Loading…
Loading…
7,360 results • Best match
Annual Maintenance of the all Electrical Installations and operation of package type/window/split/ductable split AC machines including round the clock (24hr.X 7days) monitoring, operation and maintenance work of the Master control Panel and AMF panel
Annual Maintenance work (El AC Lift FDS) at Asansol District Hospital Paschim Bardhaman.. Supply and fixing of 7.5 TR Ductable Split AC machine Indoor Fan Motor of Pediatric Ward Compressor at SNCU CCU of Asansol District Hospital.
Supply and erection of Containerized Cabins with suitable Furniture, Split AC, Electrical fittings etc wherever applicable for site offices for use as office cum shelter at road weigh bridge, Railway siding and at mines areas of WBPDCL
Comprehensive maintenance of following capacity HPAC, Comprehensive maintenance of Split AC, Comprehensive maintenance of AFD system, Replacement of existing faulty tube light, Rewinding of faulty ceiling fan, Replacement of existing faulty Compound light, Operation of Electromechanical services
Repair and Renovation works of Electrical Installation of three phase electric Power Socket to run 3 phase machines, Air Conditioner and SITC of G plus 2 MRL Lift at Raipur Government Polytechnic, Bankura------SITC of Lift.
Supplying, installation and commissioning of 2nos. 1.5ton split type 3star (100 percent copper) inverter type room air conditioner machine in proposed portion for the sitting of Special Tabulators and Staffs, Record Section,College Street campus,C.U.
S.I.T.C OF AIR CONDITIONER MACHINES FOR THE LAB OF PROF SANGHAMITRA SENGUPTA 739, PROF.A.SIDHHANTA 735 and 744 DEPT OF BIOCHEMISTRY,PROF SUTAPA CHOWDHURY,DEPT OF ANTHROPOLOGY, STUDENT FACILITY CENTRE TECHNOLOGY CAMPUS WITH ALL RELATED WORKS,C.U.
SITC of 1.5/2.2 Ton Air-Conditioner Machine and 2nos Silent DG Set (82.5KVA and 62.5 KVA) with allied Electrical installation work at Inter-National Hostel, Golapbag, Burdwan University, Purba Bardhaman. - SITC of Air-condition machine
SITC of Air Conditioner Machine installation with allied EI Work at different room like ICTC department, PV examination room and PAC room etc at SuriSadar Hospital, in the district of Birbhum RN 24001060 Project ID HF252640893S000
Annual Comprehensive Maintenance Contract (CAMC) for different type Air conditioner machines fixed at Banga Bhawan, Bangla Bhawan, O/O the Resident Commissioner, Govt. of West Bengal under maintenance of Banga Bhawan Sub Division,PWD, New Delhi
Renovation and augmentation of establishment for 24 beded Hybrid Critical Care unit 8 CCU and 16 HDU beds at MCH DH SDH SSH level SITC of Air Conditioner Machine at Murshidabad Medical College and Hospital, Murshidabad.
Installation of Lightning Conductor UPS and Battery Air Conditioner and some high voltage street light for the building of District Registration Establishment Purulia in the District of Purulia under the Directorate of Registration and Stamp Revenue
Supplying, installation and commissioning of 6nos. 2ton split type 5star 100 percent copper inverter type room air conditioner machine in the Establishment Section and Students Section under UCAC, Gr. Fl., Asutosh Building,College Street Campus, C.U
SITC OF AIR CONDITIONER MACHINE SPLIT 1.5TR, INVERTER TYPE , 100 percent COPPER WITH REMOTE CONTROLLER TO BE INSTALLED IN THE LAB Of PROF SANGHAMITRA SENGUPTA, DR.SUJOY GHOSH DEPT OF ZOOLOGY,LABORATORY UGC-UPE UNDER HERBARIUM, C.U.
Comprehensive Annual Maintenance contract of Air Conditioner Machines for Bungalows of DM District Judge SDO Sadar SDO Jhalda ADMD ADMZP ADM DLLRO ADM Gen PWD Inspection Bungalow Purulia Circuit House Purulia Division PWD Purulia Electrical Divisi
Supply, delivery and fitting fixing of (40 mm to 300 mm) cast iron manually gear operated Wafer type Butterfly valve in the pipe line of ductable package AC units at Janaswasthya Karigari Bhavan (Nijalaya) under NTKMD, PHE Dte.
Thorough renovation of Cabins at the first floor and second floor of fraser building for treatment of COVID 19 patients AC installation work
WBPWD/AE/SESD-I/e-NIQ-10 of 2025-26
Comprehensive maintenance of WAC and Split AC unit and its associated power feeding arrangement, Replacement of faulty fl Tubes, Replacement of faulty compound Lights, Rewinding of faulty ceiling or wall fan, Operation of Electromechanical services at TE Bldgs
Repairing of Electrical Installation work along with SITC of Split AC Machines through PWD at the top floor of45 Ganesh Chandra Avanue, Kolkata700013in connection with Shifting of office of the Dte of State LotteriesWB.-- Supply and Installationof AC
Supplying, installation and commissioning of 4nos. (1.5ton) window type 3 star (100 percent copper) room air conditioner machine in the Research Laboratory (Room No NRS22) of Prof. Dr. Dilip Kumar Maiti, Department of Chemistry, Rajabazar Sc College
INSTALLATION OF NEW AIR CONDITIONER MACHINES ALONG WITH OTHER ELECTRICAL WORKS AT NEWLY CONSTRUCTED BANGLA SAHAYETA KENDRA AT MAYSORE GARDEN, NEW ROOM AT 56/2 PRATAPADITYA RD, NEW SWM OFFICE AT 56 TOLLYGUNGE RD IN WD-88.
Repair and Renovation works of Electrical Installation of three phase electric Power Socket to run 3 phase machines, Air Conditioner and SITC of G plus 2 MRL Lift at Raipur Government Polytechnic, Bankura-------Electrical installation work, SITC.....
Supply , Installation and Commissioning of 5nos. 2.0 Ton split type 3 star 100 percent copper inverter type air conditioner machine -Make Voltas/ Carrier / Daikin or equivalent at the Library, Alipore Campus, C.U. Buy Back old unusable Machines.
Comprehensive annual maintenance contract without compressor of the room air conditioner machines split and window type 52 nos. installed at the Economics Campus and 11 nos. installed in Cash Section, College Street Campus, CU, for 3 years.
S.I.T.C OF AIR CONDITIONER MACHINES FOR THE LAB OF PROF PRITHA BHATTA -CHARYA,DEPT OF ENVIRONMENTAL SCIENCE,PROF ALOKE GHOSH,DEPT OF BIOCHEMISTRY AND PROF PARTHIB BOSE OF ZOOLOGY DEPT. WITH ALL RELATED WORKS, UNIVERSITY OF CALCUTTA.
Supply, Installation, Testing and Commissioning of Air Conditioner Machines, power plug points with proper earthing installation for procurement and installation of semi auto analyzer machines at WHU-37, 41 and 50 under NUHM Scheme Br-V, KMC
Arrangement for providing AC Technician in respect of day to day proper operation/functioning of 8.5 and 11.0 Tr. Air-Cooled ductable split Air-Conditioning unit installed at 1st floor, 2nd fl and 3rd floor of the Court Block at City Civil Court.
A M C operation and repair of EI, Air - conditioning , Lift Installation etc. for both of the Tangra and Sealdah Campus and CCL Hostel of D.N.De Homeopathic M C H Supply of different materials for day to day maintenance of electrical installation
SITC of Air Conditioning machines at 6th floor (Room No 601/3 and 601/4) along with other allied electrical installation work of Annex building-3, Sales tax complex under Directorate of Commercial Taxes, govt. of west Bengal at 14,Beliaghata road.
