Loading…
Loading…
1,681 live1,046 closing this weekmost from Rural Development and Panchayat Raj Department and Zilla Parishad
1,681 results • Best match
Providing and fixing of submersible motor pump in newly drilled bore well and water supply CPVC pipeline for earthing pit at 33/11 Kv S/s Kotgaon under O&M Dn. Balod.
Providing and fixing of submersible motor pump in newly dirlled bore well and water supply CPVC pipeline for earthing pit at 33/11 Kv S/s Dondi under O&M Dn. Balod.
Repairing and maintenance of power driven submersible motors of different horse powers, pumps of different discharges and heads installed at tube wells of different diameters and at different depth including repairing and maintenance of starters, mai
Installation of 09 no. DTH Tube well bore in Sector 37,DLF,Sector 28,Ashoka Enclave 1 in ward no.24, 29 and30 Division V A Faridabad
Construction of 125mm Dia Machine Drilled Bore Well along with Submersible Pumping Unit and Allied Installation to be carried out at NHO Reyaz Ahmad khan Gujjar at Village Katsu Sallar, in District Anantnag.
Drilling of New Bore Well and Supply and Erection of Motor, Cable, Panel Board with EPL at Mel Parali HO Parali AT MOHANUR BLOCK IN NAMAKKAL DISTRICT UNDER Union General Fund 2026 2027
Construction of 125mm Dia Machine Drilled Bore Well along with Submersible Pumping Unit and Allied Installation to be carried out at NHO Master Mohammad Yousuf Dhamabal RakhiBrah Ward No 7, in District Anantnag.
INVITING RATES FOR PROCUREMENT OF JAL PRADAY HANDPUMP SAMGRI FOR FINANCIAL YEAR 2026 TO 2027
Construction of 25 HP Tubewells and related works on Buddha Bazar Road in Municipal Council Bisauli.
Restoration of Existing Borewell at NRPL Panipat HQ Premises
RDDDC2627113556 C/O BOREWELL NEAR ASTAN SHARIEF AT DIERI
Drilling of Borewell Near Bhagat Singh School in Humnabad
Drilling 165mm dia. X up to150 mtr. Deep bore by DTH rig & providing of necessary Single / Three Phase sub pump set with accessories on newly drilled bore at various Village of Garudeshwar Taluka For Rashtriya Ekta Divas Program
CONSTRUCTION WORK OF PRIMARY HEALTH CENTER INCLUDING 1 G AND 1 H TYPE QUARTER BOUNDARY WALL, TUBE WELL AND APPROACH ROAD AT VILLAGE KHAR BLOCK KHALWA DIST KHANDWA
Installation of 02 (two) nos. Mini Deep tube well with submersible Pump at Ramthakur seva Mandir/ Gedu Miah Jame Maszid in different places under Ward no-21, AMC
Digging of borewell,installing motor pump and providing electrical supply to the borewell in ward no.18 galihalli cross,ashraya badavane in TMC Tarikere
NAGAR PANCHAYAT BHIRA KI SEEMANTARGAT 70 NOS. INDIA MARK SECOND HANDPUMP REBORE KA KARYA
Construction of 125 mm dia machine drilled Bore well including allied accessories in the premises of Divisional Office (Executive Engineer Civil Investigation and Design Division PDC Sopore) for drinking water purpose in District Baramulla
Providing New Bore well with 7.50 H.P Submersible motor pump and extension of pipeline from Govt Arts and science college in Indra Nagar H/o Komarapalayam under Panchayat Union General Fund works 2026-2027
Restoring Functionality through Repairs / Maintenance of Bore well Schemes No. 101 (under PR-1) (Cluster-1) of Department of Agriculture in district Pulwama, under Implementation of National Mission on Saffron Command area 23.52 Ha
Supply, laying, testing and commissioning of 600 mm dia pipeline including shifted line from CMWSSB pump house inside Mines IA and interconnecting with existing 700 mm dia bore well pipeline near Uzhavar Sandhai, Vadalur.
Work of construction of 200mm diameter tube wells in all strata supply and installation of submersible pump sets and other allied works as per financial offer testing commissioning with 2 year defect liability period under PHED Division Alwar
Work of construction of 200mm diameter tube wells in all strata supply and installation of submersible pump sets and other allied works as per financial offer testing commissioning with 2 year defect liability period under PHED Division Alwar
Work No 02 Installation of a mini tubewell near Sundar Saini house in Madiyo Mohalla Sabdalpur Ward No 05 Nagar Panchayat Saidnagli
Nagar Panchayat Mendu me Vibhinna Sthano Par India Marka Handpump Ki sthapana Ka karya NO 30
INVITING RATE FOR PROCUREMENT OF HANDPUMP SAMAGRI FINANCIAL YEAR 2026-27 NAGAR PARISHAD AJAYGARH DISTT.PANNA M.P.
