content gauge system.Make:Nivo Controls pvt Ltd.Indore (b) Check the cable continuty till respective central display boards. Repair/renew defective cable
2028 Eqpt/System:Tank content gauge system.Make:Nivo Controls pvt Ltd.Indore (c) The tank level display units shows inaccurate readings. Prove for satisfactory performance.
2028 Eqpt/System:Tank content gauge system.Make:Nivo Controls pvt Ltd.Indore (d) The central display unit shows inaccurate readings. Prove for satisfactory performance.
2028 Eqpt/System:Tank content gauge system.Make:Nivo Controls pvt Ltd.Indore (e) check & tighen the all connections at JBs & connector bars.
2028 Eqpt/System:Tank content gauge system.Make:Nivo Controls pvt Ltd.Indore (f) Take final trails & prove for satisfactory performance
2028 Eqpt/System:Tank content gauge system.Make:Nivo Controls pvt Ltd.Indore (g) Renew faulty cargo tank level sensors
2029 Eqpt/System:Sewage treatment plant,Make:Hamworthy Pvt Ltd,Model:ST3A-C,Capacity:3kg/day,S.no:G097188-01 (a) Overhauling of STP aeration blower to be carried out (Job include overhauling of electric motor and blower unit)
2029 Eqpt/System:Sewage treatment plant,Make:Hamworthy Pvt Ltd,Model:ST3A-C,Capacity:3kg/day,S.no:G097188-01 (b) Renew High level, Low level and high level alarm limit Switches.
2029 Eqpt/System:Sewage treatment plant,Make:Hamworthy Pvt Ltd,Model:ST3A-C,Capacity:3kg/day,S.no:G097188-01 (c) Renew level switch to control the start stop of the dischage pump.
2030 Eqpt/System:Emergency DD pump (a) Carry out calibration of lub oil sensors
2030 Eqpt/System:Emergency DD pump (b) Renew lub oil sensors
2030 Eqpt/System:Emergency DD pump (c) Carry out calibration of lub oil temperature sensor
2030 Eqpt/System:Emergency DD pump (d) Carry out overhauling of self starter 12V of DD pump
2030 Eqpt/System:Emergency DD pump (e) Renew self starter 12V
2030 Eqpt/System:Emergency DD pump (f) overhauling of dynamo 12v of DD pump
2030 Eqpt/System:Emergency DD pump (g) Renew dynamo
2030 Eqpt/System:Emergency DD pump (f) Carry out Serviceability checks for DD Engine control System.
2031 Eqpt/System:Fire Detection Panel, Make Autroprime,Model:BS-200M
2031 Eqpt/System:Fire Detection Panel, Make Autroprime,Model:BS-210M (a) Fire protection Equipment intermittently buzzer false alarm. Defect to rectify and system to prove for satisfactory operation.
2031 Eqpt/System:Fire Detection Panel, Make Autroprime,Model:BS-210M (b) Renewal of Inbuilt Emergency batteries for Fire Alarm Panal to be carried out.
2031 Eqpt/System:Fire Detection Panel, Make Autroprime,Model:BS-200M (k) Check the cable continuity from fire alaram panel in W/H to all smoke detect sensors. Repair defective cable
2032 Eqpt/System: Starter panels
2032 Eqpt/System:Group starter panels (a) Removing dust particals by cleaning of all connections,internal components,bus bars with cleaning agents. Repair for any dent,damage,crack and corrosion .
2032 Eqpt/System:Group starter panels (b) Renew defective fuses, (Qty-04), switches (qty-06) ,push buttons (Qty-4), and indication lamps(Qty-12)
2032 Eqpt/System:Group starter panels (c) Repair defective panel door hinges.
2032 Eqpt/System:Group starter panels (d) Renew the door rubber seals gaskets with neoprene gaskets
2032 Eqpt/System:Group starter panels (e) Fabricate the panel door keys (Minus type-20,triangle type-20, circle hole type-20)
2033 Electrically Operated Windlass (a) Windlass motor - Check the motor & Controller for proper grounding. Ensure tightness of all connections in the terminal box. Renew rubber gasket between cover and shell body of the controller
2033 Electrically Operated Windlass (b) Renew defective contacts and wiring
2033 Electrically Operated Windlass (c) Renew brake lining
DRY DOCK AND ALLIED SERVICES WORK PACKAGE (A) Docking and undocking charges (Both Versions) Firm not to quote. Docking and Undocking will be done by Navy in Navy Permises i.e ND(v) /slipway.
(B) Dock blocks preparation & laying out as per docking plan Firm not to quote. Job will be done by Navy .
