Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-AOC 29 GOBRA GORISTHAN ROAD KOLKATA 700046 | KOLKATA | KOLKATA | WEST BENGAL | 700046 | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.4 L+₹1.6 L (15.3%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹19.2 L+₹8.5 L (78.7%)Rejected-AOC 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | L3 | Rejected-AOC L3 |
Tender Value
₹14.6 L
EMD Value
₹29,221
Closing Date
26 Sept 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GM SgTPP
Office of the General Manager Administrative Building Sagardighi Thermal Power Project 742237
Unit III ESP Overhauling Work Stage II SgTPP WBPDCL
2022_WBPDC_401594_1
WBPDCL/SGTPP/NIT/E1983/22-23
Open Tender
Support/Maintenance Service
Lump-sum
365 days
Sagardighi Thermal Power Plant
As per NIT
3 documents required · 3 mandatory
₹0
₹29,221
Yes
Contract Cell Administrative Building Sagardighi T
25 Mar 2023
5 Sept 2022
28 Sept 2022
12 Sept 2022
26 Sept 2022
12 Sept 2022
19 Sept 2022
120 days
Dry cleaning work:Dry cleaning of ESP starting from ESP inlet funnel to ESP outlet funnel , all ESP hoppers, Gas distribution Screens, all emitting electrodes and collecting plates and other allied zones. (Day2 to Day4. 04 gangs of manpower working at atime in 04 passes)
Water washing work :Water washing of total ESP internals (72 nos Fields), including all hoppers, collecting plates, emitting electrodes and other allied zones. At the time of water washing if any chocking found in the hoppers, the choking shall be cleared immediately.(Day3 to Day 9. 02 groups of manpower working at a time round the clock stictly to finish within stipulated date.)
Internal checking & rectification work:ESP Internal Checking & rectification Work. Internal checking & Rectification of ESP fields (72 nos of ESP fields in A, B, C & D Path) thoroughly. (Day6 to Day 16. Simultaneous Work to go on in 02 passes at a time.)
CRM system:Checking and rectification of Collecting rapping system of all the ESP fields thoroughly. Replacement / Repair & Alignment of rapping shafts, bearings, Pin wheel, hammer assembly of all the rapping mechanism, if required after checking for all ESP Fields (72 Nos). (Day6 to Day 16. Simultaneous Work to go on in 02 passes at a time.)
ERM System:Checking and rectification of Emitting rapping system of all the ESP fields thoroughly. Replacement / Repair & Alignment of rapping shafts, bearings, Pin wheel, hammer assembly of all the rapping mechanism, if required after checking for all ESP Fields (72 Nos). (Day6 to Day 16. Simultaneous Work to go on in 02 passes at a time.)
Shaft insulator system : Replacement / Repair & Cleaning of Shaft Insulator and its Heater. (Day 8 - Day 18. Thorough cleaning by Petrol wash to ensure full dryness of insulators.)
Support insulator system: Replacement / Repair & Cleaning of Support Insulator and its Heater. (Day 8 - Day 18. Thorough cleaning by Petrol wash to ensure full dryness of insulators.)
Hopper heater: Replacement / Repair & Cleaning of Hopper Heater. (Day 10 - Day 20.)
Guide vane: Checking,Repair/Replacement and strengthening of Guide Vane of ESP Inlet Duct. (Day 4 - Day 15. Separate Group to be enganged with all separate tools & consumables than that working inside ESP.)
Baffle plates : Refitting/ Repair of Baffle plates of all the ESP hoppers (144 nos) thoroughly.(Day6 to Day 18. Simultaneous Work to go on in 02 passes at a time.)
CRM & ERM Gearboxes:CRM & ERM Gear Boxes. Lubrication of Collecting and Emitting rapping motor and its gearbox. (Day 18- Day 22.)
Insulation Testing of ESP:Fields.Meggaring of ESP Fields. After completion of aforesaid jobs, Meggaring of each field to be carried out until it comes to its desired value. (Subjected to completion of above jobs.)
ESP TR sets: The entire Transformer – Rectifier units should be checked thoroughly and cleaned body only including checking of oil level and changing of silica gel depending upon the condition then. (Day 18- Day 22.)
HV Safety Bkrs:Alignments of all the safety breakers, 72 Nos. (1 for each field) should be checked & rectified. These must also be cleaned. (Day 8 - Day 18. Thorough cleaning by Petrol wash to ensure full dryness of insulators.)
ESP MCC panels: All the MCC panels (LTMSB-A,B,C & D) of ESP fields & its ACP (A,B,C & D) Panels, also the EC Panels (72 nos), including 11 KV/ 415V Dry type Transformers (08 Nos.) to be cleaned & tightness checked.(Day 12 - Day 16.)
ESP manhole doors: Inspection and repair of all manhole Doors of A-path, B-path, C-path & D-path (Subjected to completion of above jobs.)
Painting work: Painting of all outdoor equipments of ESP.
Repairing of Gas Distribution Screen:Repairing of Gas Distribution Screen based on report after checking. Repairing / Replacement to be done by necessary scaffolding which is under the Scope of Party.
DEVO ENTERPRISE
TECHNO ENGINEERING
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .