Loading…
Loading…
1,70,166 results • Best match
Const of Bore well at Gushi Shiekh Mohalla Block Kupwara
Providing Bore well near Judge bungalow at Dargamitta (2nd call)
Drilling of 1 no. Bore well at GPRA Domlur, Bangalore.
PROVIDING BORE WELL AT PUNADIPADU LAND SURVEY NO 284 1.2.4
PROVIDING BORE WELL AT PUNADIPADU LAND SURVEY NO 284 1.2.4
Procurement of hand Bore well maintenance materials in Amadalavalasa Municipality.
Procurement of Bore well materials in Amadalavalasa Municipality.(1st Call)
Drilling of Bore well at HRS, Ambajipeta, East Godavari District.
Providing pumping machinery to existing bore well in Bidar City
Providing Bore Well at Kukatpally PO Building under Secunderabad Dn
SITC of submersible motor pumping set in new bore well
Repair and Overhauling Service - BORE WELL; NA; No; Buyer Premises
Providing Deep Borewell at Vivekananda Nagar
BORE WELL CONSTRUCTION AND MWSS
Pipe Hand Pump, Hand Pump Rod, Paipe Socket, Chain Hand Pump, Chain Bolt, Bolt Nut, Tonti, Handle, Tipai, Cylinder, Cylinder Rod, Bogi, Check Valve, Barcel, Medki Barcel, Rod Socket, Ring, Slip Cylinder BOQ Title BOQ BOQ
Drilling of new bore wells flushing of existing bore wells repair and reconditioning of pump sets, and formation of flow diversion channels for the Combined Water Supply Schemes at Veppampatty Kamatchipuram, Sillamarathupatti Total 3 CWSS inTheni
Sinking of Tube well with Submerssible pump with community tank with soak pit infront of Sishkuri Dilip Tudu house Mouza Khatil jl no 42 plot 343 XV FC Tied
Installation of machine boring deep tube well at Sansad No VI at Salsalabari
INSTALLATION OF TWO NOS NEW TUBE WELL AT PODLARA NEAR RICEMWAL AND CHATANIBAD
Installation of machine boring deep tube well at Sansad No XIII at Bhelukdabri
PURCHASE OF ORDINARY AND MARK-II TUBE WELL MATERIALS UNDER UDAYPUR GRAM PANCHAYAT.
Sinking of deep tube well at the corridor of Kashem Ali Gazi house
DEEP DRILLED TUBE WELL OF 125/115 MM DIA, 60 MTRS WITH INSTALLATION OF INDIA MARK II HAND PUMP FOR THE YEAR-2023-24 UNDER D.W. AND S. DIVISION NO.-1, DUMKA GROUP-SRDT-1
Fishing out of fallen hand pump pipe line from ordinary tube well including labour charges, transportation, loading, unloading, and again installation of hp after repairing work etc.50 nos. Sub Division Sagar District Sagar M.P.
Fishing out of fallen hand pump pipe line from ordinary tube well including labour charges, transportation, loading, unloading, and again installation of hp after repairing work etc.50 nos. Sub Division Deori District Sagar M.P.
Estimate for sinking of 01 (One) nos. (100mm x 40mm dia) Tube well with a supply of PVC Pipe upto 300.0m depth fitted with India Mark-II hand Pump near Rabindranath Halder at Mirzapur Sansad
Fishing out of fallen hand pump pipe line from ordinary tube well including labour charges, transportation, loading, unloading, and again installation of hp after repairing work etc.50 nos. Sub Division Banda District Sagar M.P.
Construction of 125/115 mm Dia and 120 Mtr. Deep Ordinary Tube Well and Installation of Hand Pump, Construction of Platform, Drain and Soakage pit etc Complete In Villages of Block Chourai Under Division Chhindwara.
DEEP DRILLED TUBE WELL OF 125/115 MM DIA, 60 MTRS WITH INSTALLATION OF INDIA MARK II HAND PUMP FOR THE YEAR-2023-24 UNDER D.W. AND S. DIVISION NO.-1, DUMKA GROUP-SRDT-1
DEEP DRILLED TUBE WELL OF 125/115 MM DIA, 60 MTRS WITH INSTALLATION OF INDIA MARK II HAND PUMP FOR THE YEAR-2023-24 UNDER D.W. AND S. DIVISION NO.-1, DUMKA GROUP-SRDT-2
Drilling Of 150/125/115 mm Dia and 90 mtr Deep Telescopic Tube Well with Installation of Hand Pump and Construction of Plateform for Unapprochabl/Accessless Habitation in Different Villages of District Mandla. (24 Nos)
DEEP DRILLED TUBE WELL OF 125/115 MM DIA, 60 MTRS WITH INSTALLATION OF INDIA MARK II HAND PUMP FOR THE YEAR-2023-24 UNDER D.W. AND S. DIVISION NO.-1, DUMKA GROUP-SRDT-2
Drilling Of 150/125/115 mm Dia and 90 mtr Deep Telescopic Tube Well with Installation of Hand Pump and Construction of Plateform for Unapprochabl/Accessless Habitation in Different Villages of District Mandla. (24 Nos)
Drilling Of 150/125/115 mm Dia and 90 mtr Deep Telescopic Tube Well with Installation of Hand Pump and Construction of Plateform for Unapprochabl/Accessless Habitation in Different Villages of District Mandla. (24 Nos)
sinking of 01 (One) nos. (100mm x 40mm dia) Tube well with a supply of PVC Pipe upto 300.0m depth fitted with India Mark-II hand Pump near The Barakara Arif Laskar at Barakara Sansad
Drilling of 300x100 mm dia Gravel Packed Tube Well and installation of Hand Pump and Construction of Platform at Ramta pura Puniyani Wali Gali Ward No. 14 Gwalior , file No. 128/18x9/1. 3rd call
Sinking of 1(one) no. 100 mm x 40 mm dia. Tube-well having 5 nos strainer Fitted with DWP hand pump and Soak Pit facility near Gosaba 3 no FP,Mouza-Gosaba,GP-Gosaba
Estimate for sinking of new tube well (Hand Pump) of(size 80 mm x 40 mm)and with PLARTFORM and Soak Well infront of Ratan Saren at Baghadanga at Begpur GP 92513735 (2024 -2025)(11
Estimate for sinking of 01 (One) nos. (100mm x 40mm dia) Tube well with a supply of PVC Pipe upto 300.0m depth fitted with India Mark-II hand Pump near Manju Sardar at Kamarchak Sansad
Sinking of Rig Bore Tube Well and Installation of Mark-II Hand Pump at Dakai Roy Para Kalimandir, Mouza - Dakai, Jl No - 268 under Dahala GP, Fund- 15th FC, FY 2022-23, Activity Code- 66559383
CONSTRUCTION OF BORE WELL AT 4 PLACES OF DIFFERENT GRAMAPANCHAYATHS IN MALAPPURAM DISTRICT AS PER THE DETAILS ATTACHED WITH THE TENDER UNDER PANCHAYATH DEPOSIT SCHEME
CONSTRUCTION OF BORE WELL IN PHC AND UPSCHOOL VALLACHIRA
Drilling of 125mm dia nominal bore holes With AC Pipe for hand pump installation of India MarkII Extra deep well hand pumps complete including constt of Platform in urban rural area WSS in jurisdiction of Div Laxmangarh, Distt Sikar ARC
Hand Pump Maintenance in Block Sohawal District Satna
Hand Pump Maintenance in Block Unchehara District Satna
Hand Pump Maintenance in Block Majhgawan District Satna
Steel components (Deepwell Hand Pumps Components) as per IS 15500 (Part 4) (Q3), Brass/Bronze Components (Deepwell Hand Pumps Components) as per IS 15500 (Q3), Rubber Components (Deepwell Hand Pumps Components) as per IS 15500, IS 12732 (Q3) (3 (3 ))
Maintence of Handpump in Block Bundi having 139 Villages and 1030 Handpumps Including Minor Spare part with labour Vehicle etc. In district Sehore Completion Time Period 365 Days
Maintence of Handpump in Block Sehore having 298 Villages and 2100 Handpumps Including Minor Spare part with labour Vehicle etc. In district Sehore Completion Time Period 365 Days