Loading…
Loading…
5,947 results • Best match
Construction of PLC and Chlorination room including Yard lighting and site development work for Implementation of Drink from Tap with 24 x 7 water supply to Zone No-4 at CDA ward No.4 and ward No-5(P), CMC, Cuttack under SUJAL
Installation of Automation system including SCADA, PLC and Chlorination system with provision of D.G. Set for Implementation of Drink from Tap with 24x7 water supply to Zone No.28 at Badambadi Ward No. 31(P) and 36(P) CMC, Cuttack under SUJAL
Installation of Flow Meter,Flow Control Valve,Automation system including Scada,PLC,provision of DG set, OFC system and chlorination Work for Implementation of Drink from Tap with 24x7 water supply to Zone No11 at Gorakabar (700KL)W.No.8P, 9P,16P CMC
PLC and Chlorination room construction and yard lighting and site development for Implementation of Drink from Tap with 24 x 7 water supply to Zone No.12 (450KL) at Bijupattanaik Chawk Ward No. 9(Part) and 16(part) CMC, Cuttack under SUJAL
PLC and Chlorination room construction including yard lighting and site development work for Implementation of Drink from Tap with 24 x 7 water supply to Zone No-35 (227KL) at Badambadi ward No-44(P) and 45(P) CMC, Cuttack under SUJAL
Installation of Automation system including SCADA and PLC,OFC system and chlorination work with provision of DG set for Implementation of Drink from Tap with 24x7 water supply to Pratapnagari Ward No.58 and 56(P) (DMA-III) CMC, Ctc under SUJAL
Installation of Automation system including SCADA and PLC, OFC system and chlorination work with provision of DG set for Implementation of Drink from Tap with 24 x 7 water supply to Ward No. 56(P) CMC, Cuttack under SUJAL. (DMA-I) Pratapnagari
Supply, I&C of DGMS approved ETMS for UG mine with 5 years of CAMC after 2yrs of warranty
SITC, 3 YEARS CAMC AFTER 3 YEARS WARRANTY AND 6 OPERATION OF DIGITAL DISPLAY BOARD OUTDOOR(12* 8ft) (Q3)
Enterprise G Pass Solution along with G Pass Kiosk, Software with 1 yr warranty and 4 yr CAMC (Q3)
Maintenance and new work related to sewerage line work.
Construction of drainage/ sewerage line, maintenance of drainage/ sewerage line, manhole cleaning etc.
As per the NIT
Facility Management Services - LumpSum Based - Industrial; AMC for Ms Avery make 60T Weighbridge and attending Annual Verification and Stamping by Legal Metrology Department as per scope of work; Consumables to be provided by buyer
AMC of Cleaning of electronic and electrical equipment exist in Road Weighbridges control room and day to day maintenance of structural platform of weighbridges for one year (365 days) at Kulda OCP, Basundhara area
Custom Bid for Services - PROVISIONING OF BUDGET FOR RENEWAL OF AMC FOR 27 NUMBERS OF ABRO MAKE DYNAMIC BALANCING MACHINES OF ED SED KORAPUT FOR A PERIOD OF TWO YEARS per Annexure Z BOQ
Custom Bid for Services - AMC for PLC and Scada based control system for Blockchain at MSP and PLC and HMI operated control system for Monazite FBD for 2 years as per scope of work
AMC for 33 kv overhead line drawn from 132 kV /33 kV Nandira substation to 33 kv/3.3kv and 33 kV/6.6 kV/3.3kV substations of Ananta OCP for a period of 730 days.
AMC for Providing and fixing foundation bolts with microconcrete grouting at damaged portion of column pedestal on as and when required basis inside New SILO of Bharatpur OCP for a period of 02 years.
AMC for dismantling, fabrication and erection works in day to day maintenance of circuit 1, 2, 3, 4 and 5 of Feeder Crusher of Jagannath OCP, Jagannath Area for a period of one year
AMC for repairing and maintenance of Electrical Installations, domestic electrical wiring, fault rectification etc upto medium voltage for 01 year 260 Working Days at Kaniha Area Office and Residential Quarters under control of KA
Supply, Installation and Commissioning of 05 Nos 100 MT Electronic Weigh Bridges and Prefabricated Control Room along with Three Years (03) AMC at Different Mining Circles of the Directorate of Mines, Govt. of Odisha
Custom Bid for Services - AMC for shifting of pumps set over pontoons and base with valves universal joints jetting hose attached with pumps during advancement and retreat of pump at Belpahar OCM LKP Area
Custom Bid for Services - PDI1S25040 Non-comprehensive AMC for testing of Fire Detection and Alarm System FDAS devices at various buildings and Process Units of Paradip Refinery and Petrochemical areas Similar Category Support Services
Custom Bid for Services - AMC towards cleaning washing of Engine Guard Radiator guard operator cabin body mud cleaning etc of various HEMMs auxilary machines Collection storage of Burnt Oil at JMB workshop Bharatpur OCP
Custom Bid for Services - AMC of 4 numbers of DG sets installed at NTPC Dulanga for a period of 3 years through OEM Similar Category Operation and Maintenance Services of Power Generator(DG-Set)
Supply, Installation, Testing and Commissioning of additional 60 MT capacity fully electronic computerized lorry weighbridge on turnkey basis at FSD Dungripalli of 2 years guarantee period and 3 years Comprehensive AMC including Civil/Electrical work
AMC works for day to day pipe line works, flange supply and welding, pump shifting and miscellaneous works in the mines of Ananta OCP for a period of one year as and when required basis
AMC for Complete Health Check up with respect to Design Specification, Problem / Deviation Identification, Suggestion for Rectification to Eliminate Trouble and Attending on call Breakdown Services for Hydraulic Power Packs Systems of Rodding Shop-II
AMC for Cross belt jointing and drum lagging by cold/hot joint in rubber/nylon belt conveyors of 1200mm and 1400mm width of CHP and RLS of Bharatpur OCP for a period of one year.