Dock hire charges for an estimated duration of 60 Days as per OCR Firm not to quote. Dry Dock facility will provided by Navy in Navy Permises i.e ND(v) /slipway.
Wet basin/alongside hire charges for the remaining duration each (i.e. total refit duration of 90 days – 60 days docking period) Firm not to quote. Dry Dock facility will will provided by Navy in Navy Permises
Provision of sufficient lighting for duty staff. Firm to quote.
(a) Quote for maintenance of two in no. fire lines for the refit duration . Firm to quote.
(b) Two each connection/ disconnection charges for for the refit duration. Firm to quote.
Provision of two transports (cars) for entire refit duration (one for refit Co-ordinating staff and one for ND(V) monitoring Team) for 10 hrs or 100KM/day whichever is less. Firm to quote.
Towing charges To & Fro. Firm not to quote. Facility will be provided by Navy.
QC inspection for the entire scope of work by third party IRS/LRS/ABS/QC/TPI for the refit duration as per the QIS. Firms not to quoted for this serial since QC will be by ND(V)/MQC Dept.
Provision of stationory / office items for ND(V) / Refit monitoring team for entire refit duration period. Cater budget of Rs 2000/- per month. Requirement will be intimated RMT/ NDV on as requirement basis. Payment at actuals. Note:- firms to quote.
Mandatory spares MAIN ENGINE SPARES (MAIN ENGINE,MAKE-CUMMINS) SEPARATOR, FUEL WATER-4095190
RESISTOR, CORROSION-4058965
HOSE,ELBOW-3030514
HOSE,ELBOW-3030782
CLAMP,T BOLT-125741
CLAMP,T BOLT-140313
CLAMP,T BOLT-3175623
BELT,V RIBBED-206996
HOSE,FLEXIBLE-AM 6060 SS
HOSE,FLEXIBLE-AM 6030 SS
CLAMP,HOSE-179904
SWITCH,COOLANT LEVEL-4383931
HARNESS,WIRING-3331473
HOSE,FLEXIBLE-4058282
SEAL,O RING-3046943
SEAL,O RING-3085709
HOSE,FLEXIBLE-2870878
HOSE,FLEXIBLE-AK10036 SS
INHIBITOR,CORROSION-4926654
HOSE,FLEXIBLE-3349292
HOSE,PLAIN-3393305
VALVES,SHUTOFF-3035346
SEAL,RECTANGULAR RING-154087
SCREW,SOCKET HEAD CAP-S 189 C
INDICATOR,RESTRICTION-3637209
HOSE,PLAIN-3818271
CLAMP,HOSE-209773
WASHER,PLAIN-8265
SWITCH,MAGNETIC-3050692
KIT,OIL COOLER-3804934
GASKET,OIL COOLER CORE-206973
GASKET,LUB OIL CLR HSG-3065790
GASKET,TOR CNV OIL COOLER-3065791
SEAL,O RING-70624
DIPSTICK,BLANK-216484
KIT,UPPER ENGINE GASKET-4352578
CUP INJECTOR-3077716
TAPPET,HYD VAR TIMING-3075381
SEAL,O RING-193736
RETAINER,SCREEN-174299
SPRING,INJECTOR-3042428
BALL,CHECK-167157
PIN,ROLL-203426
SCREEN,FILTER-3054999
GASKET,INJECTOR-173086
SPRING,INJECTOR-3042427
SEAL,INJECTOR-207244
KIT,BARREL & PLUNGER & CUP-KIT3238540
KIT,TURBO REPAIR HC5A-3545647
HOSE,FLEXIBLE-3086021
HOSE,FLEXIBLE-AM16025 NF
CLAMP,HOSE-43828 A
PUMP,WATER-4081093
NUT,HEXAGON FLANGE-3056158
GASKET,TURBOCHARGER-206576
HOSE,FLEXIBLE-3035580
HOSE,FLEXIBLE-3414590
HOSE,FLEXIBLE-AM16025 NF
CLAMP,HOSE-43828 A
HOSE PLAIN-3970407
CLAMP BOLT-3924386
GSKT IN MFD-3936993
CLAMP T BOLT-125740
CLAMP T BOLT-125741
CLAMP T BOLT-152026
HOSE HUMP-3030763
HOSE FLEXIBLE-209955
HOSE FLEXIBLE-209957
HOSE FLEXIBLE-3918562
SEAL O RING-3037236
GSKT TURBO DRAIN-3937706
CLAMP V BAND-3905216
UPPER ENGINE GASKET SET-4025271
KIT COOLANT TEST-3167226
INJECTOR-3926787
KIT,HX40 TURBO REPAIR-3575169
TESIONER BELT-5259022
KIT WATER PUMP-3973114
BELT V RIBBED-3289224
GSKT CONN-3945603
HOSE PLAIN-4940670
CLAMP-3937613
FILTER LO-3401544
FILTER FUEL-4962810
FILTER COOLANT-4104821
HOSE FLEXIBLE-AK 6012 SS
GASKET, OIL COOLER CORE-3918174
GASKET,LUB OIL CLR COVER-4063496
COOLANT TEMP SWITCH-4327017
SWITCH PRESSURE-2897691
SENSOR TEMP-4071830
SENSOR PRESSURE-4071833
FUEL SOLENOID -3348327
DG SPARES HOUSING HEAT EXCHANGER-3229452
LUBE OIL FILTER BY PASS-3873576
FUEL FILTER-4084133
LUBE FILTER-3166554
TURBOCHARGER-3529293
PULLEY SEA WATER PUMP-3876140
GASKET ELEMENT-137155
GASKET COVER ELEMENT-137067
O RING-137074
O RING-137075
GASKET HEAT EXHANGER-137071
SEA WATER PUMP-3881150
FUEL SOLENOID -3240573
GASKET COVER ELEMENT -137067
O RING -137074
O RING -137075
GASKET HEAT EXHANGER-137071
COVER HEAT EXCHANGER -137059
ELEMENT HEAT EXCHANGER -194731
SWITCH MAGNETIC -3050692
VACUUM INDICATOR -3872813
GASKET OIL COOLER -3630969
MANIFOLD EXHAUST -AR3245837
TURBO REPAIR KIT -3545399
PUMP SPARES BEARING (CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS) -NU 308 ECP
BEARING (CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS) - 7208 BEP -7208 BEP
BEARING MAKE:-B.E PUMPS, NU 306 ECP-NU 306 ECP
BEARING MAKE:-B.E PUMPS, 7206 BEP-7206 BEP
OIL SEAL MAKE:-B.E PUMPS, - 30-45-7-30-45-7
JOHNSON PUMP, MECHANICAL SEAL -EJ2030V-CH-50-200-1220
JOHNSON PUMP- BEARING -EJ2030V-CH-50-200-2250
JOHNSON PUMP- BEARING -EJ2030V-CH-50-200-2260
JOHNSON PUMP- SHAFT -EJ2030V-CH-50-200-2200
JOHNSON PUMP-IMPELLER-EJ2030V-CH-50-200-120
IMPELLER (CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS)
SHAFT (CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS)
MECHANICAL SEAL (CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS)
METAL COUPLING (CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS)
JAW COUPLING (CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS)
RUBBER COUPLING PAD (CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS)
OIL SEAL (CARGO PUMP(LSHSD),MAKE:-TUSHACO PUMPS)
SHAFT(EMERGENCY BILGE PUMP,MAKE:-B.E PUMPS,MODEL-A 5110KK-DGS2-316-MS3)
IMPELLER (EMERGENCY BILGE PUMP,MAKE:-B.E PUMPS,MODEL-A 5110KK-DGS2-316-MS3)
PURIFIER SPARES SET OF SPARE PART FOR DRIVE (WESTFALIA SEPERATOR) - -2058-9902-120
SET OF SPARE PART FOR BOWLHOOD (WESTFALIA SEPERATOR) - -2058-9902-110
CORRUGATED HOSE, COMPL.(WESTFALIA SEPERATOR) -- 0018-6656-100
GASKET (WESTFALIA SEPERATOR) - -0007-1729-830
VALVE,COMPLETE (WESTFALIA SEPERATOR) - -2058-8280-000
MISCELLANOUS SPARES Lubrication oil for Air Compressor
Portable pump 1 HP
VALVE AIR RELAY - , CUMMINS Engine-3022697
BEARING (A- BRACKET BUSH /STERN TUBE BUSH) - -RAILCO NF22
ELECTRICAL SPARES HEATING ELEMENTS FOR COOKING RANGE 440V,1.5KW, TYPE:W
ENGINE SELF STARTING MOTOR 24V DC 5HP
ENGINE SELF STARTING MOTOR 12V DC 5HP
HYDROBAR PRESSURE TRANSMITTER, (PROTECTION IP68,DIAPHRAGM,FLANGE 1.5",ASA 150LBS,MATERIAL-SS) FOR TANK CONTENT GAUGES
SMF BATTERIES MAKE:EXIDE,7AH,12V
CARE MARINE AND ALLIED SERVICES
Sadhav Offshore Engineering Company
Patel Engineering Works Vizag
SAGAR SHIP REPAIRERS AND MARINE SERVICES
MARINE CARE N ASSOCIATES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .