Loading…
Loading…
8,246 results • Best match
Renewal with General Repair Work of Sarasawan Uno road Tilak Narayan Tubewell s to Kathare Village link road via Nahar ki patari
water supply in the municipal area 03 Nos. Tubewell Construction Pump House and Pumping Plant in ward no. 01, 02, 03 Work.
Operation and maintenance of UGR/Tubewell of Affordable House and LIG/MIG in Sector-22D (2026-2027) YEA (WC-E,M-02)
Laying of 200/150mm DI-K7/M.S. Raising Main Pipe line From TubeWell To Raising Shifting In Moh-Wahid Nagar/Rampura, Najibabad
Laying of 200 150mm M.S.DI-K7 Raising Main Pipe line shifting work From TubeWell To Ho Shri Mustakim In Moh-Rawapuri Sahanpur
Laying of 200 DI-K7 Raising Main Pipe line From Tubewell Mirdgan Kari Hannan House To Baba harihar Mandir Length 480 Mtr.
Construction of PMC work from the tubewell of Ramdrash of Nauwadih via Bankara Bujurg to the house of Nesar. (Length- 1210 M)
SUPPLY AND CARRIAGE OF PEA GRAVEL 2.00MM TO 3.35 MM SIZE FROM LALKUWAN TO GAURI BAZAR STORE DEORIA TUBEWELL CONSTRUCTION DIVISION GORAKHPUR.
INSTALLATION OF THREE PHASE ELECTRONIC METER UNDER FULL DEPOSITE SCHEME ON UNMETERED CONNECTION OF PRIVATE TUBEWELL UNDER EDD II AND III MAINPURI
Ward 03 lala ke plat se sarkari tubewell tak or sahayak galio me rubber mold C C tiles or nali nirman kariya
Construction of Tubewell and E and M Related works construction of pump house cum chlorinating room in NP salempur ward no 1
LOT04 VIKASH KHAND HANUMANGANJ SE GRSM SABHA DHARAMPURA ME BHAJAN KE TUBEWELL SE BABA KE BARI TAK CC INTERLOCKING ROAD KA KARY
Gram Panchayat Gulriha ke majre Parsiya Aagyaram mein Mahadev Siswariya marg se Tubewell hote hue Gas Agency ki ore Awshesh Kharanja Karya
ARRANGEMENT FOR TUBEWELL BORING FOR DRINKING WATER AND WATER SUPPLY ETC. AT 33/11 K.V. S/S, NEW ALAMBAGH, KANPUR ROAD, LUCKNOW
Construction of connecting road Gauribazar Rudrapur Road to Government Tubewell and Karaulya Tola Nishad Basti under Rudrapur Vidhan sabha in Dist Deoria
Construction of a Tubewell including Pumping Plant, 1000 LPM discharge, Piller and Gravel feed chambers and 3 MONTHS trial and run etc.
09- GRAM KUDANA MAI BIJLI WALI SADAK PAR MAHADEV BHATTE KE PASS SE BISHAMBAR AVM BHOPAL KI TUBEWELL TAK MITTHI KHARANJA NIRMAN
Under District Ambedkarnagar, Construction work of pitch road from village Kharagpur Main Road Santram Mishra tubewell to Rajbhar Basti, Lot No 3
Under District Ambedkarnagar, Construction of Interlocking Road from Rohanpara Purwa Marg to Om Prakash tubewell to J.P. English Academy, Lot No 7
Construction of Tubewell along with appurtenant (E/M) Works in Kaseru Buxar (Radha Garden) Ward 24 Nagar Nigam Meerut under deposit programme
Construction work of P.C. road from near to Chhatrapal Singh s tubewell C.C. road to Balaji Temple in village Faridpur Bhoru.MLA-Bijnor
Laying of 200 DIK7 Rising Main Pipe line from OM General Store to Unchi puliya Tubewell at Mohalla Banookchiyaan Ward No 07
New Construction of Allipur Kali Nadi to Alampur Nobat Singh tubewell road under the CMGSY Scheme for the financial year 2026 27
ARRANGING ONE NOS TUBEWELL OPERATOR AND MISCELLANIOUS CIVIL WORKS IN CAMPUS OF MADHYANCHAL VIDYUT VITARAN NIGAM LTD HEADQUARTER , 4A-GOKHLE MARGE, LUCKNOW
Facility Management Services - LumpSum Based - CONSTRUCTION OF TUBEWELL; as per Estimate; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - CONSTRUCTION OF TUBEWELL; as per Estimate; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - CONSTRUCTION OF TUBEWELL; as per Estimate; Consumables to be provided by service provider (inclusive in contract cost)
Facility Management Services - LumpSum Based - CONSTRUCTION OF TUBEWELL; as per Estimate; Consumables to be provided by service provider (inclusive in contract cost)
WARD NO. 27 AWAS VIKAS B-BLOCK ME ADITYA KUMAR DIXIT H.NO. 398 SE LILY PARK TUBEWELL TAK NALI, SADAK MARAMMAT KARYA.
