Loading…
Loading…
8,252 results • Best match
SPECIAL MANDR AT OFFICE BUILDINGS PERTAINING TO E.U.D.D.-B.K.T., E.U.D.D.- UNIVERSITY., E.U.D.C.-VI, AND ARRANGEMENT FOR TUBEWELL BORING FOR DRINKING WATER AT SUB-DIVISION MUNSIPULIA (NEW), TRANS GOMTI ZONE, LUCKNOW
Repair work of damaged tiles in Ward-56, repair work of damaged side track and repair of main hall from sweet store shop to police station Lisadi Gate and tubewell
SWACHH BHARAT MISSION KE ANTARGAT NAGAR BAGPAT MEIN MATERIAL RECOVERY FACILITY (MRF) TEEN SAD, FACING DEEWAR, INTERLOCKING, TUBEWELL, SHAUCHALAY, MS GATE, CC ROAD VAH INTERNAL ELECTRIFICATION OFFSED KA NIRMAN KARYA
Supply of Grit at Departmental HMP Khorabar and Renewal work with General Repair of Chauri Chaura Chakiya Tubewell to Harria road (ODR) km 1,2,3,4,5,6,7,8,9,10,11,12 Length 12.00 km LOT 5/29
Repair and construction of damaged boundary wall of Allahabad University, Bailey Farm House Campus, path-way, road construction, 15HP submersible pump, tubewell pump house transformer, panel and electrical development work
18 - ward number 18 mohalla chambari mein tubewell pump ke samne wali gali mein gulab Singh ke Makan se chhote Lal ke Makan Tak nali v interlocking sadak Nirman karya
Under District Jaunpur, Construction work from Seth shop to Tubewell intersection to Kudnapur Patel Basti 24 Nevada Aslampur Pitch Road to Rojan Ali shop to Kapoor Road, Lot No 17
ward number 06 evam ward number 02 ke Madhay munshif Aawas Ke Samne se Bhagwat ke Godam Hote Hue Sake wali tubewell Tak CC road Nirman evam nala marmmat Karya
Work for the extension of a 550-meter-long, 110 mm diameter PVC pipeline from the tubewell to the Mahindra Tractor Agency in Ward No. 20, Satya Nagar (Bamba Road).
Construction of Boundary Wall in Brick masonary with intermediate RCC Column including cost of all material,labour and TnP required for completion of work on Tubewell Division Land,Kanpur Dehat
Construction of Electrical sytem to release connection of 16 KW. for Tubewell, Executive Engineer, Nagar Nigam-Zone-6, Lucknow in the area of E.U.D.D.-Aishbagh, LESA, Lucknow under deposit Budget.
Construction of a total of 07 Rainwater Harvesting units at Tubewell No. 18 in Pirgarh Tubewell No. 14 in Qureshi Tubewell No. 20 in Kalyanpura Tubewell No. 21 in Mohammadi Madhaiya Tubewell No. 22 in Ashiyana Colony, Joya Road etc
As per tender documents
Soil investigation, Survey, Design, Supply of all materials, Labour, required for construction, erection, completion, testing and commissioning of water supply works such as repairing of RCC OHT,Rising main, Distribution system,Tube wells etc.
Construction/Repairing of Over Head Tank, Pump house, Boundary wall, staff quarter, gate, Site development and Laying, Jointing of rising main, distribution system and Construction of New/Rebore tube wells including PLC SCADA automation
Survey Soil investigation, Design, Supply of all materialsetc. Required for construction of Tube Wells,Pump House,Over Head Tanks, SCADAroom, Rising Main, Distribution Network, House connection,Boundary wall,MS gate,site development work etc.
8434 E8 REPAIR, MAINT AND REPLACEMENT OF UNSERVICEABLE PARTS OF SUBMERSIBLE,CENTRIFUGAL PUMP SET, DEVELOPMENT OF BOREWELL, ELECTRIC CONTROL PANEL, SUBMERSIBLE CABLE SECURITY LIGHT, SIGN BOARD AND ALLIED WORKS OF UB AREA UNDER GE EAST BAREILLY
Provn of trolley mounted DG Set, Provn of WS throgh redevelpement of borewell, Provn of LTUG cable, Provn of compressor for HN 7 Chiller at AFSK and Provn of 03 phase Voltage stablizer at 7AFH Kanpur
REDEVELOPMENT OF BOREWELL AT NEIL LINE PH KASTURBA ROAD PH SULTANPUR ROAD HAVLOCK LINE NRC AND HRDC PH INCL REPAIR/REPLACEMENT OF OTHER CONNECTED MISC ITEMS AT AGE EXT W/S UNDER GE E/M LUCKNOW
PROVIDING E AND M WORK SERVICES AT HAF HINDAN GHAZIABAD SH SITC OF 4 NOS SUBMERSIBLE PUMP SET IN NEW 4 NOS BOREWELL NEAR PUMP NO 12 GOLF COURSE KARGIL AND AEB AT AF STATION HINDAN
X3 NK012145 PLUNGER PUMP, X3 NK012146 HAND PUMP, X3 NK012147 DC VALVE, X3 NK012148 PNEUMATIC RELIEF VALVE, X3 NK012149 QUICK RELESE VALVE
Construction of Over Head Tank Pump House Staff Quarter House connection Boundary wall Distribution System Rising Main Tube well and Approach road etc work ETC
Work of installation and pipeline of 1 no. 500 LPH mini tube well in Ayurvedic Hospital in Ward No. 22 Moh Puranihat under NPP Jalaun.
Construction of (300x200)mm Size 160/140mtr. Deep 41 H.P. Capacity one no. New Tube-well with oher appurtenant work in Nagar Panchayat Jhunsi Prayagraj.
Sawachh jal apurti hetu budhbazar puliya ke pass nagar panchayat ki Bumi par new ribor tube well ke sanchalan hetu pump room ka nirman kariya
As Per BoQ
Replacement of old CC water tank with PVC circular water tank and installation of deep tubewell at Laxman Bagh colony and Tilak Nagar Colony, Kanpur. Subwork/Packages: Replacement of old CC water tank with circular PVC water tank
Installation, commissioning, testing of Energy meters on PMCC feeders and digital water meters on borewells at Kanpur Terminal
Rebore of India Mark II Hand Pumps in ward no. 10 Gulariya near house of Valmiki and Bhoorey, near Chamunda, in Hussainpur near house of Prabhu, in Chunni Wali Mandhayya near house of Jeeto.
Nagar Panchayat Farid Nagar Mein handpump ki sthapna Hetu ward 11 3 Sarkari transfer Naushad ke ghar ke pass ward 4 Mein Islami ke Chauk Mein ward 11 main Bajar Rajendra ki dukaan ke pass ward number 10 Lallu ke Makan Ke Samne Ward 7 Lalit purv chair
REBORING OF INDIA MARK-II HANDPUMP IN 8 PLACES WARD 31 GHOPLA MATA KA MANDIR , WARD 31 GHOPLA SCHOOL KE PASS , WARD 31 GHOPLA ROAD SE GAON WALE RAASTE PAR , WARD 41 NAGLA TAASHI GATE KE PASS MAIN CHAURAHE PAR , WARD 86 DR. BARNI KE PASS ZAKIR COLONY
CONSTRUCTION WORK
CONSTRUCTION WORK
Bore
CONSTRUCTION WORK
WATER WORK
RCC over head tank, pump house, rising main, distribution system, pump house, staff quarter, boundary wall, gate, site development, renovation of existing facilities, including laying and jointing of rising main, construction of tube wells etc
Soil investigation, Design, Supply of all materials, Labour, TanP etc. required for construction, completion, testing and commissioning of water supply works such as RCC OHT, UGR, Rising main, Distribution system, Tube wells, Pump house, etc.
Laying and jointing of 90 100 mm dia HDPE pipe PN 6 class PE-100 pipe , Installation of mini tubewell and Construcion of pump house at Banwa-Palhari ward (Hanumant Nagar)
Construction of CC Road From Shri Chandrabali Yadav House to Shri Jitendra Yadav House to Pich road shri Prahalad Singh Tubewell To wards at village bhilampur in Block Maharajganj Azamgarh-25
Under District Ambedkarnagar, Construction of CC Road From the tubewell of village Ismailpur Rajjab Ali to the house of Vikram Vishwakarma to the house of Ravindra Kumar Verma, Lot No 27
Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Kuchlai Under Krishi Utpadan Mandi Samiti Mishrikh.
Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Judaura Under Krishi Utpadan Mandi Samiti Hardoi.
Honable Sansad Sri Raj Nath Singh ji , Rajiv Gandhi ward Pratham sthit Vivek Khand-3 Gomti Nagar Lucknow Puja Park mein peyjal ki samasya ke niraakaran Hetu Mini tubewell adhisthapan Karya
Construction works of 03 Nos Rebore Tubewell by RC Rig Machine in Shastri Nagar I Block Shergarhi Ganga Nagar JP Pocket and Saket Sports Colony Nagar Nigam Meerut under deposit programme
Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Majhoria Under Krishi Utpadan Mandi Samiti Lucknow.
Construction of Tubewell and S/F of 01 HP Submersible Pump, S/I/C/T of 2 KW off grid solar plant in Hatpath Kharauli Under Krishi Utpadan Mandi Samiti Unnao
Operation and Maintenance of Tubewell, water pipeline and other appurtenant E and M works and equipments, Laying and Rehabilitation of water pipeline in Village Kheda Dharampur and Itehara in Greater Noida
Estimate for Construction of Mini Tubewell Installation of 12.5 HP Submersible Pump with Chlorination Plant and Pump House size 3.00 2.5x 3.00 cum cholorination Room size (1.8x1.2x3.00)m in ward mohav
Laying 110mm HDPE pipe line work in mohalla Muftisarai ward no 02 from purane slater house new Tubewell to purani basta chungi and Illiyas anjum and Guddu kureshi to saleem house