Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance DOOR NO 1 1 K M PALEM VILL A KOTHAPALLI POST DEVARAPALLI MD ANAKAPALLI DIST 531 022 | ANAKAPALLI | ANDHRA PRADESH | 531022 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
29 Jan 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Azmat Arshi
GE P Navy Kalinga
Repairs to Transformers outdoor type capacity 100 KVA, 11KV/ 433 Volt Make ITL Transformers Sl No 9662, at Phase III Sub Station Bheemunipatnam
2024_MES_638403_1
GE(P)/N/K/JOB/08 of 2023-24
Limited
Miscellaneous Services
Works
30 days
GE (P) Navy Kalinga
Repairs to Transformers outdoor type capacity 100 KVA, 11KV/ 433 Volt Make ITL Transformers Sl No 9662, at Phase III Sub Station Bheemunipatnam
2 documents required · 2 mandatory
₹0
Exempted
30 Jan 2024
20 Jan 2024
30 Jan 2024
20 Jan 2024
29 Jan 2024
20 Jan 2024
Amount
Repairs to Transformers outdoor type capacity 100 KVA, 11KV/ 433 Volt Make ITL Transformers Sl No 9662, at Phase III Sub Station Bheemunipatnam The following work is required:- (a) Disconnecting the Electrical Cable Connections from HT & LT side for Removing out the transformer for Repair Works (b) Loading the transformer with help of crane and transporting the same to civil work shop for repairing and transporting back the same to site after repair works and unloading with crane and placement to the original posotion with necessary cable Reconnection for HT 11 KV and LT 433 Volt complete. (c) Removing out the top cover and conservator tank and vent piope breather assembly tap changer switch etc. one Job. (d) Removing out the transformer oil to containers and keep to safe place for refill the after repair works. (e) Removing out the core assembly from transformer tank and separating the LT and HT coils completely for rewinding and reconditioning. (f) Rewinding of LV and HV coils completely for three phses with inhsulated copper conductor with necessary insulation and appropriate gauge and size and packing materials completely. (g) Varnishing to the HT and LT coils completely and internal connections and necessary testing like short circuit polarity test ratio test etc. (h) Impregnating the complete core and windig with content temperature for proper IR value 01 Job. (j) Re assembling the transformer core assembly to the transformer tank and necessary internal connections for HT and Lt side. (k) Refilling the transformer oil to tank with dehydration and necessary die electric strength Up to 60 KVA. (l) Testing and commissioning the transformer with load.
UV POWER TECH
F AND M TECHNOLOGIES
stage.html
html • 0.02 MB
finance_714658.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .