| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 CrAdmitted-Finance | ₹10.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹11.3 CrAdmitted-Finance | ₹11.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹17.8 CrAdmitted-Finance | ₹17.8 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.) L1 | AECOM Asia Company Limited L2 | YUKSEL PROJE ULUSLARARASI AS-INDIA L3 |
|---|---|---|---|---|---|---|
| 1.00Remuneration for Local Staff (inclusive of per diem allowance) | ||||||
| 1.01 | Team Leader cum Senior Tunnel Engineer | 24 | Month | - | - | - |
| 1.02 | Tunnel Design Expert | 24 | Month | - | - | - |
| 1.03 | Senior Geophysicist | 14 | Month | - | - | - |
| 1.04 | Senior Geotechnical Engineer | 24 | Month | - | - | - |
| 1.05 | Ventilation/Lightening Expert (Senior E&M Expert) | 14 | Month | - | - | - |
| 1.06 | Senior Geologist | 24 | Month | - | - | - |
| 1.07 | Environmental Specialist | 10 | Month | - | - | - |
| 1.08 | Material Engineer | 14 | Month | - | - | - |
| 1.09 | Highway cum Pavement Engineer | 10 | Month | - | - | - |
Tender Value
₹16.2 Cr
Closing Date
10 Feb 2020, 3:00 pmClosed
DIRECTOR GENERAL BORDER ROADS
HQ DGBR SEEMA SADAK BHAWAN RING ROAD DELHI CANTT NEW DELHI 110010
CONSULTANCY SERVICES FOR PREPARATION OF FS AND DPR FOR CONSTR OF RAIL CUM HIGHWAY UNDER WATER TUNNEL INCLUDING APPROACH RD ACROSS MIGHTY RIVER BRAHMAPUTRA, APPROXIMATELY IN BET PACHIGAON (JAMUGURI) AND KALIABOR TEA ESTATE (SILGHAT) THROUGH EPC MODE
2019_BRO_511389_1
CE (P) VTK/DPR CONSULTANCY/02/2019-20
Open Tender
Consultancy
720 days
PACHIGOAN (JAMUGURI) AND KALIABOR TEA ESTATE
REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹0
Exempted
HQ DGBR, SEEMA SADAK BHAWAN
3 Jun 2020
16 Oct 2019
11 Feb 2020
17 Oct 2019
10 Feb 2020
11 Nov 2019
19 Oct 2019 - 31 Oct 2019
4 Nov 2019
Amount
Remuneration for Local Staff (inclusive of per diem allowance)
Team Leader cum Senior Tunnel Engineer
Tunnel Design Expert
Senior Geophysicist
Senior Geotechnical Engineer
Ventilation/Lightening Expert (Senior E&M Expert)
Senior Geologist
Environmental Specialist
Material Engineer
Highway cum Pavement Engineer
Quantity Surveyor / Documentation Expert
Senior Survey Engineer
Sub Professional Staff (To be assessed by consultant as per requirement of assignment)
Support Staff Note: To be assessed by consultant as per requirement of assignment
Office Manager
Typist
Office Boy
Night Watchman
Transportation (Fixed Costs)
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance etc. A. For use of consultants
Duty Travel to Site (Fixed Costs)
Office Rent (Fixed Costs)
The rent cost includes operation & maintenance, cleaning, repairs etc for the entire duration of services.
Office Supplies, Utilities and Communication (Fixed costs)
Office Supplies Drafting
Supplies Computer
Running costs
Domestic and International Communication
Office Furniture and Equipment (Rental)
Office Furniture and Equipment
Reports and Document Printing
Monthly Reports (3 copies per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with LA Report
Draft LA Clearances I Report
Final LA and Clearances I Report
Draft Environment Assessment report & RAP
Final Environment Asessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Document
Final Detailed Project Report with Bill of Quantities, cost estimates, updated Drawings etc.
Final EMP
Final Bidding Documents
Draft 3(a), 3A and 3D notification or equivalent publication as per prevailing LA act of area under consideration as per NH act or State act or relevant act for land acquisition (03 copies each)
LA & Clearances II report
Survey and Investigation
A. Topographical Survey (Fixed Rate)
Complete Topographic survey using mobile/aerial LiDAR or equivalent technology for project area (with approaches) including hire charges for equipment and supply of survey teams comprising of project survey field staff etc. Inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision.
B. Investigation (Fixed Cost)
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey / Studies
Land Acquisition Studies
Sub-soil Investigation for Tunnel
Boring in all type of Soils (other than rock)
Boring in hard rock
C. Net Work Survey and GPR
Net work Survey of the existing Highway as a repository for civil work as per directions from Authority
GPR Survey for Detection of under ground utilities
Cost of supply and fixing Boundary Pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum)
Land Acquisition Team including support staff and logistics/transportation
A. Land Acquisition Team including support staff
Ex-Land Revenue Inspector/ Officer or equivalent
Ex-Kanoogo/ Girdwar or equivalent
Ex-Patwari or equivalent
Typist
B. Logistics for Land Acquisition Team
Computer including necessary peripherals
Printers
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km
Estimate of Cost for Expateriate Consultants (Name and Poisition to be filled in below columns by the bidder) Renumeratrion of Expatriates Staff including per diem allowance
Position
Position
Position
Position
Position
Position
Position
Position
Position
Position
Position
Mobilization and Demobilization - International Airfares (Fixed costs) (To be filled by the bidder in below columns)
Position
Position
Position
Position
Position
Position
Position
Position
Position
Position
Position
Mobiliation and Demobilization - Inland Travel in Home Country (Fixed Costs)
Other Miscellaneous expenses (Like DA, Internal travel expenses other incidentals) (Fixed cost)
AECOM Asia Company Limited
YUKSEL PROJE ULUSLARARASI AS-INDIA
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_535511.xls
BOQ • 0.34 MB
RFP.pdf
Tender Documents • 4.06 MB
Download all tender documents and submit your bid