Loading…
Loading…
2,649 results • Best match
Operation and Maintenance of Electrical and Mechanical installations of NKN Data Centres, 3rd floor at NIC, A-Block, BRKR Bhawan, Hyderabad during 2025-26. Sub Head: Annual Comprehensive maintenance of Split/ Vertical/ Cassette Type Air-conditioning and 4 Nos. 10 TR PAC units in NKN Data Centre 3rd floor.
Replacement of lime concrete roof slabs with RCC slab, strengthening of load bearing walls and Arches, Restoration of architectural design elements and other civil, sanitary and electrical works in Old Assembly, Building in the premises of Telangana ... Additional Air Conditioning works
Laying of CC Road and remodelling of SW Drain by laying 600 mm dia NP3 Pipeline from Nafees residency to IT Tower, AC Guards and CC Road from Ambedkhar statue to towards Criminal Court under Redhills division -75, Mehdipatnam Circle-12, KZ, GHMC (Item No.9)
Providing furniture and Electrical connection to AC Units and computers in Newly constructed Office of the Executive Engineer(AM), T.R., Hyderabad and O/o. Deputy Executive Engineer(AM), Ranga Reddy District at MMC Malakpet, under AMC., Hyderabad of Hyderabad District (Work reserved for Sagara Communities) (2nd Call)
Annual maintenance service contract of BLUESTAR make LCWX1 200EEF Water Cooled Screw Chillers model AC units in UCB AC Plant of KTPS VI Stage Paloncha as and when required during the period from 01-04-2025 or from actual date of commencement to 31-03-2026.
AIR CONDITIONER 2TON, STABILIZER, COPPER PIPE, Drain pipe, supply and installation
Supply, Installation, Testing, Commissioning of 33 TR Capacity Air cooled Airconditioner, Supply, Installation, Testing commissioning of 33TR Capacity, 13200 CFM horizontal floor mounted double skin Air handling unit, Supply, Installation, Testing and Commissioning of 3 Phase VFD Drives, Supply and laying of 19 G copper pipe of size One and one eighth inches Copper Pipe for Suction Line with Nitrile Rubber Insulation of 19mm thick, Supply and laying of 19 G copper pipe of size Five Eighths Inch with 13mm thick insulation for Liquid Line, Supply, installation and testing of GSS construction of 16G opposed blade volume control dampers, Supply and Installation of G.I perforated cable tray with top cover with supports, Modification of existing plenum Chamber, Supply and installation of 32 mm dia CPVC or UPVC drain piping insulated with 9mm nitrile rubber for AHU, Supply Installation Testing and Commissioning of Electric control panel, Supply and installation of remote status indication panel at control room, Earthing, Providing Heat Insulation Treatment in AC Plant Room, Providing under deck insulation, Providing Iron Angle Platform Arrangement for Outdoor Condensing units, Supply of 2 ft x 2 ft return air Grills, Provision of Indicators for filter clogging and Condenser clogging, Dismantling and Shifting of Existing Units, Cooling Towers, AHUs, Any other materials or works requirement to complete the SITC, Belts for Blower, Pressure Gauges for refrigerant and oil, Dial type Thermometer, Air-Filters, Empty Gas cylinder with regulating valve adopter and pressure gauge., Liquid line strainer, Whirling Psychro meter, Anemometer, Thermometer, Valve Key, Thermal insulation of exposed duct out side the building Bid Number ( ) : GEM/2024/B/5460049 Dated : 03-10-2024 Bid Document 1/28
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Providing Additional EI work, Providing Geysers and other connected electrical Installations, Providing of lift and Air Conditioner units at Block No. 7 at Nyay vihar Complex , Jubilee Hills, Hyderabad allotted to the Honble Sri. Justice K. Sarath. Sub work : Providing of 4 Passengers Hydraulic Elevator
Replacement of existing old outdated Main panel with new panel boards (for Lighting and Power), with new outgoing UG cables for power, VTPN DBs and Switchgear, new wiring to Air Conditioner units etc for power loads distribution in City Civil court, Purana Haveli , Hyderabad
Supply, delivery, fixing and testing of new split AC unit with copper piping and other necessary accessories at O/o Director(Oprs-II) in DGM (Engg) cabin at III floor of front admin block under building and vehicle maintenance Sub Division in SWC Division, HMWSSB, Khairathabad, Hyd.
Custom Bid for Services - Schedule-A1: Operation and maintenance of substations, Electrical panels & fixtures in electrical buildings, E-Learning centre, Auditoriums, all hostels, all laboratories, pathway lights and lifts, Air Conditioners, Air .., ... And Air Conditioning System) ... And Air Conditioning System) ... And Air Conditioning System) ...
Construction of Center for Dalit Studies at Government Land in Survey No.1/11, Block -B, Ward-8 of Yousufguda (V), Khairthabad (M) in Hyderabad District. Sub work : Providing of Air Conditioning at Auditorium, Providing Audio Video System at Auditorium & Providing Audio Video System at Conference Hall and Board room.
Providing comprehensive maintenance and quarterly servicing to various VRV A.C Units installed in the office of Engineer-In-Chief (R&B) Errumanzil and 2Nos of 10TR and 2 Nos of 18TR VRV AC Units(Daikin Make) at Central Hall, Main Building, High Court, Hyderabad for the Year 2024 25.
Replacement of existing Old unserviceable AC units with new Energy Efficient Inverter Model Air condition units in court hall Nos 33rd and 34th and 8th,9th, 12th, 31st , 33rd, 34th chambers of Honourable Judges located in Main Building, Red Building and A block on the High Court premises, Hyderabad
Operation and Maintenance of Specialized service equipments 11 KV 315 KVA Sub Station Fire Hydrant System DG sets in Residential and Non Residential Buildings for FSTI at CISF Hakimpet Hyderabad During year 2025 2026 Sub Head Servicing and Cleaning ... for AC units installed ...
Operation and Maintenance of Substation equipment, DG set, AC units, Fire Alarm System and Passenger Lifts at AGAP & Telangana, Hyderabad during the year 2025-26. SH: Refilling of various types of Fire Extinguishers and replacement of old piano type switches and sockets with modular type switches and sockets.
1) MOEI & Fans i/c RMO pump set, AC units, Compound Light etc. at GSI Office, Bhubaneswar DG-2023-24. 2) MOEI & Fans i/c Pump RMO Pump set of GSI Residential colony, Baramunda, Bhubanewar DG-2023-24. SH-Providing manpower for day to day operation and maintenance.
Annual Repair & Maintenance (A/R & M/O) of E&M Equipment i/c Operation and Maintenance of Substation equipment, DG set, AC units, Fire Alarm system and Passenger lifts at ESIC Medical College & Hospitals, New 200 Bedded OPD Block located at Sanath Nagar, Hyderabad during the year 2025-26.
Supply, installation, Erection, Commissioning of Inverter High static Ductable Air Conditioner Unit
Electrical installations to Digital entry setup room to be constructed at Gate No. 4 and replacement of split air conditioners at baggage scanner rooms at Gate No. 6 and 7 in the premises of High Court, Hyderabad. Sub Work: Providing Air Conditioners.
TGGENCO BTPS STAGE II CAM Division-Preventive periodical maintenance and servicing of Precision air conditioners present in ESP Control room, Packaged air conditioners present in Administration Building and 220V DC battery chargers of stage-II and split ACs for the year 2026-27
Providing alluminum partitions rooms, false ceiling, flooring and renovation of toilets and colouring to accomadate CPRO office members and staff of CPRO in 2nd floor of I&PR Complex, Masabtank, Hyderabad. Sub Estimate: Rewiring to E.I., providing ... for Air conditioners and ...
Providing of Air Conditioners Emergency Operation theaters of the Govt. General Hospital at Gadwal in Jogulamba Gadwal District
Custom Bid for Services - CAMC of Central AC plant containing 3 x 22TR Air Cooled Package type Air Conditioners with GIducting operated with Refrigerant R22 Make Voltas For TWO Years As per Annexure1 66TR X 24Months, Custom Bid for Services - CAMC of ... Central AC units with ... central Air Conditioning plant ...
Construction of District Police Office Building (Balance Work), Main Gate, Security Room, Front Side Compound Wall and Internal BT Roads to the complex at Asifabad of Komurambheem Asifabad District. Sub work: Providing Cassette type Air Conditioning System (GF+FF - Partially) for DPO Building at Asifabad of Komurambheem Asifabad District. (3rd call-STN)
Balance work of stilt floor,Compound wall,Providing lift,Generator,Audio and Video system to Conference hall and Third floor of DCP office Complex,Malkajgiri- Subwork: Providing Variable refrigerant flow(VRF) Type air conditioning system for DCP chamber,CP ante room and CP mini conference hall at DCP Malkajgiri of RR Dist
Operation and Comprehensive maintenance of substation Street lights AC units Fire alarm System wet riser system and DG sets installed at GST Bhavan CEO Building Basheerbagh Hyderabad during the year 2022-23. SH: Temporary Illumination of GST Bhavan CEO Building for Republic day celebration. Subwork/Packages: Temporary Illumination of GST Bhavan CEO Building for Republic day Celebrations
Providing repairs and servicing of 7TR Package AC units in Telephone Exchange, Saifabad, Hyderabad
Supply, delivery, fixing and testing of new outdoor PCBs and 3B controllers for the existing 18/21 HP ODUs for facilitating and functioning of BVRF AC units installed in executive chambers at II, III, IV floors of front administrative building block under Building and Vehicle Maintenance Sub division in UFW Division.
Operation and Comprehensive Maintenance of Substation, Street lights, AC units, Fire Alarm System, Wet Riser System and DG Sets installed at Aayakar Bhavan & GST building, Hyderabad, the year 2024-25. SH: O & M of IEI & Fans including 11 KV Substation, Water supply pumpset, DG sets, Fire Alarm System, Operation of Lifts.
Operation and Comprehensive Maintenance of Substation, Street lights, AC Units, Fire Alarm System, Wet Riser System and DG sets installed at Aayakar Bhavan & GST building, Hyderabad the year 2026-27. SH: O&M of IEI & fans including 11 KV Substation, Water supply pumpset, DG sets, fire Alarm System, Operation of Lifts.
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Extention of one duct
Providing furnished accommodation for General Consultant (GC) in the fourth floor of HMRL Metro Rail Bhavan including removal and reconstruction of Brick Masonry walls, Flooring, Electrical Points, Re-modeling of Air Conditioning System, Supply and Installation of Modular Work Stations, Cabins, Conference hall, Storage units, Power & Repairs and maintenance of toilets and Other related works.
Dismantling shifting and ITC of 4 Nos 7TR Precision Package AC units from TE Musheerabad to STR TBN Hyderabad SH ITC of 4 Nos 7TR Precision Package AC units at STR 3rd floor Telephone Bhavan, Hyderabad
Supply, Installation, Testing and Commissioning of 2TR Split AC, Supply and installation of suitable size MS Stand, Supply, Installation, Testing and Commissioning of 20 SWG thick soft copper piping, Supply, Installation, Testing and Commissioning of ... for AC units , ...
Supply and fixing of LED tube lights, Ceiling fans and AC Repair for Malkajgiri circle office and ward offices to meet minimum basic facility in Malkajgjri Circle -28 in Secunderabad Zone, GHMC