Loading…
Loading…
8,251 results • Best match
3. Special Repair work at From Tubewell of Sudesh in Marukhedi to Muzaffarnagar Thanabhawan Road till Rajwaha Patri Road in the F.Y. 2021-22 in Distt. Shamli
Construction of 1 No 350x200 mm Dia Tubewell Upto 200 Meter Below Ground Level And Other Related Works At PMAY Housing Site 480 Units Jahirpur District Lucknow
CONSTRUCTION OF CC ROAD AND RCC DRAIN FROM KRISHNAPAL MASTER HOUSE TO RAM CHANDRA TUBEWELL TAK IN WARD 10 TURANG SINGH NAGAR HARDO NAGAR PANCHAYAT KHAGA FATEHPUR
Under Sansad Nidhi Yojna (Shri Chandan Chauhan ji, MP) Construction of BOE Soling work from Manoj Thakran Tubewell to Yogendra Nagar Road at Vill. Bhokarhedi Sikri, Muzaffarnagar
Under District Jaunpur, Construction of Interlocking road from Tubewell of Bechan to pitch road via Thakur Basti in Gram Panchayat Malukpur under block Khutahan, Lot No 58
Instalation Work of 12 Nos India Marka Handpump At NP Nagram
25 NOS RECHARGE PIT ON INDIA MARKA HANDPUMP FOR WATER CONJERVATION .
Sthaye roop se kharab handpump ke punsthapan ka karya ( Rebor hanpump)
Work of installation and pipeline of 1 no. 500 LPH mini tube well in Ward No. 10 Moh Rawatan under NPP Jalaun.
Work of installation and pipeline of 1 no. 500 LPH mini tube well in Ward No. 13 Moh. Rapatganj under NPP Jalaun.
Soil filling and interlocking road and drain construction work from Mandi Road tube well to transformer in Ward No. 14 Moh Shyodatt.
Construction of Tube Well (200)mm dia 160M Deep and Installation of Pumping Plant etc complete. at Nagar Panchayt Mursan Distt. Hathras.
Work of installation and pipeline of 1 no. 500 LPH mini tube well in Ward No. 04 Moh Fardnavis under NPP Jalaun
Work of installation and pipeline of 1 no. 500 LPH mini tube well in Ward No. 02 Moh Kachoran under NPP Jalaun.
SEE IN TECHNICAL BOQ
NAGAR PALIKA PARISHAD KHEKRA MAI VIBHIN STATHNO PAR NISHPRAYOJAN HANDPUMPS ME 30 NUMBERS VARSHA JAL SANCHAY HETU GROUND WATER RECHARGE SYSTEM
ADHISTHAPAN KARYA
WORK
190/Npp(2021-22)/21 Atarra Date- 25/12/2021
AS PER NIT
as per nit documents
Construction Repairing of Over Head Tank Pump house Boundarywall staff quarter gate Site development. Laying jointing of rising main distribution system. Construction of NewRebore tube wells including PLC SCADA automation of
PROVIDING E AND M WORK SERVICES AT HAF HINDAN GHAZIABAD SH SITC OF 2 NOS SUBMERSIBLE PUMP SET IN NEW 2 NOS BOREWELL AT PUMP NO 7 AND 2 AT AF STATION HINDAN
15,000m core drilling in Deohar-Deokund, Dighul, Bichhiari, Naktu South area, Sonbhadra district, Uttar Pradesh with borehole depth varying from 120m to 450m.
Supply of Pea gravel in Distt-Sambhal
Supply of Pea Gravel
CONSTRUCTION OF 03 LAKH LITRES RCC OVERHEAD TANK, 03 LAKH LITRES RCC UNDERGROUND TANK & 01 NO. TUBEWELL INCLUDING ELECTRICAL WORKS AT 101 RAF, SHANTIPURAM, PRAYAGRAJ (UP) Subwork/Packages: MAIN WORK
Construction of Multi Storied Faculty Qtr. at MNNIT, Prayagraj (SH Boring and Installation of 01 No tubewell in Residential colony and connection with existing pipe line) Subwork/Packages: plumbing work
Construction of RCC CWR ,Pumphouse, Boundarywall,Staff quarter,Laying and Jointing of Rising Main, Distribution System, Construction of New Tubewells including PLC SCADA Automation of all tubewells as per specification.
As per BOQ
Civil work
Water Cooler with installation including submersible (Q3), Fogging Machine (Q3), Backhoe Loader (Q3), 14-Ward Hand Pump Reboring Work (Q3)
Mintinance and Repair link road Belthra Road Sonadih Gram Sabha Gaurital ghosa Sadak Marg to Chand Shekhar Maurya house Viya Government Tubewell Under Krishi Utapadan mandi samiti Belthararoad
Under District Ayodhya, Construction of CC road from Ram Dheeraj tubewell to Ram Kewal Pal house in Revatiganj Bazar Ghurehata link road in block Haringtonganj, Lot No 28
Shifting, Loading, Carting and Unloading of the Pumping Plant Dozer, D.G. set and Stabilizer from Mela Store to different Tubewell in all respect in Magh Mela 2023-24
Construction of 1 No 350x200 mm Dia Tubewell Up to 210 Meters Below Ground Level And Other Related Works at PMAY Housing Site 672 Units Anaura District Lucknow
Increasing capacity of 250 K.V.A. Transformer in to 400 K.V.A. Transformer at Bhadewan Tubewell in the area of E.U.D.D.-Aishbagh, LESA CIS Gomti, Lucknow against Business Plane Scheme
Works related to Construction of Tubewell by departmental Rig machine as per Scope of work mentioned in Tender Document at Bairwa Chamania Gram Panchayat Water Supply Scheme Maharajganj
Construction of 01 No Rebore Tubewell by RC Rig Machine with other related works complete at 200 Cusec Raw Water Intakewell campus Muradnagar Distt Ghaziabad under deposit programme
Supply Installation Testing Commissioning of 500 lpm, 39 m head submersible pumping plant and its all accessories for Sonpur Urf Sonkatiya water supply scheme Tubewell in district Maharajganj
Purvanchal vikas nidhi (Jilansh) yojnantargat, Vikas khand-Bansgaw, Gram-Siswan ur Siuwa me Vindhyachal Chaurasiya ke ghar se kandhla tubewell tak 265.00 mtr. C.C. Road ka nirmaan karya.
Aadampur me lalbihari ke makan se sandeep rai ke tubewell hote hue sri ram ke ghar ke se har govind rai ke ghar tak cc road nirmad kary
Construction of Electrical system to releasing connection for Tubewell at Manak Nagar (Kesari Khera) of Jalkal Vibhag, Nagar Nigam, Jone-5, Manak Nagar, Rajajipuram, Lucknow agaist deposit scheme.
Estimate for construction of mini tubewell,installation of 10.0hp submersible pump with chlorinating plant and pump house size (3.002.5.3.00 other) work in Nagar Panchayat Lar Deoria ward 05.
Tubewell lock of Harkh and footpath Ram from the house of Shri Ram Master in Road, Nali (Board No. 07) is CC. Construction of Road and Covered Drain.
Tubewell no. Construction work of tin shed garage for the purpose of securing the ehicles/machinery of the sanitation department on the municipal land in front of 02.
Laying of 200mm DI K-7 Raising Main Pipe line From New TubeWell To Near H/o Shri Abdul Wali In Moh-Maliyan/Saniyan, Ward No. 03 Sahanpur
Karyalya adhichan Abhiyanta Irricatioin wroks Cricle Moradabad Tranjit Field Hostel and tubewell colony moradabad esthit awaso ko mukhya marg se jodne wali chattigrast sadako ka punarnirman ka karya
Work No.11- Rising main and other Related Works 200mm diameter D.I. Pipe from installed tubewell near Ghazipur Road to main pipeline in Ward No. 12, Baxpur, Radhanagar.
Ward Achalapur Me Tubewell No 5 ke Paas Dixit Chauraha par Sthith pul se Gopal Singh ke Makan ke Samne Tak R.C.C. Nala wa Slab ka Nirman Karya