Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.0 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹49.9 L+₹1.9 L (3.89%)Rejected-Finance VILLAGE SHAKUNI BAGWALIPOKHER ALMORA RANIKHET UTTARAKHAND | NAINITAL | UTTARAKHAND | 244715 | L2 | Rejected-Finance Reject | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-GST Failed | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Due to not submit tender document off line in office |
Tender Value
₹58.2 L
EMD Value
₹1.2 L
Closing Date
7 Feb 2023, 3:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle Ranikhet
Annual Maintanance and Operation work of 33 and 11 KV Sub-station Chaukhutiya and Jalali under EDD Ranikhet
2023_UPCL9_53971_1
EDD(R)-31/2022-23
Open Tender
Repair and Maintenance Services
Item Rate
365 days
Chaukhutiya and Jalali
As per Tender Document
2 documents required · 2 mandatory
₹5,900
Executive Engineer
₹1.2 L
23 Sept 2023
16 Jan 2023
8 Feb 2023
16 Jan 2023
7 Feb 2023
16 Jan 2023
Amount
Maintenance and preventive maintenance of 33/11 KV S/s, 33 KV, 11KV, LT/HT line and DTR's as per JE instructions (47 Km 33KV, 338 Km 11KV, 778 Km LT line and 317 Nos. DTR) including timely release of NSC & distribution works as per JE Instructions and consumer complaints handling as per UERC supply code 2020 including contractor profil.
Operation work in shifts (4 shifts) for operation of 33/11 KV S/s at Chaukhutiya. 3 shift out of 4 shift system.
Meter reading and bill distribution work of consumers as per schedule monthly / bimonthly basis including SBM & accessories-cartage etc. Unbilled/RDF penality will be imposed @ 300/bill
Supervison work of maintenance and meter reading works 1 for Chakhutiya & Jalali S/s.
Description of Work / Item(s)
Amount
Replacement of damaged/rotten or erection of midspan poles including cartage from S/s Ranikhet/ESC Almora and back cartage of scrap if any to JE store (NOTE- Amount per pole will be paid as per this rate but penality will be imposed twice the rate)
Replacement of IDF/Mechanical meter 40 per month.
R&R of damaged transformer 5% of 317 = 15. Excess damaged transformers will be replaced free of cost by the contractor.
Hari Sharan Sharma And Sons
Hari Sharan Sharma And Sons
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .