Loading…
Loading…
2,644 results • Best match
Providing of 1 No INVERTER Model Cool type split Air conditioner at 1st Floor Zonal Commissioner, Chambers in Zonal office building in Begumpet Circle-30 , Secunderabad Zone, GHMC.
Providing of 3 Nos 2 Ton Inverter Model Split Air conditioner units at the official residence of Honble Judge at the High Court for the State of Telangana.
Providing New Split Air conditioner unit in official room of Smt. A.Padmasini Asst Secretary located at 3rd floor, Administrative Building in the P/o Telangana Legislative Assembly, Hyderabad.
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6452216 Dated : 15-07-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 257996 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 7 Bid Number : GEM/2025/B/6486526 Dated : 07-08-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 625909.76 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Procurement of 30 No.s Split type 2.0/1.8 TR Air conditioning Units for replacing 11No.s defective units in the bay kiosk at 220KV SS Nagole and 19 No.s at 400KV SS Malkaram
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6481269 Dated : 24-07-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 82261 Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6589385 Dated : 20-08-2025 Bid Document 1/7 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6942880 Dated : 03-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 78980 Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/7003257 Dated : 16-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Replacement of Air conditioner with new split Air conditioner unit in Government quarter No.7 Ministers Residential complex at Road No.12 banjara hills, hyderabad O/b Honble Minister Sri T.HarishRao for irrigation and marketing of government of telangana.(3rd call)
Custom Bid for Services - Schedule A1 Yearly Maintenance Schedule Annual Maintenance Contract for Split type Air Conditioning units (High Wall/Cassette) in Critical Places of various makes for a period of two years over the entire HYB division i.., ... type Air Conditioning units (High ... Centralised air conditioning system ... Precision Air Conditioners Hiring ... of Air Conditioners and ... Centralised air conditioning system ... Precision Air Conditioners Hiring ... of Air Conditioners and ... Centralised air conditioning system ... Precision Air Conditioners Hiring ... of Air Conditioners and ... Centralised air conditioning system ... Precision Air Conditioners Hiring ... of Air Conditioners and ...
Maintenance, repairing and servicing of existing split air conditioner units at Zonal office building and circle office buildings of Circles 3,4 & 5 in Saroornagar Circle, LB Nagar Zone, GHMC
Providing new Inverter model Cool type split Air conditioner units in the Speaker Office Room -7 at Annex Building in the P/o Telangana Legislative Assembly, Hyderabad (2nd call)
roviding new INVERTER Model Split Air conditioner units Under Buy Back in the Chamber of Hon'ble Leader of Opposition, R.C Building in the P/o Telangana Legislative Assembly, Hyderabad.
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number ( ) : GEM/2025/B/5826130 Dated : 20-01-2025 Bid Document 1/7 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Reserved for Make In India products Reserved for Make In India products Yes MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Renovation of Electrical Division II 2nd Floor Nirman Bhava Koti Hyderabad SH Providing IEI & Fans MCCBs Split and Cassette AC units etc as required.
Hot and Cold Air Conditioners, automatic line voltage corrector or step type auto transformer, Extra Refrigerant Pipe for Air Conditioners(Accessories), Extra Electrical Cable for Air Conditioners (Accessories), DRAIN PIPE FOR AIR CONDITIONERS ... for Air Conditioner (Accessories)
Split Air Conditioner (Floor Type), as per IS: 1391 (part 2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6414501 Dated : 07-07-2025 Bid Document 1/8 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise consignee wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank ICICI Schedule 1 EMD Amount (In INR) 3676 Schedule 2 EMD Amount (In INR) 4412 Schedule 3 EMD Amount (In INR) 14706 Schedule 4 EMD Amount (In INR) 2941 Schedule 5 EMD Amount (In INR) 1471 Schedule 6 EMD Amount (In INR) 22794 ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 15 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. 2/8 (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : NTPC LIMITED NTPC Limited NTPC Bhawan, SCOPE Complex, Institutional Area, Lodhi Road, New Delhi - 110003 (Ntpc Limited) UIN Number NCTGC2415P Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6908009 Dated : 21-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 3.00 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Senior Accounts Officer ADRIN Secunderabad 500 009, Department of space, N/A, PMO (Sujana T)
Providing Split Air Conditioner Units at the Chamber of Hon'ble Chairman , OSD Chamber, Staff Room and PA Room with Connected Electrical Items of Telangana State Finance Commission at Irrumanzil, Hyderabad.
Providing of 35 Nos 1.5 Ton Inverter Model Split Air Conditioner units at the residences of Hon'ble Judges who are appointed in the High Court for the State of Telangana
Voltas Split Air Conditioner, Wall Mount Type 2 Ton 5 Star Brand: Voltas (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687722204626 dt.01/06/2024)
Providing of 3 Nos 2 Ton Inverter Model Split Air conditioner units and 1 Number 2 ton tower model type Air conditioner unit at the official residence of Honble Judge at Somajiguda, Hyderabad. of the High Court for the State of Telangana.
Providing of 3 Nos 2 Ton Inverter Model Split Air conditioner units and 1 Number 2 ton tower model type Air conditioner unit at the official residence of Honble Judge at Somajiguda, Hyderabad. of the High Court for the State of Telangana.
Repairs and servicing of 07No.s cassette type Mitsubishi make air conditioning units in ACHP PLC control room and Battery charger room for the period from 01.04.2025 to 31.03.2026 pertaining to SD-IV/EM/KTPP
Repairs and servicing of 07No.s cassette type Mitsubishi make air conditioning units in ACHP PLC control room and Battery charger room for the period from 01.04.2025 to 31.03.2026 pertaining to SD-IV/EM/KTPP
Supply and Installation of 12 No's of AC units i.e.8 No's,1.5 TR, 3 star Inverter type split AC units for Mini Hydel Stations (5 No's for HPS, Pochampad, 2 No's for HPS, Nizamsagar and 1 No for MHS Peddapally) and 4 No's of 1.8 TR, 3 star, 230V ... type split AC units to ...
Providing Lighting and power points to Tower AC units at Lunch Room at 2nd Floor, Main Building, High Court, Hyderabad.
Providing 1Nos of 2.0 TR AC units and 4Nos of 1.5 TR split AC units at official residence of VVIP Hydershakote, Suncity, Hyderabad. 2nd Call
AMC of AC units mounted on HEMM working at JVROC, KGM Area for a period of 3 years with spares
Providing 2 Nos of 2TR cassette AC unit, 1 Nos of 3TR cassette AC unit and 1 Nos of Split AC unit at NIC rooms in computer section in 6th floor of Administrative building in the premises of High Court, Hyderabad
Air Conditioning Package 2TR Split AC supply installation and commissioning works in SWAS and FOHS DCS room at Bhadradri TPS Manuguru
Replacement of existing Split AC units in ADC quarter No. D1, D3,D4 in the P/o Raj Bhavan, Hyderabad
Providing Split AC units in Suite No.4 of North Block Guest House in the P/o. Raj Bhavan , Hyderabad
Supply High Wall Mounted Split AC, Installation of High Wall Mounted Split AC
SITC of split AC units and AC unit wiring, EI and Fans LAN wiring for proposed DDG and ADG chamber at RMC DC Telephone Bhavan Saiafabad Hyderabad SITC of split AC units recall
Providing New Split Air conditioner unit in Ante-chamber and Peshi allotted to Sri. Gutha Sukender Reddy, Hon'ble Chairman, Telangana Legislative Council in the p/o Telangana Legislative Council buildings, Hyderabad.
Providing 1 No of 2.0TR Split Air Conditioner Unit to the Chamber of Registrar(IT)-cum-CPC located in the 6th Floor of Administrative Building in the High Court premises Hyderabad.
Providing New Split Air conditioner units 1.5 TR 3 Star in the Medical Officers Chambers of Allopathy - 2 Nos and Medical officer Chamber of Homeopathy Dispensaries at Old MLA's quarters Hyderabad.
Providing 2 Nos new Inverter Model split air conditioner Units in Family Qtr. No. 702, Honble Speakers Residence at Legislators Residential complex (MS- III Block), Old MLAs Quarters, Hyderguda. (6th Call)
Supply, installation & comissioning of 5-star(BEE) rated inverter type (Variable speed) high wall split Air Conditioner unit, Nominal cooling capacity-4500 K.Cal/Hr., 1 Ton, Power Supply: 230V AC 50Hz
Supply, Installation and Commissioning of 1) Energy efficient 5 Star, Inverter Type, wall mounted split air conditioner of 1.5 ton capacity suitable to operate on 230V, 50Hz, Single phase, AC supply.
Air Conditioner Average Turn Over of Last 3 Years 100 Lakh (s) Experience with Gov. Required 2 Year (s) Air Conditioner ( 8 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner ... wall Split AC Window AC , ... wall Split AC , ... Mounted Split AC (Cassette ... ( Cassette AC ), ... Standing Split AC Technology ...
AMC of AC Units mounted on Hydraulic Shovels working at GKOCP, Kothagudem Area for a period of 2 years with spares.
Supply and installation of 2.5 Ton Blue star Tower AC and 2 Ton Samsung split AC for SLBHES, SLMW, Nagarkurnool-509326.
Replacement of old and unserviceable AC Unit under buy back with new 1.5 ton Split Air Conditioner in O/o. the Prl. Secretary to Govt. (Poll.), GAD, 9th Floor BRKR Bhavan, Hyderabad.
Providing New Split Air conditioner unit in Chamber allotted to Estimates Committee Chairman, in the first floor of the old Assembly Building in the p/o Telangana Legislative Assembly, Hyderabad.(2nd call)
Replacement of existing old 2Nos split Air conditioner units under buy back with new A.C's in the EPABX Exchange situated in Ground floor of J-Block in the P/o T.S.Secretariat ,Hyderabad.
Providing New INVERTER Model Split Air conditioner unit Under Buy Back in Room No: 101, Office of Congress Legislature Party, R.C Building in the P/o Telangana Legislative Assembly, Hyderabad.2nd call