Air conditioning arrangement for extension n renovation of existing seminar hall of Medicine dept incl two new toilets and renovation of one toilet block with adjacent of sisters room for COVID training purpose at the 2nd floor of RRM Bldg in CNMCH
EI work supply and fixing of AC machine and SITC of Fire detection system in light structure shed over roof of Directorate of Child rights and Trafficking Saishali Building DF Block Sector I Salt Lake Kolkata 64 SITC of Split Air Conditioning system
SITC of Air conditioning machines and allied Electrical Installation works at KMC ward of CB Post Natal TRIAGE Room Hematology OPD Room No 6 Medicine OPD Room No 8 and Neurology OPD within the compound of NRS Medical College and Hospital Kolkata
Replacement of old Air conditioning system at 4 no. O.T in the 1st and 2nd floor of C.B building -Supply, installation, testing and commissioning of HVAC system in C.B building TOP and UP area of O.T. at MCH Kolkata during 2024-25
Electrical Installation work for Renovation of Shifting of the Department of Barasat High Way Division I Makintosh Burn Building to Purta Bhavan Room No 17 18 19 and 20 Salt Lake Kolkata 91 Supply and Installation of VRF Air conditioning System and
AMC of 38 Split and 1 no window type Air conditioning machine unit at RBPCL,2nd floor, M . N. Saha Building, Student Facility room and Chemistry Laboratory,Prof Debashish Das,2nd floor, N .R. Sen Building Rajabazar Science College, CU, Kolkata-9
Annual Maintenance of the EI work at PMSSY-III, building at BSMC and H under BSMC and H Electrical Section-III.-----Repairing of 2 Nos. 30 KVA UPS incl. air conditioning arrangement at Eye IPD building under BSMCH in the district of Bankura.
Air Conditioning Work for Reno. of Paediatric Surgery Wards and allied doctors room, Sister rooms, Teaching rooms at central portion of 2nd and 3rd fl. of main Bldg. within the campus of IPGMER_SSKM hosp., Kol._SITC of Fire Detection an Alarm system
Electrical Repair and Maintenance work incl. AC installation of Treasury Dept. at Kolkata Collectorate Building under Writers Buildings Electrical Section-VI PWD EI work.
Renovation of ENT OT at 2nd floor of Baker Building under the NRSMCAND H, Kolkata Electrical installation and AC installation Works Electrical installation Work
As per tender documents
Supply and fixing Split AC 5 Star 2 Ton, Voltage Stablizer single phase automatic operated 220V to 240V, Sub main wiring with red black green 4sqmm wire, Metal enclosures with 20 Amp MCB, Socket with one single pole MCB
Repairing of Electrical Installation work along with SITC of Split AC Machines through PWD at the top floor of 45 Ganesh Chandra Avanue, Kolkata700013 in connection with Shifting of office of the Dte of State Lotteries, WB.---Electrical Installation
Temporary EI work for working light for Tableau,security lighting, pandle lighting,CCTV,fan,power plug,split AC etc at both side of Red road IGS in connection with Independence Day Parade 15th august-2023 under MES-II PWD
Temporary EI work for working light of Tableau, security lighting, pandle lighting, CCTV, fan, power plug, split AC etc at both side of Red road IGS in connection with Independence Day Parade 15th august 2025 under MES II PWD.
Annual Maintenance service for a HV A C system at Sanhati Mancha 45Ton and Split AC system Municipality building Gitanjali guest house Shraboni lodge B.C RoY polyclinic UPHC-II UPHC- I Under Katwa Municipality Up to 31/03/22025
Replacement of more than 10 years old split AC machines and SITC new Split Type Air-conditioned Machines at PA room and adjacent room of HMIC correctional services, 1st floor, Jessop Building under Writers Building Electrical Sub-Division, PWD.
SITC of Split type room Air-conditioner machines along with Electrical Installation Work for the room no 307 and 405 located at 3rd and 4th Floor of Excise Directorate Building, Situated at 32, B.B. Ganguly Street, kolkata-700012.
Annual comprehensive maintenance for air conditioner at N K D A office 1 MAR, Administrative Bldg, Utility Building, Business Club, Upasana Griha, Dog Creche, Cattle Pound, Medical Center an Vaccine / Wellness Center, DCP Office, Zero Waste Shop, FBS
Operation and maintenance for air conditioner at N K D A office 1 MAR, Administrative Bldg, Utility Building, Business Club, Upasana Griha, Dog Creche, Cattle Pound, Medical Center Vaccine Wellness Center,DCP Office,Zero Waste Shop,Football stadi