Loading…
Loading…
1,69,826 results • Best match
Construction of 697 piezometers (borewells and tubewells) lotwise with protection works in Telangana State. EMD should be submitted for lotwise as specified in the bid document.
DRILLING OF 125MM HAND PUMP AND DRILLING OF 150MM TUBEWELL WARD NO. 01 TO 15 BIJAWAR
WATER SUPPLY ARRANGEMENT WITH HAND PUMP TUBEWELL NEAR NOWPUKURIA SHERFUL HOUSE UNDER BELDANGA I PANCHAYAT SAMITY
SUPPLY AND DELIVERY OF TUBEWELL SPARE PARTS IF INDIA MARK II HAND PUMP FOR REPARING WORKS
Creation of a new source of drinking water Sinking Resinking of Tubewell or Hand pump (98313284)
PANCHAYAT SAMITI KOTPUTLI KE ADINASTHA GRAM PANCHAYATO ME SINGAL PHASE TUBEWELL AND HAND PUMP INSTALLATION WORK
INSTALLATION OF TUBEWELL HAND PUMP 01 NOS NEAR RAMESWARPUR MIYAPARA GRAVEYARD UNDER BELDANGA I PANCHAYAT SAMITY
Sinking PVC Tubewell and Installation of Mark-II Hand Pump at Barberia Bijipukur Activity Id- 97863927
SINGKING 3 INCH DIA CYLINDER TUBEWELL HAND PUMP FOR DRINKING WATER AT MALIA MALPARA AT MALIA
INSTALLATION OF TUBEWELL WITH HAND PUMP AND CONST OF PLATFORM WITH DRAIN. within Sitalkuchi Panchayat Samity
Ward No 03 me hand pump se tubewell tak RCC naali evam CC road nirman karya.
Drilling of Bore well and fixing of Hand pump set from Ambedkarnagar Community Hall and Shivajinagar Chowrastha in D.No. 03 of Municipal Corporation, Karimnagar Estimate Cost of Rs. 1.45 Lakhs
Electrification and lighting System at Mandoli OHT Store and Tube wells.
Installation of Tube wells and Bore wells at Dhundipara
Installation of Tube wells and Bore wells at Kasibati
Installation of Tube wells and Bore wells at chenchoir
Installation of Tube wells and Bore wells at Dilalpur
Drilling Of 4 1/2 Dia Borewells And Errection Of Handpumps Various Locations In Div.No.43, Hanamkonda.(Corp quota 2019-20) (4th Call)
Providing Labours for repairing of Handpumps with free services of departmental Handpump Technician In all Villages of Sonkatch Block District Dewas
Providing Labours for repairing of Handpumps with free services of departmental Handpump Technician In all Villages of Khategaon Block District Dewas
Providing Labours for repairing of Handpumps with free services of departmental Handpump Technician In all Villages of Kannod Block District Dewas
Providing Labours for repairing of Handpumps with free services of departmental Handpump Technician In all Villages of BAGLI Block District Dewas
Providing Labours for repairing of Handpumps with free services of departmental Handpump Technician In all Villages of Khategaon Block District Dewas
Providing Labours for repairing of Handpumps with free services of departmental Handpump Technician In all Villages of Kannod Block District Dewas
Providing Labours for repairing of Handpumps with free services of departmental Handpump Technician In all Villages of Dewas Block District Dewas
Providing Labours for repairing of Handpumps with free services of departmental Handpump Technician In all Villages of Dewas Block District Dewas
BORE WELL CONSTRUCTION AT CHERUPUZHA
Providing 200mm Dia 2 No of Bore wells Power Bore wells with Submersible pump set and Hand Bores at Gunadala Pump House area in 1st Division
NEW TUBE WELL NEAR BY LAND OF MORSOLIM RAJ WITH SOAK PIT CHATHAL AND DRAIN
Maintenance of Power Borewell motors, Existing Hand Pumps and Static tanks at Various Places in Ward No.5, Mallapur in Kapra circle, GHMC.
Repair of various hand pump under Jal Shakti Sub Division Arki Section Baler in Tehsil Arki District Solan HP SH_ Flushing of 7nos Hand pumps of various location under DMFT PMK_2025_157.
Drilling of 150 mm dia Ordinary Tube well, 120 Mtr. Deep in Installation of Hand Pump and Construction of Platform, Drain and Soakage Pit, Complete. In Various Villages of Block Chhindwara, Mohkhed and Chourai District Chhindwara No. of Tubewells 21
Deepining of Existing Borewells and Providing New Bore Wells and supply & delivery of 1 Hp submersible pumpsets for improvement of water supply at Nutakki and Ramachandrapuram areas in Mangalagiri tadepalli municipal corporation
Rubber Components (Deepwell Hand Pumps Components)- IS:15500, IS:12732, Special Tools (Deepwell Hand Pumps Components)-IS:15500, Ball Bearings-IS:6455, Steel components (Deepwell Hand Pumps Components) as per IS 15500 (Part 4), Handpump ... (Deepwell Hand Pumps Components) ...
WORK OF EXTENSION OF HIGHT OF EXISTING HAND PUMPS AT BLOCK NASRULLAGANJ IN DISTRICT SEHORE TOTAL NOS OF EFFECTED HAND PUMP 50
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_23
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_09
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_05
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_06
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_19
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_14
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_12
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_20
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_21
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_18
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_07
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_17
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_11
Construction of Drilled Tube Well 125 X 115mm diaX60 Mtrs (Av.) deep Drilled Tube Well with installation of Hand Pump lowering 32 mm dia G.I. pipe with platform and 3M long drain as per UNICEF Design under D.W. and S. D. Hazaribag Gr_HZB_DT_08