Loading…
Loading…
1,69,824 results • Best match
NEW TUBE WELLS AT NEAR EKRAMUL MOLLA
Construction of Tube wells at COA, Peethampuri.
Supply of Tube Wells Materials part 1
Automation work on 04 small tube wells.
Supply of Tube Wells Materials para 2
Unit_6_Installation of tube wells under Kalma GP
UNIT_12_Installation of Tube wells under Tulin GP
Installation of Tube Wells at Kharban Village
NEW TUBE WELLS NEAR NAJMUL MOLLA HOUSE
Installation of Tube Wells at Astagora Jahirathan
Unit_7_Installation of Tube wells under Kalma GP
Provision of two tube wells in RDSO
Installation of Tube well Near house of Banamali Patra with Platform Drain and Soak Pit San 7
Installation of Tube well Near house of Tapan Pal with Platform Drain and Soak Pit San 4
Installation of Tube well Near house of Bhupen Barui with Platform Drain and Soak Pit San 12
Sinking of Tube Well with platform, drain and soakpit near at ho Sahebali Molla at Sarkar Para
Installation of Tube well Near house of Tapan Shau with Platform Drain and Soak Pit San 14
Sinking of Tube Well with platform, drain and soakpit near at ho Chhorap Mondal at Uttar Panikhali
Installation of Tube well Near house of Pranab Mal with Platform Drain and Soak Pit San 03
SINKING OF TUBE WELL WITH PLATFORM DRAIN AND SOAKPIT NEAR HOUSE OF TAIBUR SEKH SANSAD VI 67059362
Sinking of Tube Well with platform drain and soakpit near at ho Anar Sardar at Palan para
Sinking of Tube Well with platform drain and soakpit near at ho Yusuf Sardar at North Panikhali
Providing New borewell with motor pumpset at ward 18 and new Borewell with Hand pump at Kattupakkam colony Burial Ground in Uthiramerur Town Panchayat.
Drilling bore hole 4 nos .of 8 inch dia with submersible pump set upto 180 m depth bore hole at Nichitpur township under Sijua area.
Supply of Tube well materials for Repair and maintainance of Gram panchayet Tubewell (AID-87778016) Phase-2
C/o 02 Nos Tube well and Rising main Tubewell to 3900kl UGR in Sector- 22A yea
C/o 02 Nos Tube well and Rising main Tubewell to 3700Kl UGR in Sector- 22D yea
Tube well repairing purchase of tube well parts water testing
Tube well repairing purchase of tube well parts water testing
PURCHES OF TUBE WELL PARTS FOR REP OF TUBE WELL
TUBE WELL SPARE PARTS FOR MAINTANANCE OF EXISTING TUBE WELL
Tube Well Repairing and New Tube Well at all Samsad
purchase of tube well parts and maintain the tube well
Drilling and providing 4 inch/5inch dia Hand pump 07 nos. Tube well with all complete including pipe work at Ganga Sagar rehab site under Rjamahal Area.
Construction of Tube well platform, Siltation Chamber and Leach Pit for 10 HH of public hand pump at Simla Sardarpara, near Debnagar F.P.School at Gopipur and near hand pump at Kuthuria Kathpulpara under Mertala Gram Panchayet out of SBM(G) G.A.
Construction of 03 nos. Deep bore well providing and commissioning of submersible pump motor with all electrical, cable panel, starter etc and construction of panel room at Sangam Vihar Colony house under GM Unit Piparwar Area.
1. Tile terracing of control room i.e. NRB at 66kV S-Stn. Shahzadpur. 2.Providing deep bore well to meet the daily needs of water supply and to maintain arboriculture arrangements at 66kV S-Stn. Santokhi.
Providing Deep bore well with Mini Power pump at Rajakilpakkam Erikarai ,Padmavathi Nagar 18,22th,Bank Colony Road,Mohan Nagar Main Road 3rd Street jn,Narikuravar colony ward no 66,68 and 69 in Tambaram City Municipal Corporation
Supply of 2 HP, 1 phase, submersible pump suitable for deep bore well, discharge approx 50 LPM, head 60-80 mtr with motor, control panel and all accessories. Make Any reputed make confirming to IS sp
CWSS to 73 habs Drilling of Bore well
Providing New Bore well with Mini Power Pump with new borewell at Chinnanarasampettai Street (Ward No.6) in Uthiramerur Town Panchayat.
Relocation of Tube Well by Drilling 125/115 mm dia drilled Tube Well in all kinds of soil rock for installation of hand pump under DW and S Division Simdega for the year 2023-24 No of DT 30 Nos (Group 02)
Relocation of Tube Well by Drilling 125/115 mm dia drilled Tube Well in all kinds of soil rock for installation of hand pump under DW and S Division Simdega for the year 2023-24 No of DT 30 Nos (Group 01)
Sinking of Tube Well near the house of Sasthtipada Sardar at HARIPUR JL No 21 Under Haripur Gram Panchayat
Sinking of Tube Well with platform, drain and soakpit near at h/o Hiranmoy Poddar at Mansakhali Kachhari Math
Sinking of Tube Well near the house of Shibsankar Muniyan at HARIPUR JL No 21 Under Haripur Gram Panchayat
1/ Main road from Office of Amar Ujala Ware House via Hand Pump upto RTO (Amount Rs. 20.00 Lacs). 2/ Road from Asia Hotel to Hand Pump left and right tube (Amount Rs. 13.86 Lacs) (Under Action Plan 2022-23 for Potholes Free Roads Programme)
Drilling of 125 115mm and 180m deep tubewells with installation of handpumps and construction of platforms in Block SHAHPUR District Betul
Drilling of 125 115mm and 180m deep tubewells with installation of handpumps and construction of platforms in Block Amla District Betul
Drilling of 125 115mm and 180m deep tubewells with installation of handpumps and construction of platforms in Block GHODADONGARI District Betul