Supply, Installation, Testing and Commissioning of additional 60 MT capacity fully electronic computerized lorry weighbridge on turnkey basis at FSD Hirakud of 2 years guarantee period and 3 years Comprehensive AMC including Civil/Electrical works.
Comprehensive AMC of CWS colony including cleaning, sanitary repair, water supply maintenance, gardening, upkeeping for change of occupancy, miscellaneous repairing works, electrical maintenance works for a period of 2 years at CWS, IBV 2023-25.
Supply, Installation, Testing and Commissioning of additional 60 MT capacity fully electronic computerized lorry weighbridge on turnkey basis at FSD Kesinga of 2 years guarantee period and 3 years Comprehensive AMC including Civil/Electrical works.
SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF FULLY AUTOMATIC FOG MIST GENERATING DUST SUPPRESSION SYSTEM FROM BASUNDHARA CHECK GATE TO SARDEGA RAILWAY SIDING ALONG COAL TRANSPORTING ROAD(3.70KM) BASUNDHARA(W)OCP, MAHALAXMI AREA INCLUDING 2 yrs AMC
Comprehensive AMC of CWS colony including cleaning, sanitary repair, water supply maintenance, gardening, upkeeping for change of occupancy, miscellaneous repairing works, electrical maintenance works for a period of 2 years at CWS, IBV 2026-28
Hydraulic rail bender (JIM CROW) Heavy duty (60Ton) as per RDSO specification no TM/SM/5 dated 08.05.1991( Second Revision 2022) or latest up to the date of tender opening with AMC five years (optiona
Custom Bid for Services - AMC for Complete Health Check up with respect to Design Specification Problem Deviation Identification Suggestion for Rectification to Eliminate Trouble and Attending on Call Breakdown Services for Hydraulic Power Packs Sys..
Custom Bid for Services - AMC for Repairing cleaning of Radiator Hydraulic oil cooler of different HEMM machines of field and workshop working at Jagannath OCP as and when required basis for period of two years
Operation And Maintenance Of Other Machines And Plants - Comprehensive AMC contract for FOIS Network Connectivity with equipments and Data charges of Rail Static IP Link installed at Bharatpur OCP for a period of 02 Year
S/R to Kushakala-Singhpur- Bonai-Border Road such as retaining wall from ch. 6/800 to 6/900 Km.,7/300 to 7/400 Km.,7/500 to 7/600 Km.,8/000 to 8/100 Km.,13/400 to 13/500 Km. and 13/700 to 13/800 Km.)for 2019-20 under Annual Maintenance Plan(AMP)
Net work Improvement (installation of isolation valve, Air valve sluice valve, pipe laying valve chamber) for Implementation of Drink from Tap with 24 x 7 water supply to Zone No-5 at Bidanasi Ward No-1 (P) and 2(P) CMC, Cuttack under SUJAL
Construction of PLC and Chlorination room and yard lighting with site development work for Implementation of Drink from Tap with 24 x 7 water supply to Zone No-11 at Gorakabar (700KL) Ward No. 8(P), 9(P), 16(P) CMC, Cuttack under SUJAL
Installation of Flow Meter, Flow Control Valve, PLC and chlorination system with provision of D.G. set for Implementation of Drink from Tap with 24x7 water supply to Zone No-35 (227KL) at Badambadi ward No-44(P) and 4(P) CMC, Cuttack under SUJAL
Installation and Automation system including Scada, PLC,OFC system and chlorination Work with provision of D.G. set for Implementation of Drink from Tap with 24x7 water supply to Zone No- 8(850KL)at Krushak Bazar W.No-7,W.No-1(P), 6(P) CMC,CTC SUJAL
Laying of 300mm dia (D.I/M.S) Clear water rising main from Dhabaleswar bridge to proposed ESR and laying of 100mm/150mm/200mm dia distribution main for Implementation of Drink from Tap with 24x7 W/S to Dhabaleswargada in Ward No.3 under CMC, Cuttack
Construction of PLC and Chlorination room including yard lighting with site development work for Implementation of Drink from Tap with 24x7 water supply to Zone No-8(850KL) at Krushak Bazar Ward No-7,Ward No-1(P),6(P) CMC, Cuttack under SUJAL