Operation and Maintenance of Borewells and 25 HP Pump etc. at Ward No 8, under Div-II Municipal Corporation Manesar
Flushing and Deepening of borewells at Lakshmi garden and Nanjegoundan puthur and Ward areas in Ward No.13, North Zone.
DRILLING OF BOREWELL,SUPPLY AND ERECTION OF MOTOR,CABLE,GI PIPES AND OTHER ACCESSORIES FOR BOREWELL AT ARASU PANIYALAR NAGAR/AASIRIYAR NAGA H/O KANDIYANKOVIL
Digging of borewell,installing motor pump and providing electrical supply to the borewell in palegar camp of ward no.02 in tarikere town muncipal limits.
CONSTRUCTION WORK OF PRIMARY HEALTH CENTER INCLUDING 1 G AND 1 H TYPE QUARTER), BOUNDARY WALL, TUBE WELL AND APPROACH ROAD AT VILLAGE RAIPURA, BLOCK SHAHPURA DIST. DINDORI M.P.
Providing New Borewell in Muniyandipuram at Pulipatti Village and Panchayat
INSTALLATION/CONSTRUCTION OF BOREWELL NEAR MASJID SHARIEF AT JUGI HANDEW
CO Borewell NHO Gh Hassan Thoker and others at Naidgund
Providing New Borewell and at Arundhathiyar Street in Vengatampettai Panchayat
Providing New Borewell and at Pillaiyar Kovil in Annathanampettai Panchayat
Providing borewell at sengottaiyan colony periyar street in Gobichettipalayam Municipality
Annual Redrilling and Flushing of Borewell in Madanayakanhalli CMC Limits
CONSTRUCTION OF TUBEWELL DUMERA BASS VILLAGE RIDI
SUPPLY BOREWELL SUBMERSSIBLE MOTOR PUMP SET 15 HP, SUPPLY BOREWELL SUBMERSSIBLE MOTOR PUMP SET 20 HP, SUPPLY BOREWELL SUBMERSSIBLE MOTOR PUMP SET 25 HP, SUPPLY BOREWELL SUBMERSSIBLE MOTOR PUMP SET 30 HP, SUPPLY OF AUTOMATIC STAR DELTA ONLINE STARTER OF 15 HP, SUPPLY OF AUTOMATIC STAR DELTA ONLINE STARTER OF 20 HP, SUPPLY OF AUTOMATIC STAR DELTA ONLINE STARTER OF 30 HP, SUPPLY OF AUTOMATIC STAR DELTA ONLINE STARTER OF 40 HP
Deep Drilling of 125 mm dia Bore Holes by using ODEX method including providing, installation, testing, commissioning of Mark II Hand Pumps and construction of platforms at (15 Nos) different locations in Surankote Constituency of District Poonch on
Deep Drilling of 125 mm dia Bore Holes by using ODEX method including providing, installation, testing, commissioning of Mark II Hand Pumps and construction of platforms at (10 Nos) different locations in Poonch and Surankote Constituency of District
Repair and Maintenance of existing borewells at Indra Nagar, North Housing Unit and Ward areas in Ward No 78, South Zone
VELLORE DISTRICT PROVIDING NEW BORE WELL WITH 7.5HP MOTOR AND UPVC PIPE CABLE WIRE AND ACCESSORIES EXTENSION OF PIPE LINE AT DHOMAR COLONY IN LATHERI PANCHAYAT KV KUPPAM BLOCK SFC(DP) 2026-2027 PACKAGE NO 01
VELLORE DISTRICT PROVIDING NEW BORE WELL WITH 7.5HP MOTOR AND UPVC PIPE CABLE WIRE AND ACCESSORIES ,EXTENSION OF PIPE LINE AT ARUNTHIER COLONY IN THIRUMANI PANCHAYAT KV KUPPAM BLOCK SFC(DP) 2026-2027 PACKAGE NO 03
Labour charges for the extension of the Chatlapur Bore well water supply pipe line from KK-3 f/bed to KK-5 f/bed by laying HDPE line along the Road at MM Township, Mandamarri Area