NAGAR PANCHAYAT UMRI KALAN WARD NO- 13 ME MINI TUBEWELL SE LAYIWALI PULIYA TAK 110 METER P.V.C. PIPELINE KA VISTAR KARYE.
GULABBADI FATAK SE SARKARI TUBEWELL TAK HOTMIX DWARA SADAK NIRMAN KARYE VA SADAK KE DONO TARAF SIDE PATRI KA NIRMAN KARYE.
Supply of materials for the repair of India Mark II handpumps installed within the municipal limits.
SPECIAL REPAIR/REPLACEMENT OF BER BOREWELL WITH PUMP SET INCLUDING ALLIED WKS AT PUMP HOUSE NO 28 AT SHIVAJI LINE UNDER GE (U) E/M MEERUT CANTT
INSTALLATION OF ONE NOS BOREWELL FOR WATER SUPPLY IN NTH KAMLA NEHRU NAGAR, GHAZIABAD SH: SITC OF NEW SUBMERSIBLE P UMP WITH ACCESSORIES. Subwork/Packages: SITC OF NEW SUBMERSIBLE PUMP WITH ACCESSORIES.
Drilling of DC and DTH method in Ramnagar block, Distt. Chitrakoot
SUPPLY WORK
work
As per NIT documents
Title1, Title2, Title3, Title4, Title5, Title6, Title7, Title8, Title9, Title10, Title11, Title12
Construction of Savdah plateform, hand pump, submersible road and boundary wall at nagar panchayat haidrabad
Work of new India Marka-2 hand pump repair under Nagar Panchayat Ushait 10 nos
NAGAR PALIKA PARISHAD DATAGANJ KE SIMANATARGAT INDIA MARKA-2 HAND PUMP KE RIVOARE KA KARYA
NAGAR PANVHAYAT GYANPUR ME HAND PUMP KE PASS SOK PIT KA NIRMAN KARYA 18 JAGAH
Janpad Jhansi me Apex road, 2 nos Nali nirman, 1 nos Handpump evam 1 nos solar light lagane ka karya (as per list attached) under scheme V.N. 2025-26 Hon ble Shri Babulal Tiwari Ji, MLC Jhansi
Construction of 10 Nos B type, 05 Nos C type Shop, Office building, 02 Nos Staff quarter, 02 Nos Auction Platform (9X40) , 02 Nos Sumbersile pump, 02 Nos Handpump, Gate etc at Sub Mandi yard- Naighasan ( Tikonia)
Line 12 Ward No. 1 Mein (1 Sthan per) Ward No. 15 Mein (2 sthanon per) tatha Ward No. 20 Mein (1 Sthan per) Ward No. 25 Mein (2 sthanon per) tatha Ward No. 44 Mein (1 Sthan per) kul 7 Nag Indiamark II hand pump lagana ka Karya as per tender notice.
Supply Of Pea Gravel Upto Tubewells of Bijnor
SITC of 62.5 KVA DG Set at 1500 RPM, 415 volt, 50 Hz, 3 phase conforming to BS-649-5514 including cabling and other associated works complete in all respect at 7 Nos. Tubewells of Nagar Palika Parishad Muzaffarnagar
SITC of 62.5 KVA DG Set at 1500 RPM, 415 volt, 50 Hz, 3 phase conforming to BS-649-5514 including cabling and other associated works complete in all respect at 8 Nos. Tubewells of Nagar Palika Parishad Muzaffarnagar
Construction