Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 128 37 S BLOCK YASHODA NAGAR KANPUR U P | FATEHPUR | UTTAR PRADESH | 208001 | Admitted-Finance |
| 2 | Admitted-Finance 916 9 AWAS VIKAS COLONY RISHIKESH | DEHRADUN | UTTARAKHAND | 248001 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
7 Feb 2024, 2:00 pmClosed
SE
EDC Tehri
Increasing capacity of 16 KVA to 25 KVA DTR and construction of associated HT and LT line at different places of Gullar Section in EDSD Munikireti under EDD Tehri
2024_UPCL4_67991_1
43/EDCT/2023-24
Open Tender
Miscellaneous Services
Item Wise
90 days
Muni Ki Reti
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
Yes
EE ETD
₹75,000
Yes
17 Feb 2024
20 Jan 2024
8 Feb 2024
20 Jan 2024
7 Feb 2024
20 Jan 2024
Electrical Items :
Nut & Bolts
X ARM CLAMP FOR SP-23 WITHOUT NUT & BOLT
LT CLAMP WITH N&B ST POLE SP-10
STAY CLAMP FOR SP-23 WITH NUT & BOLT
LT CLAMP WITH N&B ST POLE SP-23
STAY CLAMP FOR SP-10 WITH NUT & BOLT
PG CLAMP FOR RABBIT/WEASEL WITH N/B
LT SACKKLE INSULATOR CLAMP
LT Distribution Box 3Phase 4Wire
PRC 70-70/35-35 sqmm to 25 sqmm
LT XLPE Cable 1x16mm² insulated for DB
LT AB Cable 3x35+1x25 sqmm
LT XLPE AB CABLE 1CX16+25 SQ.MM.
LT DISTRIBUTION BOX 1 PHASE
Al. Lugs 50 sq. mm.
LABOUR (SERVICES)
CHEMICAL EARTHING
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF LT STAY SET
ERECTION OF 11 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-10 POLE
ERECTION OF SINGLE SP-23 POLE
ERECTION OF SP-23 DOUBLE POLE
GROUTING OF POLE
MUFFING OF POLE
DISMANTLING OF 16 KVA DTR
PAINTING OF SP-21/23 POLE
LAYING OF LT PVC CABLES(UPTO 150 SQMM)
INST. OF 25 KVA DTR ON POLE STRUCTURE
FIXING OF FUSE SET
FIXING OF LIGHTNING ARRESTOR
LAYING OF 3P 4W LT LINE (RABBIT)
LAYING OF 2P 3W LT LINE (RABBIT)
GUARDING OF LT/11 KV LINE
LOPPING & CHOPPINGOF TREE BRANCHES
T-OFF CONNECTION COMPLETE 11 KV LINE
CONST.,INST.OF DANGER BOARD/ NUMBER PLATE
MAKING OF SECTION POLE
CARTAGE SP-10 POLE, 71-100 KM
CARTAGE SP-21/23 POLE, 71-100 KM
CARTAGE OF PETTY MATERIAL,71-100 KM
CARTAGE OF 16/25 KVA DTR, 51-70 KM
CARTAGE OF 16/25 KVA DTR, 71-100 KM
HEADLOAD CARTAGE SP-10 POLE(0-1 KM)
HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM)
HEADLOAD CARTAGE OF MATERIAL(0-1 KM)
HEADLOAD CARTAGE OF 16 KVA DTR(0-1 KM)
HEADLOAD CARTAGE OF 25 KVA DTR(0-1 KM)
LAYING OF LT AB CABLE 3X35+1X25 SQMM
Installation of LT DB 1 Ph for LT AB
Installation of LT DB 3 Ph for LT AB Cab
DISCONNECTION & RECONNECTION OF CONSUMER
Laying of AB Cable 1x16+25 mm
Fixing of PG Clamp L2L 50-50
BACK CARTAGE OF PETTY MATERIAL,71-100 KM
MAKING OF T/F BASE
BACK HEAD LOAD CART. OF PETTY MAT. 0-1KM
M/S RAJ SHREE ELECTRICALS
DHRUV ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .