Loading…
Loading…
7,360 results • Best match
Tools & equipment useful for Mobile Repairing, Tools & equipment useful for AC repair & maintenance, Tools & equipment useful for Plumber, Tools & equipment useful for Electrician
Upkeepment of entire Electrical and allied installation with provision of materials and manpower at Basirhat S.D.O office campus with Bunglow and Quarter in the district of North 24 Parganas AMC of AC machines for the period of 1 one year.
Upkeepment of entire Electrical and allied installation with provision of materials and manpower at Basirhat S.D.O office campus with Bunglow and Quarter in the district of North 24 Parganas---AMC of AC machines for the period of 1 (one) year.
Annual Comprehensive Maintenance of entire E.I works for a period of one year at the newly constructed Howrah Commercial Tax Building under Directorate of Commercial Taxes, Govt of West Bengal at 7/1 Mackenzie Lane, Howrah-AMC of AC Machine.
1.5 Ton 3 Star Inverter Split AC 2 Way Swing 2025 Model, Brush Cutting Machine, Portable Fogging Machine, Chair Executive Wooden, Wooden Centre Table 4 x 2 feet, Wooden Peg Table 15 inch x 15 inch, Looking Mirror with Hanging Pegs
COMPREHENSIVE ANNUAL MAINTENANCE OF 1 NO. 6.5 TR PRECISION AC PAC EMERSON MODEL NO PEX125RA SA 100 AND 2 NOS OF 3 TR INDUSTRIAL SPLIT AC EMERSON MODEL NO INTLESPLIT, 3TR INSTALLED AT SERVER ROOM OF BHEL PSERs KOLKATA OFFICE.
Office Table, Visiter Chair, Exicutive Chair, All in One Desktop, HP All in One Printer With Scanner, UPS 600 VA, Ceilling Fan, Split AC 1 Ton, A4 Paper, HP Cartridge, Tag File, Cover File, Pen Stand, Life Jacket for Supervision
Supply Delivery installation testing and commissioning of 4 (Four) no. 1.0 Tr. 3-Star energy rating fully copper Non inverter type Split AC machines with all accessories and necessary electrical works at the 04 no. Swiss Cottage Tent at Geonkhali Mah
Annual Maintenance service for a HV A C system at Sanhati Mancha 45Ton and Split AC system Municipality building Gitanjali guest house Shraboni lodge B C Roy polyclinic UPHC-II UPHC- I under Katwa Municipality Up to 31/03/2026
Supply, Installation, Testing and Commissioning of 3nos 2TR and 1no 1.5TR Hi Wall type Split AC machines in the office chamber of Assistant Law Officer (HIT Wing), Superintending Engineer (Circle-V/R and B Sector 7th Floor,A-Block), Internet
Repairing of Electrical Installation work along with SITC of Split AC Machines through PWD at the top floor of 45 Ganesh Chandra Avenue Kolkata700013 in connection with Shifting of office of the Dte of State LotteriesWB.-SITC of Fire Detection system
Urgent Requirement of 4 Nos. 16.5 KW/ 5.0 Tr Cooling Capacity Concealed Split AC Machine with allied Electrical Installation Works at Step Down Ward, Department of CTVS at 2nd floor of CTVS Building within the compound of IPGMER - SSKM Hospital, Ko
Urgent Requirement of 4 Nos. 16.5 KW/ 5.0 Tr Cooling Capacity Concealed Split AC Machine with allied Electrical Installation Works at Step Down Ward, Department of CTVS at 2nd floor of CTVS Building within the compound of IPGMER - SSKM Hospital, Ko
Annual Comprehensive Maintenance of 1.5/1.8/2.0 Ton capacity split type Air Conditioner Machines installed at The Chief Engineer, P.W.D. (WZ) and The Chief Engineer, P.W. (R )D, (WZ) at Durgapur,under the jurisdiction of Durgapur Electrical Section-I
SITC OF AIR CONDITIONER MACHINE SPLIT TYPE 100 PERCENT COPPER 1.5TR,INVERTER TYPE WITH REMOTE CONTROLLER TO BE INSTALLED IN THE LABORATORY OF DR.SUDIPTA ROY OF DEPT.OF BOTANY AND DR.SUJOY GHOSH DEPT OF ZOOLOGY WITH ALL ALLIED WORKS, C.U.
SITC of 1.5/2.2 Ton Air-Conditioner Machine and 2nos Silent DG Set with allied Electrical installation work at Inter-National Hostel, Golapbag, Burdwan University, Purba Bardhaman. - Supply and delivery of silent DG set 62.5 KVA and 82.5 KVA
Air Conditioner Spilt type 1 point 5 TON, Extra electrical cable for for high wall spilt ac 2 point 5 sqmm 4 core, Copper pipe for spilt AC, MS BRACKET FOR ODU, DRAIN PIPE FOR AC MTR, Refrigerant R32
Electrical Installation Works including SITC of Air Conditioning System an FDS for shifting of PAO I, PAO II and PD Cell Offices at 2nd and 3rd Flr of Old Khadya Bhawan, Kolkata-87--SITC of Central AC System and SITC of Unitary AC System.
Operation and Maintenance of Air Conditioning system and Fire fighting arrangement at Office of the EE, SMD, PHE Dte. , EE , Alipore Division ,PHE Dte, EE, S 24pgs W/S Division-I, PHE Dte. and Office of the SE, S24pgs W/S circle, PHE Dte.
Air Conditioning work with allied EI, SITC of UPS System as well as Fire Detection Systems for Establ. of dedicated four bedded HDU Room from previous ERCP Room, Dept of School of Digestive and Liver Diseases at 3rd. fl of SDLD bldg._A.C. work
E.I work including arrangement of Air-conditioning in respect of setting-up of one permanent VWDC centre for the C.C Court, Calcutta at 3rd floor of C.C Court Building. Supply and Installation of wall fan and stand fan at VWDC and other place at C.C.
Supply and Replacement of Compressor at Unit 1 DCS Room and Commissioning of the same Supply and Replacement of Compressor for Tower AC and SWAS Chiller and Commissioning of the same at Stage II under EMIPH I and EMIPH II Department SGTPP WBPDCL
Upgradation of Dhaniakhali RH from 30beds to 100 beded State General Hospital at Dhaniakhali purches of AC machine SITC of floor standing tower AC machine at office of the Executive Engineer Hooghly Division office PWD. near D M Bunglow in the d
SITC of AC machine including requisite E. I work at the 1st Floor of Accounts section of Administrative building RGKMCH.I) AC Installation Work. II) EI Work.
INSTALATION AND FITTING OF 5 STAR VOLTAS AIR CONDITIONER 1 TON MODEL NO 125V VECTRA ELEGANT AND 1.5 TON MODEL NO 185V VECTRA ELEGANT 2 PCS AND V-GUARD VTI 4130 FOR 1.5 TON INVERTER AC 2 PCS FROM OWN FUND
Annual Comprehensive Maintenance of 1/1.5/ 1.8/2.0 /5 Ton HAT / 7.5 Ton HAT /2 Ton HAT capacity split type Air Conditioner Machines installed different Govt. office Buildings at Asansol like Asansol Court,Judge Bungalow, POCSO Court Civil Court an
Supply, installation, Testing and Commissioning of 5 nos 1.8 or 2.0 Tr. Split type room air conditioner machine including necessary Electrical work at 3rd floor of Senior IAS quarters at State Government Circuit House Complex at 9 by1, Hungerford Str
Comprehensive, Preventive and Corrective Maintenance of 6 Nos Ductable, Split 3 nos Split Type Room Air Conditioner machines at Ejlash of Chief Judge and Additional District Judge Bench-l and II , 1st floor English office and chamber of 18th MM 19
SITC of Split type room Air-conditioner machines along with Electrical Installation Work for the room no 508, 504, 306 and 206 located at 5th, 3rd and 2nd Floor of Excise Directorate building , Situated at 32, B.B. Ganguly Street, kolkata-700012.
Supply and installations of 1.5 Ton 3 star wall Mounted Room Air Conditioner Model 4503192 183 CZ13/2022 Air Flow Volume 950 CMH Refrigerant R32 650 Gms, Power Supply 1 Ph. 230 V 50 Hz Cooling Capacity 4950 W Input Power14
SITC of AC system of the five rooms marked as N21 to N24 and the room of PA to DS of the 2nd Floor of the New North Annexure Building at West Bengal Legislative Assembly House Kolkata Phase I Air conditioner
S.I.T.C OF AIR CONDITIONER MACHINES 100 PERCENT COPPER WITH REMOTE CONTROLLER FOR THE LAB (729) OF PROF SANJOY GHOSH ,DEPT OF BIOCHEMISTRY AND PROF. AR BANERJEE (412),l PRODF D.MONDAL(425) OF DEPT OF ANTHROPOLOGY WITH ALL RELATED WORKS, C.U.
Annual Comprehensive Maintenance of entire E.I. Works for a period of one year at the newly constructed Howrah commercial tax building under directorate of commercial taxes, Govt. of West Bengal at 7/1 Mackenzie lane, Howrah-AMC of AC Machine for 01
CSS College of Obs, Gynae. and Child Health - Emergent work for supporting and covering of AC Duct related to the work of urgent replacement of Ductable split AC etc. of labour room, Picu Annex area of 1st floor Central Block_2023-24_2ND CALL
Supply and Installation of two new split AC 1 point five ton in the office chambers of Special secretary and Sr Deputy Secretary on the 1st and 7th floor at Deptt. of MSME and T, Shilpa Sadan, 4, Abanindranath Tagore Sarani, Kolkata 700016.
Supply and delivery of 7.5 kW/10 HP, 8 Pole, 750 RPM, 3-phase Cooling Tower Fan Motor and re-winding of 5 HP/8 Pole/710 RPM/415 V burnt out Cooling Tower fan motor for Main Debate Hall Air Conditioning System of Assembly House, Kolkata
ENGINE BLOCKS FOR BMP ENGINE, WASHING PLANT WITH 3 HP MOTOR, COMBINATION SPANNER 06MM TO 32MM, SEAL FOR HIGH PRESSURE JACK MODEL NO 1393, GUIDE NUT FOR JACK MODEL NO 1852, BMP ENGINE STAND, BTY CABLE 10 MTR BLACK AND RED FOR LIGHT, AIR LINE WITH ... FOR AIR CONDITIONER ONIDA, ... SOLUTION AIR CONDITIONER , ...
nternal Electrical Installation work for the construction of Vulnerable Witness Deposition Court (VWDC) at the Basirhat Sub-Divisional Court , Basirhat North 24 Parganas.-E.I and AC Installation.
Renovation of Electrical work and AC installation works at Room No-17 Central Block Ground floor for setting up the ICTC (ANT) unit of CSS COGCH Kolkata.
ACM of Room A.C. M/Ch., concealed split type Tower AC M/ch and Ductable Split type AC of dift. capacity and dift. makes instal. at dift. Bldgs.. of SSKM Hospital incl. K.M.H (Annex-V) Kolkata under the jurisdiction of AE(LR) SSKMESD,P.W.Dte.
SUBMERSIBLE CABLE 3 CORE 10SQMM 180 MTR ROLL (Q3), CHANGEOVER SWITCH 160AMP 4 POLE TPN (Q3), SHEET STEEL ENCLOSER FITTED WITH PLUG & SOCKET SINGLE PHASE 20A 240V (AC BOX) WITH 20A MCB SP C CURV (Q3), CI SLUICE VALVE 80MM (Q3), SUBMERSIBLE CABLE 3 ... FOR WINDOW AC (Q3), ... FOR WINDOW AC (Q3), ... FOR WINDOW AC (Q3), ... FOR WINDOW AC (Q3), ...
SITC of Air conditioner system at Repair and Modification of the conference Room on first floor of Block II, Beside south zone chief engineer office at writers Buildings under Writers Buildings Elec Sec No. IV under Writers Buildings Elec Sub Div, PW
Annual job contract for Operation and Maintenance of E and M installations with Fire Fighting, Fire Alarm System and Air Conditioner Units etc. for non-operational area of Kolkata airport, RHQ, ER and Behala Airport 2020 to 21 and 2021 to 22
Upgradation of Sirity Crematorium compound at B.L. Saha Road, Kolkata, Ward -116, under KMC (Electrical Part D - Arrangement of distribution wiring network, lighting, lightning arrester and AC installation)
Shifting of Chest Department from Students Health Home and Reconstruction of Psychiatry Department and indoor ward at Chest Building under NRS Medical College and Hospital AC installation work
Custom Bid for Services - BRC for Fabrication and Erection of HVAC ducts onboard ships under construction at GRSE Similar Category Piping Erection Service Repair and Overhauling Service Operation And Maintenance Of HVAC System (Heating, Ventilation ... And Air Conditioning System) ...
Electrical Installation to the Roof Top Shed proposed to be created over G plus 6 storied building of Netaji Subhas Open University situated at DD26 sector I Salt Lake Kolkata 700 064 SITC of split AC machines at Seminar Hall Dining hall and Rest roo
Supply Installation Testing and Commissioning of Split AC Machines at Waiting Hall for Visitors of Honble MOS IC and Working Area for support staffs of Honble MOS IC except PS PA and EA at 2nd Floor of Five Pump Fire Station New Town Rajarhat
Annual Mtc. of the all EI and opt.of package type/window/split/ductable split AC machines including round the clock (24hr.X 7days) monitoring, opt. and mtc. work of the Master control Panel and AMF panels and 2 nos. DG. Set inside Kolkata Raj Bhavan
SITC of AC units of different places at David Hare Block Build under M C and Hospital, Kolkata - E.I and AC Work Electrical Work .-- Arrangement of 160 KVA power supply for proposed new cath Lab at MCH Build 2nd Floor--patr C SFU and Change over Inst