Loading…
Loading…
2,644 results • Best match
Providing New Split Air conditioner units in official rooms of Secretaries and Chief Marshal in the P/o Telangana Legislative Assembly, Hyderabad. (3rd call)
Providing of Split Air Conditioner and Power Stabilizers for T-HUB at Various Places (Mahabubnagar,Nagarkurnool,Wanaparthy,Gadwal) in Erstwhile Mahabubnagar Disttrict. 3rd call
Providing of Split Air Conditioner and Power Stebilizers for T-HUB at Various Places Mahabubnagar Nagarkurnool Wanaparthy Gadwal in Erstwhile Mahabubnagar Disttrict 2nd call
Providing of 4 Nos Split Air Conditioner units at D-Hub, DH Kondpur in Ranga Reddy District under NHM in Telangana State. (3rd call)
Hot and Cold Air Conditioners, Air Conditioner-IS 1391
Replace / Modify 2 Nos 60 TR Chillers to 12 Nos 11TR Ductable AC Units at JN Auditorium JNTUH Kukatpally Hyderabad
Replacement of existing old Air conditioners with new Inverter model Cool type split Air conditioner units in the newly allotted Chamber to the Chairman on paper laid Committee Sri.Komatireddy Rajgopal Reddy and Anteroom at First Floor of Library Building in the P/o Telangana Legislative Council, Hyderabad
Providing Split AC units in quarter No. D2 in the P/o Raj Bhavan, Hyderabad
Providing new cables, DB's and Switch gear for Tower Air Conditioning Units (24 Nos) proposed to 8 Nos of Court Halls at A block at High Court, Hyderabad
Procurement and installation of 15Nos. Split type 2.0 Ton Air Conditioning Units in place of old units duly removing old ones at 400KV SS Suryapet in OMC, Nalgonda
Supply, Installation, Testing and Commissioning of Inverter Type Split Air Conditioning Units and Providing and Fixing of Mineral Fiber Acoustic False Ceiling with GI T-Grid Suspension System
Providing split Air conditioner unit in Members' Service Section located at Ground floor, Administration Building in the P/o Telangana Legislative Assembly, Hyderabad. (8th call)
Providing 1 No of 2.0TR Split Air Conditioner Unit to the Deputy Registrar Chamber Located at New Filing Section in the High Court premises, Hyderabad.
Providing new INVERTER Model Split Air Conditioner units under buy back in the Anti Room No.105, R.C.Building in the P/o.Telangana Legislative Council, Hyderabad.
Custom Bid for Services - Annual maintenance of the Air conditioning units and the Water Coolers of various capacities installed at various locations over Secunderabad Division for a period of 2 years Similar Category ANNUAL MAINTENANCE SERVICE FOR ... Centralised air conditioning system
Custom Bid for Services - Annual maintenance of the Air conditioning units and the Water Coolers of various capacities installed at various locations over Secunderabad Division for a period of 21 months Similar Category ANNUAL MAINTENANCE SERVICE FOR ... Centralised air conditioning system
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6832821 Dated : 28-10-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2), Split Air Conditioner (Floor Type), as per IS: 1391 (part 2) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete ... category Split Air Conditioner Including ...
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6838478 Dated : 30-10-2025 Bid Document 1/7 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Providing of Air Conditioners with new 15 Nos Inverter Model Cool type Split Air Conditioner units in the Quarter No. 4 at Minister Residential complex (MRC) occupied by Honble Minister for Transport , Roads and Buildings , Legislative Affairs and Housing, Sri Vemula Prashanth Reddy , Road No. 12 , Banjarahills, Hyderabad
Replacement of 17 Nos Non inverter model 2.0/1.8TR Split Air conditioner units at main house and Durbar Hall in the p/o Raj Bhavan, Hyderabad.
Providing New Split Air conditioner unit in the Guest House at MS I Block Quarter No 807 in the P/o Old MLA Quarters , Hyderguda, Hyderabad.
Providing Air Conditioners of 4.0/3.8 TR Tower model type AC units at VIP Hall of SATS Head Office
Dismantling, shifting, and reinstallation of existing air conditioning units from Annex Building to various offices located in the premises of Telangana Legislature Buildings, Hyderabad.
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2025/B/6583104 Dated : 19-08-2025 Bid Document 1/7 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority HAL (QC) Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number : GEM/2025/B/6583012 Dated : 19-08-2025 Bid Document 1/8 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority HAL (QC) Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner (Floor Type), as per IS: 1391 (part 2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6427995 Dated : 25-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Providing new INVERTER Model Split Air conditioner units Under Buy Back in the Newly alloted Chambers of Chief Marshal in the P/o Telangana Legislative Council, Hyderabad.
Providing Split Air conditioner units for Personal Secretary to Governor Qtr. No 302 A block of Staff Quarters in the p/o Raj Bhavan, Hyderabad. (2nd Call).
Replacement of Split Air Conditioner unit with new AC unit at AIMIM Legislature party office, R.C Building in the P/o. Telangana Legislative Assembly, Hyderabad. (3rd Call).
Providing of 1 Nos 2 Ton Inverter Model Split Air conditioner units at the residence of Hon'ble Judge of the High Court for the State of Telangana.
Providing 1 No of 2.0TR Split Air Conditioner Unit to the Honble Judge Chamber located at 2nd Floor main Building in the Premises of High Court, Hyderabad.
Maintenance, Repairing and servicing of existing Split Air Conditioner units at Zonal office building and Circle office buildings of Circles 3,4 & 5 of LB nagar Zone,GHMC
Providing of 4 Nos 2 Ton Inverter Model Split Air conditioner units at the residence of Hon'ble Judge of the High Court for the State of Telangana.
Providing of 1 Nos 2 Ton Inverter Model Split Air conditioner units at the residence of Honble Judge of the High Court for the State of Telangana.
Maintenance, Repairing and servicing of existing Split Air conditioner units at Zonal Office Building, and Circle office building of Circles-3,4,&5 in LB Nagar Zone, GHMC
Replacement of old damaged by new supply of 7 Nos 1.5 Ton Inverter Model Split Air conditioner units in the Hon'ble Cm camp office,Pragathi Bhavan,Hyderabad.
Providing 1.5 Ton on high Wall Split Air conditioner unit in Corona control Room "C" block 9th floor in the P/o BRKR Bhavan,Hyderabad. (2nd call)
Split Air Conditioner (Floor Type), as per IS: 1391 (part 2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6823452 Dated : 25-10-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
1.5 Ton Window AC, 1.5 ton split AC, 1.5 ton split AC inverter, 2.0 ton split AC inverter, 2.0 ton split AC, 2.0 ton Cassettee AC, 1.5 ton cassettee AC
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6407537 Dated : 03-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Number ( ) : GEM/2025/B/5860372 Dated : 24-01-2025 Bid Document 1/7 EMD Detail Required No ePBG Detail Required No Reserved for Make In India products Reserved for Make In India products Yes MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination ITC available to buyer Yes Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6918330 Dated : 21-11-2025 Bid Document 1/8 Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority HAL (QC) Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6564163 Dated : 23-08-2025 Bid Document 1/8 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 12 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DGM TELANGANA, Department of Atomic Energy, ELECTRONICS Corporation OF INDIA Limited, PMO (Erukala Ramachandra) Splitting
Split Air Conditioner (Ceiling Mount Type), as per IS: 1391 (part 2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6401862 Dated : 02-07-2025 Bid Document 1/7 Bid to RA enabled No ITC available to buyer Yes Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6756672 Dated : 07-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
REPAIR MAINTENANCE OF SPLIT AC WINDOW AC WATER COOLER AND CONNECTED ITEMS AT MCEME UNDER GE MCEME SECUNDERABAD
REPAIRS MAINT OF SPLIT AC WINDOW AC WATER COOLER AND CONNECTED ITEMS AT MCEME UNDER GE MCEME SECUNDERABAD
Providing of additional 2 Nos 2 Ton Inverter Model Split Air conditioner units at the residence of Hon'ble Judge of the High Court for the State of Telangana.
Providing 2 Nos of 2.0TR Split Air Conditioner Units to the Photocopy Section(CMO) located in the Ground Floor of Administrative Building in the High Court premises Hyderabad.