4 live1 closing this weekmost from South Central Railway and Northern Power Distribution company of TS LTD
4 results • Best match
Setting up of 187.5 MW/750MWH(187.5MWX4 Hrs) Battery Energy Storage Systems(BESS) in Telangana under Tariff-Based Global Competitive Bidding(TBCB) at Maheswaram 400/220KV Sub Station of TGTRANSCO with Viability Gap Funding(VGF) Supported through PSDF under “B.O.O” model With 15 Years Tenure.
DESIGN, SUPPLY, TESTING, INSTALLATION and COMMISSIONING ALONG WITH COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT (CAMC) FOR 10 (TEN) YEARS OF A GRID-CONNECTED 1 MW / 4 MWh (4-HOUR) BATTERY ENERGY STORAGE SYSTEM (BESS) ON 100 percent TURNKEY BASIS AT THE 33/11 kV Waterworks SubStation KARIMNAGAR DISTRICT OF TGNPDCL.
Set of Battery Storage Units (Ni-Cd Battery 6 Volts , 150Ah) as per BLW Drg.No.10609375, Alt.- Aa2, RDSO Specification No.MP.0.51.01.02(Rev.03 or latest) July 2021 for WDP4 locomotives. Each set consisting of 10 Nos.of Ni-Cd batteries as per above drawing and Specification.