Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-Finance B 1 H 3 91 SPRINGBOARD BUSINESS HUB PRIVATE LIMITED MATHURA ROAD MOHAN ESTATE NEW DELHI DELHI 110044 | NEW DELHI | NEW DELHI | DELHI | 110044 | L1 | Accepted-Finance Accepted |
Tender Value
Refer Docs
Closing Date
19 Aug 2023, 6:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Commandant Charanmeet Singh
CGDHQ-1, Porbandar
Yearly routine on FM 200 system onboard ICGS Samundra Pavak
2023_ICG_613245_1
344/203/01/23-24
Single
Miscellaneous Services
Turn-key
90 days
CGDHQ-1
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
21 Aug 2023
11 Aug 2023
21 Aug 2023
11 Aug 2023
19 Aug 2023
11 Aug 2023
EA-3202: Following routine to be carried out on major firefighting system FM-200 through PAC firm M/s Johnson Controls India Pvt. Ltd. As per maintenance schedule: - (a) After removal of solenoid valve from FM-200 cylinder heads of the system, the following checks need to be carried out:- (i) Electrical remote control cabinet opening from remote. (ii) Pneumatic release cabinets. (b) System check – check each electrical manual release unit for operation. (c) Check fire alarm and evacuation alarm lights and sounds. (d) Check that all AC are shut down or dampers are closed, if any. (e) Check that all pneumatic actuator operates after pre-set time delay. (f) Check that all electric actuator operates after pre-set time delay. (g) Check operation of discharge pressure switch and check indication lamp. (h) Reset all pneumatic actuator, electrical actuators, discharge pressure switch and the fire alarm system. (j) Pipe work / nozzles – check pipes and fittings are to correct standards. (k) Check nozzles to ensure that they are free from debris. (l) Check dust caps are fitted. (m) Containers – check containers are free from mechanical damage, corrosion or unauthorized interference. (n) Check containers brackets are fitted and all bolts tightened. (p) Check pneumatic actuation tubibg is firmly fixed and all connections are tight. (q) Blow through system pipes with hot air and check nozzles of respective compartments for blockage, if any. (r) Check FM-200 & nitrogen cylinders weight and pressure. Refill if required. (s) Check and pressure test system system pipe lines.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_686626.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .